Free Essay

Cp-2

In:

Submitted By mynick
Words 2237
Pages 9
Course: PM 592 Assignment: Course Project CP-1
Executive Summary
Totally Amused, Inc, is a hotel and water theme park innovator which burst into the amusement industry only 10 years ago and has made several big splashes with successful property/facility introductions in multiple states since then. However, the amusement park industry is extremely competitive, so each new venue is built bigger and better than the next to maximize customer enjoyment and park ticket sales.
Totally Amused is looking to take its current indoor and outdoor water park locations to the next level, venturing into an area that is not all too familiar. Management is considering a big move into the indoor theme park market. Although water parks and traditional theme parks have their similarities, they have many differences.
The project consists of a new 100,000 sq. ft. building which will annex onto one side of an existing building. The indoor facility will feature a first-of-its-kind two-level go kart track, a six-story Ferris wheel (enclosed in glass), 24 lanes of bowling, mini golf, a four-story rope course, and scores of arcade games.
Although this new venture sounds like a walk in the park, an important decision is at hand! The project has reached the 50% scheduled completion stage and a control evaluation is being undertaken to analyze the performance of the project and to recommend corrective measures to support the continuation of the project.
The project, which commenced on April 4, 2008 was initially expected to be completed on December 19, 2008; and was estimated Project Summary: Project Industrial Process Human Machine Interface has a total cost of $129,600.00 with a scheduled start date of 5/27/12 and ending on 9/19/13, for project duration of 344 days. This project will also require 4,144 working hours, consume 39 tasks, and utilize 11 total resources; 2 of which are material resources while all other resources are man power. Below is a project summary document to give summary detail for Project Industrial Process Human Machine Interface: Project Industrial Process Human Machine Interface

Also listed in the appendix is a detailed schedule for project Industrial Process Human Machine Interface (Appendix “Project Task Schedule”, 3) listing start and end dates, task durations, and slack time per task. This project schedule will be will be a very useful tool when to assist with decision making and potentially resources re-allocation in the event of unforeseen issues related to project time and cost constraints. Also listed is a project Gantt chart detailing tasks, task durations, task dependencies, task resources, and cost associated with each task(Appendix, “Project Gantt Chart Tasks 1 - 22”, 4), (Appendix, “Project Gantt Chart Tasks 22 39”, 4).

Project Description: The Industrial Process Human Machine Interface Project is a proposed project to create a software application to enable machine operators to easily operate and control industrial machines with a touch screen and/or computer application interface. Many industrial controls processes and applications require the use of hard wired, bulky devices that often fail and are difficult to troubleshoot and repair. The Industrial Process Human Machine Interface will offer a software application interface to replace these devices and make machine control and operation for industrial operator simple and seamless. Even though there are already some proprietary human machine interfaces...

This project is a pilot project for the development of a business venture to promote the installation of energy efficiency and conservation features into homes to save home owners money through the reduction of monthly energy bill. The objective of the project is to install energy efficiency features into a home of about 2500 square feet in Atlanta, Georgia and expected to be completed within 5 months at an estimated cost of $96,558.21, using a three point estimation; and achieve about 50% savings in energy usage.
The expected benefits include: * Reduced utility and maintenance costs * Increased home comfort * A healthier and safer indoor environment * Improved building durability * Ultimate increase in home value
The project will begin on April 16, 2013 and be completed on November 20, 2013. A Financial Analysis on the cost and potential energy savings shows a positive net present value (NPV) of $49,889.24. The project is therefore financially viable and should be approved for bank financing.

Running Header: Indoor Theme Park Project
CP-2 Indoor Theme Park Project
October 5, 2011Project Cost and Schedule Control, PM 592
Introduction

