Free Essay

Courseware 101

In:

Submitted By bob2411
Words 8006
Pages 33
BASIC PAY—EFFECTIVE JANUARY 1, 2014
Pay Grade O-10
1

2 or less

Over 2

Over 3

Over 4

Over 6

Over 8

Over 10

Over 12

Over 14

Over 16

Over 18

O-91 O-81 O-71 O-62 O-5 O-4 O-3 O-2 O-1 O-33 O-23 O-13 W-5 W-4 W-3 W-2 W-1 E-94 E-8 E-7 E-6 E-5 E-4 E-3 E-2 E-15

9,946.20 8,264.40 6,125.40 5,106.60 4,405.80 3,873.90 3,347.10 2,905.20

10,272.00 8,648.40 6,729.60 5,752.50 5,100.30 4,391.40 3,812.10 3,024.00

10,488.30 8,826.00 7,171.20 6,150.60 5,440.80 4,739.70 4,390.50 3,655.50

10,548.60 8,967.30 7,171.20 6,225.60 5,516.40 5,167.80 4,538.70 3,655.50 5,167.80 4,538.70 3,655.50 4,551.60 4,015.80 3,699.90 3,401.10

10,818.60 9,222.90 7,198.50 6,474.30 5,832.30 5,415.30 4,632.30 3,655.50 5,415.30 4,632.30 3,903.30 4,761.00 4,179.60 3,909.90 3,606.60

11,269.20 9,475.80 7,507.20 6,622.80 6,171.00 5,687.10 4,632.30 3,655.50 5,687.10 4,779.90 4,047.90 4,968.30 4,501.80 4,236.00 3,909.30 3,959.40 3,594.90 3,228.60 2,922.30 2,427.30 2,034.90 1,716.90

11,373.90 9,767.70 7,547.70 6,949.50 6,593.10 5,862.60 4,632.30 3,655.50 5,862.60 5,028.60 4,195.20 5,178.00 4,837.20 4,397.40 4,050.60 4,836.90 4,134.30 3,709.80 3,331.50 3,076.20 2,427.30 2,034.90 1,716.90

11,802.00 10,059.00 7,547.70 7,189.50 6,921.30 6,151.50 4,632.30 3,655.50 6,151.50 5,220.90 4,340.10 5,493.90 4,995.00 4,556.40 4,247.70 4,946.40 4,242.90 3,914.40 3,530.40 3,094.80 2,427.30 2,034.90 1,716.90

11,924.70 10,351.20 7,976.70 7,499.70 7,149.60 6,302.40 4,632.30 3,655.50 6,395.40 5,364.30 4,538.70 5,770.50 5,177.70 4,751.10 4,442.40 5,084.70 4,372.80 4,084.20 3,591.30 3,094.80 2,427.30 2,034.90 1,716.90

12,293.40 11,269.20 8,735.10 7,974.00 7,280.70 6,302.40 4,632.30 3,655.50 6,535.50 5,364.30 4,538.70 6,033.90 5,366.10 4,902.90 4,595.40 5,246.70 4,513.80 4,200.30 3,635.70 3,094.80 2,427.30 2,034.90 1,716.90

12,827.10 12,043.80 9,180.30 8,199.30 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 6,249.30 5,704.50 5,040.60 4,735.80 5,411.10 4,767.60 4,323.90 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

4,003.50 3,655.80 3,234.90 2,839.80

4,306.50 3,808.20 3,540.90 3,145.20

4,429.80 3,964.50 3,635.40 3,227.40

2,752.50 2,380.80 2,181.00 1,999.50 1,805.40 1,716.90 1,531.50

3,004.20 2,619.60 2,327.40 2,101.80 1,918.80 1,716.90

3,119.10 2,735.10 2,440.20 2,215.80 2,034.90 1,716.90

3,271.50 2,847.60 2,555.10 2,328.00 2,034.90 1,716.90

3,390.60 2,964.90 2,734.50 2,427.30 2,034.90 1,716.90

Notes:
1. 2. 3. 4. 5. 6. Basic pay for an O-7 to O-10 is limited by Level II of the Executive Schedule which is $15,125.10. Basic pay for O-6 and below is limited by Level V of the Executive Schedule which is $12,266.70. While serving as Chairman, Joint Chief of Staff/Vice Chairman, Joint Chief of Staff, Chief of Navy Operations, Commandant of the Marine Corps, Army/Air Force Chief of Staff, Commander of a unified or specified combatant command, basic pay is $21,147.70. (See note 1 above). Applicable to O-1 to O-3 with at least 4 years and 1 day of active duty or more than 1460 points as a warrant and/or enlisted member. See Department of Defense Financial Management Regulations for more detailed explanation on who is eligible for this special basic pay rate. For the Master Chief Petty Officer of the Navy, Chief Master Sergeant of the AF, Sergeant Major of the Army or Marine Corps or Senior Enlisted Advisor of the JCS, basic pay is $7,816.20. Combat Zone Tax Exclusion for O-1 and above is based on this basic pay rate plus Hostile Fire Pay/Imminent Danger Pay which is $225.00. Applicable to E-1 with 4 months or more of active duty. Basic pay for an E-1 with less than 4 months of active duty is $1,416.30. Basic pay rate for Academy Cadets/Midshipmen and ROTC members/applicants is $1,017.00.

BASIC PAY—EFFECTIVE JANUARY 1, 2014
Pay Grade O-10
1

Over 20

Over 22

Over 24

Over 26

Over28

Over 30

Over 32

Over 34

Over 36

Over 38

Over 40

O-91 O-81 O-71 O-62 O-5 O-4 O-3 O-2 O-1 O-33 O-23 O-13 W-5 W-4 W-3 W-2 W-1 E-94 E-8 E-7 E-6 E-5 E-4 E-3 E-2

16,072.20 14,056.80 13,319.10 12,043.80 9,625.20 8,422.20 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 7,118.40 6,459.30 5,933.10 5,205.30 4,906.80 5,673.60 4,896.30 4,371.60 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

16,150.50 14,259.90 13,647.30 12,043.80 9,878.40 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 7,479.60 6,768.00 6,069.90 5,313.60 4,906.80 5,895.60 5,115.30 4,532.40 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

16,486.80 14,552.10 13,647.30 12,043.80 10,134.60 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 7,748.40 7,021.80 6,215.40 5,399.70 4,906.80 6,129.30 5,236.80 4,618.50 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

17,071.50 15,062.40 13,647.30 12,105.60 10,632.00 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 8,046.30 7,311.00 6,413.10 5,399.70 4,906.80 6,486.90 5,535.90 4,946.70 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

17,071.50 15,062.40 13,647.30 12,105.60 10,632.00 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 8,046.30 7,311.00 6,413.10 5,399.70 4,906.80 6,486.90 5,535.90 4,946.70 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

17,925.30 15,816.00 13,989.00 12,347.70 10,844.10 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 8,448.90 7,457.10 6,413.10 5,399.70 4,906.80 6,810.90 5,647.20 4,946.70 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

17,925.30 15,816.00 13,989.00 12,347.70 10,844.10 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 8,448.90 7,457.10 6,413.10 5,399.70 4,906.80 6,810.90 5,647.20 4,946.70 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

