Nepal Biogas Plant -- Construction Manual
Construction Manual for GGC 2047 Model Biogas Plant
Biogas Support Programme (BSP)
P.O. Box No.: 1966, Kathmandu, Nepal
September, 1994

Sundar Bajgain
Programme Manager
Biogas Support Programme
Tel. 5521742, 5534035
Email snvbsp@wlink.com.np
Scanned by Biofuel Mailing List member Olivier Morf (with thanks) Introduction
The success or failure of any biogas plant mainly depends upon the quality of construction works. To come to a successfully constructed biogas plant, the mason should not only respect the dimensions as indicated on the drawing but also follow the correct construction method. Hereunder, in a step-by-step fashion, the right construction method of the 2047 design GGC model biogas plant is given.
1. Different Sizes of Plant
To become eligible to receive the investment subsidy provided by His Majesty's Government of Nepal under the Biogas Support Programme (BSP), only the 2047 design GGC model plants of 4, 6, 8, 10, 15 and 20 cubic meters capacity should be constructed. If the design and size of the plant other than mentioned above is chosen, the subsidy is not allowed. The table below gives some relevant data about these six different sizes of biogas plants.
Table 1
S.N. Size of Plant Daily Fresh Dung (Kg) Daily Water Liters Approx. No. Cattle Required
1. 4 24 24 2 - 3
2. 6 36 36 3 – 4
3. 8 48 48 4 – 6
4. 10 60 60 6 – 9
5. 15 90 90 9 – 14
6. 20 120 120 14 and more
* Plant size is the sum of digester volume and gas storage
** Based on a hydraulic retention time of 70 days
A biogas plant consists of five main structure or components. The required quantity of dung and water is mixed in the inlet tank and this mix in the form of slurry is allowed to be digested inside the digester. The gas produced in the digester is collected in the dome, called as the gasholder. The digested slurry flows to the outlet tank from the dig through the manhole. The slurry then flows through overflow opening to the compost pit where it is collected and composted. The gas is supplied to the point of application through the pipeline.

Before deciding the size of plant, it is necessary to collect dung for several days to determine what is the average daily dung production. The amount of dung daily available helps in determining the capacity of the plant. For example, if 55 kg of dung is collected daily, a 8 m3 plant has to be selected. It should be kept in mind that at least six kg dung is required for 1 m3 of plant capacity. The important point to be considered is that the size of plant has to be selected on basis of available dung not on the family size.

If a plant is underfed, the gas production will be low; in this case, the pressure of the gas might not be sufficient to displace the slurry in the outlet chamber. This means that amount of slurry fed into the digester is more than the amount of slurry thrown out from the outlet. This will cause the slurry level to rise in the digester; gasholder and it may eventually enter to the gas pipe and sometimes, to the gas stove and lamp while opening the main valve. Therefore, the slurry should always be fed according to the prescribed amount as indicated, in the above table.
2. Construction Materials
If the construction materials to be used in the plant construction such as cement, sand, aggregate etc. are not of good quality, the quality of plant will be poor even if design and workmanship involved are excellent. In order to select these materials of best quality, their brief description regarding the specifications has been given hereunder. (The list construction materials are given in annex 1).
a) Cement
The cement to be used in the plant construction has to be of high quality portland cement from a brand with a good reputation. It must be fresh, without lumps and stored in a dry place. Bags of cement should never be stacked directly on the floor or against the walls but wooden planks should be placed on the floor to protect cement from dampness.
b) Sand
Sand for construction purpose must be clean. Dirty sand has a very negative effect on the strength of the structure. If the sand contains 3% or more impurities, it must be washed. The quantity of impurities especially the mud in the sand can be determined by a simple test using a bottle. This is called the 'bottle test'. For this test, small quantity of sand is put in the bottle. After this, water is poured in and the bottle is stirred vigorously. The bottle is than left stationary to allow the sand to settle down. The particles of sand are heavier than that of mud so it settles down quickly. After 20-25 minutes, the layer of mud verses sand inside the bottle are measured. Course and granular sand can be used for concreting work but fine sand will be better for plastering work.
c) Gravel
Gravel should not be too big or very small. It should not be bigger than 25% of the thickness of concrete product where it is used in. As the slabs and the top of the dome are not more than 3" thick, gravel should not be larger than 0.75" (2 cm) in size. Furthermore, the gravel must be clean. If it is dirty, it should be washed with clean water.
d) Water
Water is mainly used for preparing the mortar for masonry work, concreting work and plastering. It is also used to soak bricks/stones before using them. Besides these, water is also used for washing sand and aggregates. It is advised not to use water from ponds and irrigation canals for these purposes, as it is usually too dirty. Dirty water has an adverse effect the strength of the structure; hence water to be used must clean.
e) Bricks
Bricks must be of the best quality locally available. When hitting two bricks, the sound must be clear. They must be well baked and regular in shape. Before use, bricks must be soaked for few minutes in clean water. Such bricks will not soak moisture) from the mortar afterwards.
f) Stones
If stones are to be used for masonry work, they have to be clean, strong and of good quality. Stones should be washed if they are dirty.
3. Construction Site Selection
The following points should be kept in mind when deciding on a site for biogas plant construction.
• For proper functioning of the plant, the right temperature has to be maintained in the digester. Therefore, a sun site has to be selected.
• To make plant operation easy and to avoid wastage raw material specially the dung, the plant must be as close as possible to the stable (cattle shed) and water source. If the nearest water source is at a distance of more than 20 minutes walk, the burden of fetching water becomes too much and no plant should be installed in such places.
• If longer gas-pipe is used the cost will be increased, the pipe is expensive. Furthermore, longer pipe increase the risk of gas leakage due to more joints in it. The main valve has to be opened and closed before and after use Therefore, the plant should be as close as possible to the point of use so that the above problems are eliminated.
• The edge of the foundation of the plant should be at least two meters away from the house or any other building to avoid risk of damages.
• The plant should be at least 10 metres away from the well or any other under ground water sources to protect water from pollution.
4. Digging and Pit Depth
When a suitable site is selected, a small peg has to be stuck in the ground at the centre spot of the digester. A cord has to be attached to this peg with the length indicated on the drawing under dimension 'C'. Now this cord is the radius of the digester pit and the circumference can be decided by moving the edge of the cord on circular fashion. The pit depth is indicated on the drawing under dimension 'E'. The excavation work should only be started after deciding the location of manhole and outlet tank. The pit wal1s should be as vertical as possible and, most important, the pit bottom must be leveled and the earth must be untouched.