The new indoor theme park project was initially planned for duration of 180 Dayswith a start date of April 14, 2008. The preliminary cost was $4,846,920. Theindoor theme park attraction includes a Ferris Wheel, Ropes Course, Climbing Wall, Carousel, Bowling Alley, Go Carts and Mini Golf. The final walk through is scheduledon December 18, 2008 with a grand opening on December 19, 2008.This report has been prepared to evaluate the cost and schedule of the indoortheme park project. The project data was utilized to produce a project schedulerepresenting the project at a specific point during implementation. Microsoft Projectis the tool selected to perform the project monitoring and control.
Executive Summary
It has been nearly 5 months since the commencement of the indoor theme parkproject and 40% of the tasks are complete. The AC (Actual Cost) is not provided soit is presumed that costs are in control and there are no plans to take correctiveactions to control costs at this point in time.There are many tasks behind schedule. The entire project is behind schedulewith a Performance Index of 0.68. This indicates that for every $1 spent on thisproject there is only an efficiency of $0.68 value. There are corrective actions thatcan be implemented to turn this project around and get it back on target. I willexplore these corrective actions later in the report.Based on my review of the information contained in this document, I do notbelieve that this project should be abandoned. My report contains details abouthow we can control the delay in the project and come up with some correctiveactions to make sure the project is not delayed any further.
Schedule 1
The provided data has been extracted from MS Project. The work breakdownstructure (WBS) is broken down to 3 levels. The installation of the Ferris Wheel isbroken down further, and is dependent on task slab on grade.After all the data was entered and base lined, the review date and current datehas been set to October 1, 2008. The project start date is April 14, 2008, and afternearly 5 months the project is evaluated to determine the actions necessary tocomplete the project in time. The entire project is 40% complete meaning that theproject is behind schedule. The Actual Cost information has not been provided, so Ibelieve the project is neither under nor over budget.The completed project activities are Site Layout & Site Grading, Footings &Foundations, Masonry, Frames, Columns and Beams, Slab on Grade, Stacks & Vents,and Electrical Boxes. There are many scheduled completed tasks that are notcomplete.Attached is the Gantt chart showing the progress of project as on Oct 1, 2008:- Theme Park Project177 daysMon 4/14/08Tue 12/16/08Site Layout & Site Grading10 daysMon 4/14/08Fri 4/25/08ArchitectFootings & Foundations55 daysMon 4/28/08Fri 7/11/082Builder,Foundations Materials[0]Masonry 60 daysMon 5/19/08Fri 8/8/083SS+15dBuilder,Concrete[0]Frames, Columns and Beams 40 days Mon 6/9/08Fri 8/1/084SS+15dBuilder,Frames Columns and Beams[0] Joists & Roof Deck33.37 daysMon 8/4/08Thu 9/18/085Builder,Lumber andSteel[0] Running Header: Indoor Theme Park Project
Slab on Grade35 daysMon 7/14/08Fri 8/29/083Builder,SlabConcrete[0]Rough Carpentry35 daysMon 9/1/08Fri 10/17/087BuilderInterior Studs20 daysMon 9/1/08Fri 9/26/087BuilderInterior Drywall30 daysMon 9/29/08Fri 11/7/089,6Builder,Drywall[0]Painting35 daysMon 10/13/08Fri 11/28/0810FS-20dPainterElevator38.22 daysMon 9/1/08Thu 10/23/087Builder,Elevator[1]Doors 5 daysMon 10/20/08Fri 10/24/088Builder,Doors[0]Custom Theme Painting15 daysMon 10/20/08Fri 11/7/0811SS+5dPainterFlooring15 daysMon 11/3/08Fri 11/21/0810FS-5dBuilder1,Flooring[0]Finish Carpentry15 daysMon 11/3/08Fri 11/21/0810FS-5dBuilder2Bathroom Compartments/Accessories3 daysMon 11/24/08Wed 11/26/0816BuilderPlumbing85 daysMon 7/28/08Fri 11/21/08Hangers & Supports40.15 daysMon 7/28/08Thu 10/2/083FS+10dHangers &Supports Plumbing[1],PlumberPipes & Fittings40 daysMon 9/22/08Fri 11/14/0819Pipes &Fittings[0],Plumber Test 5 daysMon 11/17/08Fri 11/21/0820PlumberHVAC95 daysMon 7/28/08Fri 12/5/08Stacks & Vents30 daysMon 7/28/08Fri 9/5/083FS+10dStacks &Vents[0],SteamfitterHangers & Supports38.22 daysMon 9/8/08Thu 10/30/0823Hangers & SupportsPlumbing[1],SteamfitterDuctwork & Piping30 daysMon 10/20/08Fri 11/28/0824Ductwork &Piping[0],Steamfitter Test5 daysMon 12/1/08Fri 12/5/0825SteamfitterElectrical 