...Hyderabad Metro is a rapid transit system, currently under construction, for the city of Hyderabad, India. It is being implemented entirely on PPP mode, with the state government holding a minority equity stake The Phase I of the project includes 3 lines covering a distance of around 71 km. The metro rail stretches between Nagole and Mettuguda (8 km) and between Miyapur and S. R. Nagar (12 km) are targeted to be operational by December 2014.In September 2012, the Indian government has approved Phase II which is expected to start in 2013. It includes around 80 kilometers. Hyderabad Metro Rail project has been selected as one of the top 100 strategic global infrastructure projects to be showcased at the forthcoming Global Infrastructure Leadership Forum being held in New York during February–March, 2013 Another important milestone has been crossed by the Hyderabad Metro Rail Ltd on Sunday with the casting of 1,000 segments. According to HMR managing director NVS Reddy, the precast segments will be joined together on top of the pillars to form a viaduct (flyover-like structure) on which two railway tracks (up and down lines) will be laid. The normal distance between two pillars is 31 metres (101 feet) and it will be covered by 11 segments. Each segment weighs about 35 tonnes and has a deck width of 8.8 metres (29 feet) to facilitate simultaneous movement of two trains in opposite directions. With a requirement of about 330 segments per one kilometer, the first precast 1,000...
Words: 273 - Pages: 2
...Metro rail systems: Boon or bane for urban India? Indian cities will begin operating metro rail transport systems in seven cities, which taking the total number of cities with such systems to 11. But some fear that the sleek trains will be unaffordable for the vast majority of city dwellers, where 77 per cent of the population lives on less than 20 rupees (S$ 0.45) a day. Mumbai - based civil engineer Sudhir Badami, said that the metro transport system might be viable to some extent in big cities, but certainly not in smaller cities. They are already struggling to find money to provide their basic facilities such as piped drinking water, sanitation, education and health care. Others also think that building a metro network takes too long and is too disruptive. In contrast a bus system can be put in place within a year with minimal disturbance. They also believed a well – planned bus system can carry 30,000 commuters an hour. It is the same number as a metro rail system. In contrast, the director of urban development ministry in New Delhi, Prakash Singh said that buses are not feasible in some cities. He thought that cities needs additional land to widen existing roads and create a dedicated bus corridor. But, a separate, dedicated corridor was carved out from the existing road and ended up creating chaos on the road as other vehicle had to make do with much narrower road. In my opinion, the government in India should still create the metro rail transport system but with...
Words: 417 - Pages: 2
...UB101 Daniel Chowaniec Reflection Paper This has been an awesome experience here at the University at Buffalo and it has all happened so quickly. I can’t believe how fast it has gone by. First day I remember sitting by Starbucks and thinking there are a lot of kids here at UB. I couldn’t believe the diversity that UB had, it is quite amazing for sure. It has been such a ride for sure. Meeting new friends, separating myself from people who would take me away from studying. Going to my first UB football game, and taking my first test. My experience at University at Buffalo has been nothing but good to me so far. I am ready for the first semester to end. I have worked really hard from start to finish, it has been really crazy with school work and late nights studying. I am very much ready to sit back and enjoy a few days off to myself. I am very happy it is almost over because although University at Buffalo is a great school, it’s nice to have a break from the books and the stress that comes from it. A lot has went well for me since I been here at University at Buffalo. I made a lot of new friends, and lots of people from different countries. The overall experience has been tremendous. The transition from high school to not just a college, but to a big University has been going well for me. At first I was a bit intimidated from the size of the school. I got lost several times, and lost my car in the parking lots. I would walk up and down the parking lots, and walk past...
