Free Essay

Boiler Basics

In:

Submitted By hilmy00
Words 5812
Pages 24
“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

BOILER-BASICS
What is a Boiler? Boiler, also called STEAM GENERATOR, is an apparatus designed to convert a liquid to vapor. In a conventional steam power plant, a boiler consists of a furnace in which fuel is burned, surfaces to transmit heat from the combustion products to the water, and a space where steam can form and collect. A conventional boiler has a furnace that burns a fossil fuel or, in some installations, waste fuels. A nuclear reactor can also serve as a source of heat for generating steam under pressure. Boilers were built as early as the 1st century AD by Hero of Alexandria but were used only as toys. Not until the 17th century was serious consideration given to the potential of steam power for practical work. Denis Papin of France designed the first boiler with a safety valve in 1679; boilers were made of wrought iron; as the advantages of high pressure and temperature were realized, manufactures turned to steel. Modern boilers are made of alloy steel to withstand high pressures and extremely high temperatures. Most conventional steam boilers are classed as either fire-tube or water tube types. In the fire-tube type, the water surrounds the steel tubes through which hot gases from the furnace flow. The steam generated collects above the water level in a cylindrically shaped drum. A safety valve is set to allow escape of steam at pressures above normal operating pressure; this device is necessary on all boilers, because continued addition of heat to water in a closed vessel without means of steam escape result in a rise in pressure and ultimately, in explosion of the boiler. Fire-tube boilers have the advantage of being easy to install and operate. They are widely used in small installations to heat buildings and to provide power for factory processes. Fire-tube boilers are also used in steam locomotives. In the water tube boiler, the water is inside tubes with the hot furnace gases circulating outside the tubes. When the steam turbo generator was developed early in the 20th century, modern water tube boilers were developed in response to the demand for large quantities of steam at pressures and temperatures far exceeding those possible with fire-tube boilers. The tubes are outside the steam drum, Which has no heating surface and is much smaller than in the fire-tube boiler. For this reason, the drum of the water tube boiler is better able to withstand higher pressures and temperatures. A wide variety of sizes and designs of water tube boilers are used in ships and factories. The express boiler is designed with small water tubes for quick generation of steam. The flash boiler may not require a steam drum, because the tubes operate at such high temperatures that the feed water flashes into steam and superheats before leaving the tubes. The largest units are found in the central-station power plants of public utilities. Units of substantial size are used in steel mills, paper mils, oil refineries, chemical plants, and other large manufacturing plants.

BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

What is combustion? The process of combustion is a high speed, high temperature chemical reaction. It is the rapid union of an element or a compound with oxygen that results in the production of heat-essentially; it is a controlled explosion. Combustion occurs when the elements in a fuel combine with oxygen top produce heat. All fuels, whether they are solid, liquid or in gaseous form, consist primarily of compounds of carbon and hydrogen called hydrocarbons. Sulfur is also present in these fuels. What are the products of combustion? When the hydrogen and oxygen combine, intense heat and water vapor is formed. When carbon and oxygen combine, intense heat and the compounds of carbon monoxide or carbon dioxide are formed. When sulfur and oxygen combines, sulfur dioxide and heat are formed. These chemical reactions take place in a furnace during the burning of fuel, provided there is sufficient air (oxygen) to completely burn the fuel. Very little of the released carbon is actually “consumed” in the combustion reaction because flame temperature seldom reaches the vaporization point of carbon. Most of it combines with oxygen to form CO2and passes out the vent. Carbon, which cools before it can combine with oxygen to form CO2, passes out the vent as visible smoke. The intense yellow color of an oil flame is largely caused by incandescent carbon particles. Is the combustion process 100% efficient? Combustion can never be 100% efficient. All fuels contain some moisture and noncombustible: • • • Top-quality coal is 20% noncombustible. Residual oil is 10% noncombustible. Natural gas is 6% noncombustible.

What are the various types of combustion? There are three types of combustion: • • • Perfect Complete Incomplete

Perfect combustion is achieved when all the fuel is burned suing only the theoretical amount of air, But as we said before perfect combustion cannot be achieved in a boiler. Complete Combustion is achieved when all the fuel is burned using the minimal amount of air above the theoretical amount of air needed to burn the furl. Complete combustion is always our goal. With complete combustion, the fuel is burned at the highest combustion efficiency with low pollution. Incomplete Combustion occurs when all the fuel s not burned, which result in the formation of soot and smoke. BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

What is the air requirement for combustion? Oxygen for combustion is obtained from the atmosphere, which is about 21% oxygen by volume or 23% by weight. About 2000 cubic feet of are is required to burn one gallon of fuel oil at 80% efficiency to sea level. About 15 cubic feet of air is required to burn one cubic foot or natural gas at 75% at sea level. Stated another way: A 100 HP boiler requires 75,000 ft3 of fresh air per hour for combustion to take place. Most of the 79% of air that is not oxygen is nitrogen, with traces of other elements. Nitrogen is inert at ordinary flame temperature and forms few compounds as the result of combustion. Nitrogen is an unwanted “parasite” that must be accepted in order to obtain the oxygen. It contributes nothing to combustion, it increases the volume of combustion products to be vented, and it steals heat from the reaction and now creates a growing environmental problems as well.

