FINAL PROJECT:
Chapter 1:
Page: 23
Case Study: National Air Express 1. Is the productivity measure of shipments per day per truck still useful? Are there alternatives that might be effective?
The productivity can be measured by the number of stops covered by each driver. I think measuring shipments per day per truck is still useful. It helps to keep on track with the amount of services that can be offer on every day basis and with the area covered by each driver. By doing that, the company can tell how many areas have been covered by a driver per day; therefore productivity can be assessed in measurable way. 2. What, if anything, can be done to reduce the daily variability in pickup call-ins? Can the driver be expected to be at several locations at once at 5pm?
To reduce daily variability in pickup call-ins, the company should avoid call-ins during peak time; what I mean is that the company can offer to its customer’s deals to call at maybe nights when the network is not that busy so people for important calls only can use and benefit from the network.
By offering deals to clients that call at night times the driver might be able to make to several place before peak time which is 5pm. This strategy can be apply in order to reduce the business during the day time so the driver can easily and correctly do their job. 3. How should package pickup performance be measured? Are standards useful in an environment that is affected by weather, traffic, and other random variables? Are other companies having similar problems?
Package pickup performance should be measurable by surveying the customers. Customers can give an idea of their satisfaction, about how the goods are coming to them. Feedbacks are necessary for the company so that it can generate new ways of improvement.

