the Board of Trustees. Once this is done, building permits can be obtained at the same time that bids for furniture are requested and the faculty recruitment process is initiated. After the building permits are obtained, construction can begin. Upon completion of the construction, landscaping can start and the interior work on the offices can be done simultaneously. After the interiors are completed, a certificate of occupancy can be obtained after the final inspection of the interiors by the Fire
Words: 263 - Pages: 2
fire rating between hard and softwood; and these constituted the sample size. The rationale for this selection of hard and softwood is to provide a measurable and deliverable recommendation to construction experts in Nigeria of the best and regular use classification of timber in building construction projects for feasible and optimal sustainability. The analysis of data obtained from the laboratory, was done using Analysis Of
Words: 329 - Pages: 2
1.0 Introduction Due to the geographical position of Bangladesh every year this country needs to face number of natural disaster. Facing so many disasters like flood, cyclone, drought, earthquake now people of this country know at least a little, how to manage the natural disaster, what to do and what not to do during those crisis. But, still we lack of managing the manmade disaster. Like the “Building Collapse”. Recent Rana Plaza tragedy had made us aware about our present vulnerable position
Words: 2241 - Pages: 9
employer training programs or apprenticeships. Most employers recommend an apprenticeship as the best way to learn carpentry. These programs combine on-the-job training with related classroom instruction. On the job, apprentices learn elementary construction design and become familiar with common carpentry jobs, such as layout, form building, rough framing, and outside and inside finishing. They also learn to use the tools, machines, equipment, and materials of the trade. Apprentices receive classroom
Words: 1612 - Pages: 7
class Employee { //Data members protected string firstName; protected string lastName; protected char gender; protected int dependents; protected double annualSalary; protected Benefits benefit; protected string employeeType; protected static int numEmployees = 0; //Constants public const string DEFAULT_Name = "not given"; public const int MIN_DEPENDENTS = 0;
Words: 335 - Pages: 2
Petrie’s Electronics Project Closeout Report For Project Management Jim Wantanabe – Project Manager Jim Wantanabe spent a lot of time planning and conducting interviews with key stakeholders inside the company. He also worked with the marketing group made up of loyal customers, to get some good ideas about what they would value in a customer loyalty program. The team came up with requirements and constraints for the customer loyalty project also alternatives were made to show different scenarios
Words: 311 - Pages: 2
WEEK 1 ASSIGNMENT E 10–1: Acquisition costs; land and building LO10–1 On March 1, 2013, Beldon Corporation purchased land as a factory site for $60,000. An old building on the property was demolished, and construction began on a new building that was completed on December 15, 2013. Costs incurred during this period are listed below: Salvaged materials resulting from the demolition of the old building were sold for $2,000. Demolition of old building
Words: 505 - Pages: 3
Can Design Improve Construction Safety?: Assessing the Impact of a Collaborative Safety-in-Design Process Marc Weinstein1; John Gambatese, M.ASCE2; and Steven Hecker3 Abstract: This paper analyzes the impact of a large-scale safety-in-design initiative during the design and construction of a semiconductor manufacturing facility in the Pacific Northwest of the United States. Drawing on multiple data sources including individual interviews, group interviews, construction documentation, and an expert
Words: 9270 - Pages: 38
Learning Portfolio 1 Results “To design and construct an appropriate water filter and quality testing system to supply clean and drinkable water for a remote Nepalese community.” Reflection My original problem statement In the process of devising a team problem statement, each member was given 10 minutes to generate an individual problem statement which addressed the objectives and identified the constraints outlined in the brief. This followed Dym’s model as shown in the prescribed ‘Engineering
Words: 793 - Pages: 4
The planning, organisation and control of a project is lengthy because of the many stages from inception to completion and handover. There are various stages and temporary infrastructure in construction which take the project from design to completion. Inception is the very first stage of a construction process, as this is where the client has a general outline/idea of the requirements and a plan for future action. It is at this stage that an architect is appointed and the client is given a briefing
Words: 747 - Pages: 3