18,821.10 16,606.80 14,338.50 12,347.70 10,844.10 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 8,871.00 7,457.10 6,413.10 5,399.70 4,906.80 7,151.70 5,647.20 4,946.70 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

18,821.10 16,606.80 14,338.50 12,347.70 10,844.10 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 8,871.00 7,457.10 6,413.10 5,399.70 4,906.80 7,151.70 5,647.20 4,946.70 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

19,762.50 17,436.90 14,338.50 12,347.70 10,844.10 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 9,315.00 7,457.10 6,413.10 5,399.70 4,906.80 7,509.60 5,647.20 4,946.70 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

19,762.50 17,436.90 14,338.50 12,347.70 10,844.10 8,675.70 7,356.60 6,302.40 4,632.30 3,655.50 6,726.00 5,364.30 4,538.70 9,315.00 7,457.10 6,413.10 5,399.70 4,906.80 7,509.60 5,647.20 4,946.70 3,687.30 3,094.80 2,427.30 2,034.90 1,716.90

Notes:
1. 2. 3. 4. 5. 6. Basic pay for an O-7 to O-10 is limited by Level II of the Executive Schedule which is $15,125.10. Basic pay for O-6 and below is limited by Level V of the Executive Schedule which is $12,266.70. While serving as Chairman, Joint Chief of Staff/Vice Chairman, Joint Chief of Staff, Chief of Navy Operations, Commandant of the Marine Corps, Army/Air Force Chief of Staff, Commander of a unified or specified combatant command, basic pay is $21,147.70. (See note 1 above). Applicable to O-1 to O-3 with at least 4 years and 1 day of active duty or more than 1460 points as a warrant and/or enlisted member. See Department of Defense Financial Management Regulations for more detailed explanation on who is eligible for this special basic pay rate. For the Master Chief Petty Officer of the Navy, Chief Master Sergeant of the AF, Sergeant Major of the Army or Marine Corps or Senior Enlisted Advisor of the JCS, basic pay is $7,816.20. Combat Zone Tax Exclusion for O-1 and above is based on this basic pay rate plus Hostile Fire Pay/Imminent Danger Pay which is $225.00. Applicable to E-1 with 4 months or more of active duty. Basic pay for an E-1 with less than 4 months of active duty is $1,416.30. Basic pay rate for Academy Cadets/Midshipmen and ROTC members/applicants is $1,017.00.

ALLOWANCES
Basic Allowance for Housing RC/Transient Family Separation Allowance (January 1, 2014) Pay Without With All Pay Grades: $250 Partial Differential Grade Dependent Dependent 0-10 $ 50.70 $ 1,555.80 $ 1,913.70 $ 333.30 Basic Allowance for Subsistence Family Subsistence Supplemental (Effective January 1, 2014) Allowance (Effective October 1, 2010) 0-9 $ 50.70 $ 1,555.80 $ 1,913.70 $ 333.30 0-8 $ 50.70 $ 1,555.80 $ 1,913.70 $ 333.30 Officers: $246.24 All Pay Grades 0-7 $ 50.70 $ 1,555.80 $ 1,913.70 $ 333.30 Enlisted: $357.55 Not to Exceed $1100.00 0-6 $ 39.60 $ 1,426.50 $ 1,722.60 $ 276.30 Clothing Allowances (Effective October 1, 2013) 0-5 $ 33.00 $ 1,373.70 $ 1,660.80 $ 267.00 0-4 $ 26.70 $ 1,272.60 $ 1,463.70 $ 177.60 Standard Initial Clothing Allowance (Enlisted Members Only) 0-3 $ 22.20 $ 1,020.60 $ 1,211.10 $ 177.60 Army Navy Air Force Marine Corps 0-2 $ 17.70 $ 808.80 $ 1,033.50 $ 209.40 Male Female Male Female Male Female Male Female 0-1 $ 13.20 $ 693.90 $ 925.20 $ 226.20 1567.43 1798.42 1850.14 2037.08 1490.92 1700.28 1823.51 1870.39 03E $ 22.20 $ 1,101.60 $ 1,302.00 $ 186.00 Cash Clothing Replacement Allowance (Enlisted Members Only) 02E $ 17.70 $ 936.60 $ 1,174.50 $ 222.30 Army Navy Air Force Marine Corps OlE $ 13.20 $ 814.50 $ 1,085.70 $ 261.00 Male Female Male Female Male Female Male Female W-5 $ 25.20 $ 1,293.30 $ 1,413.60 $ 111.00 306.00 327.60 334.80 342.00 244.80 248.40 424.80 446.40 Basic W-4 $ 25.20 $ 1,148.10 $ 1,295.70 $ 136.80 Standard 439.20 468.00 478.80 489.60 349.20 352.80 604.80 637.20 W-3 $ 20.70 $ 965.70 $ 1,188.00 $ 206.40 0 0 637.20 637.20 0 0 0 0 Special W-2 $ 15.90 $ 856.80 $ 1,091.40 $ 218.10 Civilian Clothing Allowance Type of Duty Initial Replacement 15 days in 30 days period 30 days in 36 month period W-1 $ 13.80 $ 718.50 $ 944.70 $ 211.20 E-9 $ 18.60 $ 942.90 $ 1,243.20 $ 278.70 989.28 329.76 0 0 Permanent E-8 $ 15.30 $ 866.40 $ 1,146.90 $ 261.30 0 0 329.76 659.52 Temporary E-7 $ 12.00 $ 798.60 $ 1,064.40 $ 302.40 Personal Money Allowance (Monthly Amount) E-6 $ 9.90 $ 738.00 $ 983.40 $ 292.20 1. While serving as Chairman or Vice Chairman of the JCS, $333.33 or Army or Air Force CS, CNO, or CMC E-5 $ 8.70 $ 663.60 $ 884.70 $ 248.70 E-4 $ 8.10 $ 577.20 $ 768.90 $ 215.10 2. Senior Member of the Military Staff Committee of the U.N. $225.00 E-3 $ 7.80 $ 536.70 $ 715.20 $ 176.10 3. General or Admiral $183.33 E-2 $ 7.20 $ 511.50 $ 681.60 $ 235.50 4. Lieutenant General Vice Admiral $41.67 E-1 $ 6.90 $ 511.50 $ 681.60 $ 278.70 5. Senior Enlisted Member of a Military Service $166.67 For other pays or specific requirements for the pay cited in this table, go to the web at: http://www.dtic.mil/comptroller/fmr/07a/index.html

INCENTIVE AND SPECIAL PAYS
Aviation Career Incentive Pay
Years of Aviation Service

2 or less 125.00

Over 2 156.00

Over 3 188.00

Over 4 206.00

Over 6 650.00

Over 14 840.00

Over 22 585.00

Over 23 495.00

Over 24 385.00

Over 25 250.00

Career Enlisted Flyer Incentive Pay
Years of Aviation Service

4 or less 150.00 Pay Grade Amount O-10 O-9 O-8 O-7 O-6 150.00 150.00 150.00 150.00 250.00 Pay Grade O-5 O-4 O-3 O-2 O-1

Over 4 225.00 Amount 250.00 225.00 175.00 150.00 150.00 Pay Grade W-5 W-4 W-3 W-2 W-1 Amount 250.00 250.00 175.00 150.00 150.00

Over 8 350.00 Pay Grade E-9 E-8 E-7 E-6 E-5 Amount 240.00 240.00 240.00 215.00 190.00

