Proceedings of the 2010 International Conference on Industrial Engineering and Operations Management Dhaka, Bangladesh, January 9 – 10, 2010

Productivity Improvement through Line Balancing in Apparel Industries
Md. Rezaul Hasan Shumon, Kazi Arif-Uz-Zaman and Azizur Rahman Dept. of Industrial Engineering and Management Khulna University of Engineering and Technology Khulna, Bangladesh Abstract
The apparel industries must produce momentous quantities in shorter lead times. Apparel product is highly correlated with high level of productivity; sewing line should be balanced in shorter possible time and effective way for each style and quantity. The focal constraint against the higher productivity is the difference in individual capacity which is the mode of improper line balancing and bottle neck process. This paper is based on an effective layout model where to hit upon the bottleneck process through benchmark capacity and led us to use balancing process using two separate concept of manufacturing processes- modular line and Traditional system both together. The research shows that this balanced layout model has increased the efficiency by 21%, and labor productivity by 22%.

Keywords
Scheduling, Line Balancing, Bundle system, Modular Line.

1. Introduction
Since the late 1970s, the RMG industry started developing in Bangladesh primarily as an export-oriented industry and the domestic market for RMG has been increasing fast due to increase in personal disposable income and change in life style. The sector rapidly attained high importance in terms of employment, foreign exchange earnings and its contribution to GDP. Since buyer comes to this region for the lowest labor price ($0.11 per shirt for Bangladesh, $0.26 for India, $0.79 for Srilanka [3]), the quality of the garments, efficiency and productivity of Bangladesh RMG sector remain ignored even in the tough competitive market. Factories in Sri Lanka operate at 80% - 90% of efficiency, whereas in Bangladesh, according to some experts, productivity is between 35% and 55% of efficiency with very few exceptions [3]. For the RMG sector in Bangladesh, productivity alone can make a difference between life and death.

3. Methodology
We discussed the paper comparing the productivity and efficiency before and after applying the balancing technique. Considering experience, capacity, one production line is selected from the sewing floor. One garment order is chosen which was started in that line, knowing total amount of order, style description, fabric type and color. Two important attributes have been considered, one is possible standard method for each process and another is considerable time in between the input has been fed to the time study took to record the actual individual capacity of each worker. We have recorded the time to make each process for each and every worker to find out the number of operator and helper, type of machines, basic and standard pitch time and individual capacity. To find out the (standard allowable minute) S.A.M value, process wise capacity has been calculated, in addition to that we have calculated the target, benchmark capacity, theoretical manpower, actual capacity line graph, labor productivity and line efficiency. Line has been balanced considering the bottleneck and balancing process where the balancing process has shared the excess time after the benchmark production in the bottleneck process. After balancing, new manpower has been proposed and final capacity of each worker has been reallocated. We have compared the line graph after balancing the line, labor productivity and line efficiency. Finally a proposed production layout has been modeled with balanced capacity.

4. Equations
4.1 Standard Pitch Time (S.P.T) = Basic Pitch Time (B.P.T) + Allowances (%)

4.2 Target = 4.3 Theoretical Manpower = 4.4 Labor Productivity = 4.5 Machine Productivity = 4.6 Line Efficiency:

* 100%

* 100%

5. Data Analysis and Calculations
5.1 Before balancing the line In Annexure 1: time study sheet is attached showing the different types of machine used, number of operators and helpers, basic and standard pitch time and capacity per hour. Table 1: Bench mark Target, Labor and machine productivity and Line Efficiency before balancing line. Total Output Per Day 1200 Total Manpower = 37 Working Time = 600 Minutes S.A.M = 8.90 Target /Hour = 250 100% Efficiency Target /Hour = 200 80% Efficiency Bench Mark = 150 60% Efficiency = 100 40% Efficiency Labor Productivity = 32 Machine Productivity 55 Line Efficiency % = 48 Process wise capacity of each work station has been shown in Annexure 2 where Standard allowable minutes (S.A.M) has been calculated by adding S.P.T of each process. Table: 1 shows the target per hour for the line calculating total 37 manpower worked on that line for 6oo minutes with a S.A.M value of 8.90. We have standardized the Bench mark target of 200 pieces of garment at 80% efficiency. Observation before balancing the line has been reflected as labor and machine productivity is 32 and 55, line efficiency is 48%.where the total production has been attached in Annexure 4.