Words: 1913 - Pages: 8
...Christian Zanta cmzanta@buffalo.edu (518)641-8732 Present Address: Permanent Address: 100 Villas Drive West 9 Laury Lane Buffalo, NY 14228 Glenville, NY 12302 OBJECTIVE To obtain an internship that will utilize my leadership, critical thinking skills, ethical behavior, and ability to build strong relationships. EDUCATION University at BUffalo, THE STATE UNIVERSITY OF NEW YORK Bachelor of Science in Business Administration, expected May 2016 Finance Concentration GPA 3.58/4.0 EXPERIENCE Enterprise Application Systems, Amherst, NY Student Assistant, 09/2014-Present • Provide general support service for IT professionals General Electric Summer Intern, Schenectady, New York Renewables ERP Finance Contractor, 06/2014-08/2014 • Conducted a thorough analysis of General Ledger and its reports • Developed an understanding of the existing financial structure, as it exists today and how it will look in the future • Met and lead brief meetings with Finance teams of different GE businesses to discuss ways of simplifying their jobs during the closing process • Successfully aided Finance teams in simplifying processes by eliminating over 300 global transactions Scotia Parks and Recreation, Scotia, NY Recreational Camp Counselor, 05/2013-08/2013 ...
Words: 282 - Pages: 2
...Route and service adjustments have been made to improve efficiency and effectiveness throughout the Metro system through better use of resources. Click on the links below to view detailed Metro bus and rail timetables. Metro Local Service To/From Downtown Los Angeles 1-99 East/West routes in other areas 100-199 North/South routes in other areas 200-299 Metro 24-hour Owl Service 24-hour Limited stop service 300-399 Express to/from Downtown Los Angeles 400-499 Express in other areas 500-599 Shuttles & Circulators (Provides Local service within one or two adjacent neighborhoods and/or jurisdictions) 600-699 Metro Rapid service 700-799 Metro Rail Service Metro Blue Line 801 Metro Red Line 802 Metro Green Line 803 Metro Gold Line 804 Metro Purple Line 805 Metro Expo Line 806 Metro Transitway Metro Orange Line 901 Metro Silver Line 910 Stay Connected Receive email alerts and follow on the web. 001-099 Timetable 100-199 Timetable 200-299 Timetable 300-399 Timetable 400-499 Timetable 500-599 Timetable 600-699 Timetable 700-799 Timetable 24 Hour Owl Service Timetables Rail Lines Transitways Connections & Other Carriers Other Carriers Metro Pocket Guides Metro's Pocket Guides provide essential information for riders in 10 different languages. Want the basics on fares, hours of operation and prepaid passes? Pocket Guides have the answers. ...
Words: 332 - Pages: 2
... | |Prof. Mirna L. Arroyo Miranda, JD, DrPHs-III | | Prueba de conocimiento (Take Home) I. Resuelve los siguientes problemas: 1. María tenía catarro y fiebre. El medico le recomendó que tomara cuatro decilitros de agua clara. Indique: a. ¿Cuántos LITROS de jugo de china debe tomar? b. ¿Cuántas ONZAS de jugo de china debe tomar? 2. José y Juan están haciendo una competencia de aviones de papel para ver cuál de los dos puede volar más alto. El avión de José voló 4 metros. El avión de Juan voló 79 cm. ¿Cuánto más voló el avión de José? 3. Un grupo de POPAC quiere viajar de Ponce a Rincón para ir de surfing. Para saber cuánta gasolina necesitan, ellos calcularon que el viaje será de 75 Km de distancia. Indique: a. ¿Cuántos metros de distancia dura el viaje? b. ¿Cuántas MILLAS viajarán los estudiantes? 4. Para preparar una masa de pan de 2 libras, necesito 1.75 Kilogramos (Kg) de harina de trigo. Indique: a. ¿Cuántas LIBRAS de harina necesito? b. ¿Cuántos kilogramos de harina necesito para preparar una masa de pan para 18 libras. (Nota: resuelva usando lo aprendido sobre razones y proporciones.) 5. Se necesitan 4 decilitros de solución salina para limpiar una máquina de terapia respiratoria en un hospital X. ¿Cuántos decilitros de agua necesitaría para limpiar 4 máquinas...