Over 14 400.00 Pay Grade E-4 E-3 E-2 E-1 Amount 165.00 150.00 150.00 150.00

Hazardous Duty Incentive Pay (Crew Member- Non-AWAC)

Hazardous Duty Incentive Pay (Non-Crew Member)
ALL GRADES – 150.00

Imminent Danger Pay/Hostile Fire Pay
ALL GRADES – 225.00

Diving Pay
Officers – 240.00 (Max) Enlisted – 340.00 (Max)

HDIP (Parachute, Flight Deck, Demolition, & Others)
All Grades – 150.00 (Member qualified for HALO Pay – 225.00). For other pays or specific requirements for the pays cited in this table, go to the web at: http://www.dtic.mil/comptroller/fmr/07a/index.html

COMBAT ZONE TAX EXCLUSION
Basic pay for the MCPO of the Navy, CMSgt of the AF, Sergeant Major of the Army or Marine Corps, basic pay is $7,816.20. Combat Zone Tax Exclusion for O-1 and above is based on this basic pay rate plus HFP/IDP ($225).

Submarine Duty Incentive Pay (Effective October 1, 2011)
Cumulative Years of Service

Pay Grade 2 or less Over Over Over Over Over Over Over Over Over 2 3 4 6 8 10 14 16 18 595.00 835.00 O-6 595.00 790.00 835.00 O-5 365.00 525.00 595.00 705.00 790.00 O-4 355.00 510.00 595.00 705.00 O-3 305.00 425.00 O-2 230.00 425.00 O-1 285.00 375.00 W-5 425.00 285.00 375.00 W-4 425.00 285.00 375.00 425.00 W-3 425.00 285.00 375.00 425.00 W-2 425.00 285.00 375.00 W-1 425.00 425.00 600.00 E-9 415.00 550.00 E-8 405.00 E-7 E-6 155.00 170.00 175.00 300.00 325.00 375.00 140.00 155.00 E-5 250.00 275.00 80.00 95.00 100.00 245.00 E-4 80.00 90.00 95.00 E-3 90.00 75.00 90.00 E-2 75.00 E-1
Submarine Duty Incentive Pay for O-7 through O-10 is $355.00

MONTHLY CAREER SEA PAY—(NAVY AND MARINE CORPS)—EFFECTIVE OCTOBER 1, 2001
Pay Grade

O-6 O-5 O-4 O-3 O-2 O-1 W-5 W-4 W-3 W-2 W-1 E-9 E-8 E-7 E-6 E-5 E-4 E-3 E-2 E-1

1 or less 100 100 100 100 100 100 210 210 210 210 180 135 135 135 135 70 70 50 50 50

Over 1

Over 2

Over 3 315 315 260 210 210 210

Over 4 320 265 225 225 225 240 240 240 240 240 320 320 320 300 300 290

Over 5

190

80 80 60 60

195 160 160 160 160 160 160 100 75

210 305 305 305 280 280 280

280 260 260 260 405 405 380 365 245 350 350 350 315 315

Cumulative Years of Sea Duty Over Over Over Over Over 6 7 8 9 10 335 360 370 395 405 320 345 350 365 285 300 310 315 265 275 285 300 315 265 275 285 300 315 265 275 285 300 315 435 490 435 490 395 400 405 435 490 370 380 435 475 280 350 380 420 455 375 490 500 375 490 500 375 490 500 325 350 450 465 325 350 450 390

Over 11 420 370

Over 12 435 335 335 335 335 560 560 560 525 475 520 520 520 480

Over 13

525 525 525

510 510 510

550 550 550 495

Over 14 455 400 380 365 350 350 630 630 595 560 505 575 575 575 510

Over 16 475 420 395 380 365 365

Over 18 500 440 405 395 380 380 700 700 630

Over 20 535 475 420 405 395 395

525 620 600 600 525

620 550

MONTHLY CAREER SEA PAY—EFFECTIVE MAY 1, 1988 (AIR FORCE MEMBERS)
Cumulative Years of Sea Duty
Pay Grade 1 or less Over 1 Over 2 Over 3 Over 4 Over 5 Over 6 Over 7 Over 8 Over 9 Over 10 Over 11 Over 12 Over 13 Over 14 Over 16 Over 18 Over 20

O-6 O-5 O-4 O-3 O-2 O-1 E-9 E-8 E-7 E-6 E-5 E-4

100 100 100 100 50 50

120 120 120 120 120 120

225 225 185 150 150 150 175 175 175 150 150 150

230 190 160 160 160 190 190 190 170 170 160 200 185 185 185 350 350 350 315 315

240 205 190 190 190

255 230 215 195 195 195 375 375 375 350 350

265 245 220 205 205 205 390 390 390

280 250 215 215 215 400 400 400 365

290 260 225 225 225 225

300 265

310 240 240 240 240 420 420 420 380

410 410 410

450 450 450 395

325 285 270 260 250 250 475 475 475 410

340 300 280 270 260 260 520 500 500 425

355 315 290 280 270 270 520 450

380 340 300 290 280 280

60 60

325 325

MONTHLY CAREER SEA PAY—EFFECTIVE OCTOBER 1, 2002 (ARMY MEMBERS)
Pay Grade O-6 O-5 O-4 O-3 O-2 O-1 W-5 W-4 W-3 W-2 W-1 E-9 E-8 E-7 E-6 E-5 E-4 E-3 E-2 E-1 1 or less Over 1 Over 2 Over 3 225 225 185 150 150 150 310 310 310 310 310 328 328 328 295 295 295 150 150 150 Over 4 230 190 160 160 160 338 338 338 338 338 347 347 347 321 321 308 160 160 160 200 185 185 185 506 506 478 464 345 425 425 425 380 380 170 170 Over 5 Cumulative Years of Sea Duty Over Over Over Over Over 10 6 7 8 9 240 205 190 190 190 534 534 492 471 380 255 230 215 195 195 195 265 245 220 205 205 205 280 250 215 215 215 290 260 225 225 225 225 590 590 590 576 555 Over 11 300 265 Over 12 310 240 240 240 240 660 660 660 625 516 516 516 464 555 555 555 484 Over 13 Over 14 325 285 270 260 250 250 730 730 695 Over 16 340 300 280 270 260 260 Over 18 355 315 290 280 270 270 Over 20 380 340 300 290 280 280

210 210 210 210 182 130 130 130 130 65 65 50 50 50

499 450 458 458 458 425 425

189

78 78 60 60 60

196 156 156 156 156 156 156 120 120 120

506 478 478 477 477 477

393 393 190

534 534 520 490 490 490 445

625 625 625

503 503 503

588 588 588 503

620 620 620 523

646 646 555

SPECIAL PAYS FOR HEALTH PROFESSIONAL OFFICERS
Variable Special Pay (Medical Officers)
Pay Grade Under 3 3 But Less Than 6 6 But Less 8 But Less 10 But Less Than 8 Than 10 Than 12 12 But Less Than 14 14 But Less 18 But Than 18 Less Than 22 22 and Over

Intern
Thru O-6 Above O-6

100.00 416.66 583.33 1,000.00 958.33 916.66 833.33 750.00 666.66 583.33
For specific requirements for the pay cited in this table, go to the web at: http://www.dtic.mil/comptroller/fmr/07a/index.html

