BKAS3063 ACCOUNTING SYSTEM ANALYSIS & DESIGN ANSWER FOR TUTORIAL 3 There are several methods that systems analysts use to determine requirements for a proposed system. The requirements gathering techniques can be categorized into traditional, modern, or radical. The traditional requirements gathering techniques are interviews, questionnaires, , and documents analysis. The modern requirements determination techniques include Joint Application Design (JAD), group support systems, prototyping
Words: 689 - Pages: 3
Written Assignment: 1. Chapter 1 – Introduction to System Analysis and Design Answer questions 1, 2, 3, found on page 34 of the reading, and answer minicase 1 Learning Outcomes: LO1, LO2, LO3) a. What are the six general skills all project team members should have? Six general skills all project team members should have are technical, business, analytical, interpersonal, management, and ethical. b. What are the major roles on a project team? There are five major roles on a project
Words: 771 - Pages: 4
Final Exam "OL1" Spring 2014 IFSM 201 –Section 6391 By typing my signature below, I pledge that this is my own work done in accordance with the UMUC policy on academic dishonesty and plagiarism http://www.umuc.edu/policies/academicpolicies/aa15025.cfm. I have not received or given any unauthorized assistance on this assignment/examination _____________________________________ (Typed signature represents actual signature) Instructions: Your responses should demonstrate your understanding
Words: 747 - Pages: 3
and maintain the applications. When making the decision to develop new software in-house there are several different mechanisms that come into play, which are handled by a steering committee through the process of a system development life cycle (SDLC). From the viewpoint of an employee, the agency can utilize the IT department to help formulate the exact requirements of the system and can compare the different features that may be available within an software package that is already created.
Words: 960 - Pages: 4
All the requirements have been gathered, and the business processes are composed, the project is ready to move to the next phase of the SDLC. The Design Phase is where the design team simply ask, "How do we build it?" The project team will now transition the business requirements into the system requirements. The blueprint for the new system is made up of design documents and physical models. Application Architecture is the design organized into the entire software application; included are the
Words: 886 - Pages: 4
[1] INSTITUTE FOR OPEN LEARNING STUDY MANUAL MANAGING CHANGE CODE: BIS-3318 COPYRIGHT Published by the International University of Management Windhoek, Namibia © International University of Management 2009 No part of this publication may be reproduced, stored in retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without prior permission
Words: 10875 - Pages: 44
Riordan Finance and Accounting Process Improvement Proposal CIS/207 December 04, 2012 Executive Summary Riordan Manufacturing, Inc. is composed of three primary facilities in the United States, with locations in Georgia, Michigan, and California. Headquarters is located in San Jose, California. In addition to the core entities, Riordan Manufacturing has a joint business venture located in Hangzou, China. Investigation into the company’s operating procedures and expenses revealed several
Words: 2329 - Pages: 10
of priorities until it has to be. The term used in systems engineering, information systems and software engineering to describe a process for planning, creating, testing, and deploying an information system is called Systems development life cycle (SDLC). This term is also referred to as the application development life-cycle, which is a term used in systems engineering, information systems and software engineering to describe a process for planning, creating, testing, and deploying an information
Words: 2352 - Pages: 10
accurately. The scope of the project will be outlined by specifying business roles that will be included in the development. We will also try to include and describe the project’s operational, technical, and economic viability that are examined in the SDLC analysis phase summary. Key Stakeholders There are many stakeholders involved in Riordan Manufacturing. Most of the stakeholders are influential to the changes and projects involved in the company. The employees that are also involved in using
Words: 951 - Pages: 4
Applications Development (RAD) • The name speaks for itself – need for RAD driven by rapidly changing business needs • Can be viewed as an example of the spiral model for systems development. The spiral model acknowledges the stages that form the SDLC but builds into each stage iteration, prototyping and extensive user involvement. • Prototyping may be of whole system or part of the system to tease out particular problem areas • Early versions of prototype may be paper-based • Important users
Words: 847 - Pages: 4