What is primary air? Primary Air controls the rate of combustion, which determines the amount of fuel that can be burned. What is secondary air? Secondary Air controls combustion efficiency by controlling how completely the fuel is burned. What is excess air in combustion? Excess Air is air supplied to the burner that exceeds the theoretical amount needed to burn the fuel. How does the composition of fuel used influence the combustion air requirements? Combustion air requirements are based on the composition of the fuel used. Fuels commonly used contain nitrogen, ash, oxygen, sulfur, carbon and hydrogen. When a fuel has a large volume of nitrogen that must be accepted along with desired oxygen, more excess air must be provided. That excess air has a chilling effect on the flame. Some fuel particles fail to combine with oxygen and pass out of the vent unburned. Water vapor is a by-product of burning hydrogen. It too subtracts heat from the flame and becomes steam at flue gas temperature, passing out of the vent as vapor mixed with the combustion products. Natural gas contains more hydrogen and less carbon per unit of heat content than oil and consequently its combustion produces a great deal more water vapor, Which withdraws a greater amount of heat from the flame. Therefore gas efficiency is always slightly less than oil efficiency. Air requirements for combustion are generally expressed in cubic feet air per gallon of oil or per cubic foot of gas for convenience because fans, ducts and other air moving devices are rated incubi feet per minute or cubic feet per hour. The Fuel/Air Ratio for combustion is actually a weight ratio based on the required weight of oxygen for a given weight of fuel.

BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

Does the altitude affect the air required for combustion? At sea level or at altitudes up to 3000 feet, the weight of oxygen per cubic foot of air does not vary sufficiently to create major problems. At higher altitudes, air density has to taken into consideration. At 5000 feet above sea level, air has approximately 4/5 of its weight at sea level, therefore about 20% more air by volume must be introduced to obtain the required oxygen for combustion. Fuel gas obeys the same Physical laws as air-at 5000 feet above sea level 20% greater gas volume is required to obtain sea level weight of combustibles. A gallon of fuel oil has the same weight at any altitude and no fuel-input increase is necessary. Boiler Design What is the heat balance for a boiler? Fuel fed to a burner is converted to heat. The heat is absorbed by the water in the boiler….but not all the heat released from the fuel is used to heat the water. Some of the heat is wasted in the process. The heat balance of a boiler consists of accounting for all the heat units in the fuel used or wasted. It is a balance because it is the sum of all the heat consumed. Heat balance of a boiler is found by using the following equation: A=B+C A= heat energy available in the fuel B= heat energy absorbed any the water in the boiler C= heat losses Therefore: Efficiency of the unit = B divided by A What are the energy losses the occur in a boiler? Gases of combustion to atmosphere (about 9%) Incomplete combustion (about 1%) Moisture in fuel (less than 1%) Moisture in air used for combustion (less than 1%) Water vapor produced from the burning of hydrogen (about 2%) Unburned combustibles (about 2%) Radiation (about3%) Total heat losses in this examples equal 18-19% While some of these losses are preventable losses over which the boiler operator has control, such as: Heat carried away in the dry chimney gases Incomplete combustion of the fuel Unburned combustibles (about 2%) Much of the resulting efficiency of a boiler is the result of its basic het transfer design. Boiler designs that use all possible heat transfer surfaces to their fullest advantage consistently produce the most efficient source of steam or hot water with the lowest total lifetime costs. BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

What are the various heating surfaces in a boiler? Regardless of how a boiler is constructed, it has only one purpose to transfer the heat, produced by burning fuel, to the water. Transfer of heat will occur through all of the metal surfaces, if they are exposed to heat on one side and have water on the other side. These surfaces are those that make up “boiler heating surface” calculations. Heating surface is expressed in square feet and may be defined as: Radiant Heating Surface- (also called direct or primary) including all water-back surface that are directly exposed to the radiant heat of the combustion flame. Converted Heating Surfaces – (also called indirect or secondary) including all those water-backed surfaces exposed only to hot combustion gases. Extended Heating Surface – referring to the surface of economizers and super heaters used in certain types of water tube boilers. This term is not used with fire tube boilers. What is a “pass” for a boiler? Boilers are called “one-pass,” “two-pass,” “three-pass” or “four-pass,” according to the number of times the heat released in combustion is conducted through the boiler before the gases exit the vent. The furnace in which the combustion takes place is counted as one “pass,” If the tubes are arranged so that they are actually an extension of the combustion chamber, as in a vertical tube unit, then they are not considered as a separate pass and the unit is then called a “one pass” boiler. If the tubes are arranged so that the combustion gases must make a 1800 turn to enter them, then each group of flue passages requiring a reversal of gas direction is referred to as a separate “pass.” For examples: a three-pass boiler consists of a furnace (first pass) from which the gases exit with a 1800 turn in to a course of flue tubes (second pass) from which they exit with a 1800 turn into another course of flue tubes (third pass) before exiting into the vent. How are boilers rated? Commercial boiler ratings may be stated in several ways, but are always directly related to the amount of heat that will be produced when the boiler is fired ar a specified fuel input under specified conditions. The basic factor governing boiler output is the rate of heat release that can be maintained in the furnace as determined by the type of firing equipment used: The heat release rate of a boiler is an expression of the rate at which the combustion of the fuel liberates heat energy based on the fuel input in Joules per hour. Heat release rate may be defined as either Joules per hour per cubic meter of furnace volume or as Joules per hour square meter of radiant heating surface. Gross output rating is the total amount of heat available at the boiler outlet for a specific fuel input. Gross output is usually expressed in:

BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

Thousand of Joules per hour (KJ) Boiler Horsepower (BHP) Kilograms of steam per hour One boiler horsepower is defined as the evaporation of 15.7 Kilograms of water at 1000 C into steam 1000 C. At 0 gauge pressure, or 1000 C heat of the vaporization of steam is 2252 KJ/Kg. Therefore: One Boiler Horsepower is equal to 35356 KJ Note: In order to avoid combustion, the gross output for any steam pressure s always shown at the standard condition “from and at 1000C.” Although more heat input per kilogram of steam is actually required as steam pressure increases, the work equivalent per kilogram of steam also increases as steam pressure increases, so the rating stated at “standard” condition are valid regardless of the pressure at which the boiler is operated. Which boiler designs are more common? Fire tube Boiler- Here the combustion products from the burning fuel are conducted to the boiler flue outlet through flue passages (tubes) that are surrounded by water. The tubes may be arranged horizontally or vertically above the furnace. Sometimes baffles to tabulators are inserted in the tubes to control gas velocity and improve the heat transfer by forcing the hot gases into more intimate contact with the tube walls. Water tube Boiler- Here the hot combustion gases are directed over the tunes in which the boiler water circulates. Metal or refractory baffles direct the gas flow to improve heat transfer. Hoe do I select a boiler? There are five points of concern that should be applied when selecting the appropriate boiler design for a specific installation. They are: System Type: Steam or Hot Water System Load Performance Considerations Codes and standards The two system types encountered are steam and hot water systems. Steam and hot water boilers for these systems are defined according to design pressure and operating pressure. Design pressure is the maximum pressure used in the design of the boiler for purpose of calculating the minimum permissible thickness or physical characteristics of the pressure vessel part of the boiler. Typically, the safety relief valves are set at or below design pressure. Operating pressure is the pressure of the boiler at which it normally operates. The operating pressure is set at a suitable level below the setting of the pressure relieving valves to prevent their frequent opening during normal operation.

BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

Steam boilers are designed for low pressure of high-pressure application. Low-pressure boilers are limited to 15-psig design and are typically used for heating applications only. High-pressure boilers have operating pressures typically from 75 psig to 300 psig and are typically used for process loads and/or heating requirements. Hot water boilers are commonly used for heating applications with the boilers supplying water to the system at 820C to 1040 C. Typical operating pressures for these systems are from 30 psig to 125 psig. If a system requires hot water of more than 1160 C, a high temperature water boiler should be used. What is a system Load? System Load is measured in either KJ or Kilograms of Steam(at a specific pressure and temperature). To determine system load, you will need to know the following information: Heating Load Process Load Combination Load A Heating Load is typically low-pressure steam or hot water and s relatively easy to define. The Heating load will include large seasonal variations but no large instantaneous demand changes. A heating boiler should be sized to the worst probable weather conditions, which means that true capacity will rarely be reached. Once a heating load is computed, the number can easily be transferred into equipment size requirements. A process Load is usually a high-pressure steam application pertaining to manufacturing processes where heat from either steam or hot water is used in the process. A process load can be further defined as continuous or batch load. Continuous load is defined as a load that is fairly constant, very much like a heating load. Batch loads are loads characterized by short-term demands or the M.I.D. factor. Due to the fact that a very large instantaneous demand can be several times larger than the rating of the boiler, very careful boiler selection should take place in such process load situations. Many facilities have combination loads with a mixture of different types of processes and heating. The information given above should be taken into consideration in an additive manner when you encounter such situations. Loads vary and a boiler must be capable of handing the minimum load, the maximum load and all the load variations in between. These variations fall into three basic types: Seasonal Variations Daily Variations M.I.D. Variations

BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

To accurately determine the load of any system. Load tracking is recommended. The ability of a boiler to answer variable load demands depends on the boiler type, feed water valve control and combustion controls. If the analysis of a load show a highly variable situation, a more complex control package may be required. Below is an illustration of a load tracking collection form. Minimum Heating Load 1 Heating Load 2 Heating Load 3 Total Heating Load Process load 1 Process load 2 Total Process Load Instantaneous Load Total Load Average Maximum -

Utilize a load demand matrix to analyze each load and determine minimum, average, and maximum load requirements. What are the considerations in selecting the ideal number of boilers? The important criteria in selecting the ideal number of boilers are: Need for back-up boilers Load Type Downtime When selecting boiler consideration should be given to future expansion, emergency repairs and maintenance situations. Often, especially in a heating/process mixed load situation, a section of a large “winter” boiler and a smaller “summer” boiler will provide the best and most cost effective solution when measured on a lowest yearly operating cost basis.

BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

What are the performance considerations in selecting a boiler? Untreated or raw water is never pure. Water contain varying amounts of gases, solids and pollutants. Water in the form of rain absorbs gases from the air asit falls to the ground. As it absorbs into and seeps downward through the ground it picks up even more chemicals and minerals. By the time the water is pumped up from its ground source and delivered to our faucet. It is loaded with salts, dissolved gases and inorganic compounds. Common impurities that can affect physical plant operations are listed below. Common Water Impurities Impurity Source Effect Algae Organic growth Fouling Calcium Mineral deposits Scale Carbon dioxide dissolve gases Corrosion Chloride mineral deposits Corrosion Free acids industrial waste Corrosion Hardness mineral deposits Scale Magnesium mineral deposits Scale Oxygen dissolved gases Corrosion Silica Mineral deposits Scale Solids Undissolved material Fouling What are the major problems associated with water quality and equipment? The five major problems associated with water quality and equipment problems are: Scale Formation Corrosion Fouling Foaming Embitterment Scale is an extremely hard substance created when mineral salts come out of solution as their solubility drops with a rise in water temperature. Scale –forming salts adhere directly to heating surfaces forming layers of insulation on the metal substantially decreasing its heat transfer efficiency. Corrosion occurs when metals (by acid or electrolytic action) attack metals. The metals is eaten away similar to the generalized rusting of an automobile fender. Corrosion increases maintenance costs, results in premature replacement of equipment and causes unnecessary safety risks. Corrosion occurs where levels of oxygen or carbon dioxide are high, where pH values are low, where contact occurs between dissimilar metals and in damp environments or corrosive atmospheres. Fouling occurs when restriction develops in piping and equipment passages, creating inefficient water flow. The major consequences of fouling to boiler room equipment are energy waste and increased operating/ maintenance costs. BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

