1. Prepare a cost sheet with the following information Sales for the year 275000 Inventories at the beginning of the year ; Finished goods 7000 :Work in progress 4000 Purchase of material 110000 Material – At the beginning of the year 3000 * At the end of the year 4000 Direct labour 65000 Factory overhead 60% of the direct labour cost Inventory at the end of the year: Work in progress 6000 : Finished goods 8000 Other expenses: Selling expenses 10 % of sales and administrative
Words: 319 - Pages: 2
|While Starbucks is a product manufacturer and |The strategy that will be used for this | | |distributor to a degree, it is its SERVICE model|assignment is the manufacturing of low-cost| | |for which it is most well known. The strategy |footwear. Alibaba, an online manufacturer | | |will be one that focuses on quality over
Words: 582 - Pages: 3
agriculture products and also construction and forestry equipment, the popular product sold for agricultural division was a conveyor system. The gatherer chain is part of the conveyor system and also sold as a replacement part, the supplier Saunders Manufacturing had a long-term relationship with Deere. Over the past three years, the sales revenue and margin for the gatherer chain had been declining, see chart below: Two years ago Last year ago Current Budget Aftermarket Price $40.00 $36.25 $30.00
Words: 275 - Pages: 2
company I read about was Nike. Although Nike is a successful business it has legal issues that it is coming across for many years now. The legal issues that Nike is having have to do with the manufacturing of the business. Nike only does the marketing and design and does not do any of the manufacturing, the manufacturing is done in another countries, which consists of Vietnam, which was South Korea, and in the 1970s the Nike shoes were made in Korea and Taiwan. By the 1980s a majority of Nike shoes were
Words: 703 - Pages: 3
performance work systems has existed for quite some time and has its roots in the late twentieth century amid the upheaval in the United States manufacturing environment (Barnes, 2001, p. 2). During this period, the manufacturing industry in America had realized that global competition had arrived and they needed to rethink the ‘tried and true’ manufacturing processes. The concepts that arose out of these turbulent times are items that eventually would become key components of a high performance work
Words: 501 - Pages: 3
7. Materials Conversion Units completed and transferred out (all units are 100% complete with respect to materials) 190,000 190,000 Work in Process, March 31: Materials: 60,000 X 100% 60,000 Conversion: 60,000 X 30% 18,000
Words: 277 - Pages: 2
3) For variable manufacturing overhead, the favorable spending variance suggests that cheaper items were used, which could p which could be that more skilled/qualified workers were hired, which should lead to favorable labor efficiency variances. Due that the efficiency variances were related to factors other than the cost of the labor or overhead. 4) It depends, Sarah is correct if the variable overhead costs consisted only of costs that were related to direct manufacturing la variance would
Words: 372 - Pages: 2
Production System Analysis In Treysan Prefabricated TREYSAN PREFABRICATED STEEL CONS. IND. AND TRADE CORP. MERVE BUYUKBAS IE 299 October 6, 2013 Industrial Engineering Bilkent University 06800 Ankara Abstract This report is an examination of Treysan Prefabricated Company observed by myself as an intern. In the three stage of the report, firstly, identity of company is defined. Then in the second part, general information is given including the part that the company’s took place in the
Words: 3078 - Pages: 13
parts and restocks the Store-Shelf. Manufacturing for a particular product starts at Toyota units only after order is received from a store shelf and only enough quantity is manufactured to fulfil the current order. That means the store shelf is always stocked to satisfy any new order and at the same time manufacture enough quantity to fill the store shelf. Toyota follows a pull-type operation for manufacturing. That is, Toyota production System manufacturing is being pulled by demand (Make to Order
Words: 275 - Pages: 2
Assignment 6-1 AMGT390-F1WW (SU10) Justin Reed August 6, 2010 Professor Clark Lexi Electronics problem: Lexi Electronics is nearing completion of a two-year project to develop and produce a new digital phone. The phone is no bigger than a Popsicle stick but has all the features of a standard digital cellular phone. The assembly line and all the production facilities will be completed in 5 months. The first units will be produced in 8 months. The plant manager believes
Words: 674 - Pages: 3