Words: 322 - Pages: 2
...Ayudantía N°4: Molienda Ayudante: Javier Muñoz Fecha: 5 de mayo, 2011 Conceptos Generales Ley de Bond: Densidad Aparente: Modelo de H&F: Ejercicio 1 La operación de un molino de bolas convencional en una planta de concentración de Cu presenta los siguientes parámetros operacionales: Tasa de Producción Horas Operacionales Consumo Promedio de Energía Tamaño Alimentación (F80) Tamaño Producto (P80) 150.000 660 2.000.000 13.000 180 Ton/mes Hrs/mes KWh/mes µm µm Se espera que en el siguiente período, el tamaño de la alimentación sea más grueso alcanzando un tamaño de 26.000 µm. Para no afectar la recuperación del proceso de flotación, se debe mantener el tamaño objetivo del producto de la molienda. a. Asumiendo que el molino trabaja siempre a su máxima potencia y que el índice de molienda de Bond se mantiene constante, ¿Cuál es la variación porcentual en la tasa de producción de mineral producto del cambio en la granulometría de alimentación? b. ¿Cuál es el impacto económico en términos de ingreso bruto? Asuma un precio de venta de 4 US$/lb de Cu, una recuperación de 90% y una ley de cabeza de 1% de Cu. Solución: a. Para el caso 1, en que el tamaño de la alimentación es 13.000 µm, usamos la ley de bond: De aquí podemos obtener el índice de molienda de bond: Por enunciado nos dicen que el índice de molienda se mantiene constante, por lo tanto, será el mismo para el caso 2, en que el tamaño de la alimentación es de 26.000 µm. Podemos entonces obtener el nuevo...
Words: 563 - Pages: 3
...targeted to exceed 30 per cent. Total investment in infrastructure during the Eleventh Plan is estimated to increase to more than 8 per cent of GDP in the terminal year of the Plan --higher by 2.47 percentage point s a s c ompa red t o the Tenth Pl an. The private sector is expected t o be contributing nearly 36 per cent of this investment. RAILWAYS Some of the major goals set for Vision 2020 in the document include (a) laying of 25,000 km of new lines; (b) quadrupling of the 6,000 km network with segregation of passenger and freight lines; (c) electrification of 14,000 km; (d) completion of gaugeconversion; (e) upgradation of speed to 160-200 kmph for passenger trains; and (f) construction of 2,000 km of high-speed rail lines. • Freight performance: Freight loading on Indian Railways during April-November 2011 was 618.0 MT as compared to 593.4 MT in April-November 2010, an increase of 4.14 per cent. • Upgradation of passenger amenities: Till December 2011 450 Adarsh stations had been completed with basic facilities such as drinking water,adequate toilets, catering services, waiting rooms and dormitories especially for lady passengers. • The computerized passenger reservation system (PRS) of Indian Railways is the largest passenger reservation network in the world, available at 2,829...
Words: 1202 - Pages: 5
...also plans to invest £14.5 billion in high speed trains. New projects • Red Line (Bangsue-Rangsit) - The project is an overhead-electrified commuter train with a total length of 26.3 km of which 7.1 km are at grade and 19.2 km are elevated and 8 stations. • Airport Rail Link Expansion – The project is to extend the route from Phyathai Station to Don Mueng Airport to link with Suvarnabhumi Airport and to expand from Suvarnabhumi Airport to Pattaya City. • Purple Line (Tao Poon-Ratburana) - This project is an extension of the Purple Line between Bangsue and Bangyai (under construction). It comprises approximately 20 km of 13.2 km underground and 6.8 km elevated metro rail, 11 underground stations and 5 elevated stations. • Green Line Extensions (Baring-Samutprakarn, Mo Chit-Sapan Mai) - This extension to the existing Green Line (Sukhumvit Line) comprising approximately 25 km of elevated structure, 21 stations, depot and park & ride. • Blue Line Extension - This extension to the existing underground system comprise 22 km elevated and 5 km underground metro system with 17 stations, including 4 underground stations. • Orange Line -This is a new line comprising 11 km elevated and 26.5 km underground metro system with 29 stations, including 21 underground stations. • Pink Line – This is a new line comprising 34.5 km all elevated structure with 24 stations. High Speed Trains - The Thai Government plans to invest in 4 high speed train lines at an approximate cost of £7...
