Free Essay

It Capstone Rfp

In:

Submitted By etabor
Words 5862
Pages 24
5 Doctors
RFP #108064
Network Implementation
Attachment F - Specifications
October 19, 2012

Prepared by:
Jason Langley

BriskIT
313-555-4410
www.briskit.com TABLE OF CONTENTS Page
1.0 GENERAL REQUIREMENTS FOR SYSTEM 4
1.1 General Information 4
1.2 Technical Requirements 4
1.3 Vendor Qualifications 5
1.4 Delivery 5
1.5 Contractor Responsibilities 5
1.6 Basic Execution Requirements for All Systems 6
1.7 Installation Requirements 6
1.8 County’s Responsibilities for Delivery and Installation 7
2.0 NETWORK ELECTRONICS 7
3.0 TELEPHONE SYSTEMS 7
3.1 General Telephone Requirements 7
3.2 System Functional Requirements 8
3.2.1 General 8
3.2.2 Miscellaneous 8
3.3 Requirements for Proposed Telephone System Additions 9
3.3.1 General Requirements for Systems 9
3.4 System Physical Requirements 9
3.4.1 Public Safety Building – 115 W. Doty 10
3.4.2 1 Fen Oak Resource Center – 1 Fen Oak Drive, Madison 10
3.4.3 Health and Human Services – 125 Veterans Road, Stoughton 11
3.4.4 Health and Human Services - 1460 W. Main Street, Sun Prairie 11
3.4.5 Job Center – 1819 Aberg Avenue 12
3.5 Proposal Response (place all costs/pricing in Cost Summary Sheet) 13
3.5.1 Base Proposal 13
3.5.2 Information on the Telephone/Voice System Products and Services Proposed 14
3.5.3 Voice Messaging System - NuPoint Messenger IP 14
3.5.4 NuPoint Messenger IP Upgrade 15
3.5.5 Pre- and Post-cut Pricing 15
3.5.6 Telephone/Voice System Delivery and Installation 15
3.6 Add/Alternates 16
3.7 Telephone/Voice System Maintenance 19
3.7.1 General 19
3.8 Environmental Requirements 19
3.9 Execution 20
3.9.1 Progress Meetings 20
3.9.2 Observers 20
3.9.3 Scheduling 20
3.9.4 Station Reviews 20
3.9.5 Delivery 20
3.9.6 Setup 20
3.9.7 Coordination 21
3.9.8 Incorporation or Removal of Existing Equipment 21
3.9.9 Cutover Notification 21
3.9.10 Cutover: 21
3.9.11 Testing 21
3.9.12 Training 22
3.9.13 User Training 22
3.9.14 Post-Cutover Requirements 23
3.9.15 Documentation (Electronic copy) 23
3.9.16 Traffic Reports: 24
3.9.17 Systems Acceptance and Project Closeout 24
3.9.18 Warranty 25
3.9.19 Hotline Telephone Support 25
3.9.20 Management and Systems Training 25
3.9.21 User Groups 25
4.0 Cable Systems 25
4.1 General Information and Requirements Cabling Unit Pricing 25
4.2 Cabling Unit Pricing 26 1.0
GENERAL REQUIREMENTS FOR SYSTEM 2.1. General Information
5 Doctors has the following: 1. 5Doctors is currently five (5) separate sites. Made up of equipment that is out of date and does not meet HIPPA regulations * Insert current inventory