When fouling is allowed to continue and proliferate in a system, cooling towers, heat exchangers and other critical devices could give rise to the emergence of health-related issues such a Legionnaires Disease. Foaming is a condition in which concentrations of soluble salts (aggravated by grease, suspended solids or organic material) create frothy bubbles (resembling the foam in a beer mug) in the steam space of a boiler. Foaming can cause priming- in which the bubbles break and create a liquid that combines to form slugs of water that are carried over into the steam system. Pressure from the steam can create velocities as high as 125-160 km per hour for slugs of water discharged into steam lines. These slugs can wreak havoc with turbine blades, actuating devices and piping downstream of the boiler. Caustic Embitterment occurs when hairline crakes appear in highly stressed areas due to high concentrations of alkaline salts that liberate hydrogen, which is then absorbed by the iron in steel, effectively changing its physical properties. This condition is caused largely by boiler water with pH values 11 + and manifests itself in high-temperature areas of the boiler. Unless Embitterment problems are constantly monitored and controlled, they will take their toll in higher fuel costs, increased safety risks, unnecessary downtime and equipment replacement. How do I improve the input water quality for my boiler? There are three tools that can be used to improve water quality: Internal Treatment- conditioning the water to pre-determined levels by using a variety of chemicals. Demineralization- the replacement of specific inorganic salts by ion exchange. Desecration- the removal of dissolved oxygen and carbon dioxide by heating and bombarding the water with steam. While demineralization and desecration can be accomplished easily by investment in the appropriate support equipment, internal treatment calls for a more concerted effort. However, most organizations large enough to have in-house maintenance will find that the combination of these three tools will more than pay for themselves in defrayed operating costs. By-products of a well-implemented program are: Increased Heat Transfer Lower Fuel Expenditures Lower Chemical Consumption Expected for steam trap maintenance, water treatment has the most potential for reducing annual operating costs of your power plant. What is meant by chemical treatment for water? Is chemical treatment the cheapest way to treat the input water? Some people consider chemical treatment to be the least expensive and only necessary water treatment program for their system. They often feel that way because the relatively “small” amounts of money spent consistently “seems” like less of an investment than equipment first costs. While chemical treatment is a necessary part of water treatment it is almost never the cheapest or most effective single way. For most systems, the best possible cost/benefit ratio will come from a balanced equipment/chemical treatment approach. BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

Chemical treatment is simply thee addition of chemicals to the feed water to accomplish one of two things: To cause compounds to stay in solution to be removed by continuous or surface blow down. To cause compounds to precipitate out of solution to be removed by bottom blow down. Chemical treatment programs that are mot accompanied by effective blow down monitoring are one of the leading causes of excessive boiler operating inefficiencies and/or failure. Most organizations with an in house staff will be able to perform water treatment duties themselves. Maintenance departments that don’t have the in-house time or expertise ought to consider contracting these duties out to a reputable vendor. How do I maintain optimum efficiency of my system? What is required to insure that your system is operating as its optimum efficiency is a staff or vendor who can regularly perform the following functions: Will be familiar with all of your water treatment/boiler room equipment and its frequency of operation. Will keep a written analysis of yur water, indicating constituents found and in what amounts. Will regularly test your water and log results. Will interpret results of in- house tests and make appropriate corrections to your treatment program. Will establish parameters for the use of chemicals and method for introduction/removal for the system. Will see to it that equipment is fed, bled and blown down as per equipment manufacturer’s instructions. Will perform regular inspection of all equipment. Will establish chemical inventory and reorder points. Will do all of the above on a regular basis. Which equipment is necessary to support a water treatment program for an open steam system? Chemical Feed System Water Softener system Bottom and/or Surface Blow down Boiler Feed water System or Deaerator System Condensate Return System Chemicals Feed is an important part of even the smallest physical plant. This equipment enables you to “feed” the appropriar\te amounts of chemicals into a system to protect equipment against scaling and corrosion. These units usually consist of a tank, stand, pump, motor and agitator. Wired so that the unit operates in conjunction with the feed water or deaerator unit in open steam systems, this equipment insures that the chemical treatment of your water is consistently being BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

