Study Material

Page 12 of 50 - About 500 Essays
  • Free Essay

    Reductor

    ESTABLISHING THE STRESS LOADING THE ELEMENTS [pic] Fig. 1.1 2. MAIN SCREW CALCULUS 2.1. CHOOSING THE MATERIAL It is chosen OL 50 STAS 500/2 [3] PRE-DIMENSIONING CALCULUS The calculus load F= Q·ctgαmin αmin= 30º [pic] Fig. 2.1 F= Q·ctgαmin= 8914·ctg30°= 15439.5 N Calculus of the load Fc, N Fc= β·F= 1.3·15439.5= 20071.3 N β= 1.25 ... 1.3 [3] The thread's inner diameter [pic]

    Words: 1854 - Pages: 8

  • Premium Essay

    Spartan Heat Exchange

    and lower production costs. 3. Rick Coyne the materials manager needs to come out with plan to support new business strategy. Main objectives for this department are - o Reduce customer lead time for finished products from 14 weeks to 6 weeks. o Inventory turnover needs to be 20 times. o Material stock-out needs to be eliminated. o Reduce raw material cost by 10% over 12 months. Basic Issues: 1. MATERIAL SHORTAGES & STOCK-OUTS IN MANUFACTURING OPERATIONS

    Words: 606 - Pages: 3

  • Premium Essay

    Delta Plastic; Inc

    Delta Plastics, Inc. Darnetta J. Cowan Strayer University Delta Plastics Inc Prepare a 3 –Sigma chart for both production processes using the new and standard material (use of quality report in “Delta Plastics, Inc, Case A.” chapter 5. See attached excel Charts for this answer. Discuss whether or not both processes are in control and what conclusion may be drawn. I tried to put the statistics together to have an overall perspective of the defects since most of them fall in the

    Words: 352 - Pages: 2

  • Free Essay

    A Water Concessioners Porters 5 Forces Analysis

    maintain a water utility company. 3. Bargaining Power of Supplier- Medium. Although the primary raw material of A Water Utility concessioner is water which is basically free, the materials used for distribution line maintenance and expansion are quite few. Though this is the case, A Water Utility concessioner still has a slight control on the pricing of these materials unless the raw materials for these items like resin, steel, alum coagulating chemical used in treating raw water), etc. increases

    Words: 353 - Pages: 2

  • Free Essay

    Supply Chain Risk

    Nature of the supply chain risk: Physical contamination of product: physical contamination of product can occur because machines have not been set up as per specification causing foreign material may be discharged into the juice. Example, if a capper head is not set up to specification shavings can be discharged into the juice and if this is not observed by QC right away, thousands of cases of juice maybe destroyed leaving customer out of stock. Physical contamination may also occur because

    Words: 479 - Pages: 2

  • Free Essay

    Case

    industry standards. Korean firms have a low cost base and compete primarily on low cost. European firms have begun to focus on standardizing their product lines to a few high-volume products and compete on delivery lead times and price. Rick Coyne, Materials manager for Spartan, is faced with a proposal of “renewing” Spartans business strategy. Spartan would like to reduce customer lead times for finished products from 14 weeks to six weeks. Second, Spartan would like to move from an inventory turnover

    Words: 590 - Pages: 3

  • Premium Essay

    Wonder Widgets

    Overview Wonder Widgets, Inc. designs and manufactures widgets for use in various commercial manufacturing facilities. Wonder Widgets has been in business since 2004 with a steady and reliable group of core customers. Recently however, costs of raw materials have risen reducing the profitability of the company. The board of directors has become concerned and requested an independent valuation of the company with recommendations for increasing profits or cutting losses and shutting down the plant. Current

    Words: 788 - Pages: 4

  • Premium Essay

    Case Study 5

    * Design. Create own product with in-house designers. * Materials requisition and payment. Find sources of materials and pay for them; suppliers will require a cash outlay six months before delivery. * Materials. Receive material and store them in their offices. (Fabric on big bolts is stored offsite). Some raw materials have to be checked for quality before sending them to the factories. * Distribution. Ship material to three to five local factories. * Garment assembly. Factory

    Words: 963 - Pages: 4

  • Premium Essay

    Kost Mondial

    consider we are not outsourcing a single function of our bakery production but yes as far as delivering the items are concerned, and then yes we’ve outsourced our transportation function. The suppliers of our raw material are located in different places of Karachi. All the raw material required in order to start the venture would be purchased from there. PRODUCTION PROCESS LAYOUT As mentioned, production of bakery stuff will take place in our Kost Mondial kitchen. Our chef Touqeer Ali will be guiding

    Words: 1344 - Pages: 6

  • Premium Essay

    Sme Industry

    best price for the raw material you need to manufacture automotive OEM parts or for construction needs or for manufacturing or raw material for precision engineering. Maybe you need Chemicals & Additives or Inks or Paints, or Polymers or Cement. Whatever your requirement, Buying Clubs that collect buyers and suppliers on the same platform can help manufactures fight several problems at the same time. This includes the acute problem of economical and quality supply of raw material for the manufacturing

    Words: 1350 - Pages: 6

Page   1 9 10 11 12 13 14 15 16 50