While digging, excavated soil should be thrown at least one foot away from the layout, so that it does not fall inside the pit when the construction work is in progress.

After digging the pit, a suitable arrangement must be made for the inlet pipe(s).

If because of hard rock or under ground water, the right depth can not be achieved, the pit has to be made as deep as possible, while after completion of the structure some protective measure have to be constructed so that the wal1s of outlet and dome is supported well from outside. (see chapter 10)

Bigger image
5. Construction of Round-wall
At the centre of the pit, a straight rod or pipe (the 0.5" GI gas pipe) must be placed in an exact vertical position. At ground-level, a heavy pole or pipe has to be placed horizontally on the centre of the pit. The vertical pipe can now be secured to the horizontal pipe or pole. After securing, the vertical pipe has again to be checked whether it is still in the right position.

A string or wire can now be attached to the vertical pipe. The length of this wire can be found on the drawing under the dimension 'F. One cm has to be added to this length to allow space for plastering. Every brick or stone which is laid in the round-wall has to be exactly F+ 1 cm away from the vertical pipe.

After deciding the radius of digester, the round wall is started to be constructed. The first row of bricks must be positioned on their sides so that a 4.5" high, 9" wide base is made. It is essential that first row is placed on a firm, untouched and level soil. The next rows of bricks can be positioned on their lengths so that the wall thickness becomes 4.5".

It is not necessary to make pillars in the wall but the backfilling between wall and pit-side must be compacted with great care. This backfilling has to be done in the morning before starting the construction work. Earth should be well compacted by adding water and gentle ramming all along the circumference of the digester. Poor compaction will lead to cracks in round-wall and dome.

If stone is used for the construction of round wall, the wall should rest against the pit-side as it is difficult to have proper backfilling because of the irregular shape of the outside of the stone wall. The cement mortar used can be 1 cement-4 sand to I cement-6 sand depending on the quality of the sand.

The height of the round-wall can be found on the drawing under dimension 'H' when measured from the finished floor. The dung inlet pipe and toilet pipe must be placed in position when the round-wall is 35 cm high. To reduce the risk of blockages, the inlet pipe(s) must be placed as vertically as practical possible.

Exactly to the opposite of the dung inlet pipe, a 60 cm wide opening must be left in the round-wall which acts as manhole. The digested slurry also flows out to the outlet tank through this opening. The inlet pipe from the latrine should be placed as close as possible with the dung inlet pipe with a maximum distance of 45 degrees from the dung' inlet on the dung inlet-centres-manhole line (hartline).

When the round-wall has reached the correct height, I inside must be plastered with a smooth layer of cement mortar with a mix of 1 cement - 3 sand. The digester floor can made from bricks or small stones with plaster in cement mortar.

6. Dome Construction
When the construction works of round wall as described above is completed than the dome has to be constructed. Before filling the pit with earth to make the mould for dome, backside of the round wall should be filled with proper compacted back-filling. If this is not done, the pressure of earth for the mould can lead to cracks in the round-wall.

On the vertical centre pipe a mark has to be made - distance "J", as given in the drawing, from the finished floor. The compacted earth has to reach this level. The vertical pipe can now be removed by pulling it upwards. It has to be replaced by a shorter O0.5" dia. pipe, approx. 0.5 metres length in the earth exactly at the same spot. Now the template should be used to make the shape of the dome. The top of the round-wall wall must be clean when the template is in use. The template can be checked by making sure the top is horizontal and the side exactly vertical. Furthermore, the part of the template that touches the round-wall must be in the same position all over the round wall.