Standards are useful in an environment that is affected by the weather, traffic and other random variables. This shows to the customers that the company is willing to provide services in anyways.it also shows the strength of the company and drivers.
Problems:
1.1. John Lucy….. a) What is their productivity?
120/ 40 = 3 units/hr. b) What will be their productivity if rate is increase to 125/day?
125/40 = 3.125 units / hr. c) What will be their unit increase in productivity per hour? 4.125 – 3 = 0.125 units d) What will be their % change in productivity?
0.125/3 =0.042 = 4.2%
1.2. Riverside Metal works… a) Calculate the labor productivity of the line
160/80 = 2 valves/ hr.
b) What is the new labor productivity? 180/80 = 2.25 valves/hr.
c) What is the % of productivity increase? (2.25-2)/2 = 1.25 = 12.5%
1.8. Kleen Karpet… a) What is the labor productivity per dollar?
(520*13) = 6760; 65 / 6760= 0.0096 rugs/$ b) What is the multifactor productivity? 65/ (520*13+100*5+20*50) = 0.00787 1.15. Refer to problems 1.13 and 1.14…. $500/month $8 /hour; $0.35/loaf $ 1500 loaves/ month; 2.344/ labor hour 1500 loaves. CHAPTER 2: Page 49: Problem 2.1. The text provides three primary ways –strategic… Solution: For Differentiation: We can take an example of Starbucks, it is a coffee shop but the atmosphere is really unique compare from other coffee shops. As a student it is a great place to go and study, most of the time it is quiet, you also get the chance to smell the fresh and nice aroma of the grind coffee while working on papers. For Cost: Walmart can be a great example when it comes to cost. Walmart has a huge buying power and its costs are for every class society. It has very decent prices that almost everybody can afford. For Response: We can an example of an Amazon or EBay seller. Once you order your product online the seller will ship it to you with an exact delivery day. 2.2. Within the food services industry… For Cost leadership: I am going to pick Walmart again since it comes back to cost. Walmart is one of the biggest retailers in the market due to its low cost of products that every household can afford. The reason why Walmart can compete with other firm is due to its low cost strategy. For Response: We can take an example of ‘’ Three Tomatoes’’ which is catering company. Basically what they do is that they provide services. For instance if you have a business lunch, a dinner, wedding or whatever event you can just call them and tell them what you want. They have a vary menu, you place your order and on the event day they will provide you with the food and beverage. For Differentiation: ‘’ Texas De Brazil’’ can be an example for differentiation. ‘’Texas De Brazil’’ is a Brazilian steakhouse featuring a salad bar, a wide variety of ‘’ all you can eat meats’’, seafood, soups, and desserts. It is really different compare to some steakhouses. The ambiance is lively, they have varieties of meat (lamb, pork, beef, chicken), plus the workers there are very welcoming. CHAPTER 3: Page 90 -91: Problem 3.2. Robert Mefford has decided to run for a seat as congressman… 3.3. Draw the activity on node (AON) project network with the following activities… How long should it take Dave and his team to complete this project? It should take Dave and his team 21 days to finish the project. What are the critical path activities? A, B, D, G and A, C, F, H 3.4. Given the activities whose sequence is described by the following table… a) Which activities are on the critical path? The critical path is: A, C, F, G, I. b) What is the length of the critical path? 5+4-5+2+5 = 21 days 3.8. The city commission of Nashville has decided build a botanical and picnic area… - Draw the Gantt chart for the whole construction activity. CHAPTER 4: Page 140-142: Problem 4.5. The Carbondale hospital is considering the purchase of a new ambulance… a) Forecast the mileage for next year using a 2- year moving average. (3700+3800)/2 = 3750 ml b) Find MAD based on the 2 year moving average forecast in part (a). (Hint: You will only have 3 years of matched data.) Year | Mileage | 2 year Moving average | Error | lErrorl | 1 | 3000 | | | | 2 | 4000 | | | | 3 | 3400 | 3500 | -100 | 100 | 4 | 3800 | 3700 | 100 | 100 | 5 | 3700 | 360 | 100 | 100 | | | TOTALS | 100 | 300 | MAD = 300/3 = 100 c) Use a weighted 2- year moving average with weights of .4 and .6 to forecast next year’s mileage. (The weight of .6 is for the most recent year. What MAD results from using the approach to forecasting? (Hint: You will have only 3 years of matching data.) (3700*0.6+3800*0.4) / (0.6+0.4) = 3740 d) Compute the forecast for year 6 using exponential smoothing, an initial forecast for year 1 of 3000 miles, and α = 0.5. Year | Mileage | Forecast | Forecast Error | Error α α = 0.50 | New Forecast | 1 | 3000 | 3000 | 0 | 0 | 3000 | 2 | 4000 | 3000 | 1000 | 500 | 3500 | 3 | 3400 | 3500 | -100 | -50 | 3450 | 4 | 3800 | 3450 | 350 | 175 | 3625 | 5 | 3700 | 3625 | 75 | 38 | 3663 | | | TOTAL | 1325 | | | The forecast is 3663 miles. 