fed with the smallest amount of chemical treatment required to provide your customer with optimum treatment and payback results. A water softener System is another investment that should be made no matter how large the facility you are dealing with. These units are available in a wide range of sizes for anything from a light commercial to a heavy industrial application. Fed from a raw water source, it is the water softener that produces the conditioned water for a system up front that will reduce the undesirable minerals that produce detrimental scale on heat transfer surfaces. Use of water softener will also reduce the need for expensive chemical scale control additives. Blow down Systems eliminate the mineral build-up that causes boiler scale and corrosion. Bottom blow down units forcibly remove the sludge, that is the result of a precipitating chemical program, from the bottom of the boiler. A surface blow down/heat recovery unit produces an ongoing process that removes dissolved solids from the top level of water in the boiler while recovering a good deal of heat which is returned to the feed water at the same time. As mentioned before: chemicals treatment is performed either to causes compounds to stay in solution to be removed by continuous or surface blow down or to cause compounds to precipitate out of solution to be removed by bottom blow down. Both systems work well to lower operating. A feed water System is necessary to help maintain peak efficiency and prolong the life of the boiler where investment in a dearerator cannot be justified. A water feeding system of some type is necessary to make-up for the system loss of water. These systems consist of a tank, stand, pumps, control panel and float device driven by demand of a feed water float switch located on the boiler. Feed water systems have the dual function of storing and returning hot condensate and supplying make-up water in combination to meet the water demands of the boiler. Condensate is water which has condensed from steam in the system. This is very valuable water both for its chemical and heat content. Make-up is water that must be brought in to add to the condensate to equal the amount of water demanded by the boiler. Make-up should not be raw water that has already gone through a softening and filtering process for best results. Often feed water systems come fitted with a pre-heater tube (often referred to a “spare tube” assembly) to function well as a “poor man’s deaerator” in some causes. Use of feed water systems also accounts for large fuel saving and lower chemical costs. A Deaerator is a mechanical device designed to remove non-condensable gases from boiler feed water. Through a process of heating and bombarding water with steam, oxygen and carbon dioxide will cause pitting and corrosion- a rusting of the tubes from within and under the water. This is the major cause of boiler replacement.

BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

“Right step of Maintenance is the SOUL™ of efficiency”
An ISO 900:2008 Certified Comp.

Condensate Return units can be one of systems best cost/benefit investments. These are often simple devices consisting of a small rectangular steel or cast iron tank, pump and motor assemble and a float device to turn on the pump to move the condensate to a boiler feed water or deaerator. Capturing and reusing treated condensate will result in large energy and water treatment savings. Small tanks with small pumps are your best investment producing the best first costs and insuring tat condensate is returned to the system as quickly and as hot as possible.

What procedures are recommended while starting the boiler for the first time? Hot water systems are closed systems and are often the systems that will be replacing old lowpressure steam systems for heating in most new construction. If you are dealing with a new system, it is important to be aware that three are many harmful substances, which remain in the boiler and piping after construction. It is common to find oils, greases, weld slag and other contaminates within the system. It is important that a good initial cleaning or boil out of the entire system be conducted before filling. It is recommended that chemical treatment be provided for the initial fill of the system. Generally, Chemicals will be required to prevent scale formation, promote elimination of dissolved gases and control pH. While many experts will tell you that closed systems require little or no attention to water treatment, experience has shown that few systems can actually be considered completely closed. Especially in older hot water systems, you will encounter losses from pump packing, glands, air venting devices and threaded or flanged pipe connections. Make-up is generally provided by an automatic fill device. Make-up water provided by the fill device should have some means attached to provided chemicals treatment to the raw prior to being introduced to the system. This is generally accomplished through a shot-type chemical feeder. These device are used for batch feeding of chemicals into closed loop or low make-up water systems manually without the aid of pumps. It is also recommended that a water meter be installed to monitor the make-up water required by the system to: Monitor system loss Identify system loss Correct system loss

BARON Chemicals & Systems (P) Ltd. H-5/ 21, Krishna Nagar, Delhi-110051. Tel:011-22418572,22056393 Fax 91-11-22023200 Email: info@baronchemicals.com Web: www.baronchemicals.net

Similar Documents

Free Essay

Introduction to Boiler

...Introduction Steam boiler or simply a boiler is basically a closed vessel into which water is heated until the water is converted into steam at required pressure. This is most basic definition of boiler. The basic working principle of boiler is very simple and easy to understand. The boiler is essentially a closed vessel inside which water is stored. Fuel (generally coal) is bunt in a furnace and hot gasses are produced. These hot gasses come in contact with water vessel where the heat of these hot gases transfer to the water and consequently steam is produced in the boiler. Then this steam is piped to the turbine of thermal power plant. There are many different types of boiler utilized for different purposes like running a production unit, sanitizing some area, sterilizing equipment, to warm up the surroundings etc. There are mainly two types of boiler that are water tube boiler and fire tube boiler. In fire tube boiler, there are numbers of tubes through which hot gases are passed and water surrounds these tubes. Water tube boiler is reverse of the fire tube boiler. in water tube boiler the water is heated inside tubes and hot gasses surround these tubes. These are the main two types of boiler but each of the types can be sub divided into many which we will discuss later. Fire tube boiler As is indicated from the name, the fire tube boiler consists of numbers of tubes through which hot gasses are passed. these hot gas tubes are immersed into water, in a closed vessel...

Words: 741 - Pages: 3

Premium Essay

Private Limited

...Indian Institute of Management Ahmedabad WANSON (INDIA) PRIVATE LIMITED In A u g u s t 1975, during a session in business policy in one of the Institute's management development programs, the 'casew r i t e r and the participants were involved in a discussion o n t h e role of leadership and ideology in building a business. One of the participants suggested, with some degree of conviction: "If y o u wish to s e e the importance o f ideology in a real life business situation in India, g o to Wanson of Poona. You w i l l see how the personal philosophy of Mr. A.S. Bhathena, its founder and Managing Director, has been at work in creating an enterprise which has come to bear his distinctive v a l u e s . " The participant said that his company had excellent_ business relations with Wanson. He had also recently met Mr. Bhathena in a seminar organized by the B o m b a y Management Association and was greatly impressed by the latter's social conscience which, he felt, was r e f l e c t e d in each of his actions. The participant s a i d t h a t he w a s unusually m o v e d by Mr. Bhathena's remarks at t h i s seminar: "It is not possible for government agencies alone to t a c k l e t h e f o r m i d a b l e nation building problem. It b e h o o v e s men in i n d u s t r y a n d business, along with other professional men, to give a helping hand in uplifting the masses and uprooting mental poverty of the people which is at the root of our national rot. T h i s cannot be achieved...

