Project Submitted to the Al Musanna College of Technology in partial fulfillment of the requirements for the award of the Degree of Higher Diploma in Internet and E-Security Submitted by: (1) 2782011- Abdullah ALJaradi - “Leader” (2) 2782239 - Auf ALMujaini Project Supervisor : Mrs.Divyajyothi M G Al Musanna College of Technology Declaration We hereby declare that the project entitled “Banking Security System “ submitted for the Higher Diploma in Internet and E-Security is our
Words: 1256 - Pages: 6
engineering and explain how they relate to the action or inaction that led to the overexposure incident Technical errors in Therac-25 software One of the major weaknesses that is associated with Therac-25 software was in the lack of formal testing procedures. As results certain errors remained in the software as the product got distributed to the consumers. One of the errors that were common with the software was radiation overexposure which can be attributed to interface errors on part
Words: 774 - Pages: 4
Test Plan and Procedures System: Acme Art Gallery website Module: Virtual gallery Written By: Berat Blakaj Date: 02/24/2013 Test Plan Test Items The items that will need to be tested in our testing plan is that a visitor must be able to view all items for sale at the gallery. The visitor must be able to search for a specific artist and have all of that artists paintings displayed. We must test that a user will be able to search by genre for example landscape, still life, portrait
Words: 483 - Pages: 2
project will have three levels of testing, Unit, System/Integration and Acceptance. The details for each level are addressed in the approach section and will be further defined in the level specific plans. The estimated time line for this project is very aggressive (six (6) months), as such, any delays in the development process or in the installation and verification of the third party software could have significant effects on the test plan. The acceptance testing is expected to take one (1) month
Words: 3503 - Pages: 15
Impact of Inspection and Testing on Quality of Software; a Comparison Naila Bashir Awan, Tooba Ahmad and Mehreen Ahmed KEYWORDS: Quality Assurance, Software testing, Inspection, testing. comparison. The methodology being used is empirical research. This research paper will answer the following questions. • • Are both testing and inspection necessary for software quality assurance? Which Technique (testing or inspection) is better for checking the quality of code? Abstract---Developing software
Words: 3074 - Pages: 13
Analyze Weick's Argument Leadership as the Legitimization of Doubt Think about what Weick says about leadership and doubt. Do you agree or disagree? I fully endorse with Weick’s assertion in "Leadership as the Legitimation of Doubt”. Doubts and Uncertainty exist in a project in various forms and to varying degrees. Foreseen unknowns can be handled with contingency and risk mitigation plans. A response mechanism would have been logically thought out for such scenarios. The unexpected
Words: 1163 - Pages: 5
the detection and correction of defects. There are two types of software testing that people usually refer to. The first one is through Waterfall Model and the second one is Agile Testing. Both of these models have their own advantages and disadvantages. By weighting the advantages and disadvantages between these two concepts, we will then be able to decide on which one that we can use as a referral to do software testing. Before we begin to decide on which concepts that we can refer to, let’s
Words: 3602 - Pages: 15
[pic] Quality Assurance Plan For WAN Solutions Date: 5/26/2012 Revision Sheet |Release No. |Date |Revision Description | | | | | | | |
Words: 5473 - Pages: 22
inadequate testing. Describe the different types of tests DIA could have used to help ensure its baggage system’s success. I think the type of tests that would’ve helped DIA the most would have been: a) Application (or system) testing: This would have been a simple matter of testing the system altogether. Actually running the system before running it in front of the press would have been quite a good idea. It lets the system show its faults before making it public. b) Integration Testing: This is
Words: 522 - Pages: 3
Subsea Ver. 05 Status Re-issued Constr Issue date 2012.09.19 KENJURA, RICHARD Made by KENJURA, RICHARD Checked by NGUYEN, ROSEMARY Approved by KENJURA, RICHARD Originator: SDRL - UNIVERSAL PARTS C OF C , MTRS , COATING 10000836331-PDC-000 This document contains Aker Subsea legal entity proprietary and confidential information that is legally privileged and is intended only for the person or entity to which it is addressed and any unauthorised use is strictly prohibited. It is provided
Words: 1142 - Pages: 5