Assignment 03 ‐ PROJECT MANAGEMENT PLAN CHALLENGE The Project Management Plan (PMP) is the project document that clearly defines the project and forms its baseline guidance document for the duration. The PMP is typically the first document to be prepared by the project team once the project has been approved; as such it follows the Project Charter approval. A key to a successful PMP is that the Project Manager must ensure that the stakeholders play key roles in its development. The PMP establishes the
Words: 1159 - Pages: 5
Project Quality Management Introduction Purpose of the Quality Management Plan The Project Quality Management Plan has herein been created to document the necessary information required to effectively guarantee the quality of the delivered project. It defines the project’s quality policies, procedures, criteria for and areas of application, and roles, responsibilities and authorities. The primary quality criteria identified for the project is aesthetics and fitness for use. Recall the motive
Words: 1293 - Pages: 6
| 2013 | | | [project plan holiday inn] | [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.] | 1 Introduction Following project plan describes Holiday inn Melbourne airport hotel’s restaurant renovationproject in detail. As management decided to carry on this project this project plan generated to express
Words: 2125 - Pages: 9
increase. Sincerely, Carlos Islas Jesica Islas III. General Company Description Islas 314 Inc. is a construction company. We can fix any problems or start a whole house from the beginning. Whether the problem is electricity, plumbing,
Words: 2460 - Pages: 10
Septic systems are used because a public sewage management system is not available or present in these areas. A contemporary septic system contains a cemented tank that can hold approximately 1500-gallon solid waste resulting from residential plumbing drains, can endure many years of operation and is odorless. The septic system dispenses the wastewater into the ground soil where wishful thinking comes into play: the wastewater vaporizing. When wastewater deposited from a septic system is not
Words: 257 - Pages: 2
past, there were a little over four billion IPv4 addresses made. Most people thought that this would be enough IP’s for the world. They didn’t realize how far the internet would come. IP’s are now household items just like refrigerators and in-door plumbing. I think at the current rate the IPv4 addresses will be exhausted within the next two to three years. Though they are still in use they are a finite resource. I think that we still use these because IPv6 has been completely finished or deployed
Words: 255 - Pages: 2
Running Head: T&W Building Co v. Merrillville Sport & Fitness Inc. T&W Building Co v. Merrillville Sport & Fitness Inc. Keller Graduate School of Management Professor: James Keenan Business Law: Strategic Considerations for Managers & Owners April 2013 Parties T&W Building Company, the landlord, the defendant in the case. Merrillville Sport & Fitness, INC., the tenant, the plaintiff in the case. Facts T&W Building Company entered into a five-year
Words: 1332 - Pages: 6
The Death of A Prominent Language: Sumerian Cuneiform In many instances, Sumerian text has been influential to the ways of writing we have today. Sumerians were the first ancient civilization to start archiving the rules of writing that we use in present day. The lexicon of Sumerian language has yet to be fully deciphered; this is due to a lack of information. We have been studying Sumerian language since before the outbreak of WWI. Input from many different cultures in the attempt to decide
Words: 1404 - Pages: 6
specifications. Communications technologies can be complex and designed and installed by experienced professionals. Telecommunications are considered a fourth utility, to be designed, funded and installed with the same importance as Electrical, Plumbing and HVAC. The designer has the responsibility of providing a design using accepted engineering and architectural practices and recommends a Registered Communications Distribution Designer (RCDD) to be used as a consultant for the design of the telecommunications
Words: 1394 - Pages: 6
| |___L__ Fluorite |F. Used to produce 56% of electricity in the US | |____I_ Galena |G. Used to make electrical wires, brass, bronze, coins, plumbing, | |__M___ Gold |and jewelry | |__J___ Gypsum |H. Used to make arrowheads, spear points
Words: 1067 - Pages: 5