Architectural Design Process Programming Phase -Programming is the activity of determining the "program", or set of needs that a building needs to fulfill. Any project should begin with a thorough examination of these needs, goals and constraints, to form as complete as possible an understanding of these issues. This includes an examination of who the users of the building will be, what use they will make of the building, what rooms/spaces they need, what mood the building should create, and
Words: 362 - Pages: 2
MANAGEMENT QUESTION The construction industry is competitive and volatile. Owners of construction companies need to look at certain factors to help them predict the market. One of the factors that they can look at is the number of building plans being approved. It may be argued that if more building plans are approved there will be more work for the construction industry and therefore less companies in the construction industry being liquidated. The question therefore is: Is there a significant
Words: 1763 - Pages: 8
Conclusion 8 References 10 Introduction: The Construction Industry Institute (CII) defines as “The Optimum use of construction knowledge and experience in planning, engineering, procurement and field operations to achieve overall objectives.” To further investigate the concept of constructability, it can be looked at as a measure of how easy could a certain project be constructed. It introduces integration between both the design and construction teams in order to have an end built product of
Words: 1676 - Pages: 7
Introduction In this chapter we find alternative solutions for decreasing traffic situation in Istanbul. There are two possible solutions for that; they are usage of a third Bridge that connect two continents and usage of Ferries. Our assumptions for alternative solutions are to develop car transportation via ferries or a third bridge. In order to make comparison of all three projects more easy we take the capacity for all projects as 120,000 vehicles per day, because the capacity of the tunnel
Words: 1326 - Pages: 6
Lai, Ivan K.W. and Lam, Frankie K.S. (2010). Perception of various performance criteria by stakeholders in the construction section in Hong Kong. Construction management and economics, Vol.28, pp. 377-391. Article of the Lai and Lam analyzed the construction projects in Hong Kong through collecting data from 324 practitioners who in the past participated in such projects. A research model is developed upon nine performance criteria and their respective performances. The relative importance of
Words: 809 - Pages: 4
infrastructure and industry are critical for India as the country sees leapfrogging growth. As far as both these sectors are concerned, India is in a sweet spot, which has created multitude of opportunities in the fields of engineering, capital goods and construction. S Though, India has witnessed significant investments in both industrial and infrastructure space, the growth has remained restricted due to various weaknesses of the Indian EPC industry and difficulties for the foreign players to ply in
Words: 19229 - Pages: 77
Light steel construction and modular homes as alternative building methods in South Africa. By: Dewald Barnard 26144362 Submitted in fulfilment of part of the requirements for the degree of B.Sc(Hons)(Construction Management) In the faculty of Engineering, Built Environment and information technology University of Pretoria 1. Chapter 1......................................................................................................................................... 7 1.1Research
Words: 10715 - Pages: 43
McGraw-Hill Construction Turn Valuable information into a Revenue Stream” “It’s not easy to take millions of documents, scan them, keep them all together, index them for keyword searches and then transmit them to different locations and different databases at the same time for repurposing into different media. Xerox showed us that they had really mastered this technology.” – Tim Ryan Senior Vice President, Business Operations McGraw-Hill Construction Background
Words: 697 - Pages: 3
Vrushank Shah Post-Graduation in Construction & Project Management, CEPT University Bachelors of Technology (Hons.) in Civil-Construction, SBST, CEPT University Permanent Address: 12-B Sangita Society, Beside Ankur Complex, Ankur, Naranpura, Ahmedabad-380013. Email Address: vrushank.shah.cpm12@cept.ac.in ; vrushank5406@gmail.com ; Cell No. : 91-9924110902 PROFILE I have work experience of 32 months in execution and project management work in construction industry. I have keen knowledge
Words: 575 - Pages: 3
DIPLOMA IN BUILDING SERVICES ENGINEERING PROJECT MANAGEMENT (CC603) CLASS: DPB 5A ASSIGNMENT 2 | Content Content | Page | Organization structure (functional, matrix, product) | 3-7 | Differentiate between supervision and superintendent | 7-8 | Duties technician and assistance manager | 9 | Distinguish between technician and assistance engineer | 10 | Relate the duty between technician and assistance manager | 11 | Explain the organization structure and the main characteristics
Words: 1345 - Pages: 6