Figure 1: Variation in each process capacity per hour compare to bench mark target per hour

Plotting process wise capacity in a line graph shows the variation of each process from the bench mark target as the upper capacity is 490 pieces per hour where the lower capacity is only 115 pieces per hour compare to the bench mark target of 200 pieces. This shows the imbalance situation in the line and bottleneck condition through out the process of the whole garment making as lots of WIP stations in the line. Table 2: Balancing Processes to equalize the bottleneck process


^ E
W E D Z :  > W W E



W ,
 W

 W
 ,   E W E Z D t W E

 ,

 



E Z



d

: W 



E



d



D

^ W Z

^ W

D

>

D

^ Z

, W



,



, Z

Z

 W W



&

^

^ Z

d W

^

,

d

5.3 Bottleneck processes From Figure 1: we have identified some variations in process capacity from the bench mark target and the lower capacity from the bench mark target is the bottleneck process as production flow would stuck on the bottleneck point. Comparing total capacity of each process to the 80% bench mark target, we have identified the bottleneck processes named make and join care label, back neck elastic tape joint, match sleeve pair and sleeve and body, sleeve hem, churi hem raw edge cut, security tack and thread cut body turn in Annexure 3: marked with light brown color. Total production has been blocked in these seven work stations and large work in process (WIP) has been stuck in these bottleneck processes. 5.4 Balancing Processes Balancing method is very essential to make the production flow almost smoother compare to the previous layout. Considering working distance, type of machines and efficiency, workers who have extra time to work after completing their works, have been shared their work to complete the bottleneck processes. Previously identified seven bottleneck processes have been plotted in the left side of the Table 2. Make and join care label and Back neck elastic tape joint both have been made by lock stitch machine and these have been shared by two lock stitch machine processes. Operator who work in Process no. 7 Neck rib make width, have been worked for 50 minutes per hour in her first process, capacity 217 pieces and then have been worked in the process no. 6 make and join care label for last 10 minutes to make additional 30 pieces for overall capacity of 208 pieces on process no. 6. Similarly Process

no. 13.B back neck elastic top have been worked for 35 minutes and rest 25 minutes have been worked on process no. 12 to make total capacity of 216 pieces which was originally 153 pieces shown in Table 2. Process no.14, 25, 20 and 22 have been similarly worked on the process no.16, 23, 24 and 27 for the capacity of 195, 198, 153 and 199 pieces per hour. Process no. 24 churi hem raw edge cut have been suggested an extra floater to use after being shared worked from process no. 20. 5.5 Proposed Layout

  ,

W 

^

D &

W E  D ^ : d  D  > :

W E

W E &

W E   D ^ D ^ d 

^

D

W 

  ,

d
K> ,W >^ ,W ^

Z D t

>^

>^

E &

Z d

E : d   E  d D > W D : D ^  ^ :  D  >

K> ,W >^ ,W >^ ,W K>

,W >^

 d  d

d E :

>^



 d

 E  d

K> ,W K>

^ :  d ^ ^ &   d ,

^ ^



K>

,W >^

^ d

,

>^ &> ,W ^ ,    , , 

  ^ d d 

, 

,W >^

&>

 d

d

Figure 2: Proposed Layout Model to balance the bottleneck processes Research has been customary through this model which indicates that the processes are almost balanced from previous layout through the combination of balancing and bottleneck processes. The blue arrow on the centre table indicates the production flow through the process no. as semi zigzag combination and green arrow shows the sharing of works in between balancing and bottleneck processes. First column on both side of center table shows the

machine type and then followed by process no. process name, S.A.M value, previous capacity and after balance capacity. After first process front and back match, bundle of garments have been come to process no. 2 shoulder joint, then the bundle have been passed diagonally to process no. 4 shoulder top and in between the processes, one helper has been worked in process no. 3 shoulder cut mark which is shown in fig 1. The working bundle then has been passed to process no. 6 and so on. From process no. 6 to 7 and process no. 23 to 25, work has been flowed vertically not diagonally because of balancing out the bottleneck processes of no. 6 and 23 as diagonal flow would have create the long distance and much time to balance. For balancing 6 possible stations, we have used the short possible distance; similar machines (process 6, 7, 12, 13.B, 22, 27 have been utilized in lock stitch machines, process 23 and 25 have been utilized in flat lock machines and process 14 and 16 are service operators.