4.8. Daily high temperature in St. Louis for the last week were as follow… a) Forecast the high temperature today, using a 3 day moving average. (96+88+90) / 3 = 91.3 b) Forecast the high temperature today, using a 2 day moving average. (88+90) / 2 = 89 c) Calculate the mean absolute deviation based on a 2 day moving average 1 | 93 | 93.5 | | | | 2 | 94 | 93.5 | | | | 3 | 93 | 94 | | | | 4 | 95 | 95.5 | | | | 5 | 96 | 92 | | | | 6 | 88 | | | | | 7 | 90 | | | | | 92.7-90 = 2.7??? all error/5=2.7 d) Compute the mean squared error for the 2 day moving average. =13.35 same thing e) Calculate the mean absolute percent error for the day moving average. =2.99% same thing 4.12. Consider the following actual and forecast demand level for…276.25-340.25 Forcastn actual 4.15. Refer to solved problem 4.1. Page 138. What is the MAD? Samething as 4.8 CHAPTER 5: Page 181-182: Problem 5.10. Given the contribution made on each of the three products in the following table… Identify a reasonable operations strategy for each. - Kindle 2 (Growth Stage): Since the Kindle2 is on its growing stage I think the company should focus more on its number of production. Also the company should make sure that they have well organized and proficient productions facilities. - Netbook Computer (Introduction Stage): Since it is a new product that is being introduce to the market it would be to first have a great marketing plan. A plan that will actually describe the product as it is, and mention all the details. It would be also great to know its target market, who is going to be interested. Moreover, make sure you have a supplier and a distribution system ready. - Hand Calculator (Decline Stage): Reduce the cost of the distribution. 5.11. The product design group of Flores Electric supplies Inc. has… a) Low-Tech for 0.3; 0.4; 0.3. 45000 + (200000*0.55) = 155000 45000 + (200000*0.5) = 145000 45000 + (200000*0.45) = 135000 b) Subcontract for 0.7; 0.2; 0.1 65000 + (200000*0.45) = 155000 65000 + (200000*0.40) = 145000 65000 + (200000*0.35) = 135000 c) High Tech for 0.9; 0.1 75000 + (200000*0.40) = 155000 75000 + (200000*0.35) = 145000 * Since we are looking for the lowest EMV, I think the best decision would be to use the lowest cost which is $145000. 5.13. Residents of Mill River have fond memories of ice skating at the local park… Elegant (Good Market): (400*125) - 35000 = 15000 Net Profit Elegant (Not Good Market): (90*300) -35000 = -8000 Lost Deluxe (Good Market): (400*125) – 35000 = 15000 Net Profit Deluxe (Not Good Market): (400*70) – 35000 = -7000 Lost Do nothing = No cost therefore No profit = Yes Deluxe (Good Market 50%): 0.5*15000 = 7500 Deluxe (Not Good market 50%): 0.5* -7000 = -3500 7500-3500 = $4000……; with the 50% probability of a good market, the deluxe drawing can actually make a net profit of $ 4000. 5.14. Ritz products’ materials manager, Bruce Elwell must determine whether to make or buy a new semiconductor for the wrist TV… a) Assuming Ritz must have the semiconductor (stopping or doing without is not a viable option), what is the best decision? 1000000*0.50 =500000 1000000+500000 = 1500000 1000000*.4 = 400000 b) What criteria did you to make this decision? c) What is the worst that can happen to Ritz as a result of this particular decision? What is the best that can happen? CHAPTER 6: Page 210: Problem 6.1. An Avant garde clothing manufacturer runs a series of high-profile… a) Depict this data with a Pareto chart. Also depict the cumulative complaint line. b) What percent of the total complaints can be attributed to the most prevalent complaint? 38.89 6.5. Theresa Shotwell’s restaurant in Tallahassee, Florida, has recorded the following data for 8 recent customers… a) Graph the 8 points, find the possible causes b) This is an example of what type of graph? This is an example of ‘’Scatter Diagram’’. 6.9. Consider the everyday task of getting to work on time or arriving at you first class on time in the morning. Draw I fishbone showing reasons why you might arrive late in the morning. - Machine: Broken Car, Car in bad shape - Material: No alarm clock, Dead cellphone - Manpower: No police traffic, slow driving - Method: Wake up late, leave home late 6.12. Mary Beth Marrs, the manager of an apartment complex, feels overwhelmed by the number of complaints she is receiving….