95 daysMon 7/28/08Fri 12/5/08Boxes25 daysMon 7/28/08Fri 8/29/083FS+10dBoxes[0],ElectricianConduit33.22 daysMon 9/1/08Thu 10/16/0828Conduit[1],ElectricianWiring Devices/Switches / Receptacles20 daysMon 10/6/08Fri 10/31/0829Electrician,Wiring Devices/Switches/ Receptacles[0]Light Fixtures20 daysMon 11/3/08Fri 11/28/0830Electrician,LightFixtures[0] Test5 daysMon 12/1/08Fri 12/5/0831ElectricianMechanicals Complete1 dayMon 12/8/08Mon 12/8/0821,26,32Attraction Install and Training69 daysTue 9/9/08Fri 12/12/08Ferris Wheel40 daysMon 9/29/08Fri 11/21/08Ferris Wheel to ship3 daysMon 9/29/08Wed 10/1/08Ferris Wheel[0],FW SupplierFerris Wheel Legs & Fan install6 daysThu 10/2/08Thu 10/9/0836,7FW SupplierFerris Wheel gondola install6 daysFri 10/10/08Fri 10/17/0837FW SupplierFerris Wheel MEP install6 daysMon 10/20/08Mon 10/27/0838FW SupplierFerris wheel platform design2 daysTue 10/28/08Wed 10/29/0839FW SupplierFerris Wheel Platform 6 daysThu 10/30/08Thu 11/6/0840FW SupplierFerris Wheel Railing6 daysFri 11/7/08Fri 11/14/0841FW SupplierFerris Wheel Turnstile3 daysMon 11/17/08Wed 11/19/0842FW SupplierFerris Wheel training1 dayThu 11/20/08Thu 11/20/0843FW SupplierFerris Wheel Certification1 dayFri 11/21/08Fri 11/21/0844FW SupplierRopes course install & training38.22 daysMon 9/1/08Thu 10/23/087RideSupplier,Ropes Course[1] Running Header: Indoor Theme Park Project
Climbing wall install & training13.37 daysMon 9/1/08Thu 9/18/087Climbing wall[0],Ride SupplierCarousel install & training19.37 daysMon 9/1/08Fri 9/26/087Carousel [0],Ride SupplierBowling install & training48.22 daysMon 9/1/08Thu 11/6/087Bowling [1],Ride SupplierGo Cart install & training53.22 daysMon 9/1/08Thu 11/13/087Go Cart [1],Ride SupplierMini Golf install & training15.15 daysMon 9/1/08Thu 10/2/087Mini Golf [1],Ride SupplierAttraction install and training complete1 dayMon 11/24/08Mon 11/24/0845,46,47,48,49,50,51Furniture Installation5 daysMon 12/8/08Fri 12/12/08Builder 3, Furniture [0]System and Security Training3 daysTue 11/25/08Thu 11/27/0852Builder 4Final Walkthrough4 daysMon 12/15/08Thu 12/18/0812, 14,15,16,17,52,53,54Builder, CustomerGrand Opening0 daysFri 12/19/08Fri 12/19/0855Customer,Grand OpeningEntertainment[0]
Performance Analysis
As of October 1, 2008 the project is at 40% completion, and we can see theproject is behind schedule to open on time. The Schedule Variance of the entireproject is ($736,559), and the Schedule Performance Index is at 0.68. The SPIindicates that we are only getting $0.68 worth of work per $1.00 spent. The cost table below shows that the project appears to be on budget. MS Projectpredicts that the Budget at Completion is $4,846,675 and that is a bit less than theplanned budget of $4,486,920. Cost overruns may occur in the future if there areschedule delays which will modify the project’s Budget at Completion, making itover budget.
Performance Analysis (Cost)
|Task Name Cost Variance| Cost performance | Estimate at | Baseline cost ||CV) |Index (CPI) |Completion(EAC) |(BAC) || (EV-AC) | (EV/AC) | | ||1 |Theme Park Project |80 |1.00 |4,846,674 |4,846,920||1.1 |Site Layout & Site Grading |- | 1.00 |10,000 |10,000||1.2 |Footings & Foundations | - | 1.00 |103,600 |103,600 ||1.3 |Masonry |- | 1.00 | 281,200 |281,200 ||1.4 |Frames, Columns and Beams |- | 1.00 | 370,800 |370,800 ||1.5 |Joists & Roof Deck | 32 | 1.00 | 515,520 |515,600 ||1.6 |Slab on Grade |- | 1.00 | 218,200 |218,200 ||1.7 |Rough Carpentry | 6 | 1.00 | 103,184 | Running Header: Indoor Theme Park Project103,200 ||1.8 |Interior Studs |- | 1.00 | 10,400 |10,400 ||1.9 |Interior Drywall |- | - | 65,600 |65,600 ||1.10 |Painting |- | - | 66,000 |66,000 ||1.11 |Elevator | 8 | 1.00 | 135,579 |135,600 ||1.12 |Doors |- | - | 47,600 |47,600 ||1.13 |Custom Theme Painting |- | - | 24,000 | 24,000||1.14 |Flooring |- | - | 85,200 |85,200 ||1.15 |Finish Carpentry |- | - | 10,200 | 10,200||1.16 |Bathroom Compartments/Acc. |- | - | 1,560 |1,560 ||1.17 |Plumbing | 3 | 1.00 | 186,991 |187,000 ||1.18 |HVAC | 3 | 1.00 | 264,993 |265,000 ||1.19 |Electrical | 5 | 1.00 | 195,782 |195,800 ||1.20 |Mechanicals Complete |- | - | - | -||1.21 |Attraction Install and Training 23 | 1.00 |1,943,795 |1,944,400 ||1.22 |Furniture Installation |- | - | 153,400 |153,400 ||1.23 |System and Security Training |- | - | 2,040 | 2,040||1.24 |Final Walkthrough |- | - | 520 |520||1.25 |Grand Opening |- | - | 50,000 | 50,000|

