Green Construction INF 103 Prof. Sean Kenney 02/25/2013 What would life be like if we no longer had the resources to supply us with food, water, and the necessary resources to sustain human life? What if our air was no longer breathable? What if our streets were filled with trash? If our behavior as a society doesn’t change our habits this image can soon become a reality. Going green is necessary to preserve and sustain our required livable resources. In fact we have all gone green without
Words: 1049 - Pages: 5
Syed Akeel Bilgrami Quite often, those associated with the Indus Valley School of Art and Architecture at Karachi have been asked: - What was the need for the Indus Valley School to spend so much time and effort to re-locate an old building on its campus, and, - Why the Nusserwanjee Building? The answers to these questions can be linked to the day, May 1, 1991, when twelve prominent architects of the city brain-stormed at the Indus Valley School to evolve a design criteria for its new campus
Words: 1176 - Pages: 5
and today we are comfortably placed among our peers with a diversified and substantial order book. We have grown multifold and have been able to sustain this growth because of the dedicated and committed efforts of the entire team. From a small construction company we have matured ourselves in a large and diversified infrastructure organization. We have shown stellar business and financial performance year-on-year and have forayed into different business segments of the infrastructure sector. Economic
Words: 4742 - Pages: 19
Within 2 months after the meeting, Don issued a request for proposal using the recommended specification method with a specific construction time of 9 months. Four proposals were received. Don reviewed them quickly since he had 3 weeks to award the project and execute a contract. Winstrom Construction was a local Ohio firm that had completed much of the construction at Wright-Patterson Air Force Base. They submitted a bid of $5,960,000 with a required deposit of $1,000,000. Winstrom had worked
Words: 498 - Pages: 2
----------------------------------------AUTHORIZED TRANSLATION ------------------------------------------ PRESIDENT OF THE REPUBLIC OF INDONESIA REGULATION OF PRESIDENT OF THE REPUBLIC OF INDONESIA NUMBER : 111 of 2007 CONCERNING AMENDMENT TO REGULATION OF PRESIDENT OF THE REPUBLIC OF INDONESIA NUMBER: 77 of 2007 CONCERNING THE LIST OF BUSINESSES CLOSED AND LIST OF BUSINESSES OPENED WITH RESERVATION IN THE INVESTMENT SECTOR WITH THE MERCY OF THE GOD ALMIGHTY THE PRESIDENT OF THE REPUBLIC OF
Words: 10479 - Pages: 42
Which job seems the most dangerous? Which seems the least dangerous? Explain. Fishers and fishing workers appear to be the most dangerous with a percentage of .118% death from the total employed. The job that appears to be the least dangerous is construction laborers with a .0227% of deaths. Calculations were made by dividing total deaths by total employed. However, I would be curious to see the average age of employees, their previous and existing health issue, and work-environmental factors of
Words: 676 - Pages: 3
following criteria: A. Competencies of the Contractor & team members [50] • List of the staff members that will be working on the project (Including the resume of each member). [6] • Experience of the project manager and team members in the construction industry. References & related details for each team member should be checked and made sure that they are contactable. [8] • Projects (including size, cost, and contract approach) that the contractor has successfully completed in the past 12–18
Words: 284 - Pages: 2
Executive Summary Introduction Fosse Commercial Contractors LLC is a small construction company formed from the merger of Fosse Painting & General Construction and West General Contractors. The company has successfully operated in the Houston area for the past ten years working on both small and large scale construction, repair, and alteration projects focusing on residential contracting. With the business boom that is occurring in our local area and the desire to improve overall
Words: 635 - Pages: 3
William Streets. The State has established the Metropolitan Redevelopment Authority (MRA) and tasked it with the authority and responsibility for procuring and delivering the Project on behalf of the State. The Project is restricted to the construction of an artificial 2.7 hectare inlet on the current Esplanade Reserve Site and modifications to the surrounding environment including Barrack Square. The MRA proposes to engage other contractors to construct civic, commercial, residential, retail
Words: 823 - Pages: 4
Miguel Berrios July 28, 2013 Chapter 6 Review Questions 1. How does the WBS differ from the project network? The WBS differs from the project network in several ways. The WBS is hierarchical while the project network is sequential. The work packages of the WBS are identified independently of other work packages, have definite start and finish points, require specific resources, include technical specifications and have cost estimates. Networks provide the project schedule
Words: 541 - Pages: 3