Pay Grade
Intern Thru O-6 Above O-6

Under 3
250.00

Variable Special Pay (VSP) (Dental Officers) 3 But Less 6 But Less 8 But Less 12 But Less Than 6 Than 8 Than 12 Than 14
583.33 583.33 1,000.00 833.33

14 But Less Than 18
750.00

18 & Over
666.67

583.33

Board Certified Pay Special Pay (Medical and Dental Officers) Pay Grade
All Grades

Under 10
208.33

10 But Less Than 12
291.66

12 But Less Than 14
333.33

14 But Less Than 18
416.66

18 & Over
500.00

Additional Special Pay (ASP) (Dental Officers) (effective April 24, 2008) 10 & Over Pay Under 3 But Less Grade 3 Than 10
All Grades 10,000.00 12,000.00 15,000.00
Annual Amt
36,000.00 28,000.00 23,000.00 20,000.00 36,000.00 28,000.00

Specialty
Aerospace Med Anesthesiology Cardiology Dermatology Emergency Med Family practice Gastroenterology

Annual Amt

Incentive Special Pay (Medical Officers) Annual Annual Amt Specialty Specialty
Amt
Otolaryngology Pathology Pediatrics 30,000.00 20,000.00 20,000.00 20,000.00 20,000.00 23,000.00 36,000.00

Specialty
Subspecialty Category I Subspecialty Category II Subspecialty Category III Subspecialty Category IV Subspecialty Category V Urology

20,000.00 General surgery 29,000.00 36,000.00 Internal 20,000.00 medicine 36,000.00 Neurology 20,000.00 20,000.00 Neurosurgery

36,000.00 Phys and Prev/Occ Med 31,000.00 28,000.00 36,000.00 Psychiatry Pulmonary/IM-Critical Care Radiology

26,000.00 OB/GYN 20,000.00 26,000.00 Ophthalmology Orthopedics

Multiyear Retention Bonus (Dental Officers)
Level 1 4 Year Agreement 3 Year Agreement 2 Year Agreement 50,000.00 38,000.00 25,000.00 Level 2 40,000.00 30,000.00 20,000.00 Level 3 35,000.00 27,000.00 18,000.00 Level 4 25,000.00 19,000.00 13,000.00

DRILL PAY—EFFECTIVE JANUARY 1, 2014
Cumulative Years of Service
Pay Grade O-7 1 Drill 4 Drills O-6 1 Drill 4 Drills O-5 1 Drill 4 Drills O-4 1 Drill 4 Drills O-3 1 Drill 4 Drills O-2 1 Drill 4 Drills O-1 1 Drill 4 Drills O-3E 1 Drill 4 Drills O-2E 1 Drill 4 Drills O-1E 1 Drill 4 Drills 2 or less Over 2 Over 3 Over 4 Over 6 Over 8 Over 10 Over 12 Over 14 Over 16 Over 18 Over 20

8,264.40 275.48 1101.92 6125.40 204.18 816.72 5106.60 170.22 680.88 4405.80 146.86 587.44 3873.90 129.13 516.52 3347.10 111.57 446.28 2905.20 96.84 387.36

8,648.40 288.28 1153.12 6729.60 224.32 897.28 5752.50 191.75 767.00 5100.30 170.01 680.04 4391.40 146.38 585.52 3812.10 127.07 508.28 3024.00 100.80 403.20

8,826.00 294.2 1176.8 7171.20 239.04 956.16 6150.60 205.02 820.08 5440.80 181.36 725.44 4739.70 157.99 631.96 4390.50 146.35 585.40 3655.50 121.85 487.40

8,967.30 298.91 1195.64 7171.20 239.04 956.16 6225.60 207.52 830.08 5516.40 183.88 735.52 5167.80 172.26 689.04 4538.70 151.29 605.16 3655.50 121.85 487.40 5167.80 172.26 689.04 4538.70 151.29 605.16 3655.50 121.85 487.40

9,222.90 307.43 1229.72 7198.50 239.95 959.80 6474.30 215.81 863.24 5832.30 194.41 777.64 5415.30 180.51 722.04 4632.30 154.41 617.64 3655.50 121.85 487.40 5415.30 180.51 722.04 4632.30 154.41 617.64 3903.30 130.11 520.44

9,475.80 315.86 1263.44 7507.20 250.24 1000.96 6622.80 220.76 883.04 6171.00 205.70 822.80 5687.10 189.57 758.28 4632.30 154.41 617.64 3655.50 121.85 487.40 5687.10 189.57 758.28 4779.90 159.33 637.32 4047.90 134.93 539.72

9,767.70 325.59 1302.36 7547.70 251.59 1006.36 6949.50 231.65 926.60 6593.10 219.77 879.08 5862.60 195.42 781.68 4632.30 154.41 617.64 3655.50 121.85 487.40 5862.60 195.42 781.68 5028.60 167.62 670.48 4195.20 139.84 559.36

10,059.00 335.3 1341.2 7547.70 251.59 1006.36 7189.50 239.65 958.60 6921.30 230.71 922.84 6151.50 205.05 820.20 4632.30 154.41 617.64 3655.50 121.85 487.40 6151.50 205.05 820.20 5220.90 174.03 696.12 4340.10 144.67 578.68

10,351.20 345.04 1380.16 7976.70 265.89 1063.56 7499.70 249.99 999.96 7149.60 238.32 953.28 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6395.40 213.18 852.72 5364.30 178.81 715.24 4538.70 151.29 605.16

11,269.20 375.64 1502.56 8735.10 291.17 1164.68 7974.00 265.80 1063.20 7280.70 242.69 970.76 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6535.50 217.85 871.40 5364.30 178.81 715.24 4538.70 151.29 605.16

12,043.80 401.46 1605.84 9180.30 306.01 1224.04 8199.30 273.31 1093.24 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,043.80 401.46 1605.84 9625.20 320.84 1283.36 8422.20 280.74 1122.96 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

DRILL PAY—EFFECTIVE JANUARY 1, 2014
Cumulative Years of Service
Pay Grade O-7 1 Drill 4 Drills O-6 1 Drill 4 Drills O-5 1 Drill 4 Drills O-4 1 Drill 4 Drills O-3 1 Drill 4 Drills O-2 1 Drill 4 Drills O-1 1 Drill 4 Drills O-3E 1 Drill 4 Drills O-2E 1 Drill 4 Drills O-1E 1 Drill 4 Drills Over 22 Over 24 Over 26 Over 28 Over 30 Over 32 Over 34 Over 36 Over 38 Over 40

12,043.80 401.46 1605.84 9878.40 329.28 1317.12 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,043.80 401.46 1605.84 10134.60 337.82 1351.28 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,105.60 403.52 1614.08 10632.00 354.40 1417.60 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,105.60 403.52 1614.08 10632.00 354.40 1417.60 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,347.70 411.59 1646.36 10844.10 361.47 1445.88 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,347.70 411.59 1646.36 10844.10 361.47 1445.88 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,347.70 411.59 1646.36 10844.10 361.47 1445.88 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,347.70 411.59 1646.36 10844.10 361.47 1445.88 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,347.70 411.59 1646.36 10844.10 361.47 1445.88 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