Similar Documents

Premium Essay

Cp-2

...Course Project Part 2—Due Week 4 In project Part 2, we create a schedule and accurate budget for your project. This builds upon the assignment you completed in Part 1. You should correct errors in that assignment before continuing on to this part. You need to focus on detailed cost estimating, scheduling, and cost justification. Estimating a project budget includes cost estimates for each activity in the WBS with specific assumptions made during the estimating process, as well as quantities, unit prices, hourly rates for tasks, and accumulated totals. You must justify all of your costs; this includes direct, indirect, variable, fixed, and overhead. It is ok if these are all included in burdened labor rates. This WBS must be created in MS Project using the automatic scheduling feature, indenting to produce subtasks, and allowing the software to create the WBS numbers. Numbers inserted in the file because they look right is not correct. You should include the internal resources in your project plan with a cost assigned to them. As you may remember from PROJ586 and will see later this information is necessary to use earned value to track the project. This may not be an additional cost to your company but it is a cost of doing the project. You must use a project estimating process. A functional estimate is based upon types of purchases and expenditures, and general labor for the time the entire project was in progress. If this is the way you estimate the cost of your...

Words: 719 - Pages: 3

Premium Essay

Pm592 Cp-2

...CP-2 Theme Park PM592 Project Cost and Schedule Control Oct 21, 2012 Introduction The construction of the new theme park project is laid out for 180 days of construction to finish. This project has a start Date of Monday April 4, 2008. The preliminary cost is $4,449,920.00 and with a completion date of December 19, 2008. The theme park will include a Ferris wheel, Rope course, Climbing walls, Carousel, Bowling, Go carts, and a Mini golf. The desired walk through date is December 18, 2008 with a grand opening on December 19, 2008. Executive Summary It has been 6 months since the start of the project and we now have 40% of the tasks complete. The actual cost so far to date is $1,230,683.00. There are many of the scheduled tasks behind in this schedule. The entire project thus far is behind schedule with a work performance index of .66 and 12% behind schedule. There are corrective actions that can get this project beck on schedule at minimal cost. This project should not be abandoned and should continue forward with the support of the investors. Schedule 1 This data is being supplied from MS Project. The WBS includes all work that has to be done to complete the project from start to finish. The current WBS includes all the data and baseline, review date and the current date is set to October, 1, 2008. The project start date is April, 14, 2008. Nearly 6 months into the project it is set at 40% complete. This shows the project is behind schedule. The...

Words: 3824 - Pages: 16

Free Essay

Psy265 Wk 1 Cp 2

...Brittany PSY/265 Week 1 CheckPoint 2 Critical thinking skills are essential to every part of our lives, however they are particularly important when discussing sex. A person’s sexual decisions can have a huge impact on their life (pregnancy, disease and relationships) and should not be made without deep thought and consideration of all possible outcomes. I believe one of the most important critical thinking tools regarding sex is skepticism. People will say anything to try to convince another to have sex. An individual must be able to see through lies and sugar-coated words to see the truth and the intent behind the proposal. That is not to say that all sex should be had only if the parties involved are planning a relationship, but both parties should be able to see clearly what the parameters are. It is also essential to examine all arguments, from all sides, and then form one’s own opinions. Different organizations have different goals (e.g. pro-life vs. pro-choice groups) and therefore will distribute information that is favorable to their opinion. In order to make educated and informed decisions, one must examine all arguments and weigh them against individual values and morals. One organization should not dictate the sexual activities of a person or persons. Finally, it is very dangerous to over simplify or over generalize arguments. Take the issue of abortion, for example. Simply saying that all abortions are wrong (or ok) is not right. Every person has to...