6. Result and Findings
Changing from traditional layout to balanced layout model, there are considerable improvements have moved toward us. Among the three operators who were replaced to another line, have been used in the lock stitch and flat lock machines and machine productivity for these less used machines has been increased from 55 to 66 where for the total worker of 32 instead of 37, labor productivity has been increased to 39 from 32. Table 3: Bench mark Target, Labor and machine productivity and Line Efficiency after line balancing. Total Output Per Day 1250 Total Manpower = 32 Working Time = 600 Minutes S.A.M = 8.90 Target /Hour = 216 100% Efficiency New Target /Hour = 173 80% Efficiency Bench Mark = 129 60% Efficiency = 86 40% Efficiency Labor Productivity = 39 Machine Productivity 66 Line Efficiency % = 58 In a day we have boost up the production up to 1250 and with manpower of 32, line efficiency has been improved from 48% to 58% which is shown in Table 3. In an improved layout, target has been decreased at each efficiency level. At 80% efficiency, target is now 173 pieces per hour which has been considered as new bench mark target.

Figure 3: Variation in each process capacity per hour compare to bench mark target per hour After balancing the process flow, figure- 3: shows the less variation of each process from the bench mark target as the upper capacity is 260(previous one was 490) pieces per hour where the lower capacity is only 153(previous one was 115) pieces per hour compare to the bench mark target of 200 pieces which shows that the variation in each

process has been decreased from the previous one and reflects much better balanced production flow in the line. For Process no. 24 churi hem raw edge cut, an extra floater has been suggested to utilize.

8. Recommendations for Future Research
Result would have been more effective if we would have taken some large quantity order and balancing the process is highly related to the type of machines as machine utilized in bottleneck and balancing process should be similar. Further improvements in the productivity can be achieved by considering large amount of order minimum 10000pieces. Table 2 shows the new bench mark target which can be the further chance of improvements to balance the line with this new bench mark target. Proposed layout model has been followed the logic of modular system (one worker works more than two processes who is skilled on all processes and these combination of skilled workers finish their work in piece flow production) and traditional system (one worker works in one process and all the workers who may be skilled or not finish their work in bundle flow production) both together where only modular production system can be applicable with a series of skilled workers to achieve more productivity. On this occasion, skilled workers are eligible for the production processes and proper training and supervision is essential to achieve the optimum improvements on productivity and efficiency.

9. Conclusion
Maximum outputs have been increased to 1272 pieces a day which was previously recorded to 1192 pieces a day. Before balancing the line 4791 pieces of garments have been produced for 5 days where 4522 pieces have been produced for 4 days after balancing the line. We have saved one day lead time for that style of 9000pieces and almost 600 minutes of labor work value time. We have replaced 3 operators and 2 helpers into different lines and relatively saved 5 workers work time of 3000 minutes from that line and almost $130 (Tk1441 BDT for helper and Tk2000 BDT for operator on an average) [4] .

References
1. 2. 3. 4. file://localhost/BANGLAPEDIA_%20Garment%20Industry.htm “Quality and Productivity Management in perspective to Global Economic Situation", organized by BGMEA’s Chittagong unit as part of CAFAXPO-2009. Labor Management in Development Journal, 2001, Vol.2 Number 7P.5. World Bank development research group, June2000.