Two current sites are connected via a dial up network, all sites are using a peer to peer style network. 2. Network Electronics. BriskIT has standardized on HP switches and Juniper Wireless, and plans to provide, install and configure all network electronics associated with this request. 3. Installing cabling. Currently all the cabling that is installed is out of date and will not provide adequate bandwidth. BriskIT will install, new Category 7 cabling. 2.2. Technical Requirements
The intent of this specification is to provide turnkey network to replace the current infrastructure and, bring the technology up to specifications with regulations. All equipment and installation material required to fulfill the technical requirements shall be furnished and installed whether or not specifically enumerated herein. 1. The systems shall employ state-of-the-art technology and be in current production. 2. Only new equipment of the highest quality is acceptable. 3. Proposed systems must use the commercial power available: 115/120 volt, 60 Hz, AC. 4. Workmanship shall be professional in nature and the installations shall be done in accordance with accepted commercial standards. 5. Telnet and FTP will be disabled. 6. All phones will be VoIP. 7. All network traffic on the LAN, WLAN and, WAN will meet HIPPA requirements 8. All proposed network-connecting hardware is to be compliant and compatible with LLDP-Media Endpoint Discovery (MED), the Link Layer Discovery Protocol enhancement utilized by 5 Doctors. 9. Equipment and installation shall comply with the National Electrical code and any applicable local codes. 2.3. Vendor Qualifications 1. Proposer must be an authorized dealer/supplier of proposed telephone systems and electronics and components. 2. All configuration personnel must have completed manufacturer training and received certification(s) to design proposed systems, or the BriskIT must contract with manufacturer for configuration of all proposed components. 3. If for any reason, the manufacturer discontinues any model of equipment proposed in this configuration, the equipment must be maintained (including bugs, failures, and upgrades to standards) for a period of five years. In addition, 5 Doctors must be made aware of an upgrade/replacement path. 2.4. Delivery 1. No equipment shall be ordered or installed prior to authorization by 5 Doctors. Proposer shall not stock any materials or equipment prior to receiving authorization for installation. 2. The materials/equipment shall be delivered to its proper location and installed by the BriskIT without additional cost or expense to 5 Doctors, which shall not be deemed to have accepted any equipment until the Date of Acceptance. 3. During the time between delivery and acceptance, 5 Doctors cannot be held liable for any damages to or theft of any components. It will therefore, be the responsibility of the BriskIT to obtain insurance against loss, theft and damage. 2.5. Contractor Responsibilities 1. The BriskIT shall coordinate with the Project Manager an installation schedule for the entire project. This process is to begin at the Project Initiation Meeting. The Contractor is to deliver a written Project Schedule at this meeting. 2. BriskIT must verify communications room locations, and obtain approvals prior to layout and installation with the 5 Doctors Project Manager. 3. BriskIT is responsible to provide and install all cables and connectors necessary, including copper and fiber optic patch cables, to complete the installation of telephone equipment provided within this project. 4. Contract includes all software updates and upgrades for twelve (12) months following cutover at no extra cost (excluding labor). 5. BriskIT is required to install, configure and test all materials and equipment (testing procedures are outlined in following sections). 6. Shipping delays are the sole responsibility of BriskIT. 2.6. Basic Execution Requirements for All Systems 1. General: BriskIT is responsible to follow industry standards of good practice for the listed telephone and networking systems. 2. Aesthetic Factors: With the installation of equipment and cables, consideration shall be given not only to operational efficiency but also to overall aesthetic factors. The BriskIT shall redo any work deemed by the 5 Doctors to appear sloppy or unprofessionally completed, at no cost to 5 Doctors. 5 Doctors shall have final decision over whether work must be redone. 3. All equipment and materials shall be applied, installed, connected, erected, used and adjusted, as recommended by the manufacturers, or as indicated in their published literature unless specifically noted herein to the contrary. 4. Work, product and materials shall be properly protected during construction 2.7. Installation Requirements 1. If any proposed system, electronics or software item(s) are not shipping/deliverable by Hewlett Packard or Juniper Wireless, BriskIT must supply and install workable item(s) on loan until proposed equipment/software is delivered and installed. There is to be no extra charge by the BriskIT should this occur, nor for labor for changeover/ installation of loaner(s) to proposed equipment when it arrives. Such substitute item(s) must be approved by Project Manager prior to installation. If substitutes are found unsatisfactory, the contract may be terminated immediately. 2. There will be racks available in all technology closets. BriskIT is responsible to install/mount all proposed devices in those racks and put in place all needed patch cables. Any questions about use of racks must be directed to the Project Manager. 3. The preference is that all equipment be rack-mounted. If any items require shelves, rack ears, backboards, counters or tables, BriskIT shall provide them. 4. Any and all jumper/patch cables installed must be labeled according to TIA/EIA 606 standards and must indicate connections at both ends. 5. All rubbish, debris, and dirt resulting from BriskIT 's work shall be cleaned up as required, removed from the buildings, and, to the extent possible, recycled. The premises shall at all times be kept in a clean, safe and professional manner. 6. To facilitate routine in-house maintenance and administration of the systems after acceptance, two 5 Doctors personnel are to be observers during, and assist with all facets of the installation process. The Contractor must allow for the training/assistance of these people during installation. 7. Work shall be performed during normal hours of operation for the building where the work is taking place. Any deviations must be discussed with and approved by the Project Manager prior to work occurring. 2.8. 5 Doctors’ Responsibilities for Delivery and Installation
Please identify the exact tasks that 5 Doctors must perform and/or be responsible for in order to accomplish the delivery and installation of the system, if any. (Attach separate sheet labeled “Delivery and Installation” if needed.)