Words: 796 - Pages: 4
...Table of Contents Subgroup Title Page……1 Philippine Cuisine……….2 Sports………………………..3-4 Entertainment…………...5-6 Exotic Sites…………………7 Enjoyments of the Philippians Philippine Cuisine “To the Filipinos, food is important, as it is an integral part of local art and culture as well as communal existence” (*1). First and foremost, just like any other country in Asia, seafood is the most popular type of dish, and is most always served with rice. Filipino Chefs rely on the “freshness” of the fish, along with special sauces and spices to enhance the taste. Fish Sarciado (*3) Inahaw na Bangus (*4) Rellenong Alimasag (*5) Popular seafood dishes: (*3)( *4) (*5) * Fish Sarciado (Fried Fish Steaks) * Inahaw na Bangus (Stuffed Grilled Milkfish) * Rellenong Alimasag (Stuffed Crabs) For those who dislike seafood, the Philippines are also especially well known for their delicious roasted pigs. (Roasted Pigs in Philippines (*6)) Need something quick? The Philippines are home to one of the largest fast food chains in the world, Jollibee. Picture of a Jollibee fast food chain in Santa Maria (*7)) Sports Boxing The number one watched sport in the Phillippines...
Words: 1871 - Pages: 8
...Business Communications: WMATA Rail System Gwenda Woodland COM/295 August 10, 2015 Sandra Norris Ethics & Credibility in Business Communications: WMATA Rail System The Washington Metropolitan Area Transit Authority (“WMATA”) has been plagued with various problems within its system and on the Metro rails lately. These issues are causing Metro riders much grief and they do not feel safe or find the Metro to be dependable at this time. The problems that the Metro rail has been experiencing are rails smoking due to electrical arcing, derailment of trains, and the constant malfunction of the Metro escalators. Metro riders are concerned that whenever there are serious issues taking place in the Metro system WMATA does not have things under control, or notify the riders in a timely manner so that things do not get out of control. Electrical Arcing Accident On January 12, 2015, there was an electrical arcing accident at the L’Enfant Plaza Metro station which caused the station and two trains to fill with smoke. Panic was definitely in the air because the Metro riders were not notified immediately of an emergency evacuation plan or how quickly the situation was going to be resolved. Unfortunately, there was one passenger fatality and two passengers were hospitalized in serious condition. (National Transportation Safety Board, 2015) Train Derailment On August 5, 2015, a derailment of a non-passenger train at the Smithsonian Metro station caused service to be suspended...
Words: 632 - Pages: 3
...Mumbai and Thane on April 16, 1853 and is today one of the largest railways in the world. Indian railway is spread over 109,221km covering 6906 stations. Operating three gauges, trains in India carry over 481 billion ton kilometers and 695 billion passenger kilometers of goods and traffic respectively. Indian railway carries 40% of freight traffic and 20% of the passenger traffic in country. IR is one of the premier infrastructural wings of the economy combining all major functions of a conventional Railway system. It builds and maintains infrastructure assets like Track, Electric traction, Signaling Systems, Telecom network, Stations / Terminals etc. Apart from operating goods and passenger trains, it operates suburban trains in various metros. It manufactures locomotives, coaching stock, wagon and components of rolling stock like Wheel & Axle. It runs workshops to maintain its rolling stock & is also involved in ancillary activities like catering, tourism etc. All the above activities are managed through a strong work force of 1.41 million. Indian Railway’s operations are characterized by mixed traffic –both passenger and Freight trains share the same track and infrastructure. Passenger trains constitute nearly 70% of the trains run but contribute to less than 35% of the revenue earned, while freight trains constituting only 30% of the trains, make up 65% of the revenue. Like most of the other railways in the world, IR faced a very challenging environment towards the...