Annexure 1: Time study sheet showing total operator and helper with standard pith time and capacity.

 d ^ ^> E ^ Z E E Z , d ^ D ^ z , Z D ^ ^ Y E & & ^ ^ ^ d D : E E E d      D D D D ^ ^  ^ ^   ^ ^ ^     ^ d   : d  >  > Z D t Z & d : d E E E E > d      > ^ W ^ : : d ^ ^ & , d , d , , , Z , Z , , Z d  d d d D d d d d D : W W D D   K ' , D

>
^
^ Z E Wd d ^ ^Wd   ,

^



D D D > > E E D Z : , Z D d

^

  

,W ,W K> ,W ^ ,W >^ >^ >^ >^ K> ,W ,W >^ >^ >^ >^ ,W >^ ,W ,W K> K> ,W K> K> ,W >^ >^ &> &> ,W ,W &> ,W >^ ,W

Annexure 2: Process wise capacity per hour showing S.A.M value, and theoretical manpower.


W
^> E &  ^ ^ ^ d  >  > E Z D t E Z & d E : d  d d  E  d :  E  d W D > D D  > D ^ W D ^  ^ : W  d ^ ^ W  & ^  , d ^ , d ^ , W  , Z   ,  , Z  W ^ d d  d ^ D D : d W D : W

>
W
D  ,

t


^

, d d D D

Annexure 3: Proposed capacity per hour for each process showing proposed manpower and bottleneck processes.


W
^> E &  ^ ^ ^ d  > D t Z & d E : d  d d  E  d :  E  d W D > D D  > D ^ W ^ ^ : W  d ^ ^ W  & ^  , d ^ , d ^ ,  , Z   ,  , Z  ^ d d  d Z D E E : d W D : W ^

>

D d 

W d , d D D W D

d

Annexure 4: Total production status for the style 810105 showing production start date, complete date and date of balance the line. …………….Designers Limited Production Status ( Style No : 810105) Style : Round Neck Tee Shirt Date/ 09 22 6-Apr 7-Apr 8-Apr 9-Apr 11-Apr 12-Apr 13-Apr 15-Apr 16-Apr 22 22 22 22 22 19 19 19 19 Total Manpower Operator Helper 15 15 15 15 15 15 13 13 13 13 Total 37 37 37 37 37 37 32 32 32 32 632 856 1011 1100 1192 900 1090 1260 1272 9313 Order Completed Line Balanced Color : Deep Green Production Order Quantity: 9000 Pcs Remarks

Similar Documents

Free Essay

Material Handling Equipment

...Operations Management Materials Handling Equipments INDEX Sr. No. | CONTENT | PAGE NO. | 1 | Introduction | 3 | 2 | Objectives / Roles | 5 | 3 | Types of Material Handling Equipment | 6 | 4 | Material Handling Principles | 9 | 5 | Scope of Material handling | 10 | 6 | Importance of Materials Handling | 12 | 7 | Conveyor system | 13 | 8 | Cranes | 17 | 9 | Elevators | 20 | 10 | Industrial Trucks | 26 | 11 | Robotics | 28 | 12 | Live Racks | 32 | 13 | Role of material handling in supply chain | 35 | 14 | New generation material handling system | 36 | 15 | Summary | 38 | Introduction: Material handling refers to efficient short-distance movement of goods that usually takes place within the confines of a building such as a plant or a warehouse or between a building and a transportation agency. Material Handling is the field concerned with solving the pragmatic problems involving the movement, storage, control and protection of materials, goods and products throughout the processes of cleaning, preparation, manufacturing, distribution, consumption and disposal of all related materials, goods and their packaging. The material handling industry manufactures and distributes the equipment and services required to implement material handling systems, from obtaining, locally processing and shipping raw materials to utilization of industrial feedstocks in industrial manufacturing processes. Material handling systems range from simple pallet...

Words: 6375 - Pages: 26

Free Essay

Material Handling

...How to solve the limitations of the current system. Material handling equipment is about roles in moving, storage, and control of the goods. The categories of material handling are traditional and modern. 1. Traditional (i) Used human power (ii) Not value adding (iii) Minimize used of since it depend on the capabilities of the human to handle the risk 2. Modern (i) Used robotic system/ computerise system (ii) Adding value (iii) Maximize flexibility of used Detection systems and RFID-based automated material handling is now available and common to many of these industries are particularly flatbed conveyor. MHS based flatbed conveyor systems bring themselves to control complexity, additional storage equipment such as baskets and trays and additional user activity. The meat processing industry in the UK has refused to adopt the system because of the cost of installation if there is no commercial benefit in a financial decline through food fear accompanied by potential incompatibility between the issues of system reliability and the imposition of additional stress operator. Based on time constraints, the research has been conducted on the MHS can solve the limitations of the current system. Therefore, a consortium project called Meatract, was established to research and develop novel MHS automatically detect and track cuts in the boning...