It is important that the earth of the mould is well compacted. If the earth is further compressed after casting the dome, by its own weight and that of the concrete, it can lead to cracks in the dome. When the earth mould has the exact shape of the template, a thin layer of fine sand has to be spread on the mould-top by gently patting it on the surface. Any excess sand or soil that falls on the round-wall has to be removed.

The earth used for the mould has to be damp to prevent dry earth from soaking up water from freshly casted concrete.

Before starting the casting work enough manpower and construction materials like sand, gravel, cement and water has to be collected on the site. The casting has to be done as quickly as possible and without interruptions as this will negatively affect the quality of the cast. A constant, adequate supply of concrete (mix: 1 cement, 3 sand, 3 gravel) must be made for the mason. No concrete older than 30 minutes should be used.

A special care should be taken to maintain the thickness of dome while casting, i.e. the thickness in and near the edges should be more than the thickness in the centre. For 4, 6, 8 and 10 m3 plant, the thickness in the edge should be 25 cm where as the thickness in the centre should be 7 cm. Similarly, for 15 and 20 m3 plants, the thickness in the centre should be 8 and 9 cm respectively and the thickness in the age I should be 25 cm.

The small pipe on the top of the mould must be left in place till the main gas pipe is installed. This is to make sure that the main gas pipe is exactly in the centre.

Already during the casting, the concrete has to be protected against strong sunlight by covering it with jute bags or straw mats. This protection has to be left in place for at least one week. The day after the casting, the turret must be made.

Any delays can lead to leakage between main gas pipe and dome. Also from the day after the casting onwards, the dome has to be sprinkled with water 3 to 4 times a day which known as curing.

After approximately one week, depending temperature the earth of the mould can be removed through the manhole. When all earth is removed, the inside of the dome has to be thoroughly cleaned with a brush and clean water

On the clean surface the following plaster coats have to be applied to make the dome gas-tight.
1. Cement-water flush
2. 10 mm layer, 1 cement - 2 sand, plaster
3. 5 mm layer, 1 cement - 1 sand, punning.
4. Cement/acrylic emulsion paint coating, 1.5 paint-20 cement
5. Cement/acrylic emulsion paint coating, 1 paint -2 cement
A plaster Coat must be at least one day old before next layer can be put on. When a layer of plaster is applied, the work must be executed with the greatest care and without interruptions. The well functioning of the plant is very depending on the gas tightness of the dome.

Bigger image
7. Construction Outlet Chamber
To construct the outlet tank, excavation has to be done just behind the manhole. The level of excavation can be measured from the digester floor by taking the dimension 'I' minus the thickness of the digester floor. The earth behind the manhole and under the outlet floor has to be very well compacted otherwise cracks will occur.

The inside dimensions of the outlet can be found on the drawing under A,B and D. The distance from the digester floor to the outlet floor is given by the dimension 'I'.

It is important that these dimensions should be accurate as they determine the useful capacity of the gasholder. For the same reason the outlet floor and the top of the walls have to be level. The walls have to be vertical and finished with a smooth layer of cement plaster (mix: 1 cement - 3 sand). On the outside, the walls have to be supported with sufficient earth body up to the overflow level. This again is to avoid cracks.

The outlet tank should be on a slightly higher elevation than the surrounding so that there are no chances of water running into the outlet during the rainy season.

At the same time of dome casting, the concrete slabs for the outlet should be constructed. It is easy to make some additional concrete at this time and the slab will be well cured before they are placed on the outlet. The slabs must be 2.5" to 3" thick with proper reinforcement at 0,75" from the bottom side. The slabs must be of such size that they can be handled by 4-5 men without great difficulty.

The surface, on which the slabs are casted, has to be flat and clean. Special care has to be taken for the compaction of the concrete, as small holes will expose the steel reinforcement to corrosive vapour coming from the slurry in the outlet and will cause the corrosion which may ultimately lead to the slab collapse. Hence, if holes are formed in the slab these should be blocked with plaster layer. The outlet cover slabs are essential to protect people and animals from falling inside and to avoid excessive vaporization of the slurry in dry season.

8. Construction of Inlet Pit
The inlet pit is constructed to mix dung and water. This can be constructed with or without a mixing device. Installation of a mixing device is preferable not only because it makes plant operation easier for the user but also because it improves the quality of mix. When a mixer is installed it has to be firmly attached to the structure, easy to operate, effective in the mixing process and the steel parts in contact with the dung are to be galvanized.

The top of the structure should not be more than one meter high from the ground level and both inside and outside of the pit has to be covered with a smooth layer of plaster (Mix: 1 cement-3 sand).

The bottom of the tank must be at least 5 cm above the outlet overflow level. The position of the inlet pipe in the floor must be such that a pole or rod can enter through it without obstructions. For the same reason the inlet pipe must be without bends.

