PROJECT SCOPE

PROJECT OBJECTIVE

The purpose of this contract is to provide Umbrella Auto insurance with Network Infrastructure for its new office at Stoughton- MA, within 2 months at cost not to exceed $75,000. The building consists in 3 offices, one customer service and one first floor. The building shall be fully outfitted with the latest Network infrastructure, highly available, fault tolerant, extremely secure and capable of providing the high quality technology required to run the latest generation of data, voice and video applications.

DELIVERABLES

• #2 2000-square-foot, 3 offices , 1 customer service, 1firstfloor
• Offices will include the desktops, printers and cabling
• Costumer service will include printer, desktop and 1 laptop with wifi connection
• Fast-ethernet.
• Switches
• Equipment rack
• Patch panel
• Cables
• Wall plates

* NETWORK INFRASTRUCTURE DESCRIPTION

* The new Umbrella Auto offices consists in 3 offices (A-B-C), 1 customer service and1 first floor. * Office A has a dedicated Telecomm wiring closet. The rack has 12RU of space dedicated for installation of network equipment. * Data Centre is located on the 1st floor and has its own data server runinng. * Vertical backbone cabling * Horizontal structured cabling and will be based on CAT-6 to perform a better quality * Approximately 15 different users are expected to occupy this office with different schedule

* Wireless Network

This network also includes implementation of a secure managed wireless LAN infrastructure based on 802.lla/b/g wireless technologies covering all areas of the office space

Installation and Configuration of Equipment

* The contractor shall be responsible for physically installing all equipment at the appropriate locations as requested by the company * Configuration of all active components shall be done by the contractor based on the detailed information from Umbrella Insurance. * No work shall be performed by CONTRACTOR without explicit written approvals * The contractor must complete & ensure: The successful installation, configuration & functioning of all hardware and software including Setup, configuring, testing and commissioning of all deliveries of hardware and software systems have been successfully carried out. The installed hardware and the relevant software works and functions successfully as a complete system with current hardware and software * The Contractor shall supply, install, test and commission the systems as defined in this document to the entire satisfaction of the Company

* Warranty

The contractor warrants that all goods and services supplied under this contract are provided with one year unconditional replacement warranty including all labor and materials from issuance of the Completion Certificate after Acceptance Test.

Final Acceptance Test. The Contractor shall supply, install, test and commission the systems as defined in this document to the entire satisfaction of the Company. This series of testing will be performed after the entire network integration including the IP and other related solutions are done. Tests will include a full testing of the networks resiliency, redundancy, performance, security and convergence features including the support for the IP infrastructure.

CUSTOMER REVIEW

________________________ Paul Smith

Similar Documents

Free Essay

It113 Project Scope

...Project Scope Project Justification Our company is a small, yet diverse company. We Employ only, the most professional and experienced of employees. Our employees have been with the company from start-up and offer a great deal of loyalty to our company as well as yours. Topologies Solutions Inc. was established in 1985 and we proudly hold a great record of completion and positive results, after completion. We also insure an “Always there” Policy in concerns to present to future customer service. We, at Topologies Solutions Inc, assure we can offer the cutting edge technology and experience needed to accomplish the project. We insure that the company obtains a high performance network for a reasonable price. Project description MK Institute of Higher Learning is purposing a project with the description to network a classroom based floor. This floor will consist of three wings. Each wing accommodates one distribution closet, which must be interconnected to one another. Each wing also has eight classrooms and one computer lab. Classrooms will need 2 drops and the computer labs will need 44 drops, resulting in 60 drops in all per wing. The ISP connection will be entering from the north wing’s distribution room. The institute will also be requiring that a wireless access coverage to the central lobby area, allowing 100 users simultaneously, to be made possible. Also noting that the central lobby area consists of three solid supports, holding a 25’ ceiling. Major Deliverables ...

Words: 607 - Pages: 3

Premium Essay

Doc, Docx, Pdf, Wps, Rtf, Odt

...Current Status and Evolution of Industrial Relations System in Bangladesh Dr Abdullah Al Faruque Dr. Abdullah Al Faruque is an Associate Professor and Chairman, Department of Law, University of Chittagong, Bangladesh. Dr. Faruque is a Commonwealth Scholar and holds a PhD from University of Dundee. He is a specialist in labour law, petroleum contracts and environmental regulation. An author of a book, Dr. Faruque has also written several articles in reputed law journals both in Bangladesh and abroad. Copyright © International Labour Organization 2009 First published 2009 Publications of the International Labour Office enjoy copyright under Protocol 2 of the Universal Copyright Convention. Nevertheless, short excerpts from them may be reproduced without authorization, on condition that the source is indicated. For rights of reproduction or translation, application should be made to the ILO Publications Bureau (Rights and Permissions), International Labour Office, CH-1211 Geneva 22, Switzerland. The International Labour Office welcomes such applications. Libraries, institutions and other users registered in the United Kingdom with the Copyright Licensing Agency, 90 Tottenham Court Road, London W1T4LP/ [Fax: +44 (0)20 7631 5500; email: cla@cla.co.uk], in the United States with the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923 [Fax: (+1)978 750 4470; email: info@copyright.com], or in other countries with associated Reproduction Rights Organizations, may take...

Words: 38847 - Pages: 156