You are Hank Kolb and you realize that the quality problems with the Greasex line is a symptom of a larger quality management issue for the organization. You have formed a problem solving team within the organization to analyze this larger problem and make recommendations on how to improve the quality management system with in the organization. Describe how your team will analyze this problem and make recommendations for improvement. 1. Write a problem statement that identifies the improvement
Words: 258 - Pages: 2
Hank Kolb Case What are the causes of the quality problems on the Greasex line? Display your answer on a fishbone diagram. What general steps should Hank follow in setting up a continuous improvement program for the company? What problems will he have to overcome to make it work? The first action I would suggest Hank Kolb to do is hold an entire company meeting, one meeting per shift, to clarify the current issue amongst all management and workers. I would like for everyone to be on the
Words: 567 - Pages: 3
Hank Kolb Case Operations Management Spring 2016 March 17, 2016 The Case “Hank Kolb, Director of Quality Assurance” is about a production line of an industrial product plant called “Greasex”. After becoming the director, quality assurance, Kolb finds out that the company lacks the commitment to achieve an excellent quality product. Every department had a different method to define quality in where they focus from the design of the materials to the product itself. Like a chain effect, each department
Words: 542 - Pages: 3
Hank Kolb Case Study In the technologey sector, the Grreasex line is speccialized in manufactureing solvents packed in cans for degreassing. The comppany, like most businesses had exaperienced some trouble over the years. The Greasex line ran into problems with new filling equipment. The main problem was the presence of high pressure beyond the required upper specified limit in some second shift cans. These probhlems can be traced back to various rooot causes. These causes include personnel, and
Words: 422 - Pages: 2
department quite a headache. In this paper, I am observing a case study to identify existing quality problems and determine all the causes that contributes to the quality problems. In the final chapter there will be short recommendations on how to deal with the quality assurance issues. I.2 Corporate Background Figure 1 Process at Hank Kolb Office The above figure represents the process/supply chain along the company where Hank Kolb works for. The company deals with the manufacturing of
Words: 1512 - Pages: 7
What can Hank Kolb do to setting up a continuous improvement program and improve their quality performance on producing a zero-defected product? II. CASE ANALYSIS • What are the causes of the quality problems on the Greasex line? Display your answer on a fishbone diagram. The primary problem is the lack of commitment to achieve an excellent quality product.. Themanagement lacks policies and visible support for quality standards.Although they have recently hired Hank Kolb to oversee
Words: 534 - Pages: 3
Hank Kolb Case Hank Kolb Case What are the causes of the quality problems on the Greasex line? Display your answer on a fishbone diagram. What general steps should Hank follow in setting up a continuous improvement program for the company? What problems will he have to overcome to make it work? The first action I would suggest Hank Kolb to do is hold an entire company meeting, one meeting per shift, to clarify the current issue amongst all management and workers. I would like for everyone to be
Words: 446 - Pages: 2
Buy A Quality System for Hank Kolb essay paper online A quality system is necessary for any company to survive in the market; the company has to ensure that it has means and resources of getting a desirable end product. in all the companies these is usually a flow process from one level to the other, the failure of one of these processes result in bad end product. The function of managers especially in factories is to assure the consumers of quality control and assurances. When the manager fails
Words: 1322 - Pages: 6
Hank Kolb, Director, Quality Assurance case study examines a manufacturing industrial plant that employs 1,200 people. Hank Kolb was the newly hired director, quality assurance. Kolb was warned by the general manager, Morganthal, about the “lack of a quality attitude” in the plant, and told Kolb that he “should try and do something about this.” Hank Kolb left a very good job to accept this position because he wanted a challenge and thought this company was serious about the importance of quality
Words: 2037 - Pages: 9
Course Problem Solving Case (Hank Kolb, p. 160 – 161) Following are the instructions you are to use in analyzing the Hank Kolb case. During Class 5, you and your class members analyzed the direct causes of the quality problems on the Greasex line. You used the fishbone diagram to display your analysis. In the next paragraph you are now asked to analyze this case from a larger perspective. You are Hank Kolb and you realize that the quality problems with the Greasex line is a symptom of a
Words: 439 - Pages: 2