COALITIONCoalition 1 – All Risk No Reward Coalition | GOALGoal 1- To oppose the Keystone Pipeline Project and create awareness among the public about the negative impact that it can have on the environmentGoal2 – To persuade President Obama and Secretary Kerry to reject the proposal of the project | TACTICTactic 1 – Forming a unique blend of various state and national groups to strengthen the coalition Tactic 2- Creating awareness using paid media such as newspaper and television advertisementTactic3-
Words: 419 - Pages: 2
Northern Gas Pipelines Ltd.(SNGPL) supplying Punjab and Khyber Pakhtunkhwa. Many large gas fields are in decline, and at current production forecasts, the country is at or near its peak production. Proven remaining reserves were estimated at 27.6 tcf in 2010. By international standards, and compared to oil products, natural gas is inexpensive in Pakistan, which lead to inefficient use. A critical challenge is The high level of unaccounted for gas (UFG). Pakistan has UFG in the gas pipeline system of
Words: 2043 - Pages: 9
BLOOMFIELD, NM 87413 Residents of Bloomfield, Swell Oil Pros recently introduced a new innovative technology to the oil and gas industry in our city. Many of you work in the industry or live with pipelines across your farms or in your neighborhoods. We have installed Poly pipe liners in several of these pipelines that had leaks or were corroded and beginning to leak. Please take a few minutes to complete this survey about the services we are offering. Please submit your survey in the box at the chamber
Words: 426 - Pages: 2
You have asked the following questions: “A local jurisdiction is stating that the system with three loops meets the requirements for a grid system per NFPA 13D. This would require hydraulic calculations per NFPA 13 by 10.4.6. Is it the intent of NFPA 13D to calculate these systems per NFPA 13? Currently, we calculate these systems with a two-head hydraulic calculation per NFPA 13D section 10.2.1. We calculated all points of connection between the loops as indicated with the hydraulic node placement
Words: 375 - Pages: 2
career EMELIE BAEDECKE YLLNER ALEXANDRA BRUNILA Master of Science Thesis Stockholm, Sweden 2013 i Talent management – Retaining and managing technical specialists in a technical career Emelie Baedecke Yllner Alexandra Brunila Master of Science Thesis ME200X 2013:31 KTH Industrial Engineering and Management Industrial Management SE-100 44 STOCKHOLM ii iii Master of Science Thesis INDEK 2013:31 Talent management – Retaining and managing technical specialists in a technical career Emelie Baedecke
Words: 38034 - Pages: 153
that they're right: The American Society of Civil Engineers last year graded the nation "D" for its overall infrastructure conditions, estimating that it would take $1.6 trillion over five years to fix the problem. The results include leaking pipelines, failed air traffic control systems in major metropolitan areas, and - in an eye-opener - a power failure that paralyzed the NSA. American citizens are at risk for bridge failures and other life-threatening disasters. The Society's director adds:
Words: 299 - Pages: 2
PETRO CASE STUDY ASSESSMENT OF PIPELINE CORROSION BACKGROUND Internal corrosion monitoring & assessment of subsea production and export carbon steel pipelines during operation is a crucial part of overall subsea pipeline corrosion management strategy. Internal corrosion of the pipelines is generally assessed by continuous monitoring of operational parameters and periodic inspection of pipeline’s internal condition by inspection tools such as NDT (non- destructive testing) techniques
Words: 887 - Pages: 4
Crude oil blending is accomplished by two methods: on-line blending and tank blending. On-line Blending In this method two or more components are injected from separate pipelines and are mixed in a single line. Ensuring adequate mixing is a necessity and often requires some type of in-line static mixer or mechanical mixing device. The use of piping elements alone may not provide adequate mixing. The efficiency of this method will depend upon the resulting stream’s Reynolds number, the type and
Words: 638 - Pages: 3
Spigot & Socket Pipes Product Range 1. All S&S Pipes designed and meet the requirements of BS 5911pt.100 Irish Standard IS 6.1974. 2. All dimensions in mm. 3. All weights in Kgs based on density of concrete at 2450 kg/m3 4. Indicates pipe reinforced E H C A=DN B Arrow indicates flow direction D G = Overall Length F = Effective Length Spigot End also known as male end Socket End also known as bell end or female end Flexible Jointed Spigot and Socket Pipe A DN:Inside diam of pipe Minimum B Wall
Words: 4932 - Pages: 20
to the roof of a 3-story building. The pipeline-blast tore trenches under several main roads as long as 6 kilo-meters, and the cratered streets swallowed cars and trucks… that killed 30 people and injured over 300, which left a trail of devastation in the city. After investigations, the explosions were caused by the leak of some 10 tones of propylene gas pipeline into the ground, that a petrochemical company transmit between 2 firms with underground pipeline through main streets of the city for over
Words: 621 - Pages: 3