Words: 299 - Pages: 2

Free Essay

Communist Manefesto Cp 1 and 2

...From Capital Vol 1 In chapter four Marx says that the starting point of capital is through commodies. Marx states “from the exchange of various use-values, and consider only the economic forms produced by this process of circulation, we find its final result to be money” (329). Marx explains his idea with two kinds of circulation which are C-M-C and M-C-M. C-M-C stans for commodities transformed into money. In senario the money that is obtained from the commodity s used to get another commodity. This is in terms as an exchange like if a person where to sell a shirt for $20 dollars, and then use that money to buy bread. M-C-M stands for buying in order to sell meaning that a commodity turns into money. The difference is that the end money has “surplus value (332)”. Marxis states that the final M in M-C-M' is “M'= M+Δ= the orignal sum advanced, plus increment”(332). M-C-M represent modern capitalism because the end result is money. Meaning in the end of M-C-M we exchange money for money. There is a constant cycle but the the beginning point is money, therefore in reality the M-C-M is the general formula for capital. Aristole says states that there is an opposition between this cycle. He calls the conflict between this cycle Oeconomic to Chrematistic. As stated by Aristole Oeconomic is “True wealth consist as such values in use; for the quantity of possessions of this kind, capable of making life pleasant, is not unlimited”(333). The opposition is Chrematistic where it...

Words: 593 - Pages: 3

Free Essay

Homework 3

...James Guerra Homework #3 September 17, 2012 1. What is the difference between a directory and a file? A directory is another term for folder. Directory’s can have director’s under them Files are basic unit of storage on pc. Collection of related data, operating system runs software program files. User files are opened of viewed by application software. 2. What is the difference between an ASCII file and a binary file? Text files are most often ASCII-encoded. Binary files specially encoded by software program that created the file. Like image files, sound files. 3. Explain what a root directory is. Is the first or top most directory in a hierarchy. It can be related to the root of a tree. 4. What are the default file extensions for the following types of files? ASCII text file ____ASC_______ Microsoft Word file ____DOC_______ Microsoft Excel file ____XLS_______ Microsoft PowerPoint file ___PPT________ Compressed (zipped) file ______ZIP_____ Web page ____HTM_______ 5. What basic type of files have file extensions of  .bmp, .gif, or .jpg ? Picture files 6. If you create a new file with the long file name Budget Analysis 2005.html, what would be the short name generated by Windows?Budgetan.htm 7A.   What does a checkmark infront of the following setting allow and disallow?                Hide extensions for known file types It will only show the file name and hide the extension of the file type from showing. 7B.   What does the absence of a checkmark infront of...

Words: 385 - Pages: 2

Free Essay

Dr. Gary Kildall

... company called Digital Research. In this article it tells a story about the life and death of Gary who was on the brink of discovering untold amounts of unknown digital software for the pc (personal computer). The note on page 14 of the Computer Structure and Logics textbook tells about a time that Digital Research refused an offer from IBM ( and that opened the door for a company called Microsoft which, caused Digital Research to lose in the race of software development. The article on Gary A. Kildall was a very enlightening read. This was a good article because it tells about an intelligent man that created the basis of our pc operating systems today. The software that CP/M / Digital Research created is great and all should know about it Without it we may not have gotten as far as we have with technology today. This article plus the “gray” note on page 14 tells a story about a man who took great interest in his work. When IBM tried to sell him short or give him an offer to work for them he told them that he didn’t like the offer and he turned them down. Well this gave Microsoft a chance to come in and take the deal, but what’s funny about that is Microsoft went and reverse engineered the Digital Research tech and created a copy of it and sold it to IBM. Although at this time no one was charged for any illegal acts (maybe because it was uncommon to be able to do what Microsoft had done). I do feel two different...

