1. List and describe at least nine factors considered in the design specifications for a new system. Give at least one example for each one? The nine factors which are considered in the design specifications for a new system are 1. Input: The whole design of the system depends on the inputs that we provide to develop the system. Ex: Flow, Data Entry. 2. Output: The system developers should consider all the factors like medium, environment, database and timing Ex: medium, timing. 3. Processing:
Words: 972 - Pages: 4
I have worked as a Printing Technician from 2011 to 2014 at a plastics factory. As a Printing Technician I was responsible for producing quality art on mass produced plastic cups. A few of the things that I was responsible for were setting up the machine to run a product with a certain print, maintain the quality of the image throughout the run, and maintaining the machines that would run the product. Included in the job is an unbelievable amount of paperwork, but it was necessary in order to maintain
Words: 512 - Pages: 3
September, 16 2014 Dear Mr. & Mrs. Ramsey, Our intended proposal for the design services and space planning shall include the following program consisting of a living and entertainment area, a dining area, a kitchen space (with bar area), and a display area for art. The predetermined budget for this project is set at one hundred thousand dollars for the residence located on Connecticut Ave, NW D.C. Scope of Services: I. Design Concept 1. Includes schedule of work (concept development, preliminary
Words: 698 - Pages: 3
C&G Unit 317 / EAL Unit P3/006 Reference: Inspecting, Testing, Commissioning And Certifying Electrotechnical Systems And Equipment In Buildings, Structures And The Environment Date: 01-04-2016-Present Please give a brief description of the job you were carrying out: (eg: “I was carrying out the first fix of a new build property for Taylor Wimpy homes in Gloucester” or “I was installing new outside lights at Mrs Jones house in Cheltenham”) The jobs below have been completed over a period of time
Words: 2072 - Pages: 9
Assignment Description: For the unit 2 assignment, I needed to develop a critical path method (CPM) for the design phase of the ABC Video Rental store project. It was suggested that we use table 6-6 from The New Software Engineering by Sue Conger (2008, p. 167) as a guideline for the development of the CPM. Table 6-6 outlines the functional requirements for the program and what different software options, existing or available for development of the application, would be able to meet those requirements
Words: 761 - Pages: 4
Final Design Project The final design was a combination of a month’s worth of creativity, ingenuity, hard work and most importantly, team work. Although the preliminary design was determined to be mostly unusable, we did gain a vast amount of knowledge which was critical to the final design of our project. The first portion of the project was tasked with catching all of the marbles as they were going to be dropped all at once. Our goal was to create a mechanism which would all for the balls to
Words: 1616 - Pages: 7
having a visual reference of what is possible for our own home from an interior and exterior design perspective is great. Ideal 4 Landscaping brings the visual aspect of landscaping and interior design. WHAT IS IDEAS 4 LANDSCAPING? Ideas 4 Landscaping is a digital collection with over 7,200
Words: 1131 - Pages: 5
P1: Describe the different types of fits. There are many types of different fits in engineering. Listed below are the 3 main fits in engineering such as Clearance Fit, Interference Fit and Transition Fit which would be used day to day. Engineering fits are generally used for parts of assembly. The term ‘Fit’ is the clearance between two merging parts, and the size of the clearance, suggest whether the parts can move independently from each other or even potentially temporally joined. Clearance
Words: 1539 - Pages: 7
As Thomas A. Edison said “Being busy does not always mean real work. The object of all work is production or accomplishment and to either of these ends there must be forethought, system, planning, intelligence, and honest purpose, as well as perspiration. Seeming to do is not doing.” To start off, my academic purpose in life is to receive an Associates Degree in Registered Nurse. My career purpose is to gain new experience to get ahead in life. A personal purpose of mine is to experience life in
Words: 844 - Pages: 4
Analysis, Design, Implementation, and Maintenance). The difference is that Figure 1-3 is in a constant circle going through the different processes in an everlasting motion and Figure 1-4 is in a spiral motion until it ends which would represent the end of the project. 5. Figures 1-3 and 1-12 are similar as they are both takes on the SDLC. The difference is that Figure 1-3 has 5 sections that are in a circular motion. Figure 1-12 only has 4 sections and the process repeats on User Design and Construction
Words: 302 - Pages: 2