Service Request SR-rm-022 - Part 1 Joshua Proctor BSA/375 November 4, 2013 Laura Smith Service Request SR-rm-022 - Part 1 This paper will describe each of the key stakeholders or stakeholder groups in Riordan Manufacturing who provide requirements for the service request, explain two separate information gathering techniques used during proposed projects, identify two factors that are necessary to ensure that the information required for the project is gathered successfully, define the scope
Words: 1232 - Pages: 5
Service Request sr-rm-022 Part 2 Joshua Proctor BSA/375 November 11, 2013 Laura Smith Service Request sr-rm-022 Part 2 Introduction Riordan Manufacturing started its existence in 1991 as a company called Riordan plastics and its founder, Dr. Riordan, acquired patents for “processing polymers into plastic substrates that resisted breaking under extreme tension. In 1992, Dr. Riordan acquired capital to expand his company and renamed it Riordan Manufacturing. By 2000, Riordan Manufacturing
Words: 1511 - Pages: 7
Service Request SR-rm-022, Part 2 Ryan Finch BSA/375 After the previous meeting we discussed several important topics that have required additional research, in order to present a safe way to make transitions and new changes. We have also reviewed some different data flow that will work to improve the proper handling within Riordan Manufacturing to ensure the best relationship between each department. Once the final implementation is installed it will not only improve communication
Words: 673 - Pages: 3
Service Request SR-RM-022 Part 2 BSA/375 Service Request sr-rm-022 Part 2 Riordan Manufacturing is a research and development company that specializes in the production of polymer materials. The company is currently “employing 550 people with projected annual earnings of $46 million. The company is wholly owned by Riordan Industries, a Fortune 1000 enterprise with revenues in excess of $1 billion.” (University of Phoenix, 2013) Hugh McCauley, the COO of the company, wants to develop a new
Words: 859 - Pages: 4
Service Request SR-rm-022 By: Tammy Samooj BSA/375 October 13, 2014 Riordan Manufacturing is a worldwide Manufacturing company that employs 550 employees. It projects an annual income earnings of $46 million. Their plant that is operating in Albany, GA, produces plastic containers for beverages. Their plant that is located in Pontiac, MI, that produces plastic custom parts, whereas, the plant in Hangzhou, China produces plastic parts for fans. In San Jose, CA Riordan has its
Words: 1028 - Pages: 5
Service Request SR-rm-022 for Riordan Manufacturing Christina Noll BSA/375 December 6, 2014 Instructor: Morton Smith Service Request SR-rm-022 for Riordan Manufacturing Before the project begins information needs to be gathered from key stakeholders and from observations of how the current system works and is used. Next this document will describe information-gathering techniques that can be used, as well as systems analysis tools that can and will be used for the project. This document will
Words: 3731 - Pages: 15
Service Request SR-rm-022, Part 3 Ryan Finch BSA/375 Implementation for this design would be where Riordan Manufacturing will find some challenges with certain parts of the overall design including the end user results. Having a complete team of design analysts, IT techs, Business analyst and end users all working together will help make the difference in producing successful and efficient program in the end. Moving through each phase of the project from start to finish will be dependent
Words: 1117 - Pages: 5
has a plant located in Albany, GA which produces their plastic beverage containers, a plant in Pontiac, MI which produces customized plastic parts, and in Hangzhou, China they have a plant the manufactures plastic fan parts. The Service Request SR-rm-022 has been issued asking to integrate the existing Human Resource tools into a single integrated application. This will be done using the existing tools found in the Human Resource System. This request will have an impact on all the listed locations
Words: 1231 - Pages: 5
Service Request SR-rm-022, Part 1 BSA/375 Anjit Bose Service Request SR-rm-004, Part 1 Table of Contents Introduction.........................................................................................................3 * Information-Gathering Techniques and Design Methods................................................................................................................3 * Business Requirements for an HR System...............................................
Words: 1339 - Pages: 6
Service Request SR-rm-022, Part 2 Michael Ragland BSA/375 10/06/2015 Robert Mascarenas Describe the application architecture and process design. Include a high-level description of the security controls you recommend for the design of this HR system. Among other measures security measures can include firewalls, popup blockers, and system restore points including manufacturer system restore points. Any proprietary data, incription codes and passwords will be considered legal copyright intellectual
Words: 634 - Pages: 3