Words: 587 - Pages: 3

Free Essay

This One

...II. Description of Set-Up and Equipment to be used Figure II. The table top Setup The materials/equipment needed in this experiment are as follows: TABLE Table must has a flat surface because it will be the one who will serve as a ground in pitching, flicking or shooting the coins to its target area. YARDSTICK Yardstick will be fastened to the top of the table 24 inches from one edge. Refer to the figure above for the required measurement. It will be used also in measuring the coins that have been pitched, flicked or shooted by the specific workers. PENCIL Pencil will be used to draw the required lines on the top of the table such as 3 inches and 21 inches from the yardstick as shown in the figure above. TAPE The tape is used to attach the yardstick in the top of the table conside- ring the the required measurement in this experiment. TWENTY-FIVE CENTAVO COIN Each group must have atleast 10 pieces of twenty-five centavo coins per workers. The coins are the one who will be pitched, flicked or shooted from shot zone to the target area by the specific workers. STOPWATCH/TIMER The timer can be a stopwatch, cellphones or any devices that can measure time. It will be used to evaluate the overall time of the workers as he finished pitching, flicking or shooting the coins to its traget area. MICROSOFT EXCEL Microsoft Excel will be used to consolidate and compute all the data that...

Words: 266 - Pages: 2

Free Essay

Hypervisor 1

...Hypervisors 1 Runner Header: Hypervisors Hypervisors CIS 512 December 16, 2012 Hypervisors 2 In today’s world technology has advance in numerous ways. Technology has given the capabilities to receive, fix, and move objects without being present. This is the concept of virtualization. “Virtualization is the creation of a virtual (rather than actual) version of something, such as an operating system, a server, a storage device or network resources”. The virtualization innovation has assisted companies in a positive way, but also can inflict negative wounds to the organization. Virtualization is a proven software technology that is rapidly transforming the IT landscape and fundamentally changing the way that people compute. The 1960s was when virtualization was first deployed by IBM, itts main purpose was to operate mainframe hardware through separating them into virtual machine. In the 1980s and 1990s virtualization was not needed due to the growing numbers of desktop computing and x86 servers. New issues came to rise such as soaring maintenance and managing cost which lead to the creation of virtualization for x86 platform. Virtualization significantly drops general IT costs. Virtualization permits you to run several operating systems on a single computer. In July 2006 Microsoft made public a free Microsoft Virtual PC 2004 which is a windows hosted virtualization program. The latest version is combined with Windows 7 operating system (http://www.infobarrel.com/History_of_Virtualization)...

Words: 2624 - Pages: 11

Premium Essay

Vmware Essay

...Robert W. Morley NT1210 October 20, 2012 Week 5 Essay VMware has been the market leader in virtualization products for many years now. Microsoft with their “slow but steady” pace in the field has defiantly taken some major leaps and bounds in their offerings to the world of virtualization now. The two solutions that shall be discussed here are VMware’s vSphere 5 and Microsoft’s Hyper-V. While both are great products, and share many of the same basic capabilities, pricing and limitations on said capabilities is what will ultimately separate these two from one another. VMware as stated above has been the industry leader for years when it came to virtualization whether on a single workstation or across an entire network. It has a very easy and logical interface that can be quickly learned by most in a very short time, assuming that the proper networking, deployment, and OS knowledge is already present. VMware’s vSphere 5 does have pricing attached to it, opposed to Microsoft’s Hyper-V which is free and integrates seamlessly into current Window OS configurations. The price for management is not free on either however, and this is where VMware seems to shine with its lower pricing structure. VMware does also offer a bundle/kit pricing where Microsoft does not currently offer that option for the Hyper-V. Virtual migration features will be the next biggest contrast between these two virtualization giants. VMware offers automated live migrations, power management, and storage...

Words: 479 - Pages: 2

Premium Essay

Nt1310 Unit 3 Application Groups

...4. Application group An application group contains the storage management attributes of and index fields for the data that you load into OnDemand. When you load a report into OnDemand, you must identify the application group where OnDemand will load the index data and store the documents. An application group is a collection of one or more OnDemand applications with common indexing and storage management attributes. You typically group several reports in an application group so that users can access the information contained in the reports with a single query. All of the applications in the application group must be indexed on at least one of the same fields, for example, customer name, account number, and date. 5. Folder A folder is the user’s way to query and retrieve data stored in OnDemand. A folder provides users with a convenient way to find related information stored in OnDemand, regardless of the source of the information or how the data was prepared. A folder allows an administrator to set up a common query screen for several application groups that might use different indexing schemes, so that a user can retrieve the data with a single query. For example, a folder called “Student Information” might contain transcripts, bills, and grades, which represent information stored in different application groups, defined in different applications, and created by different programs. 6. Storage set: A storage set contains one or more storage nodes that can be used by several application...