Similar Documents

Premium Essay

Final Project

...IT 510 Final Project Guidelines and Rubric Overview The final project for this course is the creation of a System Proposal Document. In any modern enterprise, it is crucial that all of the different stakeholders, users, inputs, and outputs that relate to the business’s IT systems coalesce in a logical and cohesive way for the systems to be effective. As a member of an IT team, your overarching goal is to ensure that the IT systems ultimately do what the business needs them to do. In this course, you have learned about the key principles and practices underlying the analysis, design, implementation, and management of IT systems. In this final project, you will apply this knowledge by creating a systems proposal document. The project is divided into four milestones, which will be submitted at various points throughout the course to scaffold learning and ensure quality final submissions. These milestones will be submitted in Module Two, Module Four, Module Six, and Module Eight. The final submission will occur in Module Nine. In this assignment, you will demonstrate your mastery of the following course outcomes:     Assess the relationship of systems analysis, design, implementation, and development processes as they relate to the management of information technology systems Communicate the paradigms, processes, and activities of systems development to diverse audiences Apply structure and object oriented analysis modeling techniques to analyze, design, and...

Words: 2901 - Pages: 12

Free Essay

Ece 313 Week 5 Final Project

...ECE 313 WEEK 5 FINAL PROJECT To purchase this visit here: http://www.activitymode.com/product/ece-313-week-5-final-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM ECE 313 WEEK 5 FINAL PROJECT The Final Project will illustrate how family-centered programs, theories, and concepts support the early childhood classroom and the child’s family. The family-centered approach asserts that family involvement is important for a young child’s cognitive and social development. The Final Project, which will be presented via PowerPoint, will address the following scenario: You are the director of a preschool program that serves children ages three to five. You are giving a presentation to teachers and parents to encourage partnerships in the education of the whole child. The objective of your presentation is to encourage adaptive skills and to facilitate strategies in which to maximize these abilities that can be taught in the classroom and extended at home. Address the following points: 1. Self-help skills. 2. Pro-social skills. 3. Self-regulation skills. For each of the three skill-sets: 1. Explain the desired skills and how they relate to the classroom and home. 2. Identify and discuss two to three strategies for teaching the skill-set to children in the classroom. 3. Explain how you will help parents to utilize the strategies to reinforce the desired ability at home. 4. Identify and describe a resource (either community or web-based) for the parents to use to continue...

Words: 1497 - Pages: 6

Free Essay

Ece 313 Week 5 Final Project

...A++PAPER;http://www.homeworkproviders.com/shop/ece-313-week-5-final-project/ ECE 313 WEEK 5 FINAL PROJECT The Final Project will illustrate how family-centered programs, theories, and concepts support the early childhood classroom and the child’s family. The family-centered approach asserts that family involvement is important for a young child’s cognitive and social development. The Final Project, which will be presented via PowerPoint, will address the following scenario: You are the director of a preschool program that serves children ages three to five. You are giving a presentation to teachers and parents to encourage partnerships in the education of the whole child. The objective of your presentation is to encourage adaptive skills and to facilitate strategies in which to maximize these abilities that can be taught in the classroom and extended at home. Address the following points: Self-help skills. Pro-social skills. Self-regulation skills. For each of the three skill-sets: Explain the desired skills and how they relate to the classroom and home. Identify and discuss two to three strategies for teaching the skill-set to children in the classroom. Explain how you will help parents to utilize the strategies to reinforce the desired ability at home. Identify and describe a resource (either community or web-based) for the parents to use to continue their learningat home. The PowerPoint presentation must be 18 to 20 slides in length, not including...

Words: 353 - Pages: 2

Premium Essay

Nt1310 Unit 8 Final Project

...Final Design Project The final design was a combination of a month’s worth of creativity, ingenuity, hard work and most importantly, team work. Although the preliminary design was determined to be mostly unusable, we did gain a vast amount of knowledge which was critical to the final design of our project. The first portion of the project was tasked with catching all of the marbles as they were going to be dropped all at once. Our goal was to create a mechanism which would all for the balls to be sent through the project one by one as we believed that this would allow for more efficient and more accurate sorting. Thankfully, we were able to use the same design for the ball delivery system as in the preliminary design as the entire team was very pleased with how well it worked. The final design for the mechanism was built on a cardboard shoe box which was flipped...

Words: 1616 - Pages: 7

Premium Essay

Capstone Final Project

...Capstone Greenway Bank Project Presented by: CISSA Amed Aplicano, Ivan Armendariz, Chris Christopher, Steven Smedley, Samuel Holman Table of Content 1. Table of content…………………………………………………………………………..……1 2. Project Charter………………………………………………………………………………....2-11 3. Change Management Plan…………………………………………………………………12-15 4. Change Management Procedure……………………………………………………….16 5. Project Schedule and Gantt Chart………………………………………………………17 6. Network Activity Diagram………………………………………………………………….18-20 7. Work Breakdown Structure……………………………………………………………….21 8. WBS Dictionary………………………………………………………………………………….22-24 9. Network Logical Diagram………………………………………………………………......25-26 10. Network Physical Diagram………………………………………………………………….27 11. Server Configuration…………………………………………………………………………..28-30 12. Active Directory Schema…………………………………………………………………….31 13. Client Configuration……………………………………………………………………………32-33 14. Infrastructure Configuration……………………………………………………………….34 15. Budget/Bill of materials……………………………………………………………………….35-37 16. Quality Plan…………………………………………………………………………………………38-40 17. Risk Management Plan………………………………………………………………………..41-48 18. Meeting Minutes…………………………………………………………………………………49-66 19. Final presentation slides……………………………………………………………………..67-77 20. Progress report………………………………………………………………………………….78- 1 NT2799.U1.HO4 Greenway Bank: Project ______________________________________________________________________________ Greenway Bank Project NSA Capstone Project Charter __________...