NETWORK ELECTRONICS
10 HP A5800-48G Switch with 2 Slots
20 A5800 300W AC Power Supply
20 HP 4-Port 10-GbE SFP+ A5800 Module
10 HP X240 10G SFP+ SFP+ 0.65m DA Cable
10 HP X240 10G SFP+ SFP+ 3m DA Cable
15 HP A5120-48G-PoE EI Switch with 2 Slots
30 HP 2-Port 10-GbE A5500 Local Conn Module
5 HP A-RPS1600 Redundant Power System
5 HP A-RPS1600 1600W AC Power Supply
15 HP X290 1000 A JD5 2m RPS Cable
50 Juniper WLA532 Access Points
10 WLC800 Wireless LAN Controllers
TELEPHONE SYSTEMS 2.9. General Telephone Requirements 1. All equipment proposed must be manufactured by Polycom. 2. All phones must be VoIP. 2.10. System Functional Requirements 2.11.1. General 1. Each administrative station is to be assigned a telephone. 2. Each telephone is to be assigned a distinct seven-digit local telephone number, with five-digit dialing between all networked telephones. 3. Outbound calls will be accomplished by dialing 9 and the desired telephone number. Telephones will be assigned access to 1) internal (County) calling, 2) local calling and 3) long distance calling as required. Calls and associated costs will be tracked automatically. 4. Calls to a busy or unattended staff member’s telephone will be re-routed either to 1) his or her personal voice mailbox greeting or 2) his or her personal assistant, if one is assigned. 5. Each telephone user is to be assigned a personal voice mailbox. 6. Callers routed to one’s voice mailbox are to always have the option to press “0” to reach an available person, during the day. 2.11.2. Miscellaneous 1. All multiple line telephones must be capable of having a prime, private extension with its own voice mailbox, but also be able to have multiple line appearance for departmental answering. 2. Some users may not be assigned a telephone, but will have a DID number associated with a voice mailbox. The intent is for the users to have a DID number that rings directly to the voice mail system and answers with the user’s personal greeting. 3. The system must be programmed to allow users to dial 9-911 or 911 only (resulting in the system automatically inserting the 9) to reach the Public Safety Answering Point (PSAP). 4. Multi-line telephones must have the ability to have multiple DID numbers programmed on the buttons, with distinct visual message waiting indication for each voice mail box associated with those DID’s. Each DID appearance must ring when dialed, forward to corresponding voice mailbox, and turn on that particular DID’s message waiting light. 5. The system must be capable of having day service and night services. 6. During the day, administrative staff members (telephone attendants/receptionists) will answer calls to main telephone numbers. As appropriate, these calls will be transferred directly to 1) the desired party, or 2) the party’s voice mailbox. 2.11. Requirements for Proposed Telephone System Additions 2.12.3. General Requirements for Systems 1. The following items must be included in the base price for each site’s system. There will be no added costs to 5 Doctors if Proposer does not include them. 2. BriskIT should provide all necessary detail on the proposed systems and components to accomplish a turnkey installation; Any elements required of the 5 Doctors must be expressly identified as an “Exception”.
Miscellaneous (include in Base Proposal) Fully resilient call processing, with real time handoff to secondary server, if primary server fails | Fully resilient gateway(s) function to public switched network, should primary gateway fail/be unavailable | Long Handset Cords for all telephones – Minimum 9 ft. | Patch cables for all telephones – 3 meter Category 5e or greater | Email notification to select IT staff members upon system alarms, for all controllers and servers | Remote maintenance callback modem (or secure alternative means) in support of system security | Station Message Detail Recording (SMDR) and Call Detail Recording to support all new stations proposed, to be added to existing Mitel Call Accounting Enterprise Software | Potential activation of any and all standard Mitel Networks-provided systems features and functions | Activation of Enterprise Manager for each system proposed (EM presently licensed to manage twelve systems) | 2.12. System Physical Requirements
Equipment Requirement Definitions
Installed: Actual number of ports and/or devices to be active at time of cutover.
Equipped: Specified number of ports and/or devices available in the system at time of cutover (Equipped minus Installed = unused but available ports).
Wired: The addition of minor components or system, user and device licensing may be necessary to meet this requirement. No servers, cabinets, shelves or core system software need to be added to meet “Wired”.
Capacity: The system can grow to this requirement by adding servers, cabinets, shelves, miscellaneous components, wiring, and licensing. 2.13.4. Sheriff/Public Safety Building – 115 W. Doty * System Configuration (Microsoft Lync 2012 and Audiocodes Gateway). The installed and equipped counts are additive to existing Emergency Management/EOC Installation | Installed | Equipped | Wired | Capacity | IP Network Connection | | | | | ISDN PRI for Digital Trunks | | | | | E911 back up analog lines | | | | | Analog trunk line | | | | 1 | Trunk Side Port Connection (to access overhead paging) | | | | | Multi-Line IP Stations | | | | | Single Line Feature IP Stations | | | | | Attendant IP Station | | | | | Analog (modem, miscellaneous non-IP telephone station) | | | | | DSS/BLF associated with IP station | | | | |

