Request for Proposals

Field of Dreams

Dean Project Management (DPM) 3625 W Royal Ln., Houston, TX 77062

September 2013

Contract and Procurement Mgmt-4/2/2013
TABLE OF CONTENTS

1. INSTRUCTIONS TO BIDDERS 3 1.1. General Description of Work 3 1.2. What Must Be Included with Bid 4 1.3. Schedule of Bid Period Activities 4 1.4. Location of Work 10 1.5. Pre-Bid Meeting 10 1.6. Owner Contact for Questions 10 1.7. Pre-Award Surveys 10 1.8. Sealed Bid Requirements 10 1.9. Basis for Bid Evaluation 11 1.10. Ethical Standards 11 1.11. Responsibility for Surety Bonds 11 1.12. Proposal Format 11 1.13. List of Bidders 11 1.14. Letter of Acknowledgment 11
2. DESCRIPTION OF WORK 12 2.1. Engineering Contracts 12 2.2. Construction Contracts 13
3. PROPOSAL 13 3.1. Breakdown of Bid Price 14 3.2. Revisions and Extra Work 14 3.3. Escalation Formulas 14 3.4. Scheduled Completion Dates 14 3.5. List of Subcontractors 14 3.6. Key Supplier or Contractor Personnel 14 3.7. Length of Time Bid Is Valid 14 3.8. List of Bid Document Addenda Reviewed by Bidder 14 3.9. Notice of Conflicts or Errors in Bid Documents 14 3.10. Clarifications of Bids 15 3.11. Bidder Signature 15
4. SPECIFICATIONS AND DRAWINGS 15
5. SPECIAL CONDITIONS 15
6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 16
Appendix A 17
Appendix B 18
Supplier/Bidder List 18

INSTRUCTIONS TO BIDDERS

Dean Project Management (DPM) is seeking a Request for Proposals (RFP) from only pre-qualified construction managers for the Field of Dreams Project scheduled to open in March 2015 for the Bay Area Tigers, a semi-pro baseball team. The bid proposal should be responsive to each of the requirements that are included in all sections of this RFP.

1 General

Similar Documents

Premium Essay

Pm 598

...PM598 consists of three parts, which provide familiarization to processes associated with Contract and Procurement Management.  • Part 1 (PP1) of the course project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP Template document in the Doc Sharing area to develop information to support section one of the RFP.  • Part 1 (PP2) of the course project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor.  • Part 3 (PP3) of the course project entails selecting one of the three case studies from the PP3 - Course Project Case Study document in the Doc Sharing area and answering questions that demonstrate an understanding of the Garrett text. The deliverable for PP3 is a seven-page document that addresses each of the questions specified for the case study selected. This three-part project provides an overview of the processes and material that is used to develop a RFP as well as address relevant questions that could result from Contract and Procurement management.  The points assigned to each part of the course project are listed below: |Course Project Assignment |  Due |Points | |    Course Project Part 1 (PP1) |Week 2 |40 | |    Course Project Part 2 (PP2) |Week 4 |125 | |    Course Project Part 3 (PP3) ...

Words: 2420 - Pages: 10

Premium Essay

Slides

...Unit 6 Key Concept 1: Cable Connector Installation Copyright 2012, ITT ESI 1  Certification Process ◦ ◦ ◦ ◦ Test connections Verify cable performance Inspect environment Certification Copyright 2012, ITT ESI 2  Test Copper Connections ◦ Verify pinout ◦ Verify crimp ◦ Verify UTP not untwisted more than ½ inch  Test Fiber Connections ◦ Verify seal ◦ Verify adhesion ◦ Visual inspection Copyright 2012, ITT ESI 3  Copper Cable Tests ◦ Wire mapping:       Open Pair Shorted Pair Short between pairs Reversed pairs Crossed pairs Split pairs Copyright 20102 ITT ESI 4 Copyright 2012, ITT ESI 5  Copper Cable length ◦ Time Domain Reflectomoter (TDR)  Introduces signal on an open cable and measure time for reflection of signal to return  Measurement is compare to the nominal velocity of propagation (NVP) as specified for the cable  Can also be used to find distance to a cable break ◦ Cable resistance  Can be measured with a digital multimeter in ohms  Measurement is compared to cable specification Copyright 2012, ITT ESI 6  Copper Performance Testing ◦ Impedance – Structural Return Loss (SRL) measured in decibel (db) ◦ Attenuation – transmitter and received determine signal loss in db ◦ Near End Crosstalk (NEXT) – transmitter and receiver measure jumped signals near source ◦ Far End Crosstalk (FEXT) - transmitter and receiver measure jumped...

Words: 1538 - Pages: 7