Chapter 2 Notes: 2.1: Concept: programs must be carefully designed before they are written. During the design process, programmers use tools such as pseudo code and flowcharts to create models of programs. Key terms: Logic Error: A mistake that does not prevent the programming from running, but it causes incorrect results. Debugging: finding and correcting the code that caused the error. Program Development Cycle: the process of creating, debugging, and possibly changing the original
Words: 384 - Pages: 2
OPS 571 WEEK 2 OPERATIONAL ANALYSIS A+ Graded Tutorial Available At: http://hwsoloutions.com/?product=ops-571-week-2-operational-analysis Visit Our website: http://hwsoloutions.com/ Product Description OPS 571 Week 2 Operational Analysis, A key subject in planning a prodigious supply chain for industrial merchandises is defining the mode those merchandises are relocated from the industrial plant to the consumer. In lieu of consumer goods, this frequently encompasses stirring merchandise
Words: 674 - Pages: 3
claims, loss of goodwill, penalties- loss of customer, warranty costs 2. What is the point at which costs associated with improvement are no longer warranted? 3. What is the costs of customer dissatisfaction? Quality Tools 1. Flowcharts - identifies the sequence of activities or the flow of materials and information in a process. a picture of the steps needed to accomplish a task. Compares and contrasts actual versus ideal flow of a process. Allows a team to reach agreement on
Words: 324 - Pages: 2
Contents Contents 2 Figures 2 Aknowledgement 3 1.0 Introduction 4 1.1 Purpose 4 1.2 Scope 4 1.3 Project Timeline 5 2.0 Flowchart 6 2.1 Server Side Flowchart 6 2.2 User Side Flow Chart 9 3.0 User-friendly Interface 12 3.1 Default Mode 12 Figures Figure 1.1 – Project Timeline 5 Figure 2.1 – Server Flow chart 8 Figure 3.2 – User Flowchart 11 Figure 4.1 – GUI 12 Aknowledgement The report was done by our group Khoo Zhong Xian and Ow Jun Han. We split task to do the
Words: 1243 - Pages: 5
Report on Improvement of Customer Satisfaction for Orlando RV Define: Taking a look into the operations of Orlando RV, there is noticeable escalation in customer complaints and a steady decline in new and referral customers. The continual increase in customer dissatisfaction has raised flags for Orlando RV, as the effect of these occurrences have lead to significant decreases in revenues from period to period. The objectives of the project will be to ultimately decrease the defects of the RVs being
Words: 914 - Pages: 4
Activity 1 I. Data and Process Modeling A. Business Activities/Current Operations Supply Checking The business process also have its supply checking where they check the status of their supply checking where they check the status of their supply. If the supply is still enough for future use, they’ll just continue other business processes and if the supply will not be available, they need to call their supplier for the needed supply. Reservation Process The business also have an
Words: 481 - Pages: 2
E-R Diagram E-R Diagram Entity-Relationship Diagram is a graphical representation of entities and their relationship to each others. It describes how data is related to each other. An entity is a piece of data- an object or a concept about which data is stored. A relationship is how the data is shared between entities. In E-R Diagram, there are 3 main Components: E-R Diagram of a Hospital Management System Data Flow Diagram A Data Flow Diagram (DFD) is a graphical representation of the
Words: 457 - Pages: 2
script • DUR hard stop • Insurance problems • Production • Insufficient inventory • Pick up • • • • Unauthorized refill Script not ready Script not covered by insurance Long lines of angry customers in rush hour Process Flowchart - As Is Drop Script Pick up Invisible Line Put in slot Data Entry Hard Stop Refill DUR Dr. Call bin Ask for approval Reach Dr.? Dr. Call Back Bin Package Insurance Check Productio n QA Dr. Denial
Words: 940 - Pages: 4
6.1 MODULE DESCRIPTION This project has following modules: • Login Module • Department Module • Subject Module • Question Module • Result Module • Feedback Module • Change Password Module 6.1.1 Login Module: In login module Admin, Examiner and Participant enter the userId and password if that is valid then redirected to respected pages. Pseudo Code: //login module Begin Input userId, Password Validates Check for valid login If Input is valid Redirect to
Words: 1208 - Pages: 5
Cignet: Process Gone Wrong Cignet: Process Gone Wrong Cignet Plastics Corporation is a major and favored producer of plastic die casts for model airplane. Recently the company has experienced troubles in production regarding the quality and amount of defects that have been produced. Quality assurance has shown, through process audits, that there has been no change in the system process. Quality assurance also suggests that the defects may be due to variations in the process but are not sure
Words: 1035 - Pages: 5