2.13.5. 1 Central Office * System Configuration – Microsoft Lync server 2010 and, Audiocodes Gateway | Installed | Equipped | Wired | Capacity | IP Network Connection | | | | | ISDN PRI for Digital Trunks | | | | | E911 back up analog lines | | | | | Analog Trunk Line | | | | | Trunk Side Port Connection (to access overhead paging) | | | | | Multi-Line IP Stations | | | | | Single Line Feature IP Stations | | | | | Attendant IP Station | | | | | Analog (modem, miscellaneous non-IP telephone station) | | | | | DSS/BLF associated with IP station | | | | | 2.13.6. North Office * System Configuration – Microsoft Lync server 2010 and, Audiocodes Gateway | Installed | Equipped | Wired | Capacity | IP Network Connection | | | | | ISDN PRI for Digital Trunks | | | | | E911 back up analog lines | | | | | Trunk Side Port Connection (to access overhead paging) | | | | | Multi-Line IP Stations | | | | | Single Line Feature IP Stations | | | | | Attendant IP Station | | | | | Analog (modem, miscellaneous non-IP telephone station) | | | | | DSS/BLF associated with IP station | | | | | 2.13.7. South Office * Microsoft Lync server 2010 and, Audiocodes Gateway | Installed | Equipped | Wired | Capacity | IP Network Connection | | | | | ISDN PRI for Digital Trunks | | | | | E911 back up analog lines | | | | | Trunk Side Port Connection (to access overhead paging) | | | | | Multi-Line IP Stations | | | | | Single Line Feature IP Stations | | | | | Attendant IP Station | | | | | Analog (modem, miscellaneous non-IP telephone station) | | | | | DSS/BLF associated with IP station | | | | | 2.13.8. East Office * System Configuration Microsoft Lync server 2010 and, Audiocodes Gateway * Required elements:
-------------------------------------------------
Microsoft Lync Server 2010
-------------------------------------------------
Audiocodes Gateway
-------------------------------------------------
Required cards * * Instruments (All instruments are to be hearing aid compatible) to serve each of the sites identified above. Instruments proposed | Quantity | Instrument name and model | | | | Polycom CX600 | | | | | | | | | | | | | | | | | | 2.13. Proposal Response (place all costs/pricing in Cost Summary Sheet) 2.14.9. Base Proposal
Detail all telephone system components and price elements on the “Itemization Schedule – Equipped Configuration”; include component description, part number, quantity, unit cost, extended unit (total) cost, as presented. This will constitute the Base System. Do not include “Add/Alternates” here. Use one page per site, each accompanied by a detailed system bayfront diagrams, along with a detailed network diagram depicting all systems, components, ports and interconnecting circuits.
See Itemization Schedules below. Replicate form for each system/site.
Itemization Schedule to Meet System “Equipped” Configuration Requirements – Base Telephone System. Site address:_________________________________ Mfr.Part # Description (simple English) Quantity Unit Cost Extended ________ _______________________ ________ $________ $________ ________ _______________________ ________ $________ $________ ________ _______________________ ________ $________ $________ ________ _______________________ ________ $________ $________ ________ _______________________ ________ $________ $________ TOTAL INSTALLED COST OF ADDITIONS: $___________ SECOND YEAR MAINTENANCE (ADDITIONS) 8-5 M-F $___________
SECOND YEAR MAINTENANCE (ADDITIONS) 24X7 $___________

2.14.10. Information on the Telephone/Voice System Products and Services Proposed
Telephone System/Server * Manufacturer: * Model No.: * Software Issue: * Operating System: * Voice Messaging * Manufacturer: * Model No.: * Software Issue: * Operating System: 2.14.11. Voice Messaging System – Exchange UM

