Social Construction

Page 29 of 50 - About 500 Essays
  • Premium Essay

    Constructability and Project Delivery Method

    Conclusion 8 References 10 Introduction: The Construction Industry Institute (CII) defines as “The Optimum use of construction knowledge and experience in planning, engineering, procurement and field operations to achieve overall objectives.” To further investigate the concept of constructability, it can be looked at as a measure of how easy could a certain project be constructed. It introduces integration between both the design and construction teams in order to have an end built product of

    Words: 1676 - Pages: 7

  • Free Essay

    Two Alternative Projects to Eurasia Tunnel

    Introduction In this chapter we find alternative solutions for decreasing traffic situation in Istanbul. There are two possible solutions for that; they are usage of a third Bridge that connect two continents and usage of Ferries. Our assumptions for alternative solutions are to develop car transportation via ferries or a third bridge. In order to make comparison of all three projects more easy we take the capacity for all projects as 120,000 vehicles per day, because the capacity of the tunnel

    Words: 1326 - Pages: 6

  • Premium Essay

    Annotated Bibliograhpy

    Lai, Ivan K.W. and Lam, Frankie K.S. (2010). Perception of various performance criteria by stakeholders in the construction section in Hong Kong. Construction management and economics, Vol.28, pp. 377-391. Article of the Lai and Lam analyzed the construction projects in Hong Kong through collecting data from 324 practitioners who in the past participated in such projects. A research model is developed upon nine performance criteria and their respective performances. The relative importance of

    Words: 809 - Pages: 4

  • Premium Essay

    Epc Industry in India: Issues and Challenges

    infrastructure and industry are critical for India as the country sees leapfrogging growth. As far as both these sectors are concerned, India is in a sweet spot, which has created multitude of opportunities in the fields of engineering, capital goods and construction. S Though, India has witnessed significant investments in both industrial and infrastructure space, the growth has remained restricted due to various weaknesses of the Indian EPC industry and difficulties for the foreign players to ply in

    Words: 19229 - Pages: 77

  • Premium Essay

    Jom.Service

    McGraw-Hill Construction Turn Valuable information into a Revenue Stream” “It’s not easy to take millions of documents, scan them, keep them all together, index them for keyword searches and then transmit them to different locations and different databases at the same time for repurposing into different media. Xerox showed us that they had really mastered this technology.” – Tim Ryan Senior Vice President, Business Operations McGraw-Hill Construction Background

    Words: 697 - Pages: 3

  • Premium Essay

    Cv Resume

    Vrushank Shah Post-Graduation in Construction & Project Management, CEPT University Bachelors of Technology (Hons.) in Civil-Construction, SBST, CEPT University Permanent Address: 12-B Sangita Society, Beside Ankur Complex, Ankur, Naranpura, Ahmedabad-380013. Email Address: vrushank.shah.cpm12@cept.ac.in ; vrushank5406@gmail.com ; Cell No. : 91-9924110902 PROFILE I have work experience of 32 months in execution and project management work in construction industry. I have keen knowledge

    Words: 575 - Pages: 3

  • Free Essay

    Amali Fire 2

    DIPLOMA IN BUILDING SERVICES ENGINEERING PROJECT MANAGEMENT (CC603) CLASS: DPB 5A ASSIGNMENT 2 | Content Content | Page | Organization structure (functional, matrix, product) | 3-7 | Differentiate between supervision and superintendent | 7-8 | Duties technician and assistance manager | 9 | Distinguish between technician and assistance engineer | 10 | Relate the duty between technician and assistance manager | 11 | Explain the organization structure and the main characteristics

    Words: 1345 - Pages: 6

  • Free Essay

    Proj 592 Proj1

    The construction of the new theme park project is laid out for 180 days of construction to finish. This project has a start Date of Monday April 4, 2008. The preliminary cost is $4,449,920.00 and with a completion date of December 19, 2008. The theme park will include a Ferris wheel, Rope course, Climbing walls, Carousel, Bowling, Go carts, and a Mini golf. The desired walk through date is December 18, 2008 with a grand opening on December 19, 2008. Executive Summary It has been 6 months since

    Words: 334 - Pages: 2

  • Premium Essay

    Construction

    CONSTRUCTION In the fields of architecture and civil engineering, construction is a process that consists of the building or assembling of infrastructure. Far from being a single activity, large scale construction is a feat of human multitasking. Normally, the job is managed by a project manager, and supervised by a construction manager, design engineer, construction engineer or project architect. For the successful execution of a project, effective planning is essential. Involved with the design

    Words: 3036 - Pages: 13

  • Premium Essay

    Proposal

    managers of Streets and PWD will read and comment or approve the project proposal. Project managers and technical engineers of these same government agencies will read and comment or approve the design report. PWD will be funding the design and construction costs for the project but have little to no bridge design experience. To assist with the bridge design approval, PWD has coordinated an agreement with Streets so that Streets will take ownership of the bridge once constructed. Therefore, both

    Words: 624 - Pages: 3

Page   1 26 27 28 29 30 31 32 33 50