12,347.70 411.59 1646.36 10844.10 361.47 1445.88 8675.70 289.19 1156.76 7356.60 245.22 980.88 6302.40 210.08 840.32 4632.30 154.41 617.64 3655.50 121.85 487.40 6726.00 224.20 896.80 5364.30 178.81 715.24 4538.70 151.29 605.16

DRILL PAY—EFFECTIVE JANUARY 1, 2014

Cumulative Years of Service
Pay Grade W-5 1 Drill 4 Drills W-4 1 Drill 4 Drills W-3 1 Drill 4 Drills W-2 1 Drill 4 Drills W-1 1 Drill 4 Drills Pay Grade W-5 1 Drill 4 Drills W-4 1 Drill 4 Drills W-3 1 Drill 4 Drills W-2 1 Drill 4 Drills W-1 1 Drill 4 Drills 2 or less Over 2 Over 3 Over 4 Over 6 Over 8 Over 10 Over 12 Over 14 Over 16 Over 18 Over 20

7118.40 237.28 949.12 4003.50 133.45 533.80 3655.80 121.86 487.44 3234.90 107.83 431.32 2839.80 94.66 378.64
Over 22

4306.50 143.55 574.20 3808.20 126.94 507.76 3540.90 118.03 472.12 3145.20 104.84 419.36
Over 24

4429.80 147.66 590.64 3964.50 132.15 528.60 3635.40 121.18 484.72 3227.40 107.58 430.32
Over 26

4551.60 151.72 606.88 4015.80 133.86 535.44 3699.90 123.33 493.32 3401.10 113.37 453.48
Over 28

4761.00 158.70 634.80 4179.60 139.32 557.28 3909.90 130.33 521.32 3606.60 120.22 480.88
Over 30

4968.30 165.61 662.44 4501.80 150.06 600.24 4236.00 141.20 564.80 3909.30 130.31 521.24
Over 32

5178.00 172.60 690.40 4837.20 161.24 644.96 4397.40 146.58 586.32 4050.60 135.02 540.08
Over 34

5493.90 183.13 732.52 4995.00 166.50 666.00 4556.40 151.88 607.52 4247.70 141.59 566.36
Over 36

5770.50 192.35 769.40 5177.70 172.59 690.36 4751.10 158.37 633.48 4442.40 148.08 592.32
Over 38

6033.90 201.13 804.52 5366.10 178.87 715.48 4902.90 163.43 653.72 4595.40 153.18 612.72
Over 40

6249.30 208.31 833.24 5704.50 190.15 760.60 5040.60 168.02 672.08 4735.80 157.86 631.44

6459.30 215.31 861.24 5933.10 197.77 791.08 5205.30 173.51 694.04 4906.80 163.56 654.24

7479.60 249.32 997.28 6768.00 225.60 902.40 6069.90 202.33 809.32 5313.60 177.12 708.48 4906.80 163.56 654.24

7748.40 258.28 1033.12 7021.80 234.06 936.24 6215.40 207.18 828.72 5399.70 179.99 719.96 4906.80 163.56 654.24

8046.30 268.21 1072.84 7311.00 243.70 974.80 6413.10 213.77 855.08 5399.70 179.99 719.96 4906.80 163.56 654.24

8046.30 268.21 1072.84 7311.00 243.70 974.80 6413.10 213.77 855.08 5399.70 179.99 719.96 4906.80 163.56 654.24

8448.90 281.63 1126.52 7457.10 248.57 994.28 6413.10 213.77 855.08 5399.70 179.99 719.96 4906.80 163.56 654.24

8448.90 281.63 1126.52 7457.10 248.57 994.28 6413.10 213.77 855.08 5399.70 179.99 719.96 4906.80 163.56 654.24

8871.00 295.70 1182.80 7457.10 248.57 994.28 6413.10 213.77 855.08 5399.70 179.99 719.96 4906.80 163.56 654.24

8871.00 295.70 1182.80 7457.10 248.57 994.28 6413.10 213.77 855.08 5399.70 179.99 719.96 4906.80 163.56 654.24

9315.00 310.50 1242.00 7457.10 248.57 994.28 6413.10 213.77 855.08 5399.70 179.99 719.96 4906.80 163.56 654.24

9315.00 310.50 1242.00 7457.10 248.57 994.28 6413.10 213.77 855.08 5399.70 179.99 719.96 4906.80 163.56 654.24

DRILL PAY—EFFECTIVE JANUARY 1, 2014

Cumulative Years of Service
Grade E-9 1 Drill 4 Drills E-8 1 Drill 4 Drills E-7 1 Drill 4 Drills E-6 1 Drill 4 Drills E-5 1 Drill 4 Drills E-4 1 Drill 4 Drills E-3 1 Drill 4 Drills E-2 1 Drill 4 Drills E-1 > 4 mos 1 Drill 4 Drills E-1 < 4 mos 1 Drill 4 Drills 2 or less Over 2 Over 3 Over 4 Over 6 Over 8 Over 10 Over 12 Over 14 Over 16 Over 18 Over 20

2752.50 91.75 367.00 2380.80 79.36 317.44 2181.00 72.70 290.80 1999.50 66.65 266.60 1805.40 60.18 240.72 1716.90 57.23 228.92 1531.50 51.05 204.20 1416.30 47.21 188.84

3004.20 100.14 400.56 2619.60 87.32 349.28 2327.40 77.58 310.32 2101.80 70.06 280.24 1918.80 63.96 255.84 1716.90 57.23 228.92

3119.10 103.97 415.88 2735.10 91.17 364.68 2440.20 81.34 325.36 2215.80 73.86 295.44 2034.90 67.83 271.32 1716.90 57.23 228.92

3271.50 109.05 436.20 2847.60 94.92 379.68 2555.10 85.17 340.68 2328.00 77.60 310.40 2034.90 67.83 271.32 1716.90 57.23 228.92

3390.60 113.02 452.08 2964.90 98.83 395.32 2734.50 91.15 364.60 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

3959.40 131.98 527.92 3594.90 119.83 479.32 3228.60 107.62 430.48 2922.30 97.41 389.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

4836.90 161.23 644.92 4134.30 137.81 551.24 3709.80 123.66 494.64 3331.50 111.05 444.20 3076.20 102.54 410.16 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

4946.40 164.88 659.52 4242.90 141.43 565.72 3914.40 130.48 521.92 3530.40 117.68 470.72 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

5084.70 169.49 677.96 4372.80 145.76 583.04 4084.20 136.14 544.56 3591.30 119.71 478.84 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

5246.70 174.89 699.56 4513.80 150.46 601.84 4200.30 140.01 560.04 3635.70 121.19 484.76 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

5411.10 180.37 721.48 4767.60 158.92 635.68 4323.90 144.13 576.52 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

5673.60 189.12 756.48 4896.30 163.21 652.84 4371.60 145.72 582.88 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

DRILL PAY—EFFECTIVE JANUARY 1, 2014
Cumulative Years of Service
Grade E-9 1 Drill 4 Drills E-8 1 Drill 4 Drills E-7 1 Drill 4 Drills E-6 1 Drill 4 Drills E-5 1 Drill 4 Drills E-4 1 Drill 4 Drills E-3 1 Drill 4 Drills E-2 1 Drill 4 Drills Over 22 Over 24 Over 26 Over 28 Over 30 Over 32 Over 34 Over 36 Over 38 Over 40