Provide for 1,000 mailboxes on Microsoft Exchange UM with redundant hard drive, integrated visual message waiting indication to all stations served, 3300 IP integration, record-a-call function and unlimited automated attendant/call processing/decision tree function for 5 Doctors departments and users served. Assume: 48 active ports, 1,000 active mailboxes, expandable to 2,500. Item/Quantity Description Cost ________________________ _______________________ $______ ________________________ _______________________ $______ ________________________ _______________________ $______ ________________________ _______________________ $______ TURNKEY COST $______ 2nd Yr. Maintenance $______ Limitations: _______________________________________________ _________________________________________________________ Cost to add voice recognition for automated attendant function. Assume two (2) simultaneous sessions, one (1) text to speech simultaneous session, fifty (50) directory names. Turnkey cost: $______________ 2nd Year Maint: $_____________ Cost each additional voice recognition: $_________ Cost each additional text to speech session: $__________ Cost each additional directory name:$_______ 2.14.12. NuPoint Messenger IP Upgrade
Provide cost to upgrade existing NuPoint Messenger IP located at City County Building to Release 12 software.
Turnkey cost: $________
Incremental second year maintenance: $_________ 2.14.13. Pre- and Post-cut Pricing
Provide the cost of telephone models, hardware, software, licensing and all other price elements, including additional applications available with the proposed system platforms.
Post-cut pricing is effective for the following length of time, beginning with date of systems acceptance: ____________________________________________

Description (in plain English) | Part No. | Pre-cut
Price | Pre-cut installed Cost | Post-cut
Price | Post-cut installed cost | | | | | | | | | | | | | 2.14.14. Telephone/Voice System Delivery and Installation
Identify the exact tasks that the County must perform and/or be responsible for in order to accomplish the delivery and installation of the system. In addition, identify in detail the exact tasks that the Proposer will perform and/or be responsible for in order to accomplish the delivery and installation. Proposer shall project delivery date and installation period by function which will allow Proposer to accomplish the scheduled date of completion. Follow this format:
Task Date Client Proposer
_________ _________ ___________ ____________
_________ _________ ___________ ____________
_________ _________ ___________ ____________ 2.14. Add/Alternates 2.15.15.1. System Administrator Training Cost for system administrator to attend formal CDE class at a factory-authorized location for system administration certification on 3300 ACD and NuPoint voice messaging. Systems Administrator to learn the basics of adds, moves and changes and system maintenance. Provide cost for each person to be certified on the proposed systems. Provide documentation on curriculum. ACD: $______________ NuPoint: $____________ 2.15.15.2. System Technician Training Cost for system technician to attend factory authorized training for full certification on maintaining the proposed telephone, ACD and voice messaging systems. Please provide cost for each person to be certified. Provide documentation on curriculum.
3300 Cost: $____________ ACD: $______________
NuPoint: $____________ 2.15.15.3. ACD Agent
Provide the itemized turnkey cost of activating an initial ACD agent, to be added to any of the systems within VoIP network. Item/Quantity Description Cost ________________________ _______________________ $______ ________________________ _______________________ $______ TURNKEY COST $______ 2nd Yr. Maintenance $______ Limitations: _______________________________________________

Provide the itemized turnkey cost of activating a second or subsequent ACD agent, to be added to any of the systems within VoIP network Item/Quantity Description Cost ________________________ _______________________ $______ ________________________ _______________________ $______ TURNKEY COST $______ 2nd Yr. Maintenance $______ Limitations: _______________________________________________

2.15.15.4. Administrator Training for Mitel Call Accounting System
Provide the cost of delivering training for the one or two administrators of Mitel Call Accounting in the use of the software installed at the County. Provide hours and cost:
Proposed Hours: _________
Cost: _________ 2.15.15.5. Mitel Quick Conference
A. Provide the cost to install and activate basic audio conferencing for up to twelve endpoints, to be used by any networked IP telephone users and outside conference participants. Item/Quantity Description Cost ________________________ _______________________ $______ ________________________ _______________________ $______ TURNKEY COST $______ 2nd Yr. Maintenance $______ Limitations: _______________________________________________