Words: 1079 - Pages: 5

Free Essay

Mr. Videl

...random manner. Show that regardless of how the numbers are positioned on the wheel, there are three adjacent numbers whose sum is at least 39. Adding all 25 inequalities, we find that 3∑_(i=1)^25▒xi = 3∑_(i=1)^25▒i < 25(39) = 975. But 3∑_(i=1)^25▒i=(25)(26)/2=325 gives us the contradiction that 988 = 3(325) < 975 7. A lumberjack has 4n + 110 logs in a pile consisting of n layers. Each layer has two more logs than the layer directly above it. If the top layer has six logs, how many layers are there? . . 18. Consider the following four equations: 1) 1 =1 2) 2 + 3 + 4 = 1 + 8 3) 5 + 6 + 7 + 8 + 9 = 8 + 27 4) 10 + 11 + 12 + 13 + 14 + 15 + 16 = 27 + 64 1) 1=1 n = 1 2) 2 + 3 + 4 = 1 + 8 n = 2 3) 5 + 6 + 7 + 8 + 9 = 8 + 27 n = 3 4) 10 + 11 + 12 + 13 + 14 + 15 + 16 = 27 + 64 n = 4 Formula (n-1)²+1, or n²-2n+1+1or n²-2n+2. n²-2n+2 Exercise 4,3 10 & 15 10. If n ∈ Z+, and n is odd, prove that 8|(n2 − 1). 15. Write each of the following (base-10) integers in base 2 and base 16. a)22 b) 527 c) 1234 d) 6923 22) base 2 10110 base 16 = 16 527 base 2 = 1000001111 base 16 = 20F 1234 base 2 = 10011010010 base 16 = 4D2 6923 base 2 = 1101100001011 base 16 = 1B0B Exercise 4.4 (1&14) 1. For each of the following pairs a, b ∈ Z+, determine gcd(a, b) and express it as a linear combination of a, b. 231, 1820 b) 1369, 2597 c) 2689, 4001 a) 231, 1820 a) 231, 1820 1820 = 7 (231) + 203 ...

Words: 634 - Pages: 3

Free Essay

Humn

...Identifying Good or Bad Statements Anit Maharjan HUMN210-H5WW Meghan Roehll Franklin University 4th April, 2013 a. Nobody in the world today is really good. Yes, I have heard of good people, but not really good people. - Good statement. b. The world is not flat. Well, if you look at a map it is: - in what point of view - bad statement. c. I will need an extended period of laborious cogitation to assimilate the missive. This doesn't make any sense - bad statement. d. The number 2 is odd. Are we talking about an even number? I believe your confusion comes from the fact that 2 is a prime number, but it is still even. It is the only even number that is prime – false statement. e. If you believe in evolution, then your ancestors were filthy apes. There are two kinds of people in the world: - one is god prayer and the next is science believer. If you support the statement from the point of scientific theory of evolution by Darwin, then yes our ancestors are filthy apes, whereas if you think form the side of god’s prayer then the statement is false – good statement. f. Some swans are black. In this statement, I am not sure that some swans are black or not, all swans could be black or white – good statement. g. If you are a human, then you are a person. If you are an individual, then you are alive. Human is a person and of course the person becomes an individual and every individual breaths...

Words: 384 - Pages: 2

Free Essay

Science Music

...Year | Album | Peak chart positions | Sold | | | UK | AUS | GER | SWI | FRA | NZ | AUT | IRE | | 2000 | Bright Lights * Released: August 2000 * Label: Island | 1 | 3 | 2 | 2 | 6 | 3 | 10 | 1 | * UK: 3xPlatinum * AUS: Platinum * GER: Platinum * SWI: Platinum * FRA: Gold * NZ: Platinum * IRE: Platinum | 2001 | Dangerously In Love * Released: October 2001 * Label: Island | 1 | 1 | 1 | 1 | 3 | 1 | 6 | 1 | * UK: 4xPlatinum * AUS: Platinum * GER: Platinum * SWI: Platinum * FRA: Platinum * NZ: Platinum * AUT: Gold * IRE: Platinum | 2003 | All Night Long * Released: August 2003 * Label: Island | 1 | 6 | 5 | 5 | 10 | 6 | 14 | 1 | * UK: 2xPlatinum * AUS: Gold * GER: Gold * SWI: Gold * NZ: Gold * IRE: Platinum | 2004 | Troublemaker * Released: October 2004 * Label: Island | 3 | 12 | 10 | 10 | 14 | 12 | 18 | 3 | * UK: Platinum * IRE: Platinum | Year | Song | Peak chart positions | Sold | Album | | | UK | AUS | GER | SWI | FRA | NZ | AUT | IRE | | | 2000 | | 2 | 12 | 10 | 10 | 14 | 12 | 16 | 2 | * UK: Gold * AUS: Gold * NZ: Gold | | | | 1 | 6 | 4 | 4 | 8 | 6 | 10 | 1 | * UK: Platinum * AUS: Platinum * GER: Gold * SWI: Gold * NZ: Platinum | | 2001 | | 8 | 24 | 22 | 22 | 26 | 24 | 28 | 8 | * UK: Gold | | | | 12 | - | - | - | - | - | - | 12 | | | | | 1 | 8 | 6 | 6 | 10 | 8 | 12 | 1 | * UK: Platinum * AUS: Platinum * GER: Gold * SWI: Gold * NZ: Platinum...