5895.60 196.52 786.08 5115.30 170.51 682.04 4532.40 151.08 604.32 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

6129.30 204.31 817.24 5236.80 174.56 698.24 4618.50 153.95 615.80 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

6486.90 216.23 864.92 5535.90 184.53 738.12 4946.70 164.89 659.56 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

6486.90 216.23 864.92 5535.90 184.53 738.12 4946.70 164.89 659.56 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

6810.90 227.03 908.12 5647.20 188.24 752.96 4946.70 164.89 659.56 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

6810.90 227.03 908.12 5647.20 188.24 752.96 4946.70 164.89 659.56 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

7151.70 238.39 953.56 5647.20 188.24 752.96 4946.70 164.89 659.56 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

7151.70 238.39 953.56 5647.20 188.24 752.96 4946.70 164.89 659.56 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

7509.60 250.32 1001.28 5647.20 188.24 752.96 4946.70 164.89 659.56 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

7509.60 250.32 1001.28 5647.20 188.24 752.96 4946.70 164.89 659.56 3687.30 122.91 491.64 3094.80 103.16 412.64 2427.30 80.91 323.64 2034.90 67.83 271.32 1716.90 57.23 228.92

Similar Documents

Free Essay

Module 07

...Decide were to apply ACL and in which directions. There for I will place the access list on F0/0 of 2811 the nearest port of 182.64.0.0 R1>enable R1#configure terminal Enter configuration commands, one per line. End with CNTL/Z R1 (config) # access-list 101 deny ip host 182.64.0.0 182.62.0.0 0.0.0.0 R1 (config) # access-list 101 permit ip any any R1 (config) # interface fast Ethernet 0/0 R1 (config-if) # ip access-group 101 in R1 (config - if) # exit R1 (config) # Now I will block host to network R1 (config) # access-list 102 deny ip host 182.64.0.0 182.62.0.0 255.255.255.255 R1 (config) # access-list 102 permit ip any any R1 (config) # interface fast Ethernet 0/0 R1 (config-if) # ip access-group 102 in R1 (config - if) # exit R1 (config) # Block all telnet R1 (config) # access-list 104 deny ip host 182.64.0.0 182.62.0.0 0.0 0.0.0.0 eq23 R1 (config) # access-list 104 deny ip any any eq23 R1 (config) # access-list 104 permit ip any any R1 (config) # interface fast 0/0 R1 (config-if) # ip access-group 104 in R1 (config - if) # exit Block all ftp traffic R1 (config) # access-list 103 deny ip host 182.64.0.0 182.62.0.0 0.0 0.0.0.0 eq23 R1 (config) # access-list 103 deny ip any any eq23 R1 (config) # access-list 103 permit ip any any R1 (config) # interface Ethernet 0/0 R1 (config-if) # ip access-group 103 in R1 (config - if) # exit Reference Cisco. (n.d.). Configuring Commonly Used IP ACLs. Retrieved from       http://www...

Words: 355 - Pages: 2

Free Essay

Classical Argument: Earthquakes

...Adrian Howley Classical Argument Reporting earthquakes are very critical to studying the behavior of tectonic plates. The very first recorded earthquake occurred in the year 1831 B.C. and is currently known today as the 526 Antioch Earthquake. The area affected was Antioch, China (located between the Syria and Turkey regions). Not much is known about how the report was formed. However, this historic report did include information about how the aftershocks lasted for twelve months. Other details from this report indicate that the death toll is around 250,000 to 300,000 casualties. Scientists today can only prove that the earthquake occurred between May 20 and May 29 (date translated from B.C. to Calendar Year). The first instrument to measure the seismic waves of earthquakes was invented by Charles F. Richter at the California Institute of Technology. (Bellis, 2013) He introduced his new instrument called the Richter scale, to the world of science. His invention allows scientists today to study the mechanics behind earthquakes and locate the epicenter to which the natural disaster originated. The largest earthquake recorded by the Richter scale was measured on May 22, 1960 at a magnitude of 9.5. The quake resulted in 1,886 deaths, 2,000,000 homeless, and $1,175,000,000 total in damages. (“The Largest Earthquake”, [PDF file]) If we want to see these large numbers slide down to zero, the impossible will need to be challenged by science. Skyscrapers are buildings consisting...

Words: 914 - Pages: 4

Free Essay

Building the Burj Khalifa

...Building the Burj Khalifa: Main: Chronological order 200 Mechanical, electrical and plumbing: air conditioning (temperature), 300 Safety – (getting everyone out) refuge rooms 300 Elevators– mention of transition from steam to motor and latched systems and electrical brakes and coping with load 100 Spire 100 Maintenance - Broadcast and communications floors, Mechanical Floors Conc: How it has progressed engineering and enabled more (buttress structure). Future plans – The kingdom Tower in Saudi (1km into the sky) Building potential: Space elevator, new arising problems, strength of materials, what that would mean and enable if possible. Throughout history, progression and advancement in technology has fundamentally separated us from our evolutionary antecedents, enabling a life of greater comfort, extravagance and an increased ability to procreate and sustain ourselves. This improvement is especially apparent in the world of architecture and civil engineering, where there has been an unremitting ambition to surpass the existing boundaries, particularly with regards to height. The most renowned early example of a structure where height was key are the Pyramids of Giza where elevation was crucial in order to radiate power and divine authority. The tallest pyramid, standing at 146.5m, was built more than 4500 years ago, and remained the tallest manmade structure for the next 3800 years, until the 1300s when Lincoln Cathedral was built topping it by only 13.5m [1][2]...

Words: 3583 - Pages: 15

Premium Essay

Tallest Building In The World Essay

...western hemisphere. High building consists of approximately 104 standard floor is 541 meters. This building was opened in November 2014. One World Trade Center (Freedom Tower) looks like a pyramid when viewed from the road surface near to the building, as seen in the image of the building. https://timedotcom.files.wordpress.com 7. Taipe 101 (509m) This building is located in Taipei, Taiwan. Height of the building is 509 m with the total floors are 101. In many cases, the building is recognized as one of the most advanced skyscrapers in the world. One of the superiorities of this building is having a fiber-optic and internet connection satellite which can reach speeds of 1 gigabyte per second. Besides, the elevator building also was fastest than Burj Khalifa, 63 km/hour means that to reach the 89th floor, it only takes 39 seconds. The building was already used in 2004 has a sophisticated tools that can stabilize the building from the force of earthquakes and hurricanes. http://www.taipei-101.com.tw/ 8. Shanghai World Financial Center (492m) The tower is located in Pudong, Shanghai, China and has a height of 492 m with the floors total 101. The top floor is 474 m and was built in 1997-2008. The most distinctive of this building is the trapezium aperture at the top. Aperture with a diameter of 46 m it functions for reducing the pressure of the wind. And the uniqueness of this building if we observed it looks like a giant corkscrew. http://www.maersk.com/ 9. International...