Even though mixing device is not installed, the inlet pit should be round in shape as this is more economical material-wise and easier for hand mixing.

In case of toilet attachment to the plant it is better to construct without siphon or trap as the pan with siphon needs more water which may result excess water inside the digester. It is also not possible to de-block the pipe when the toilet has a trap. The toilet should not be farther than 45 degrees from the hart line. Additionally, the toilet pan level should be at least 25 cm above the outlet overflow level.

9. Lay-out of Pipeline
The gas pipe conveying the gas from the plant to users point is vulnerable for damages by people, domestic animals and rodents. Therefore, only light quality galvanized iron pipe should be used which must be, where possible, buried 1 foot below ground level. Fittings in the pipeline must be sealed with zinc putty, teflon tape or jute and paint. Any other sealing agent, like grease, paint only, soap etc. must not be allowed. To reduce the risk of leakage, the use of fittings, specially unions, should be kept to a necessary minimum. No fittings should be placed between the main gas valve and the dome gas pipe.

The biogas coming from the digester is saturated with water vapor. This water vapor will condense at the walls of the pipeline. If this condense water is not removed regularly, it will ultimately clog the pipeline. Hence, a water drain has to be placed in the pipeline. The position of the water drain should be vertically below the lowest point of the pipeline so that water will flow by gravity to the trap. Water can be removed by opening the drain. As this has to be done periodically, the drain must be well accessible and protected in a well, maintained drain pit.

For connecting burners with gas pipelines, use of transparent polyethylene hose must be avoided. Only neoprene rubber hose of the best quality should be used.

As soon as there is gas production, all joints and taps must be checked for leakage by applying a thick soap solution. If there is leakage the foam will either move or break.

10. Compost Pits
Compost pits are an integral part of the biogas plant; no plant is complete without them. A minimum of 2 compost pits must be dug near to the outlet overflow in such a way that the slurry can run freely into the pits. Enough earth body must remain however, at least 1 meter, between the pits and the outlet chamber to avoid cracking of the chamber walls. The total volume of the compost pits must be at least equal to the plant volume.

To make a potent and easy to use as fertilizer, the compost pits should be filled with agricultural residues together with the slurry from the plant.

The earth coming from digging the compost pits can be used for backfilling of the inlet and outlet chamber and for top filling on the dome.

For proper insulation during the cold season and as counter weight against the gas pressure inside, a minimum top filling of 40 cm compacted earth is required on the dome. If, e.g. because of high ground water table, the plant is not positioned deep enough, the top filling will be prone to erosion due to wind and rain. In these cases proper protection, i.e. with a dry stone circular wall, has to be applied.

If the concerned mason and plumber strictly follow the above described instructions during the construction phase, the complete plant will be of high quality. Hence, the plant owner will be benefitted ultimately from the investment and positive return will be achieved as per the expectations. This again will persuade his relative and neighbors to install a biogas plant as well, while a poorly constructed plant will do harm to the reputation of biogas technology.

Bigger image

Bigger image

Back to the Biofuels Library

Small Farms Library
________________________________________
Biofuels
Biofuels Library
Biofuels supplies and suppliers

Biodiesel
Make your own biodiesel
Mike Pelly's recipe
Two-stage biodiesel process
FOOLPROOF biodiesel process
Biodiesel processors
Biodiesel in Hong Kong
Nitrogen Oxide emissions
Glycerine
Biodiesel resources on the Web
Do diesels have a future?
Vegetable oil yields and characteristics
Washing
Biodiesel and your vehicle
Food or fuel?
Straight vegetable oil as diesel fuel

Ethanol
Ethanol resources on the Web
Is ethanol energy-efficient? Community development | Rural development
City farms | Organic gardening | Composting | Small farms | Biofuel | Solar box cookers
Trees, soil and water | Seeds of the world | Appropriate technology | Project vehicles

Home | What people are saying about us | About Handmade Projects
Projects | Internet | Schools projects | Sitemap | Site Search | Donations | Contact us

Similar Documents

Free Essay

Experience of Biogas Technology in China

...Experience of Biogas Technology in China Biogas has a long history in China. China is one of those countries, which pioneered in the research, development and utilization of biogas. Mr. Lo Guo-rui initiated his own research work on biogas in early 1920s with the aim to reduce import of kerosene and meet fuel crisis. He built the first biogas plant in his own house in Swatow city in Kuanglong province. The plant worked well and could meet the cooking need of his 6 family members. Subsequently he constructed about a dozen of digesters. Their performance was good. In 1929 Mr. Lo established a company named ‘Guo-Rui Gas Light Col’ for the marketing of his products. In 1930 his model received patent right from the Ministry of Industries. Soon after, he shifted to Shanghai and renamed his company as ‘China Guo Rui Gas General Cooperation’. With the construction of digesters, he started developing appliances like burner, lamp, valve etc. Gradually, he expanded his activities in 13 provinces. At his initiative more than one hundred plants have been built. In some cities biogas is used for lighting in stores. Some rich people used biogas for lighting and cooking. Even after 50 years, some of his digesters were found functioning. These are mainly rectangular. Only a few are cylindrical. The sizes vary from 6m3-108m3. These are made of cement and bricks/rocks. From technical point of view, the plants were successful. But, high construction cost hindered popularization of the technology...