Words: 318 - Pages: 2

Free Essay

You Decide

...receives it. And also some other facts which should be considered like life expectancy, importance, age etc. when deciding on whom to donate the heart to. He’s cause for damage to the heart was the steroids, of which he was unaware of the consequences of taking the steroids at the time he took so there wasn’t any sort of health irresponsibility known otherwise. His chances to live 10-15 more years are very high so it’s one point investing in him. He has a family to take care of, wife and the 3 kids who he has to support till they are on their feet and so forth. He also has been a good supporting father as he’s already being supporting their dreams career wise and the future. So my first choice with all confidence would be Jerry. The number 2 choice is Ozzie because as LONG as he does not get back on his old ways HE does hold out some hope on society as a whole as long he does NOT revert back and does good in society by helping out and he no longer does any drugs - he really can have a useful and a prosperous and productive life. His chances of living after a successful heart transplant are another 10 years but only if he stays off the drugs and which is not really guaranteed but if he does he can be a very good mentor and a coach or a guidance for teens with troubled life as they are on drugs already. Since Ozzie have seen the side effects and losses because of the drugs, he can let the teens know it too and...

Words: 604 - Pages: 3

Premium Essay

Mbjdh

...MON TUE FEB WED THU FRI SAT SUN MON TUE MAR WED THU FRI SAT SUN MON TUE APR WED THU FRI SAT 1 2 3 4 5 6 8 9 10 11 12 13 15 16 17 18 19 20 22 23 24 25 26 27 29 30 31 2012 SUN MON TUE 7 14 21 28 5 6 7 12 13 14 19 20 21 26 27 28 SUN MON TUE 1 2 3 8 9 10 15 16 17 22 23 24 29 JUNE WED THU FRI 4 11 18 25 4 5 6 7 11 12 13 14 18 19 20 21 25 26 27 28 SUN MON TUE 1 2 3 8 9 10 15 16 17 22 23 24 29 30 31 FRI SAT 1 2 3 4 5 6 8 9 10 11 12 13 15 16 17 18 19 20 22 23 24 25 26 27 29 30 AUG SUN MON TUE WED THU FRI 7 14 21 28 MAY WED THU FRI SAT JULY SAT WED THU SAT 6 7 13 14 20 21 27 28 2012 1 2 3 4 5 8 9 10 11 12 15 16 17 18 19 22 23 24 25 26 29 30 31 SEPT WED THU FRI SAT 3 4 5 6 7 10 11 12 13 14 17 18 19 20 21 24 25 26 27 28 OCT SUN MON TUE WED THU 1 8 15 22 29 FRI 2 9 16 23 30 SAT 1 2 3 4 5 6 8 9 10 11 12 13 15 16 17 18 19 20 22 23 24 25 26 27 29 30 31 NOV SUN MON TUE WED THU FRI 7 14 21 28 5 6 7 12 13 14 19 20 21 26 27 28 SUN MON TUE 1 2 3 8 9 10 15 16 17 22 23 24 29 30 31 DEC WED THU FRI 4 11 18 25 SUN MON TUE SAT SAT 2 3 4 5 6 7 9 10 11 12 13 14 16 17 18 19 20 21 23 24 25 26 27 28 30 1 8 15 22 29 7 14 21 28 1 2 3 4 5 6 8 9 10 11 12 13 15 16 17 18 19 20 22 23 24 25 26 27 29 30 31 4 5 6 7 11 12 13 14 18 19 20 21 25 26 27 28 1 2 3 8 9 10 15 16 17 22 23 24 29 30 2 9 16 23 30 3 4 5 6 7 10 11 12 13 14 17 18 19 20 21 24 25 26 27 28 31 1 8 15 22 29...

Words: 466 - Pages: 2