Words: 12136 - Pages: 49

Premium Essay

Project Management Final Paper

...1. Project Definition Form 1.1 Project Title Biaño’s Pizzaderia Inventory Management System 1.2 Project Context On March 27, 2007, the friends and neighbors of Alberto Biaño in Cebu City were treated to the first serving of Mr. Biaño's famous pizza.  This core group became his first loyal customers, as news spread far and wide of the pizza with the great homemade taste that everyone could afford.  Inspired by the resounding success of his initial offering, Alberto Biaño continued to develop his recipes to improve his pizzas' quality and taste until a perfect blend of crispy dough and aromatic sauce was achieved for everyone to enjoy. Another innovation was the concept of the “pizzaderia”, which  combined the words “pizza” and “carenderia”, to describe the little streetside eateries where Biaño’’s delicious but affordable pizzas were enjoyed by  people from all walks of life. Whether for birthdays, anniversaries, celebrations and get-togethers, everyone wanted to make a Biaño’s pizza part of their special treat. From that little pizzaderia in Mabolo, Mr. Biaño soon branched out to Capitol, Tabunok, USC Main, Mandaue and Mactan, making Biaño's pizza a truly well-loved snack in Cebu.  Realizing the potential for such great value in an affordable price, many franchisers from different places all over the country such as Cagayan de Oro, Oroquieta City, Butuan soon became part of the Biaño's Pizzaderia family 1.3 Statement of the Problem As of now, Biano’s Pizzaderia only...

Words: 3731 - Pages: 15

Premium Essay

Is535 Final Course Project

...Starting an E Commerce Online Business Keller Graduate School of Management Managerial Applications of Information Technology 11/12/2011 [Type the fax number] Jamie Lynch You want to start an E commerce business selling your products and services online but how to get started? Milestone 1 Problem: The business problem to be solved is how can an entrepreneur start and maintain a successful E commerce business online? Background: The first key to starting a successful online business is to first understand ecommerce and how it operates. Most people understand that ecommerce or electronic commerce refers to the buying and selling of products or services over electronic systems such as the Internet and other computer networks. However, it stretches beyond just the buying and selling of goods; it also includes an online process of developing, marketing, selling, delivering, servicing and paying for products and services.  “The use of commerce is conducted in this way, spurring and drawing on innovations in electronic funds transfer, supply chain management, internet marketing, online transaction processing, electronic data interchange (EDI), inventory management systems, and automated data collection systems. Modern electronic commerce typically uses the World Wide Web at least at one point in the transaction's life-cycle, although it may encompass a wider range of technologies such as e-mail, mobile devices and telephones as well”. (Electronic Commerce, modified...

Words: 3665 - Pages: 15

Premium Essay

Final Course Project Paper

...Tektronix Portfolio: Bringing Innovation and Satisfaction Week 7 Course Project Final Draft PROJ 587 Advanced Program Management Contents 1.0 Executive Summary 4 2.0 Organization’s Strategic Plan 5 3.0 Organization’s Strategic Capacity Plan 6 3.1 Defend the Core 6 3.2 Expansion of Sales and Products 6 3.3 Balance the Portfolio 6 4.0 Portfolio Management Process 7 4.1 Portfolio Strategic Plan 7 4.2 Portfolio Charter 7 4.3 Portfolio Management Plan 7 4.4 Portfolio Roadmap 8 4.5 Portfolio 9 5.0 Project Selection Criteria 9 5.1 Project Definition 9 5.1.1 Project Categorization 9 5.1.2 Project Prioritization 9 5.1.3 Weighted Scoring Method 10 5.2 Project Acceptance 11 5.2.1 Business Criteria 11 5.2.2 Logistical Criteria 11 6.0 Program Management Plan 11 6.1 Setup of Program Management Office (PMO) 11 6.1.1 Responsibilities: 11 6.2 Phase Gate Review Team 12 7.0 Plan to Identify/Resolve Triple Constraints Conflicts 12 8.0 Change Management Plan 14 8.1 Controlling Scope Change 14 8.2 Change Control Process 15 9.0 Resource Utilization Plan 16 9.1 Network Diagram 16 9.1.1 Utilization 16 9.1.2 Background Activities 16 9.1.3 Single-Tasking and Mulit-Tasking 16 9.1.4 Cross-Training 17 9.1.5 Identify Time-Critical Activities 17 9.1.6 Schedule Based on Deliverables 17 9.2 Requirements Plan 17 10.0 Works Cited 19 1.0 Executive Summary The primary purpose and goal of this report is to explain in detail the Portfolio Management...