Words: 2011 - Pages: 9

Premium Essay

Bioenergy Technology Development in Nigeria – Pathway to Sustainable Development

...affecting Nigeria’s economical progress is power. And this has been a major discuss in the country for a long time. A reliable and sustainable energy source is greatly desired to power the nation’s economy and this need cannot be overemphasized, due to the epileptic power supply to the national grid, it has become absolutely important to explore other cheap sources of power to meet our urban and rural energy need. This will in no small measure support our national grid and reduce rural-urban drift. The heavy dependence on gas generated by the Nigeria National Petroleum Co-operation (NNPC) to power our turbines at our gas plants often exposes the country to power outage due to high cost of maintenance and vandalism. Applying biomass technology to generate power can help the country develop its energy sector more rapidly as the raw material needed to feed the Bioenergy plants are almost everywhere in the country some are mere waste such as agricultural and domestic waste. The focus of this paper is on the use of bioenergy to alleviate the poverty rate in Nigeria especially in the rural areas where there is large amount of Lands and biomass material. Developing the bioenergy strength of the country also creates wealth and employment opportunity in the country; generate electricity and the production of domestic cooking gas across the rural and urban settlements in the country. 1. INTRODUCTION Energy is the mainstay of Nigeria’s economic growth and development. It plays a significant...

Words: 7763 - Pages: 32

Free Essay

Flower

...Clean Cooking Solutions through  Clean Cooking Solutions through Biogas in Nepal Presented on First CCAAC Day 10 July 2014, Kathmandu Biogas •Biogas is odorless, colorless gas produced  from any organic waste from any organic waste •It contains 60% methane gas and 40% of  CO2 and others created by the bacteria in the d h created by the bacteria in the  absence of oxygen. •The ideal temperature to generate biogas is  •The ideal temperature to generate biogas is 30‐35° C Scenario without Biogas CO2 around ½ year Result = 0 t of CO2 CO2 Result = + 50 kg of CO R lt + 50 k f CO2  per bottle of LPG Scenario with Biogas CO2 around ½ year CH4 & CO2 Result = 0 t of CO2 Savings from Biogas Annual savings of: • Reduction of workload of women/children @ 3 hours/plant/day • Fuelwood @ 2 tonnes/plant/year • Agriculture residue @0.35 tonnes/plant/year • Dung cakes @ 0.60 tonnes/plant/year t / l t/ • Kerosene @6.4 liters/plant/year • Dry bio-slurry/bio compost@1.75 tonnes/plant/year p y • Annual reduction of GHGs emission CO2 equivalent @4.2 tonnes/plant/year bio slurry bio • Proper usages bio-slurry and biocompost@80% HHs • Average Plant size is 6 cum Key findings of biog technolo under BS gas ogy SP History of Biogas development in Nepal  1955 ‐Father B R Sauboll built a demonstration biogas plant at St 1955  ‐Father B.R. Sauboll built a demonstration biogas plant at St.  Xavier's School, Godavari, Lalitpur.   1968 ‐ Khadi and Village Industries Commission (KVIC) of India built...

Words: 1781 - Pages: 8

Free Essay

Biogas

...till date: 09 9. Experiment on Biogas production for Lovely University Hostel mess using food wastage (starch and sugar) along with Algi from nearby marshy area. 2 ABSTRACT There has been many successful efforts in the past to produce biogas from cow dung slurry. Thousands of biogas plants have been installed in India and possibly abroad to say no to conventional energy resources. Afterwards there were experiments to mix cow slurry with food waste, paper waste and leaves poultry farm waste. We are going to use existing knowledge to make hostel messes energy efficient and moreover check the performance of the plant adding Algi from nearby marshy lands(easily located in village areas in India). This will help save lot LPG needed and also reduce environment hazards of land filling organic waste available in huge quantity in LPU. INTRODUCTION All over the world efforts are at their maximum level to decrease the dependency on conventional fuels giving way to green energy based upon renewable energy resources. Though LPG is used in all the hostels in Lovely Professional University (LPU) but we thought of utilizing the huge quantity of food waste coming out of hostel mess on daily basis. There are around more than 12,000 students staying in the hostels and every hostel have their own mess. Making biogas out of this would not make the messes energy efficient but also reduce the environment hazards as a result of decomposition of organic waste. Biogas production requires anaerobic digestion...