B. Provide the cost to install and activate basic audio conferencing for up to twenty-four endpoints, to be used by any networked IP telephone users and outside conference participants. Item/Quantity Description Cost ________________________ _______________________ $______ ________________________ _______________________ $______ TURNKEY COST $______ 2nd Yr. Maintenance $______ Limitations: _______________________________________________ 2.15.15.6. Maintenance
Provide annual maintenance plan costs for each of the systems as identified in Attachment H; for systems being expanded, provide the entire cost upon completion of the expansion (i.e., base plus additions). * On-site parts and labor, work to completion, 24X7 * On-site parts and labor, work to completion, M-F, 8-5
Site 8-5 24X7 1. Courthouse/City County Building _______ _______ 2. Sheriff/PSB/Emerg Mgmt/EOC _______ _______ 3. Health & Human Svcs - Northport _______ _______ 4. Health & Human Svcs – S. Park _______ _______ 5. NE Precinct _______ _______ 6. SE Precinct _______ _______ 7. NIP _______ _______ 8. Badger Prairie Health Care _______ _______ 2.15.15.7. Trade In – Existing SX2000 Equipment at Sheriff/PSB Provide the trade-in value to take title and possession of Mitel SX2000 systems installed at Public Safety Building. See Attachment H for equipment list. Trade-in value: $___________ 2.15.15.8. Wireless handset
Cost to provide and activate a single, wireless handset provided or supported by Mitel Networks. Access points and their configuration to be by County. Item/Quantity Description Cost ________________________ _______________________ $______ ________________________ _______________________ $______ TURNKEY COST $______ 2nd Yr. Maintenance $______ Limitations: _______________________________________________

Cost to add second/subsequent handset: $________ 2.15. Telephone/Voice System Maintenance 2.16.15. General 1. Proposer must provide total annual maintenance costs and guaranteed maximum annual percentage increases for telephone and voice messaging platforms, such that these costs can be accounted for during years two through five. Failure to do so will result in a loss of points during the evaluation. 2. Indicate a guaranteed price for a comprehensive work-to-completion, 100% parts and labor, annual service contract for year two (2) of each system proposed, excluding telephones.. 2.16. Environmental Requirements
Please provide your proposed MCR/TCR room requirements including:
Size, Humidity, and Temperature Levels.
____________________________________________________________
____________________________________________________________
What are the electrical power requirements of your individual proposed system(s) or expansions, by site/room? VOLTS AMPS Sheriff/EM/EOC ______ ______
One Fen Oak ______ ______
HHS – Sun Prairie ______ ______
HHS - Stoughton ______ ______
Job Service ______ ______