Words: 747 - Pages: 3

Premium Essay

Material Handling

...In manufacturing, facility layout consists of configuring the plant site with lines, buildings, major facilities, work areas, aisles, and other pertinent features such as department boundaries. While facility layout for services may be similar to that for manufacturing, it also may be somewhat differents is the case with offices, retailers, and warehouses. Because of its relative permanence, facility layout probably is one of the most crucial elements affecting efficiency. An efficient layout can reduce unnecessary material handling, help to keep costs low, and maintain product flow through the facility. Firms in the upper left-hand corner of the product-process matrix have a process structure known as a jumbled flow or a disconnected or intermittent line flow. Upper-left firms generally have a process layout. Firms in the lower right-hand corner of the product-process matrix can have a line or continuous flow. Firms in the lower-right part of the matrix generally have a product layout. Other types of layouts include fixed-position, combination, cellular, and certain types of service layouts. PROCESS LAYOUT Process layouts are found primarily in job shops, or firms that produce customized, low-volume products that may require different processing requirements and sequences of operations. Process layouts are facility configurations in which operations of a similar nature or function are grouped together. As such, they occasionally are referred to as functional layouts. Their...

Words: 1729 - Pages: 7

Free Essay

Ergonomics

...resistance. EPICONDYLITIS  also known as tennis elbow epicondylitis is the inflammation of tissues on the inner (thumb) side of the elbow. Understanding Ergonomics Anatomy  is the study of internal and external structure. Physiology  is the study of how living organisms perform the various functions of life Anthropometrics  study of different sizes or measurement of the body parts. Biomechanics  is the study of the way the work activities produces forces on muscles, nerves and bones. Industrial Design and Engineering  the design of workplaces, tools, and processes. Types of Material Handling Equipment Storage and Handling Equipment  Is used to hold or buffer materials during “downtimes” or times when they are not being transported. Bulk Material Handling  are equipment used for storing, handling and transporting bulk materials. Industrial trucks  Are motorized vehicles that are used to move and transport...

Words: 359 - Pages: 2

Free Essay

Cacete

...UTS Faculty of Engineering 46316 Materials Handling Assignment 1 – 2016 Thiago Luiz Lara Oliveira - 12224390 1. A rotary screw conveyor is to be designed to discharge Willow wood chips from the below ground bin illustrated, at a suitable rate of X tones per hour (to be estimated by students), into the furnace. The conveyor is to be a Y m long inclined screw conveyor which elevates the material 5 m. It requires a suitable pitch screw and may be selected from one of the standard diameters given in the tables. The student may choose to use a shaft-less screw. However, the student must justify his/her choice of screw giving the full reasoning supporting their choice. The equipment is in a covered area. Preliminaries: Read the reference article “Energy from Willow” and make your estimates of X and Y based on data in the paper. From CEMC (Screw Conveyor Manual v2.2) Table B: [pic] The estimative of tons per hour follow the example from the school consumption of 300 tons per year. Considering that there are 150 working days per year, 8 hours per year, there is a consumption of 0.25 tons or 552 lbs. per hour. Due to the capacity of the conveyor decreases dramatically with the increase of angle, the chosen angle is 20 degrees. Thus Y or L=15 meters or 50 feet (approximately). According to Table B, the density W= 20lbs. per cubic feet. In volume, there is a flow of (Q) 27.6 cubic feet per hour. The chosen conveyor model is the short-pitch...