Words: 1751 - Pages: 8

Free Essay

Biogas

...Biogas production in Pakistani rural areas Introduction and Background Energy in the form of gas or electricity has become an essential part of global world. The economic growth will be simulated due to the presence of sufficient quality and quantity of electricity at affordable prices. The history about biogas plants goes us back to ancient China and Persia. Millions of bio energy plants have been installed in developing countries like India, china, Nepal etc. In the era of 1950’s small biogas plants have also been installed in India, now these plants are also installing in poor rural areas. In the 19th centenary, the covered sewage tanks were being used by china to generate power energy. The 1st plant of biogas was built in 1859 at the Bombay in the India by Panhwar. 30million rural households in china that have biogas digesters, these rural areas have many benefits such as saving fossil fuels, saving time, protecting forests, saving money, saving cooking time, improve hygienic conditions, improving the rural quality of life, reducing water and air pollution(Prabhu et al.). Biogas is a kind of bio-fuel and it is derived from biogenic. Biologically break down of organic materials in the absence of oxygen is referred to as Biogas. Organic wastes include kitchen-wastes, dead-plants, animal-dung etc, these organic wastes are converted into biogas. Pakistan has one of the biggest unexploited coal and biogas resources. Greater than 70% population of Pakistan is living in rural...

Words: 1139 - Pages: 5

Free Essay

Biogas

...What is bio gas--Biogas typically refers to a mixture of gases produced by the breakdown of organic matter in the absence of oxygen. Biogas can be produced from regionally available raw materials such as recycled waste. It is a renewable energy source and in many cases exerts a very small carbon footprint. Biogas is produced by anaerobic digestion with anaerobic bacteria or fermentation of biodegradable materials such as manure,sewage, municipal waste, green waste, plant material, and crops.[1] It is primarily methane (CH 4) and carbon dioxide (CO 2) and may have small amounts of hydrogen sulphide (H 2S), moisture and siloxanes. The gases methane, hydrogen, and carbon monoxide (CO) can be combusted or oxidized with oxygen. This energy release allows biogas to be used as a fuel; it can be used for any heating purpose, such as cooking. It can also be used in a gas engine to convert the energy in the gas into electricity and heat.[2] Biogas can be compressed, the same way natural gas is compressed to CNG, and used to power motor vehicles. In the UK, for example, biogas is estimated to have the potential to replace around 17% of vehicle fuel.[3] It qualifies for renewable energy subsidies in some parts of the world. Biogas can be cleaned and upgraded to natural gas standards when it becomes bio methane. Biogas is a biofuel and it generally refers to the gas produced from organic matter as it is broken down by biological means. You can build a biogas plant for your home, community...

Words: 739 - Pages: 3

Free Essay

Biogas Production Using Pig Manure and Poultry Dungs, (Substrates) Onions and Fruit Wastes(Additives) and Fowl Rumen(Inoculum)

...Bioresource Technology xxx (2004) xxx–xxx Review paper Enhancement of biogas production from solid substrates using different techniques––a review Yadvika a, Santosh a b a,* , T.R. Sreekrishnan b, Sangeeta Kohli c, Vineet Rana a Centre for Rural Development & Technology, I.I.T., Delhi 1100016, India Department for Biochemical Engineering & Biotechnology, I.I.T., Delhi 1100016, India c Department of Mechanical Engineering, I.I.T., Delhi 1100016, India Received 31 July 2003; received in revised form 18 August 2003 Abstract Biogas, a clean and renewable form of energy could very well substitute (especially in the rural sector) for conventional sources of energy (fossil fuels, oil, etc.) which are causing ecological–environmental problems and at the same time depleting at a faster rate. Despite its numerous advantages, the potential of biogas technology could not be fully harnessed or tapped as certain constraints are also associated with it. Most common among these are: the large hydraulic retention time of 30–50 days, low gas production in winter, etc. Therefore, efforts are needed to remove its various limitations so as to popularize this technology in the rural areas. Researchers have tried different techniques to enhance gas production. This paper reviews the various techniques, which could be used to enhance the gas production rate from solid substrates. Ó 2004 Published by Elsevier Ltd. Keywords: Biogas production rate; Additives; Anaerobic filters; HRT 1. Introduction In...

Words: 9334 - Pages: 38

Free Essay

Technoprneurshp - Renewable Energy

...GRE3NKARMA | Technopreneurship | Food Waste – Renewable Energy | | Amos Tan Yi Wen, Eu Wei Yi Vivian, Abdul Azziz B Abd Talib & Andy Chua Kang Ren | 2/10/2014 | | Contents 1. Executive Summary 3 2. The Company and its Operations 4 Company Background 4 Our Mission 4 Company Ownership and Management 5 Business Form: 5 Company Location and Facilities 6 Manufacturing and Operations Plan 7 Labour 7 Equipment 8 Office Equipment 8 Suppliers 9 3. Products and Services 9 Description of the product and services 9 Biogas – An Eco-Friendly Renewable source of energy 9 Components of a Biogas Plant 10 Benefits that the product and services can bring to customers 11 Unique features of the product and service 11 4. Market Analysis 12 Global and industry overview 12 Global outlook 12 Local outlook 12 Porter Five Forces 13 PEST Analysis 14 Political 14 Economic 15 Social 16 Technological 16 Competition Analysis 16 SWOT Analysis 18 Market Trends 18 Segmentation Analysis 19 Target Market (size in terms of number of potential customers or potential dollar volume) 22 5. Marketing Strategy 22 Product Strategy 22 Operational Excellence 22 Product Leadership 22 Labeling 22 Pricing Strategy 23 Penetration Pricing Strategy 23 Sales Forecast Plan 24 Market Penetration Strategy and the cost involved 24 Focus strategy/Differentiation based strategy 24 Promotion Strategy 25 Advertising 25 Sales...