Words: 1074 - Pages: 5
...Hyderabad Metro is a rapid transit system, currently under construction, for the city of Hyderabad, India. It is being implemented entirely on PPP mode, with the state government holding a minority equity stake The Phase I of the project includes 3 lines covering a distance of around 71 km. The metro rail stretches between Nagole and Mettuguda (8 km) and between Miyapur and S. R. Nagar (12 km) are targeted to be operational by December 2014.In September 2012, the Indian government has approved Phase II which is expected to start in 2013. It includes around 80 kilometers. Hyderabad Metro Rail project has been selected as one of the top 100 strategic global infrastructure projects to be showcased at the forthcoming Global Infrastructure Leadership Forum being held in New York during February–March, 2013 Another important milestone has been crossed by the Hyderabad Metro Rail Ltd on Sunday with the casting of 1,000 segments. According to HMR managing director NVS Reddy, the precast segments will be joined together on top of the pillars to form a viaduct (flyover-like structure) on which two railway tracks (up and down lines) will be laid. The normal distance between two pillars is 31 metres (101 feet) and it will be covered by 11 segments. Each segment weighs about 35 tonnes and has a deck width of 8.8 metres (29 feet) to facilitate simultaneous movement of two trains in opposite directions. With a requirement of about 330 segments per one kilometer, the first precast 1,000...
Words: 311 - Pages: 2
...Government of Kerala assigned the Delhi Metro Rail Corporation (DMRC) the task of preparing the detailed project report (DPR) for the Kochi Metro rail project. It was expected to start by 2006 and complete by 2010. But the project was delayed because the Central Government expressed serious doubts about the economic viability of the project.[9] The Kerala government had sought the Centre's assistance for the project to be built on the lines of the Delhi Metro project in terms of funding. The Centre refused this request.[10] The Union Government was in favour of implementing the project in public–private partnership (PPP) on the build-operate-transfer model,[11] ruling out its own financial involvement. The Ministry of Urban Development (MoUD) and the Planning Commission were also against government investment in the project, and refused to accept it as a project in line with the Delhi and Chennai metros. The political rivalry between the Left Democratic Front (LDF) government in Kerala and the United Progressive Alliance (UPA) government at the Centre was a major reason for such developments and the slow down in the project.[12] The LDF wanted it to be in public sector, which was not accepted by the Central Government. The victory of the United Democratic Front (UDF) in the 2011 Kerala legislative assembly elections, changed the scenario in the state[13] and it was decided that the Kochi Metro would follow the Chennai Metro and Delhi Metro models, and would be implemented on a joint...
Words: 690 - Pages: 3
...Concept of Project & Project Management Under guidance of: Dr. Alok Rai Associate Professor Presented by: Ashutosh Mishra MBA-Marketing FMSBHU Flow of Presentation •What is a project? •Features of Project •Project Management •Project management vs. general management •Project Life Cycle •Phases of Project life cycle •Bangalore Metro Rail Project •Conclusion •References 2 What is Project? The word project comes from the Latin word projectum which means "something that comes before anything else happens". Source: www.wikipedia.org A project is “a unique endeavour to produce a set of deliverables within clearly specified time, cost and quality constraints”. -Jason Westland, CEO MPMM “Trying to manage a project without project management is like trying to play a football game without a game plan.” - K .Tate 3 Features of Project Unique in Nature Defined Timescale Limited Resources Element of Risk Approved Budget Beneficial change Source: Project Management Guidebook 4 Typology of Projects Strategic 2-5 years. High degree of change to customers. Highly complex. Systems 1-2 years. Medium degree of change to customers. Medium complex. Operational Up to 1 year. Low degree of change to customers. Less complex. 5 What is Project Management? In project management a project consists of a temporary endeavour undertaken to create a unique product, service or result. It...
Words: 899 - Pages: 4