2.17. Execution 2.18.16. Progress Meetings
Contractor shall provide a weekly update to the Consultant and County on the progress of the coordination, staging, assembly, installation, testing and all training through system acceptance. 2.18.17. Observers
To facilitate routine in-house maintenance of the system after acceptance, two County personnel are to be observers during and assist with all facets of the installation process. The Contractor shall allow for the training/assistance of these people during installation. 2.18.18. Scheduling
Work shall be performed during normal hours of operation for the building where the work is taking place. Any deviations must be discussed with and approved by the Project Manager prior to work occurring. 2.18.19. Station Reviews
As these specifications are put together with no specific equipment or vendor in mind, the Contractor shall include in the installation cost, multiple informational presentations to the County’s management and users. Contractor’s Customer Service personnel shall inform management of decisions that they will need to make regarding the equipment being installed and programmed. Further, the Customer Service personnel shall hold departmental meetings to determine features, types of phones, routing, restrictions, etc. on a per telephone basis. The County will assist, but Contractor is responsible for providing all details to the County. There can be no exceptions to this. 2.18.20. Delivery
Systems described in this document, once configured by the Contractor, shall be delivered to its proper location and installed by the Contractor without any additional cost or expense to the County; County shall not be deemed to have accepted any equipment until the date of acceptance. 2.18.21. Setup
The Contractor shall unpack equipment from shipping material and organize equipment into the kits in which it will be used. This includes checking to ensure that all equipment is complete and fully functional. Empty boxes and packaging shall be neatly organized per the County’s instructions and removable if requested. 2.18.22. Coordination
Coordination with local exchange and network carriers and E-911 Center: Contractor shall provide complete coordination between systems, local exchange and network carriers, including the submission of all connection and disconnection orders. 2.18.23. Incorporation or Removal of Existing Equipment
The Contractor will be responsible for the removal of existing equipment not incorporated into new system. Upon express approval by County, that equipment shall be boxed and removed by Contractor, then, to the extent possible, recycled. 2.18.24. Cutover Notification
Cutover from existing system to new system shall be scheduled with the County at least one month prior to occurrence. 2.18.25. Cutover:
On the days following each cutover segment, Contractor is required to provide a project team on-site to provide follow-up training, and man a help-line for users to call and report system problems. This cutover and move is expected to occur in phases, taking approximately one week. 2.18.26. Testing
Contractor shall test all equipment, software and programming database to ensure system functions as specified and as understood during planning sessions and station reviews.
The County reserves the right to randomly test connections upon completion of installation. If the results of those tests are deemed unacceptable, Contractor shall correct all identified errors at no cost to the County if it was deemed that the installation was in error.
Equipment must run 30 consecutive days without an equipment hardware failure (operator errors excluded). Failure during that time will require replacement and another 30-day period.
For each building LAN, Contractor must demonstrate connectivity/pinging of all managed devices from Main Closet to the County Project Manager or his/her designee. 2.18.27. Training
Informal Training: The Contractor shall supply at least eight (8) and up to sixteen (16) hours of training on the telephone system and equipment for at least two persons during the installation process. Training shall include: 1. Familiarization with features of all components; 2. Specifics of equipment features in proposed products; 3. Configuration details of selected equipment, and how to reinstall and reconfigure in case of failure; 4. Provision of manuals (full documentation) for all components and explanation of where and how to obtain support; 5. Explanation of most effective methods to test and maintain components; 6. Training in basic use of software proposed (not including network management software); 7. Description of warranty and servicing procedures for all components. 2.18.28. User Training
The Contractor shall conduct on-site user hands-on training sessions, limited to 12 people maximum in any one session. Sessions shall last approximately one (1) hours each. Contractor is required to install cable from the switch to the training location to provide for up to 12 live telephones. In addition, Contractor shall provide a minimum of two (2) hours of on-site hands-on training for all attendants and a minimum of twenty-four (24) hours of training for the two system administrators. This training will be necessary for all users of the system.
Contractor is required to have on site for initial day of or following cutover, a qualified trainer to sit with each console operator and remain for at least four hours each. This applies to each building location.
Refresher Training: Contractor will offer refresher training classes within three weeks following the week of cutover. This training will include live telephones for a total of up to four (4) hours. 2.18.29. Post-Cutover Requirements
Proposer is required to perform the following items within the first 30 days following the cutover of the system: 1. Completion of any outstanding adds, moves or changes. 2. Internal system traffic study. 3. Readjustment of trunking if required from information obtained form traffic study. 4. Refresher training classes. 5. Station software changes. 2.18.30. Documentation (Electronic copy)
Instruction Manual: All users are to be provided with an instruction manual with feature codes defined for their assigned telephone instrument.
Training Tapes: Training tapes from the manufacturer are required to be left on-site. The County retains the right to videotape training classes given by the Contractor.
Training Manual: A minimum of one (1) complete training manual shall be provided by the date of acceptance detailing all information necessary for full use of the system proposed. Station user manuals are to be provided for all users. Payment may be withheld until a complete and accurate training manual has been provided.
When installation is complete, Contractor shall furnish County with a complete technical manual, made up of two complete sets of project documentation and two complete sets of manufacturer hardware and software manuals. One set is to be an electronic copy, the other hard copy organized in three-ring binders. Manuals shall be delivered in alphabetical order by manufacturer.
Technical manual will include: 1. Complete and accurate wiring diagrams detailing the interconnetion of the various systems and related equipment, including all leased telecommunications circuits, lines and trunks, interconnecting wires and jacks. 2. Documentation including installed system database and programming summary, installed circuits listing, cabling systems as-builts, recorded software versions and end user telephone features 3. Detailed network diagram depicting all installed products and services. 4. Bayfront diagrams and rack elevations detailing all telephone-related equipment. 5. Identification of all closet locations (marked by name) on building layouts and include logical diagrams for each closet showing all installed equipment. 6. List in spreadsheet format which telephone and telephone extension(s) is connected to which outlet jack, which in turn is connected to which switch port (e.g. extension 5456 connected to outlet ID #S-242A connected to MC #2 Switch C, port 5). 7. IP numbers assigned to all equipment must be noted both on diagrams and on a separate table/spreadsheet. 8. Where VLANs are used, VLAN documentation shall be included, showing configuration as completed. 2.18.31. Traffic Reports:
Two free traffic reports need to be conducted and analyzed per year for each of the first five years of the system life. The traffic study will be analyzed and returned to the County within six weeks of the order. 2.18.32. Systems Acceptance and Project Closeout
Systems acceptance shall occur after: 1. 30 consecutive days with 99 percent or better availability, and 2. All of the Work has been completed in accordance with the contract and RFP specifications (including testing procedures as outlined in the accepted response), and 3. The system operates in conformance with manufacturer's published specifications, and 4. All of the documentation requirements have been met, and 5. Contractor has certified in writing to the Consultant and County Project Manager that the system is installed and operational in accordance with these specifications, and ready for use, and 6. County or County’s designated representative has inspected the installation and provided written approval.
At the completion of the above items, and upon the County’s written acceptance, operations control becomes the responsibility of the County. This constitutes Date of Systems Acceptance. The warranty begins as of this date. 2.18.33. Warranty
The Contractor, by entering into a contract with the County, warrants and represents that all materials, equipment and service delivered to the County pursuant to the contract conforms to all of the specifications contained or referred herein. The Contractor further guarantees to replace all materials, equipment, software or service, which may be rejected by the County due to defective materials or workmanship for a minimum of one year following final acceptance. Failure or neglect of the County to require compliance with any term or condition of the contract specifications shall not be deemed a waiver of such term or condition. 2.18.34. Hotline Telephone Support
Provide description of any hotline support you offer your customers. List the hours staffed and costs for the service. 2.18.35. Management and Systems Training
List all systems management and maintenance classes available for the County. Include course description, course length, location of class, and costs. Indicate which classes have been included in your Proposal. 2.18.36. User Groups
Does the manufacturer of the proposed system have a user groups the meets regularly? If so, provide information on the group:
____________________________________________________________
2.0 Cable Systems 3.18. General Information and Requirements Cabling Unit Pricing
Contractor is to provide and use Category 5e copper jumper/patch cables to connect network devices to existing Cat 5 or higher patch panels.
All jumper/patch cables installed must be labeled according to TIA/EIA 606 standards and must indicate connections at both ends.
Contractor is responsible to employ proper horizontal wire management techniques in all its work in and around cabinets and racks. If this will require the use of horizontal wire management devices, these are to be provided by Contractor and installed. Wire management devices are subject to County and Consultant’s approval.
The voice feeder cables, Category 5e or higher cables and multimode fiber optic cabling is to support the new Courthouse telephone systems.
Proposer is responsible for providing a turnkey working system.
The telephone contractor work functions shall include, but not be limited to, the following work items for installation of the cabling wiring system: 1. Provide cabling to the backplane from the telephony server
Use existing RJ-45, 110- or 66-type telephone blocks as appropriate
Terminate and splice cables a. The successful Proposer shall be responsible for the placement of all cross-connect/jumpers between: The telephone system, Ethernet data, analog voice backbone and station cables. The telephone system and MDF outside trunk cross-connect field 3.19. Cabling Unit Pricing
Unit Prices * Provide unit pricing to add 1-Category 5e UTP, Cable (225’ length), components, concealed installation, tested and labeled for telephone use. * Provide Cabling Technician/Installer Hourly Rate for miscellaneous work * Cost: $ ___________