Words: 7031 - Pages: 29

Free Essay

Biogas

...digestion of energy crop residues and wastes is of increasing interest in order to reduce greenhouse gas emissions and to facilitate a sustainable development of energy supply. Production of biogas provides a versatile carrier of renewable energy, as methane can be used for replacement of fossil fuels in both heat and power generation as vehicle fuel. Biogas fuel production from blends of biological wastes such as Cow rumen liquor (CL), Poultry droppings (PD), and Goat Faeces (GF) with Maize cobs (M) were studied. 20 g of each inoculum was mixed with 100g of degraded maize cobs in the first three digesters while the fourth contained CL 10g, PD 10 g, and M 100 g. 100 g of M alone in the fifth digester served as the control. The blends were subjected to anaerobic digestion for 10 days on the prevailing atmospheric ambient temperature and pressure conditions. Physiochemical properties of the blends such as moisture content, crude protein, ash, fat, crude fibre, carbohydrate content, C/N ratio, and pH were also determined. Results of the daily performances of each system showed that maize cobs (M) alone had cumulative biogas yield of 1.50 cm3 while those of the blends (MCL, MPD, MGF and MCLPD) were 6.11 cm3, 3.05 cm3, 2.50 cm3, and 63.00 cm3 respectively, pH and C/N ratio affected the biogas yield of the systems significantly. These results indicate that...

Words: 4542 - Pages: 19

Free Essay

International Trade

...CONSTRUCTION PROCEDURE FOR BIOGAS PLANTS Construction of fixed dome biogas plants is a specialised task that can be performed by artisans who have been trained as Biogas Technicians. A radius stick ensures uniform radius of block work around the central point, pivot, and support brick before they bind during construction, especially when the plant construction starts. 1.1 PLANT CONSTRUCTION METHODOLOGY The general methodology includes the following steps, in stages: • Clear site and demarcate the positions of major elements of the plant. • Prepare the site for construction. • Excavate the digester pit, the inlet and the outlet chambers. • Provide construction materials and organise qualified labourers. • Organise the construction site. Construction of the 1st phase of digesters: • Fixing of the Reference Line • Casting and reinforcement of digester foundation, • Construct digester walls up to outlet pipe level • Plastering of outlet wall • Back-filling and ramming • Casting of foundations for outlet chambers • Construction of outlet trench from digester to outlet chamber Construction of the 2nd phase of digesters • Cross-checking of the Reference Line • Digester construction up to inlet chamber level • Fixing of inlet pipe from digester to inlet chamber • Plastering of outside and inside walls • Back-filling and ramming • Casting of foundations for inlet chamber • Construction of inlet trench from digester to inlet chamber Construction of the 3rd phase ...

Words: 3082 - Pages: 13

Free Essay

Dfnaklnlk

...Investing in Methane Digesters on Pennsylvania Dairy Farms: Implications of Scale Economies and Environmental Programs Elizabeth R. Leuer, Jeffrey Hyde, and Tom L. Richard A stochastic capital budget was used to analyze the effect of net metering policies and carbon credits on profitability of anaerobic digesters on dairy farms in Pennsylvania. We analyzed three different farm sizes—500, 1,000, and 2,000 cows—and considered the addition of a solids separator to the project. Results indicate that net metering policies and carbon credits increase the expected net present value (NPV) of digesters. Moreover, the addition of a solids separator further increases the mean NPV of the venture. In general, the technology is profitable only for very large farms (1,000+ cows) that use the separated solids as bedding material. Key Words: anaerobic digester, stochastic capital budget model, dairy farm, alternative energy For a host of reasons, U.S. scientists, government leaders, and citizens are increasingly seeking alternative sources of energy. Green energy sources are those that do not emit harmful pollutants and/ or that are renewable. Anaerobic digesters (AD), found on dairy, hog, and poultry farms across the United States, represent potential sources of green energy. AgSTAR, a U.S. Environmental Protection Agency (U.S. EPA) program, whose goal is to increase the number of anaerobic digesters on farms in the United States, estimates there are 6,900 swine and dairy farms that could...