Words: 1169 - Pages: 5

Free Essay

Photography

...Photography Photography * Transforms the passing moment of a three dimensional event into a frozen instant reduced in size on a flat piece of paper. * Transforms a three dimensional composition into two dimensional. Uses of Photography in the Philippines * Portraiture * In the Philippines, the first forms of photos were of the size of calling cards called cartes de visite (4” x 2 ½”) and the tarjeta (3 ½” x 5 ½”) used for mailing as a postcard. * In the 1800’s, photo studios sprouted in Sta. Cruz, Binondo and Quiapo. * Life-size photos are hung in living rooms and became status symbols. * Research and Documentation * Photo journalism became a field which shows a visualized history through photos captured in actual events. * Travel and Tourism * Photos are used widely to promote the beauty of the country like photos of colorful festival celebrations, beautiful tourist spots and night life posted in the net and magazines. * Propaganda * Used as an effective communication tool to promote political messages. * Photos are also incorporated in the campaign materials of the government. * Advertising * Photographs are used to sell products, services and personalities. * Billboards and print ads used photographs more than text to sell. * Artists’ tool and art medium * Augusto Fuster is the first painter who used photographs to composed pictures as paintings. * Photographs are also used by artists...

Words: 2084 - Pages: 9

Free Essay

Most Inspiring Qoutes of All Time

...SUCCESS QUOTES Your Ultimate Inspirational Guide By Patric Chan “Enrich Your Mind, Unleash Your Potential. Success Begins Within You.” http://www.esuccessmastery.com * Anthony Robbins * Dale Carnegie * Dr. Stephen Covey * Brian Tracy * Jim Rohn * * Napoleon Hill * Mark Victor Hansen * Robert Kiyosaki * Brought to you by : Noel Hynes http://ebookdirectory.com Congratulations on taking the first step toward achieving success!! Why I wrote and compiled this ebook ... Because I know how you feel. The burning desire for success and the determination you have to achieve it. The rich knowledge and resources provided in this ebook had been read personally by me, and I had benefited from it. I guess, all the featured successful men in the ebook don’t have to be introduced anymore as I’ll assume that you would have heard of them. If you do not know about them yet, just type their name in the search engine and you will find them. I will only recommend authors and coaches whom I know from my personal experience who are successful and inspirational. If you sell the product in which you believe in or you have benefited from personally, you will be a very successful person. I’ll always prefer to promote the products/services that I had used, reviewed, joined or read before. We live in abundance of wealth today. There is no limit to our earnings; we have the capacity to earn extraordinary income if we are determined to achieve it. What is most important is how we deliver our...

Words: 7593 - Pages: 31

Premium Essay

Effects

...5 BEST PLACES TO VISIT IN THE WORLD | | BURJ KHALIFA, DUBAI * It is a skyscraper in Dubai, UAE. * It is the tallest man-made structure in the world, standing at 829.8 m (2,722 ft). 1)At 828 meters (2,716.5 feet) tall, Burj Khalifa is 3 times as tall as Eiffel Tower and twice as tall as the Empire State Building.2. Burj Khalifa holds the world Records on: tallest freestanding structure in the world, highest number of stories in the world, highest occupied floor in the world, highest outdoor observation deck in the world, elevator with longest travel distance in the world, and tallest service elevator in the world.3. It is said that the weight of concrete used to build the skyscraper is equivalent to 100,000 elephants and the steel used to construct the frame is equal to that of 5 Airbus 380 aircrafts.4. The building design takes after the Greek flower, Hymenocallis. The name is translated as Beautiful Membrane in Greek.5. The building was constructed by a South Korean Company called South Korean company, Samsung Engineering and Construction.6. Burj Khalifa was built at a cost of $1.5 billion, It is supplied with about 250,000 gallons of water daily, and its electricity needs can go up to 360,000 100-watt bulbs burning at once.7. During the peak of construction, atleast 12,000 workers worked on the construction site per day.8. The tip of the sphere of Burj Khalifa can be seen from 95 kilometers away.9. The tower was to be called Burj Dubai but this was changed at...

Words: 395 - Pages: 2

Free Essay

What Are the Key Aspects in the Construction and Design of the Burj Dubai Tower?

...structure. The Burj Dubai, situated in Dubai, will soon be the tallest building in the world, bypassing the previous record holder, the Taipei 101 by almost 290 metres giving it an astonishing 800 metre height. With over 2700 feet, designing and constructing such a vast building has given significant challenges to engineers and designers alike. Since the building can hold up to 35,000 people at once, it is essential that it is strong, comfortable and able to move people up and down it at a steady rate. This essay will explore how the designers and engineers went about solving these issues. One of the key problems the engineers had to overcome was effect of the wind load and how it would affect the building motions due to the extraordinary height of the tower. Wind load is something that must be taken into account for all buildings, but obviously the wind velocity increases the higher you go and since the structure is over 800 metres tall, there is guaranteed to be a large wind force acting on the building. Three different engineering firms: Skidmore, Owings and Merrill who were all working on the project, hired the RWDI (Rowan Williams Davies & Irwin Inc.) a wind and environmental engineering firm to conduct wind studies on the Burj Dubai’s design. The RWDI had worked on a number of previous projects such as the Petronas Towers and the Taipei 101 and its facilities included four boundary wind tunnels. Their job was to minimize the effects of the wind load and building motion of the...

Words: 2012 - Pages: 9

Free Essay

My Journal Entry 1

...Entry 1 (24th September 2012) It's exactly 12:01 am now, and seeing that this is my first entry, I should update a little of myself. I'm currently at Taiwan for a short vacation with my high school friends of about 10years. And they are Lee Sue Ee, Soh Pei Ling, and Chong Yee Wun. We arrived here on Saturday, 22nd September 2012, and so far it has been an hectic journey seeing that we are here on our own for the first time and we did not go through any travel agency. Enough of updating, I just finish my STA assessment and e-mailed it to my group mates to submit later in the morning. I just hope that I did good enough despite my heavy schedule and with little initiative. Oh yes, I am now in my room while the girls are sleeping and the view is just amazingly breath-taking. How fortunate i am that I could do my assignment while looking at this sea view. The sound of the rushing waves eases my mind to relaxation and light music as my background to suit my emotion. The only thing that lack, is a partner to share this spectacular moment. Anyway, I should sleep now. Gotta be up early later for another tour around the north-east Taiwan before heading to the capital city Taipei later in the evening. I will update my entry again later whilst exploring every possibility here. Good Night ! Good afternoon, it was quite a day after waking up restlessly. Breakfast here was amazing, I mean, what more can we ask with such nature phenomenal as our spectacular view. After finishing our...

Words: 701 - Pages: 3

Free Essay

Seven Wonders of 21st Century Architecture

...Seven Wonders of 21st Century Architecture You may not be able to name them all, but most people have at least heard of the 7 Wonders of the Ancient World. Here’s a list with links: Great Pyramid of Giza, Hanging Gardens of Babylon, Temple of Artemis, Statue of Zeus at Olympia, Mausoleum of Halicarnassus, Colossus of Rhodes, and the Lighthouse of Alexandria . Of the seven, only the Pyramid remains, the rest we know of only through historic documents.[1] There have been other “7 Wonders” lists and in 2007, the Swiss government sponsored a project to create a new list, with selections made by popular vote. Over 100 million votes were cast, and the new 7 Wonders were announced as follows: Chichen Itza (the Yucatan, Mexico pyramid), Christ the Redeemer (Brazil’s enormous statue of Jesus), Colosseum (Rome’s arena of Gladiators),Great Wall of China (you can see it from space!),Machu Picchu (ancient city built on an unbelievably high mountain top in Peru),Petra (Jordan’s city cut directly into the side of a stone mountain ),and the Taj Mahal (India’s majestic temple/mausoleum).[2] But my final Cyber Journey of the semester started not as a stroll through history, but as a trip into the future of arts and Architecture with a look at another “7 Wonders” list – The 7 New Wonders of the 21st Century [3], as selected by Architecture, an online review published by the website Quazen. With no further ado, here are the 7: * Millau Viaduct http://en.wikipedia.org/wiki/Millau_Viaduct ...