Words: 4607 - Pages: 19

Premium Essay

Final Course Project(Rebuilding the Neighborhood Playground Project

...Rebuilding the Neighborhood Playground Project Lawanna Martin MGMT404 Course Project Professor Herbig 06/20/2012 Rebuilding the Playground Project Executive Summary: For several years now the Fifth Street neighborhood has been complaining that there playground is in need of being rebuilt or remodeled. They have found that their playground in the neighborhood is not meeting safety standards required by playground new guidelines. The official in the neighborhood has done some fundraising to have the playground rebuilt to meet these standards. They would like for the playground to be safer with much more activities for the entire family to enjoy by removing the old playground and replace it with new playground equipment. They would like for the kids in the neighborhood to enjoy more outdoor play and closer to their homes. Scope Statement: Goal Definition This project will include a 2,500 square-feet area, with structural plastic playground that includes climbing wall, slides, jungle gym which is attached to each other instead of the general wood finishing, as the old playground was. It will also contain monkey bars at a fixed height so that kids will not get hurt when jumping down. There will be three swing sets (belt swing, infant/toddler swing, and tire swing), so that parents have the choice of which is safer for their kids. A concrete side walk will be included, so that kids can ride their bikes and other things. Benches will be placed closely...

Words: 843 - Pages: 4

Premium Essay

Proj 587 Project Final

...Course Project Epsilon: Portfolio Management Plan Instructor: Stanley Mefford Oct 24, 2012 Table of Contents Introduction 3 Epsilon’s Strategic Plan 3 Strategic Capacity Plan 4 Portfolio Management Process 6 Project Selection Criteria 7 Program Management Plan 8 Quality 9 Scope 10 Internal Teams 10 External Teams 11 Scheduling 11 Conflict Resolution Plan 12 Change Management Plan 13 Resource Utilization 15 Conclusion 16 Resources 17 Introduction Deploying over 40 billion emails annually, Epsilon is ranked as the top database marketing services provider and is the world’s leading multi-channel marketing and technology organization (Palmer, 2012). Epsilon works with over 2,000 global clients that represent industries across many markets including financial services, customer packaged goods, retail, travel and pharmaceutical markets. Some of Epsilon’s service offerings include: database technology, email services, and reporting/analytics. As a leader in the market, an impressive 26 of the Fortune 100 companies trust them to provide marketing services (Epsilon, 2012). Since 2009, Epsilon had been experiencing unprecedented growth. In 2011, Direct Marketing News reported that Epsilon’s 2010 global revenues increased 19% as compared to the previous year and was expected to double its revenues (Gordon & Washkuck, 2011). From the outside, forecasts couldn’t be brighter for the company. Internally, however, it was a different story...