Words: 10041 - Pages: 41

Premium Essay

Os Report

...A PROJECT REPORT ON PROJECT FINANCIANG OF THE PROPOSED 1 x 10 MW CAPTIVE POWER PLANT OF J U D CEMENTS LIMITED AT Vill. Wahiajer, Near Lumshnong Dist. Jaintia Hills, Meghalaya PREPARED BY xxxxxxxxxxxx MBA – xx SEMESTER REGD NO. xxxxxxx Note: This Report is submitted for the partial fulfillment of the requirement for the Degree of Master of Business Administration of xxxxxxxx University. I, hereby declare that the project entitled as Project Report on Project Financing of the proposed 1 x 10 MW Captive Power Plant of J U D Cements Ltd at Vill. Wahiajer, Near Lumshnong, Dist. Jaintia Hills, Meghalaya, submitted in partial fulfillment of the requirement for the degree of Master of Business Administration to the xxxxxxxxxx University, India, is my original work and the same is not submitted for the award of any other degree, diploma or any other prizes. xxxxxxxxxxxxxxxxxxx Reg No. xxxxxxxxxx Place: Guwahati Dated: Dear Sir / Madam This is to certify that Mr. xxxxxxxxxxx has worked under our supervision and guidance for the project report termed as the project report for project financing of our 1X10 MW Captive Power Plant and that this Report has been allowed to be prepared for his partial fulfillment of the requirement for obtaining the Degree of MBA (Finance) from xxxxxxxxxx University and that no part of this report has been submitted for the award of any other degree, Diploma, Fellowship or other similar titles or prizes and that the...

Words: 19005 - Pages: 77

Free Essay

Business Management

...Unit’s 1-9 Boiler Tube Leak Recognition Table of Contents Units 1-9 Table of Contents........................................................................................................................2 Terminal Objectives....................................................................................................................3 Enabling Objectives.....................................................................................................................3 System Overview.........................................................................................................................4 Introduction In this self study module, the participant will be provided with a basic review of Boiler Tube Leak Recognition that will lead the participant to an operational understanding of Kingston’s Boilers. Terminal Objective Upon successful completion of this training course, the AUO and UO will be able to discuss and display relevant knowledge of the Boiler system here at KIF. Successful completion of this training module requires a score of 80% or higher on training exams. Enabling Objectives * Describe the boiler water quality and the provisions to control the boiler water quality * Describe steam quality and how it is determined * Describe Sootblower Erosion on WaterWalls * Explain common operating practices that can cause boiler tube leaks and prevention techniques. * Identifying Boiler Tube Leaks ...

Words: 5755 - Pages: 24

Free Essay

Plat Overview

...National Aluminium Company (Nalco), a public sector unit (PSU), is India's largest producer of alumina and the second largest producer of aluminium. It is considered to be a turning point in the history of Indian Aluminium Industry. In a major leap forward, Nalco has not only addressed the need for self-sufficiency in aluminium, but also given the country a technological edge in producing this strategic metal to the best of world standards.. Following the discovery of large reserves of Bauxite ore in the east coast and the preliminary project work done by Bharat Aluminium Company Limited, NALCO was set up by the Government of India in 1981 to implement one of the largest multi-locational integrated Aluminium projects of the world with its own Captive Power Plant and Port Facilities. The technical collaboration of Aluminium Pechiney of France, the support of Eurodollar loans from a consortium of International Banks and the special dis-pensations of the Government of India and the Govt. of Orissa helped to implement the project expeditiously within the budgeted cost of Rs.2408 crore, under very difficult logistics of project management. Different segments of NALCO went into production in a phased manner starting from November 1985. Within a short span of time, the Company has emerged as a leader in the field of Aluminium production in...

Words: 1028 - Pages: 5

Free Essay

Industrial Training

...INDUSTRIAL TRAINING REPORT AT KAPAR ENERGY VENTURES SDN.BHD KAPAR, SELANGOR BY CHOLAN A/L VENU (ME090139) DEPARTMENT OF MECHANICAL ENGINEERING UNIVERSITI TENAGA NASIONAL START DATE :09/03/15 END DATE :29/05/15 ABSTRACT As a third year degree student in Bachelor of Mechanical Engineering (Hons.), I have been assigned to undergo industrial training for 12 weeks. This industrial training is one of the vital part of my coursework whereby I will be able to graduate from the degree programme if and only if I passed this industrial training session. Therefore, I have applied to several companies and Kapar Energy Ventures Sdn. Bhd., one of the leading companies in power plant field accepted my application as an intern. I went through a lot of challenging as well as knowledgeable working experiences throughout the industrial training period. Therefore, I am writing this report based on my working experiences during the industrial training period. The main purpose of this report is to put down in writing the record of my training experiences. Apart from that this report is also written with the purpose of explaining my visiting supervisor about every task as well as aspects that have been assigned to me as my job scope throughout the entire industrial training period. I hope this report will serve as a summary or as an overall view for my industrial training period. Apart from summarizing the entire industrial training experience, this report also ...