Words: 771 - Pages: 4

Premium Essay

Us 101

...M Tu W Th F S Su Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 Day 7 Week One 1/23/2012 1/24/2012 1/25/2012 1/26/2012 1/27/2012 1/28/2012 1/29/2012 Post Bio Confessions of a College Student Participate with at least 2 substantial messages per day on 4 days of the week and respond to 3 of the 5 discussion questions. Week Two 1/30/2012 1/31/2012 2/1/2012 2/2/2012 2/3/2012 2/4/2012 2/5/2012 Goal Action Plan Participate with at least two substantial messages per day on 4 days of the week and responding to 3 of the 5 discussion questions. Week Three 2/6/2012 2/7/2012 2/8/2012 2/9/2012 2/10/2012 2/11/2012 2/12/2012 Circle of Support Participate with at least two substantial messages per day on 4 days of the week and responding to 3 of the 5 discussion questions. Week Four 2/13/2012 2/14/2012 2/15/2012 2/16/2012 2/17/2012 2/18/2012 2/19/2012 Midterm Exam Participate with at least two substantial messages per day on 4 days of the week and responding to 3 of the 5 discussion questions. Week Five 2/20/2012 2/21/2012 2/22/2012 2/23/2012 2/24/2012 2/25/2012 2/26/2012 Your Daily Routines: Then and Now Participate with at least two substantial messages per day on 4 days of the week and responding to 3 of the 5 discussion questions. Week Six 2/27/2012 2/28/2012 2/29/2012 3/1/2012 3/2/2012 3/3/2012 3/4/2012 Learning Inventory Participate with at least two substantial messages per day on 4...

Words: 493 - Pages: 2

Free Essay

Into the Wild

...Anchorage couple Pair who stumbles upon an abandoned bus along Alaska's Sushana River in August 1992. They read McCandless's S.O.S. note on the rear door and perceive a rotting smell emanating from the bus. Jan Burres and Bob Itinerant couple who meets McCandless in the summer of 1990 when he is searching for edible berries alongside U.S. Highway 101. Estranged from her own son, Jan takes a special interest in McCandless. She states “She would want someone to look after her son, wherever he is, like she is looking after McCandless. Charlie Old man who lives outside Bullhead City, Arizona, and suggests that McCandless live in an empty RV of which Charlie is a caretaker. Gave him money and a pack of Cigarettes. Ronald Franz Eighty-year-old man who gives McCandless a ride from Salton City, California, to Grand Junction, Colorado. After McCandless's death, Franz heeds the young man's advice to "hit the road" and live off the grid. No doubt was the most influenced by Chris and even gave up his religion because of Chris’s death. Was probably more drawn to Chris than anyone else, arguably, due to the loss of his son and wife. Jim Gallien Last person to see McCandless alive. In April 1992, he drops off the young man on Alaska's Stampede Trail, giving McCandless his boots and advising him to reconsider his plan to live off the land. Thought he was insane for going in with nothing but a ten pound bag of rice and little supplies. Jon Krakauer The author. Describes his own...

Words: 458 - Pages: 2

Free Essay

Community Development

...Organization and Spatial Structure that affects Beijing’s Economy After I reading the article of “Strategic Management of Places”, and I know there are six dimensions of organization and special structure. The first dimension is that monopoly firms processing market power. The second dimension is that many firms are in the situation of competitive markets. The third is that many small or middle entrepreneurial startups also promote the economy of that region. The forth one is that specialize one field and take advantage of this field scale to reduce the transaction expenditure. The fifth dimension is that the region should have the diversity. And the last dimension is that cluster is very important. Although, not all these dimensions exist in one place, they still play an important role for the economy development for a place. And the place of interest I would like discuss is mainly focus on Beijing. Beijing is the capital city of China, which leads the Chinese economy. And now I analyze how Beijing housing policy could benefit from its organization and spatial structure. 1. Market Power a. I mentioned my policy in the last paper. The affordable housing policy is refer to the Chinese government organizes the real estate enterprises and some offices, which collect funds for cooperation housing-building to use the lower price than the market price of housing to sell to a median or low income families. So, the government made this policy, and made the price decision...

Words: 610 - Pages: 3

Free Essay

Important Online Educational Resources

...Studying with Peers VI. Online Books, eBooks, & Journals VII. Computers, Software, & Programming (updated to v.1.2 on 1/26/12) VIII. Science & Math (updated to v.2.0 on 1/27/12) IX. Logic, Words, & Memory X. Languages XI. Music (updated to v.1.2 on 1/26/12) XII. History XIII. Business, Economics, Finance, & Investing (updated to v.1.2 on 1/26/12) XIV. Food, Nutrition, & Cooking XV. Survival Tips XVI. Documentaries (updated to v.2.0 on 1/27/12) XVII. Other =========== I. TOP PICKS Khan Academy http://www.khanacademy.org/ Academic Earth - Online courses from the world's top scholars http://academicearth.org/ TED - Technology, Entertainment, & Design http://www.ted.com/ MIT Open CourseWare http://ocw.mit.edu/courses/ Stanford Engineering Everywhere http://see.stanford.edu/see/courses.aspx Open Yale Courses http://oyc.yale.edu/ About U. - Collection of free online courses from About.com http://u.about.com/ Wikiversity http://en.wikiversity.org/wiki/Wikiversity:Main_Page YouTube EDU http://www.youtube.com/education?b=400 The Open University - Study at the OU http://www3.open.ac.uk/study/ http://openlearn.open.ac.uk/ University of the People www.uopeople.org University of Reddit...

Words: 2831 - Pages: 12

Free Essay

Improving Byzantine Fault Tolerance Using Concurrent Information

...Improving Byzantine Fault Tolerance Using Concurrent Information by FNGenius Abstract Many futurists would agree that, had it not been for the deployment of the lookaside buffer, the understanding of Scheme might never have occurred. In this position paper, we verify the study of the Turing machine. WABBLE, our new solution for extensible epistemologies, is the solution to all of these obstacles. Table of Contents 1) Introduction 2) Related Work 3) Design 4) Implementation 5) Performance Results 5.1) Hardware and Software Configuration 5.2) Experiments and Results 6) Conclusion 1 Introduction Many computational biologists would agree that, had it not been for stable theory, the exploration of symmetric encryption might never have occurred. Given the current status of signed symmetries, systems engineers daringly desire the analysis of gigabit switches, which embodies the significant principles of networking. Further, compellingly enough, indeed, compilers and reinforcement learning have a long history of agreeing in this manner. Contrarily, suffix trees alone can fulfill the need for the producer-consumer problem. Cyberneticists largely study telephony in the place of the deployment of architecture. The usual methods for the visualization of virtual machines do not apply in this area. Nevertheless, this solution is continuously well-received. This is a direct result of the analysis of compilers. Thusly, we see no reason not to use the partition...

Words: 2744 - Pages: 11