Words: 2362 - Pages: 10

Free Essay

The Sandwich Factory

...The Sandwich Factory A: Write an Essay The central theme of the short story The Sandwich Factory is the mechanization of the workers/ humans at the factory. The story takes place in 1994 at a sandwich factory, where we meet the narrator who works there. Through him we get the impression that the employees are no longer considered humans or individuals, but almost nearly as machines, and he realizes that he doesn't want to be a part of this development. The narrator of the story is a 1st person narrator who restricts his own view to the factory. It is important that we hear his thoughts and his opinion, and that doesn't mean that we a 100% can rely on what he tells - in particular in some of the descriptions of the characters. The narrator mentions his Joy Division records, his Camuls novels and the novel Confessions of a Mark. This indicates that he is an intelligent man and in addition it also indicates that he probably is a student who has taken a low-paid job to make some money. Through the narrator we get a very negative impression of the factory. The factory itself seems like a ‘typical’ factory where the employees sit at the conveyor belt day after day, doing the same thing. This monotonous type of work is sure to affect a person at some point, for example Dot, who is a contrast to the narrator. Dot has been at the factory long enough to have lost a great part of her identity and human qualities. She has become a victim of the factory and this assertion is based on...

Words: 969 - Pages: 4

Premium Essay

Production in a Biscuit Manufacturing

...PRODUCTION FUNCTIONS OF BISCUITS Manufacturing biscuits begins with a planning process. At first, the production demand is analyzed. A biscuit company then creates a factory production plan ensuring the people working at the site, and the machines that are running are best utilized so that time and energy is not wasted. PROCEDURE OF MATERIAL RECEIVING: The necessary raw and packing materials as required by the production plan are then purchased. The purchased stock is then received from the various suppliers at the factory store that is also called Raw Material Store (RMS). All incoming materials are checked for quality in Quality Assurance Department. The store is responsible for issuing materials for the production process according to the planned requirements. It is only at this point that biscuits start to be made. After approval, incoming material is stored in raw material store and packaging material store, where sensitive items such as butter, color, flavors are stored in cold rooms. In rest of the cases Quality assurance performs testing after material is stored in relevant store and then accepts/rejects the material. PRODUCTION PROCESS: Information for daily production plan is supplied by marketing and sale department on the basis of customer demand. Keeping in view these factors, production plan is made. The whole production process consists of 5 different stages which are as follows: 1. MIXING The mixing stages are of great importance in biscuit-making...

Words: 734 - Pages: 3

Free Essay

Hello

...Charlie’s Windows Installation – Job Description Position Title: Forklift Operator Classification: Grade 2 Location: Work site Reports To: FIELD SUPERVISOR ------------------------------------------------- JOB SUMMARY: Forklift Operators will move heavy materials from one point to another at a job site. They might work in a warehouse moving heavy pallets of materials, or they might have a job of moving the supplies on a work site (such as window frames in a bulk order, installation parts and the other tools that may be required). In some instances, the forklift operator may operate other powered industrial trucks, such as a scissor lift truck. This entry-level position gives the employee the skills to move into other, higher-paid jobs as a material moving machine operator. ESSENTIAL DUTIES/RESPONSIBILITIES: * Load and unload products from trailers using forklift trucks and other material handling equipment. * Store the products properly in the warehouse. * Transport products to and from warehouse, worksite and distribution centers. * Deliver units and products to various units in safely and timely manner. * Sort, pack, wrap, tie and label products as per company procedures. * Weigh products and record weight and other data in product labels. * Monitor and maintain accurate inventory. * Clean work area (worksite, warehouse, distribution center, equipments) KNOWLEDGE/SKILLS REQUIRED: * The US Occupational Safety and Health Administration...

Words: 1094 - Pages: 5

Free Essay

Warehousing

...services. A good warehouse space and layout planning is a primary element for efficient warehouse. Tompkins and Harmelink (2004, p.240) state the purposes of warehouse layout are space usage efficiency; allowing for efficient material handling; cost efficiency; maximum flexibility and good housekeeping. Successful warehouse layout could maximize space utilization, minimize and control movement and location, and provide safety and security environment. The first step in warehouse layout planning is to consider the space requirement. Tompkins et al. (1996, p.430) state space conservation, space limitations, accessibility and orderliness are some factors on designing layout. In layout planning, as space will be limited by floor loads, truss, the height of ceiling, etc, it should be maximized utilization of concentration and cube and also minimized honeycombing. To optimize space utilization, it is not only developed by horizontally but also by vertically. Space concentration and cube utilization can benefit for the flexibility and ability for bulky receipts such as higher and thicker materials. Tompkins and Smiths (1998, p.243) describe honeycombing is storage space losing due to improper use of storage capacity. Honeycombing will limit multiple material loading and storage location sizes. Thus, honeycombing should be eliminated for space planning. For example, Zara utilized cube storage to increase its storage space. Li & Fung Group also adapted cubic location in warehouse to...

