social networking sites 2. instant messaging 3. reading local news Source: The Nielsen Company (April 2011) Copyright © 2013 CyberSecurity Malaysia 3 HIGH LEVEL USAGE = HIGH RISK Copyright © 2013 CyberSecurity Malaysia 4 HIGH LEVEL USAGE = HIGH RISK Cyber Security Incidents (1997-2013) Reported to Cyber999 Help Centre 16,000 15,218 Type of incidents: 14,000 • • • • • • • • 12,000 10,000 8,000 As at 31st August
Words: 1957 - Pages: 8
ProjectMinds’ Quick Guide to Project Management By Manjeet Singh msingh@projectminds.com A different kind of copyright No rights reserved. All the parts of this book can be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning, or otherwise. You do not need the prior written permission or authorization
Words: 4987 - Pages: 20
series of organized trial and error experiments to predict the behavior of the process through time often with the aid of a computer. It is a method that is used to solve a problem in many areas of management, for example inventory management, queuing problems, profit analysis and project management among others. Model construction: A successful simulation model has to be carefully designed in order to achieve the intended predictive purpose. Therefore important factors have to be considered
Words: 1498 - Pages: 6
dynamic, certified IT program and project manager, with broad expertise in all phases of project lifecycle planning and implementation. Highly skilled in solving complex engineering, operations and technology problems, along with managing budgets, risk and vendors. Extensive experience in bridging technology and business goals to provide productive solutions. Expertise in managing and working on large-scale development, rollouts, implementations, and migration projects. Depth of experience complemented
Words: 4744 - Pages: 19
of the top 100 corporations in the Philippines » 396 of the top 1000 corporations in the Philippines » 7 of the top 17 universal banks » 8 of the top 11 regular commercial banks » 4 of the top 8 savings and mortgage banks » The top private development bank » 21 of the top 32 holding companies » 8 of the top 14 life insurance companies » 4 of the top 6 non-life insurance companies » The top credit card
Words: 8274 - Pages: 34
DEL CASTILLO, ANJELAH AUBREY R. BSBA BLOCK-A I. THE PHILIPPINE DISASTER RISK REDUCTION AND MANAGEMENT SYSTEM REPUBLIC ACT No. 10121 AN ACT STRENGTHENING THE PHILIPPINE DISASTER RISK REDUCTION AND MANAGEMENT SYSTEM, PROVIDING FOR THE NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT FRAMEWORK AND INSTITUTIONALIZING THE NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT PLAN, APPROPRIATING FUNDS THEREFOR AND FOR OTHER PURPOSES. it enacted by the Senate and House of Representatives of the Philippines
Words: 9149 - Pages: 37
Computer: A computer is a general purpose device that can be programmed to carry out a finite set of arithmetic or logical operations. Since a sequence of operations can be readily changed, the computer can solve more than one kind of problem. Conventionally, a computer consists of at least one processing element, typically a central processing unit (CPU) and some form of memory. The processing element carries out arithmetic and logic operations, and a sequencing and control unit that can change
Words: 4999 - Pages: 20
CIRDAP The Centre on Integrated Rural Development for Asia and the Pacific (CIRDAP) is a regional, intergovernmental and autonomous institution. It was established in 1979 at the initiative of the countries of the Asia-Pacific region and the Food and Agriculture Organisation (FAO) of the United Nations with support from other UN organisations and donor countries/agencies. The member countries of CIRDAP are: Afghanistan, Bangladesh (host state), Fiji Islands, India, Indonesia, Iran, Lao PDR
Words: 7391 - Pages: 30
System Development Plan Axia College of University of Phoenix Management of Information Systems June 10, 2007 There are several phases in a system development plan, which will help The Fitness Center meet its objectives and goals. The key phases to a development plan include investigation, analysis, design, implementation and review and maintenance. Failure to complete each phase in detail may result in an unsuccessful development plan. The Fitness Center has five locations with approximately
Words: 2602 - Pages: 11
Enterprise (OBIEE 10G) Reporting Tool to OBIEE 11G at Econet Wireless (PVT) LTD Paddy Mutimusakwa Managerial Applications of Information Technology DeVry University - Keller Graduate School of Management February, 2015 Table of Contents Abstract 3 Brief Company background 4 Discussion of business problem(s) 5 Business/Technical Approach 6 Benefits of solving the problem 7 Business process
Words: 2308 - Pages: 10