Words: 6281 - Pages: 26

Free Essay

Reseasch Analysis

...To: Jeff Berne, CEO American Rubber, Inc. From: Jeff: I just received a phone call from Doug Dieterly about the boiler explosion at the La Porte facility. He reached out to me to assist you as I have worked with him in the past to quickly build communication plans in urgent situations for his corporate clients. I am sorry to hear that your company has experienced such a tragic event. Given the criticality of a quick response, I will make myself available for anything you might need in the next few hours. The next few pages detail my recommendations on your next communications. I have recommended specific groups and messages as well as a targeted order of execution. The first step you must take action on immediately. Goal is for you to get in control of the message going out as well as its tone before the media sets both for you. I believe you have less than an hour to begin executing this plan for it to be effective. Step 1: Speak with News Media on Camera Target Audience: General public, factory workers and their families Goal: Establish the facts with the public. Build a reputation as responsive and sympathetic. Send the message that you will work tirelessly to protect your workers. You will need to communicate directly with the news media via an impromptu informal interview, preferably in front of the factory to show that you are physically at the scene. If you drive an expensive automobile, I would recommend you park out of visibility of the...

Words: 1439 - Pages: 6

Premium Essay

Monu

...Electrical Engineering Online Electrical Engineering Study Site Menu Skip to content * Basics * Basic Electrical 1 * Circuit Theory * Electrical Laws * Battery * More * Machines * Transformer * Motor * Induction Motor * DC Motor * Synchronous Motor * Special Motor * Generator * Electrical Drives * Power System * Generation * Transmission * Switchgear * Protection * Measurement * Control Engineering * Electronics * Electronics Devices * Power Electronics * Digital Electronics * Microcontrollers * Digital Signal Processing * Questions * Videos * Online Exam * Online Exam * Electrical MCQ * Career with us ------------------------------------------------- Top of Form Search for: Bottom of Form Thermal Power Generation Plant or Thermal Power Station Power Plant Thermal Power Plant Steam Boiler • Fire Tube Boiler • Water Tube Boiler • Boiler Feed Water Treatment • Feed Water and Steam Circuit of Boiler • Steam Boiler Furnace • Combustion Theory Methods of Firing Steam Boiler Fluidized Bed Combustion Hydro Power Plant Cogeneration Solar Energy System Basic Wind Energy Wind Turbine Theory of Wind Turbine Thermoelectric Power Generators Magneto Hydro Dynamic Power Generation Economics of Power Generation Economiser in Thermal Power Plant Steam Condenser of Turbine Jet Steam Condenser Surface...

Words: 1739 - Pages: 7

Free Essay

Good

...Industrial Technologies Program, works with industry to identify plant-wide opportunities for energy savings and process efficiency. The BestPractices Steam Steering Committee provides a great deal of input and guidance into the program (see more information about the Committee on pages 1 and 2). Mr. Fred Fendt, Technical Fellow with Rohm & Haas, serves as Chair of the BestPractices Steam Steering Committee. Ms. Debbie Bloom, Senior Consultant for Nalco Company, continues as Vice-Chair. Mr. Doug Riley, Director of Global Energy of Millennium Chemicals, serves as the Executive At-Large. These individuals participate on the BestPractices Steam Steering Committee: Bob Bessette President, Council of Industrial Boiler Owners Victor Bogosian Director of Inspections, National Board of Boiler and Pressure Vessel Inspectors Charles Cottrell Director of Technical Services, North American Insulation Manufacturers Association Beverly France President, Industrial Interactions Robert Griffin Industrial Energy Consultant, Enbridge Gas Distribution Glenn Hahn Service Manager – Energy Services Group, Spirax...

Words: 29283 - Pages: 118

Premium Essay

Furnace Stop Working Research Paper

...Furnace Stop Working? Follow This Checklist To Troubleshoot The Problem It’s never fun when your furnace stops working, especially when it is in the middle of winter. However, you should take the time to troubleshoot the issues before you call a professional for help. You could either find a simple fix to your problem, or have more information to give to the HVAC technician. Check Your Thermostat Thermostats have become even more complicated recently as they have become smarter. While before it was quite clear if a thermostat is on or off, now settings can be buried within menus and you are not quite sure how or why your furnace is turning off and on. Start by clearing all existing schedules and smart settings that are designed to learn...

Words: 418 - Pages: 2

Premium Essay

Thermal Steam-Turbine Power Plants

...Thermal Steam-turbine Power Plants Large steam-turbine plants have two forms: condensing plants, electric power plants. The great masses of hot steam, having accomplished the mechanics work in the turbines of condensing steam-turbine plants, are condensed - i.e. are cooled down and turned back into distilled water, and returned to the boiler for production of steam to activate the turbine. Condensation of steam takes place in condensers where the hot steam is cooled when it comes in contact with tubes through which cooling water, supplied from a water reservoir (river or lake), is circulated. This cooling water, after it takes the heat from the spent steam, is returned to the water source carrying along with it the unutilized heat energy. This water is called the circulating water. The importance of the distilled water for feeding steam boilers is extremely great since chemical clean water decreases the formation of scale in the boiler tubes, and thus, makes their service life longer. Condensing plants of large generating capacity are built close in sources of fuel, in order not to transport large quantities of fuel over considerable distances. The electric power generated in such plants is transmitted over long distances for the supply of large industrial regions. So these plants are called regional thermal power plants. Heat and electric power plants, in addition to electric power generation, also supply heat to closely located...