Words: 823 - Pages: 4

Premium Essay

Case: the Mentorship Program at Tvh

...THE MENTORSHIP PROGRAM AT TVH ACKNOWLEDGEMENT In performing our assignment, it's a successful one we had to take the help and guideline of you. First of all we are grateful to Allah who gives us sound mind & sound health to accomplish our assignment. The completion of the assignment gives us much Pleasure. We would like to thank our gratitude Farhana Habib Zinnia, Southeast University, Bangladesh for giving us a good guideline for assignment. We would like to thank School of Business Studies , Southeast University for updated education system in Bangladesh . Lastly we would like to deliver our whole hearted thanks to all the BBA,. Actually it was not possible for us to complete a severe task without such help. So we pray the long life and good health for all the persons who have helped and co-operated us in our assignment.   12 January 2014 SUMMARY Our study attempts to evaluate a company TVH which started a training program that is Mentorship program but face some problem because they didn’t provide the training in a systematic way. Sometimes company face many problem for the new employee’s activities because they are not well experienced before working into a company. Then Mentorship program plays an important role to develop the employees’ knowledge if they provide proper training program. That’s why the result shows that the young people can’t take the lesson easily for their lacking of their instrumental knowledge of the company. And we are trying to solve these problems...

Words: 868 - Pages: 4

Free Essay

Forklift Policy

...Innovative Concrete Technology Forklift Policy July 26, 2011 Introduction ICT is committed to providing a safe and healthy work environment for its employees. Forklift safety is major area of concern in a manufacturing and warehousing environment. The following policy provides the rules that must be followed to operate a forklift for ITC. This policy is now included in ICT’s Standard Operating Procedures. ITC Policy Inspections • Forklifts must be inspected daily and the inspection form filled out before being operated. • Immediately inform Alex, Tish and/or your supervisor if any problems are found. • DO NOT OPERATE the forklift if problems are found • A weekly inspection and preventative maintenance service will be performed every Monday. • If at any time a forklift is found to be in need of repair, defective, or in any way unsafe, the forklift must be taken out of service until it has been restored to safe operating condition. • Spillage of oil, fluids or fuel must be carefully washed away before restarting engine. A copy of the daily and weekly inspection form to be used is on the following page. Forklift Daily Inspection Name: Hour Meter Reading: Date: Circle correct response. Explain anything marked not...

Words: 1181 - Pages: 5

Premium Essay

Fdfg

...Assignment On HRM case study Subject: Human Resource Management Course Code: MGT3125 Submitted To: Farhana Habib Zinnia Lecturer of Southeast University. Submitted By: Md. Neaj Mahmud Sajal ID No: 2012010000055 Md. Hasan ID No: 2012010000032 Al Maruf ID No: 2012010000056 Md. Mahabub Hasan ID No:2012010000058 Md. Nayeem Kawsar ID No: 2012010000059 Md. Zakaria Islam Piash ID No:2012010000486 Department of BBA Batch: 30th Section-B Submission Date: 11-01-2014 THE MENTORSHIP PROGRAM AT TVH ACKNOWLEDGEMENT In performing our assignment, it's a successful one we had to take the help and guideline of you. First of all we are grateful to Allah who gives us sound mind & sound health to accomplish our assignment. The completion of the assignment gives us much Pleasure. We would like to thank our gratitude Farhana Habib Zinnia, Southeast University, Bangladesh for giving us a good guideline for assignment. We would like to thank School of Business Studies , Southeast University for updated education system in Bangladesh . Lastly we would like to deliver our whole hearted thanks to all the BBA,. Actually it was not possible for us to complete a severe task without such help. So we pray the long life and good health for all...

