T.E. /129 /S- 2013 UNIVERSITY OF PUNE Phone : 020-25601218 Fax : 020-25601206 Email : coe@unipune.ac.in Web : http://www.unipune.ac.in EXAMINATION SECTION Ganeshkhind, Pune - 411 007 (Maharashtra) INDIA T.E. (All Branches) November, 2013. Examination Circular No.129 of 2013 Programme of T. E. [ All Branches ( Semester I & II ) 2003 and 2008 Course] Examinations, November, 2013 INSTRUCTIONS FOR CANDIDATES 1. Candidates are required to be present at the Respective College of the examination, fifteen
Words: 2390 - Pages: 10
Transfer of training is the process in which you transfer the training you received to your job. Training transfer is defined as “the application continued by learners to performance of jobs, individuals, community responsibilities of knowledge in learning activities” (Broad, 1997, p. 2). The ability of an employee to transfer training back to the workplace is not an absolute following training. One of the main factors that impact the transferring process is the fact the training is a completely
Words: 261 - Pages: 2
the management control system put in place at Kansas City Works is holding the entity back from potential improvements in performance. The management at this entity is introducing a new performance measurement system to replace the old one that was based on production of an operating statistics report. The problem with the old system was that it was too detailed and distracted focus from important issues to many relatively small issues. Also, it did not serve as a good results control system in the
Words: 597 - Pages: 3
University of Phoenix Material Scholarship, Practice, and Leadership in Motion: Part One Learning Team Project Students are grouped into teams of three to five according to established criteria. Then, teams engage in a project that integrates collaborative and reflective practice in the following steps: • Identify a problem or need that exists in your emerging doctoral community. The identified problem or need should be intrinsic and unique to your specific cohort. Your team must provide
Words: 567 - Pages: 3
Topic 4.Controlling Topic 1: What is Control and Why Engage in It? Introduction Many people think of the word “control” in the context of manipulating someone or something. They think of control as getting someone to do something that WE want them to do, and it follows that they may NOT want to do it! In management, control has a different meaning. It is simply an information system that provides valuable feedback. In your textbook, control is defined as “the process of monitoring activities
Words: 2323 - Pages: 10
Autopilot is an automatic flight control system that keeps an aircraft in level flight or on a set course. It can be directed by the pilot, or it may be coupled to a radio navigation signal. Autopilot reduces the physical and mental demands on a pilot and increases safety. The common features available on an autopilot are altitude and heading hold. The simplest systems use gyroscopic attitude indicators and magnetic compasses to control servos connected to the flight control system. The number and location
Words: 1852 - Pages: 8
Adaptive Traffic Control System Performance measure against which our proposed policy to be tested is green time utilization. This performance measure is estimated by measuring the green time during which vehicles are served for an instance of a given phase and then dividing by the total length of the green time instance (i.e. minimum and maximum green time) The supporting data for green time utilization are as follows: * Allocated minimum and maximum green time * vehicle departure times
Words: 1648 - Pages: 7
Anita Wibbert Keller Graduate Rajesh Mahbubani Week 5: Assignment Sunday, December 1, 2013 1. Inform the President of any new internal control requirements if the company decides to go public. (7 points) Instituting a system of internal checks and balances would be foremost in my recommendations to the company president since most internal control systems provide for independent internal verification; this principle involves the review of data prepared by employees. To obtain maximum benefit
Words: 901 - Pages: 4
process improvement:- Flexible work assignment and commitment to production Waste and scarp elimination Cost reduction activities Increased thru put by removing bottleneck A-2) Forming teams responsible for manufacturing, engineering, Quality Control, Production systems and supplier relationships. Laid down target levels for product and process characteristics adapting a Zero defects philosophy. Defective engines during the manufacturing process were scrapped adapting a no rework approach
Words: 1860 - Pages: 8
KTH Homework assignment ME2028 Behavioral Management Control Andreas Torbiörnsson 09 How could each of the control problems at Leo´s Four-Plex Theater be solved with the use of Cultural control? Cultural control is a type of control that encourages mutual monitoring1 and it builds a lot upon group pressure. The main idea of cultural control is to get the employees to watch over each other and to create a culture that has certain things that you specifically do or don’t do. It aims to
Words: 8201 - Pages: 33