Words: 309 - Pages: 2

Free Essay

Thermal Expansion

...Thermal Expansion happens a lot in everyday life. When something is heated and expands this is Thermal Expansion. The way Thermal Expansion works, is when it is heated the atoms expand, and then when it is cooled it shrinks. Several examples of Thermal Expansi Thermal Expansion happens a lot in everyday life. When something is heated and expands this is Thermal Expansion. The way Thermal Expansion works, is when it is heated the atoms expand, and then when it is cooled it shrinks. Several examples of Thermal Expansion would be some of the following: · When mercury in a thermometer rises it is because of thermal expansion. · Thermal Expansion caused sometimes when you see cracks in concrete that have spread it. · Take a thermostat, there are two pieces of metal in a thermostat, when it gets heated up the pieces of metal spread apart and shuts the furnace off, and when it cools back down the two pieces of metal touch each other and that triggers the furnace to come back on. · Power lines can be an example of Thermal Expansion. In the summer when it is hot you will notice that the power lines hang down lower because they expand from the heat, so then in the winter you will notice they will tighten back up. · A metal roof is a good example of Thermal Expansion. When the sun hits a metal roof it will expand then when it cools down you can hear it popping and cracking because then it contracted. Those are just a few examples of Thermal Expansion, you can see this is very common...

Words: 294 - Pages: 2

Free Essay

Nestle

...greenhouse gas emissions and to meet the challenges of depleting energy resources has seen the implementation of several initiatives to reduce energy usage. Our goal to be an energy efficient company has seen us invest in new technologies to reduce wastage and increase efficiencies. In a typical food industry, the boiler house is one of the main energy users with plain boilers having an energy efficiency of 70 – 80% depending on its usage. The following diagram provides a breakdown of the various losses that occur in a boiler: From the diagram above, it is clear significant savings can be achieved with reduced losses from Flue Gas discharge, optimising the use of excess air and automating the blow-down operations. Programme description Our partnerships with external specialists in the field of energy management have led to new opportunities to eliminate waste. These include implementing new technologies to address losses in the three mentioned areas of the boiler operations. We have installed the appropriate technologies at the Chembong Factory to recover losses in these three key areas. Energy Recovery from Flue Gas The exhaust air emitted from the boilers contains a significant amount of energy due to its high temperature that range between 250°C – 300°C. To recover this potential energy, the factory installed a heat exchanger, also known in the industry as an Economiser. Feed water flows within the tubes in the Economiser, allowing heat to transfer from the hot flue...

Words: 590 - Pages: 3

Free Essay

Plant Tour

...RECOMMENDATION Chapter I INTRODUCTION Enertech System Industries are located in Marilao, Bulacan in a three hectare lot in 2006 to expand its production capability and to be able to export its biomass, oil and gas fired boiler products to the neighboring countries. In 1978, Engineer Guillermo C. Simeon, together with a group of talented pool of Filipino engineers established the Enertech Systems Industries, Inc. The pioneering "The Boiler Technology People" of Enertech, were equipped with experience, expertise and foreign training on pressure vessel fabrication gained from working with the foreign giants. Through the years, the Enertech team has grown. It now employs about 180 regulars, consisting of engineers, accountants, business administration graduates, office workers, highly skilled technicians, welders, and backed-up by a pool of more than 500 project hired workers. Since its inception, the Enertech team's innovative approach and uncompromising attention to detail in the field of engineering has branded the company as the PIONEER and LEADER in the Philippine boiler industry. Enertech's aggressive research and development initiatives have resulted to multiple Filipino technical ingenuity breakthroughs in the Philippine Boiler Engineering...

Words: 2461 - Pages: 10

Free Essay

Stg Starting Process

... OBSERVE TURBOVISORY READINGS IN CONTROL ROOM. SWITCH ON SGC OIL SUPPLY. 7. DRAIN WATER IN THE DEARETOR AND MAKE UP LEVEL WITH FRESH DM WATER. OBTAIN CHEMIST’S CLEARANCE. 8. CHECK THE OIL LEVEL IN BFP LUB OIL TANK AND MAKE UP IF REQUIRED. 9. RUN OIL PUMP OF THE BFP AND CHECK FOR ANY LEAKAGES AND ATTAND THE SAME IF ANY CHECK THAT OIL IS COMING OUT IN THE DRAIN LINE AS VIEWED FROM THE SIDE GLASS, PROVIDED IN THE DRAIN LINE. 10. CLEAN THE STRAINERS IN THE BFP SUCTION LINE IF DP WAS GREATER THAN 0.5 KG/SQCM BEFORE STARTING THE HP AND LP BFPs. 11. CHECK INTERLOCK AND PROTECTIONS OF BOILER FEED PUMPS IF IT WAS LONG S/D. CHECK SEQUENCE OPERATION. 12. CHARGE ALL BFPs BY OPENING THE SUCTION VALVE VENT UP TO THE DISCHARGE VALVE. 13. CHARGE THE SEALING AND COOLING WATER TO THE BFP GLANDS. ENSURE WATER IN THE RETURN LINE BY VIEWING THRU THE SIGHT GLASS. 14. START BOILER FEED PUMPS AND MAKE UP DRUM LEVEL BOTH HP AND LP DRUM LEVEL. 15. MONITOR THE BEARING TEMPERATURES OF THE BFP BEARING. 16. DRAIN WATER IN CONDENSER HOTWELL AND MAKE WITH FRESH DM WATER UNTIL CHEMIST GIVES CLEARANCE. 17. CHECK THE OIL LEVEL IN THE TRUST BEARING HOUSING OF CEPs AND THE THOROUGHNESS OF THE COOLING WATER CIRCUIT OF THE BEARING HSG. SEE WATER IN THE OUTLET OF THE COOLING CIRCUIT ALSO ENSURE THAT THE SEALING WATER CIRCUIT IS THROUGH WITH ALL THE VALVES...

Words: 1457 - Pages: 6