Words: 4958 - Pages: 20

Premium Essay

Bscs Final Project Proposal-Template

...BSCS FINAL PROJECT PROPOSAL Title of the Project Term of Registration: Fall 2014 Presented by: Registration No: | Name: | L1F01BSCS0001 | ABC XYZ | L1F01BSCS0002 | ABC XYZ | L1F01BSCS0003 | ABC XYZ | Faculty of Information Technology | University of Central Punjab Project Title Write down the brief project topic in four to five words only. However, the topic should not be ambiguous or very general. Project Advisor The Name of your advisor will come here. Particulars of the students: S.No | Registration# eg.L1F00BSCS0101 | Name in Full Use Block Letters | CGPA | Signatures | 1 | | | | | 2 | | | | | 3 | | | | | Advisor’s Consent I Prof./Dr./Mr./Ms. ________________________________________________ am willing to guide these students in all phases of above-mentioned project as advisor. I have carefully seen the Title and description of the project and believe that it is of an appropriate difficulty level for the number of students named above. Note:Advisor can’t be changed without prior permission of the Manager Projects and the duration for completion of the Project is 2 regular semesters (approx.) from the date of Registration of Research Project. | Signatures and Date | Advisor | EVALUATOR/REFEREE 1 I have carefully read the project proposal and feel that the proposed project is a useful one and of a sufficient difficulty level to justify 2 regular semesters workload for above mentioned students. I have made recommendations...

Words: 1146 - Pages: 5

Premium Essay

Final Project- Strategic Plan and Presentation

...Strategic Plan and Presentation STR/581 Strategic Plan and Presentation Contents Company Overview 2 Background 2 Company Structure 3 Environmental Scan 5 External Factors 5 Internal Factors 6 Strategies 7 Generic Strategies 7 Implementation 8 Company Overview Background KnowledgeNet Enterprises LLC is a business-to-business company that is currently based in Tempe, AZ. The company was formed in 2005 in Aberdeen, Washington in a small two bedroom home in hopes of providing businesses with affordable and high-end training for the Information Technology staff (D. Rottner, personal communication, 2014).Today, KnowledgeNet Enterprises LLC now serves over 6,000 companies world-wide. The company’s focus is to offer quality training that is backed by a customer service team that provides outstanding support to all of the company’s customers (KnowledgeNet, 2013). There are many different options of training available to the company’s customers that provide flexibility for the customers that have limited time to focus on training. The company offers instructor-led training live over the web so that customers get the classroom feel and interaction without having to be in the classroom. There are also recorded versions of all the live classes to provide flexibility for customers that cannot make it to the live class. KnowledgeNet Enterprises LLC also provides practice labs, exams, and full library of online books to assist with the training (KnowledgeNet,...

Words: 3172 - Pages: 13

Premium Essay

Nt1330 Unit 9 Final Project

...the progress of tasks/activities in a project. Also, another useful tool is a Work Breakdown Structure¹, which decomposes the project into smaller tasks to show relationships between the tasks. By combining project scheduling, project time estimation and risks analysis, there will be a higher chance of finishing the project successfully without delays. 2.3.3 Cost Overruns Cost overruns are closely related to project delays, but that is not always the case. Other cases could be changing the project direction from what was planned, or stakeholders...

Words: 605 - Pages: 3

Free Essay

Netw 202 Week 8 Final Project Latest

...NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican...

Words: 495 - Pages: 2

Free Essay

Netw 202 Week 8 Final Project Latest

...NETW 202 WEEK 8 FINAL PROJECT LATEST To purchase this visit following link: https://coursehomework.com/product/netw/ Contact us at: HELP@APEXSEEKERS.COM NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded Course Home Work aims to provide quality study notes and tutorials to the students of NETW 202 Week 8 Final Project Latest in order to ace their studies. NETW 202 WEEK 8 FINAL PROJECT LATEST To purchase this visit following link: https://coursehomework.com/product/netw/ Contact us at: HELP@APEXSEEKERS.COM NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded Course Home Work aims to provide quality study notes and tutorials to the students of NETW 202 Week 8 Final Project Latest in order to ace their studies. NETW 202 WEEK 8 FINAL PROJECT LATEST To purchase this visit following link: https://coursehomework.com/product/netw/ Contact us at: HELP@APEXSEEKERS.COM NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded Course Home Work aims to provide quality study notes and tutorials to the students of NETW 202 Week 8 Final Project Latest in order to ace their studies. NETW 202 WEEK 8 FINAL PROJECT LATEST To purchase this visit following link: https://coursehomework.com/product/netw/ Contact us at: HELP@APEXSEEKERS.COM NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded Course Home Work aims to provide quality study notes and tutorials to...

Words: 859 - Pages: 4