Words: 9906 - Pages: 40

Premium Essay

Social Entrepreneurship Through Forest Bio Residue Briquetting

...Social entrepreneurship through forest bio residue briquetting Contents 1. The social problem and the opportunity 4 2. Mission, vision and values 7 3. Our solution (strategy and business model) 9 4. The entrepreneurial team 15 5. Human resources 16 6. Context 18 7. Scaling strategy 20 8. Impact measurement 22 9. Risks 25 10. Financial Plan 28 Bibliography 29 Figure 1. Exposure of the population to natural disasters 4 Figure 2. Lean canvas 8 Figure 3. Manually operated briquetting machine 11 Figure 4. Crushing option 12 0. Business plan summary This section should briefly present the main ideas of the following sections and thus should resemble an elevator speech. Accordingly, it has to be written last, after all the details of the business have been established. Length of section: 0.5-1 page 1. The social problem and the opportunity Most of the time Romania ranks last in sectors like education, health and sustainable development among European countries. But when it comes to antagonistic areas, the situation changes abruptly: Romania occupying the fourth place among the European countries threatened by natural disasters like drought, floods and landslide. In 2012 Institute for Environment and Human Security of the UN launched the World Risk Report which focused on environmental degradation and disasters. According to the study, Romania features an average risk. The report underlined the following aspect: “The risk...

Words: 8925 - Pages: 36

Free Essay

Environmental Science Paper

...Using Waste for Energy One of the most important environmental issues faced by our generation, as well as future generations, is without doubt energy. This is of major concern because we are using up our nonrenewable sources at a much faster rate than they are being replenished, but at the same time we have yet to perfect ways to completely replace nonrenewable energy with renewable energy. The article “Could Generating Energy from Waste be the Answer?” explains how researchers at Teesside University have discovered a way to produce biofuels using waste. I personally found this article interesting because it gave me new hope and insight into producing energy from sources I hadn’t previously given much thought to. Biofuels are a great source of renewable energy because they do not create harmful environmental by-products like other fuels. However, according to Dr. Komang Ralebitso-Senior, Senior Lecturer in Molecular Biology at Teesside University, they create what she calls a food-fuel conflict. As Ralebitso-Senior expresses, biofuels “can encourage farmers to grow energy crops at the expense of badly-needed food, particularly in poorer countries in the world” (par. 2). Farmers often make more money growing crops to use for biofuels rather than food. This can cause a problem because as crops grown for food decline the prices to purchase them increase. Before reading this article, I had never given much thought to how producing crops, such as corn, for fuel cuts back on what...

Words: 641 - Pages: 3

Free Essay

Bioenergy India

...enewable Energy technologies (RET) are amenable to adoption at different scales viz. a few hundred Megawatts to a few kilowatts and can be matched with end use requirements enabling their decentralized deployment. They can help promote sustainable development through increased opportunities for local employment, particularly the rural people and environmental improvement through reduced GHG emissions. Primary biomass combustion has been the main source of energy for India. According to the Integrated Energy Policy Report (2006), about 80 mtoe is currently used in the rural households. The Ministry of New and Renewable energy has estimated state-wise gross and net availability of agro residue for power generation through Biomass Resource Atlas. Projects based on both biomass combustion and biomass gasification technologies are promoted by the Ministry. Biomass based renewable energy has the potential to be at the forefront in India with the large amount of varied kinds of feedstock available, especially agricultural residues. Such projects will be sustainable with a viable business model. The lessons learnt from DESI Power project has been included in this issue. The recently launched Renewable Global Status Report 2009 is also featured here, which offers an optimistic picture about the global renewable energy industry, including the biomass sector and especially covers India’s Remote Village Electrification program that has been successful and continues to progress ...

Words: 429 - Pages: 2

Free Essay

Business

...RESUME   Madathu Vilai,  Attukonam, Manalikarai(P.O),                   NAME    : V.VIBIN SURESH              Kanyakumari Dist,                 Email       :  vibinsureshmech060@gmail.com Tamil Nadu-629164.              Mobile No : +919952776599 |   TECHNICAL QUALIFICATION: |          COURSE |     INSTITUTE |           |   PERCENTAGE |    B.E   MECHANICAL   ENGINEERING     (2008-2012) |      Ponjesly College Of Engineering, Nagercoil-3. |     |                    78.5% |   EDUCATIIOAL QUALIFICATION: |   COURSE | INSTITUTE | YEAR OF PASSING | PERCENTAGE |     HSC(MATHS) |  St.Mary Goretty.H.S.School,    Manalikarai. |  March 2008 |           75% |       SSLC |     St.Mary Goretty.H.S.School,   Manalikarai. |    March 2006 |          83.2% |     SOFTWARE KNOWN: |   * PRO-E * AUTO CAD * SOLID WORKS PERSONAL   DETAILS: |   Name                                                     :   V.VIBIN SURESH Father’s Name                                       :   C.Vincent Date of  Birth                                         :   30-08-1991 Address                                                 :    Madathu Vilai,                                                                    Attukonam,                                                                    Manalikarai(P.O),                                                                   ...

Words: 276 - Pages: 2