Words: 1320 - Pages: 6

Premium Essay

Human Resource Management

...Application case The Mentorship program at TVH Group Thermote & Vanhalst (TVH) is a global organization that specializes in constructing and repairing forklift trucks. The organization’s expansion presents Paul Sanders, HR director at TVH, with a tough problem: TVH doesn’t have system to capture, store, and leverage employees’ knowledge. There is a massive inflow of young people who lack technical know-how, and specialized knowledge is lost when older employees leave the company. In order to deal with this problem, Paul Sanders introduced a mentorship program. This program helps older employees transmit their knowledge and know-how to younger employees. Paul realizes that the transition to the mentoring system has not gone smoothly when he gets a letter from Freddy Jacobs, One of his most respected employees. Freddy challenges him with the following: “Lately we are doing nothing but explaining work process to the young guys. Our own work has to be put aside, and why? Moreover, the young guy at prepacking has never seen a forklift truck in his life, but he started oof in charge of three older people. We have worked together successfully for than 30 years, and I hope that you will deal correctly with this situation.” After Paul finished reading the letter, he frowned. Experiencing workers were putting a lot of effort into teaching newcomers the tricks of the trade, but the older workers were now becoming upset because of the career opportunities given to the newcomers....

Words: 510 - Pages: 3

Free Essay

Owner

...1. Introduction Forklift- also called lift trucks, tow motors and powered industrial trucks----are among the most common pieces of equipment in the workplace industry. Yet this machinery can also be a DANGEROUS---there are numerous forklift-related injuries each year, a number of them resulting in fatalities. On one hand, forklifts have the power to lift and move the heaviest objects. On the other hand, all that power comes with the potential for serious damage. The more you know about how forklifts operate, the better equipped you’ll be to stay safe and to keep those around your safe. Regardless of whether you’re a new operator or have years of experience, it’s up to you to follow safety practices and a basic set of rules every time you use a forklift. Starting with: Never operate a forklift unless you’re trained and authorized to do so. 2. Forklift Basics Types of forklifts There are many classes and types of forklifts, from the commons sit-down type to the narrow aisle stand-up; and from order pickers to powered pallet jacks. They may be powered by electricity, LP gas, diesel fuel or gasoline. Some are approved for use in certain hazardous conditions. There’s a forklift for just about any job……. In fact, forklifts can be grouped into the following classifications: * Class 1- Electric motor, sit-down rider, counterbalanced trucks ( solid or pneumatic tires) * Class 2- Electric motor, narrow aisle trucks (solid tires) * Class 3-Electric motor...

Words: 5689 - Pages: 23

Free Essay

It110

...Online Petstore By Rachel Crane Intro to Programming Logic IT110-1301A-05 January 14, 2013 Contents Week 1: Project Outline 3 Week 1: Class Diagrams 4 Week 1: Use Case Diagrams 5 Week 2: Java Fundamentals 6 Week 3: Java Control Structures 9 Week 4: Error Handling and File Input/Output 11 Week 5: Final Application Design & Screenshots 12 Week 1: Project Outline Everyone loves their pets so I have decided to use pet products as a target for my project. As for a company I would rather go with my own name, The Pet Shop, the one stop online shop. Furthermore since there are so many areas within a pet shop I will be focusing on products for dogs, specifically pet beds. They will be anywhere from your basic pet bed at a low cost to more expensive beds with orthopedic benefits. Pet Beds Classic bed- stuffed with padding, size 24x24, material cotton, washable Durable bed- stuffed with padding, size 24x36, material micro-fiber, washable Outdoor bed- stuffed with padding, size 24x36, material nylon, non-washable Orthopedic bed- stuffed with foam, size 24x24, material cotton, washable Week 1: Class Diagrams Class Diagram Class contains the description, size, and material for product. Method is to either Add product to Wishlist or Add product to Cart. Week 1: Use Case Diagrams Customers have the option to view products, add products to a wishlist for later purchase, or buy products online. Week 2: Java Fundamentals Java Application...

Words: 783 - Pages: 4