QA quality Assurance ; time n budget; quality assurance n quality control are diff,Assurance involves all dev process.; quali control is testing. Assurances monitor standards and procedures.

12:08 PM

SRS/FRS/BRS Software/Functional/Business requirements specification

Tester: Designing test cases, Set up, execute , evaluating n recovering tests n errors.
Func testers/black box testers

SDLC software/system devp life cycle
Req analy, design, deve, testing, implementation, maint. UML Unified Modling lang.- rep the flow Use Case pictorial rep.-req doc

BA interacts with clients n customers and gather req and analyze. BRD business req docu.
Build a combo of programs.

Defect Lifecycle. Test summary report is one of the deliverables like test results, bulk rep,test reports. Water fall WFM and agile AM- adv and dis adv;
Comparison
Requirement analysis tester role starts. Daily standup meeting Agile- Scrum

Do not leave anything untested. Waterfall it doesn’t go back

Test to break attitude, Diplomatic, think as a customer, strong desire for quality, should know about the software, attention to detail, good relations with technical and non tech ppl,

Sprint
Sprint
Sprint
Sprint

BBT input and output WBT internal. Prct planning
Req ana
Dev
Testing
Implementation

Sprint: Time frame
Scrum master
Proi based on prjct ownr.
Last Part

Audio recording started: 6:02 PM Saturday, December 26, 2015

BBT techniques
Boundary value analysis BVA: To test within the limits. Verifying at the boundaries. Each boundary before and after.n-1,n,n+1. Negative n positive testing
COMPARISION TESTING

BBT

Audio recording started: 5:45 PM Saturday, December 26, 2015
Equivalence partitioning:

EP

Audio recording started: 5:49 PM Saturday, December 26, 2015
Error guessing:

EG and
Others

Domain experts

Audio recording started: 5:54 PM Saturday, December 26, 2015

Dec 26 Page 1

User story is req in accep criteria. Black box and white box testing: BBT without the knowledge of coding by tester no need to worry abt logic and program. Testing technique testing the functionality without
WBT Testing with logical by developers.

planning: yesterday today any challenges
Scrum
retro review UTP STP Unit/System test plans

BACKLOGS???

Less time- high visible functionality ,
Scheduling is easy in WFM

Agile: to handle changing req; Smaller team; Sit in same room war room; req in the form of user stories. ; user stories of req. Accep criteria is were v see req. req given by prdct

Agile issues will be solved right away. Every day we have scrum meetings and sprints should be schedule.
SPRINT RETROSPECTIVE and SPRINT REVIEW/DEMO. Retrospective: Challenges faced. Next sprint solutions . Sprint review: development should demo in front of the clients and should be accepted. If not next sprint.

Next class review and kind test.

Design: User frndly - Archtect/senior developer. High level- Syst design;
Architec Design, modular design,
Interface design low level design- detail design design document

we have to follow the life cycle. 3 diff. lifecycles. Release notes… Produc environmentreal transactions.

Phases n stages are common implementation is a little diff.

Based on point capacity is calculated

VELOCITY????

Interface, functional, technical, environmental req.

User interface req . Is very imp.

Functional and nonfunctional testing.

Dev stage: Build UTR release notes

Test manager, lead and analyst.

Planning- project manager-Project planning- Resources and
Schedules - MS project