Similar Documents

Premium Essay

Netw600 Capstone Travel Agency Inc Rfp Response

...NETW600 Capstone Team E Week 7 Final Project Travel Agency Inc (TAI) RFP Response Table of Contents: Executive Summary 3 Background 3 Industry Trends and Projections Problem Definition 6 Requirements Definition 8 Project Goals and Objectives Project Assumptions Current Configuration of Network Identification of Business Issues and Requirements Budget Requirements Network Design 11 Alternative Approaches Customer Ownership Outsourcing and the Cloud Comparison of Alternatives Cost differences Workflow differences Reliability Maintenance Performance Findings, Conclusions, and Recommendations 16 Implementation Plan 17 Project Plan Milestones Implementation Plan Training Follow-up Appendices 19 Appendix A Appendix B Appendix C Appendix D Appendix E Appendix F References 27 Executive Summary: Travel Agency Incorporated, (TAI), has reached a pivotal point in the travel industry and is at a stage for which changing business model operations is critical and may determine their very survival. Make no mistake TAI is at a crossroad. It is crucial that TAI reduce costs and employee turnover, eliminate network congestion, and develop a presence for online bookings. It is also imperative that TAI’s reputation and business model of providing complete and very personal service while building and maintaining excellent relationships with their customers cannot be...

Words: 5744 - Pages: 23

Premium Essay

Capstone Project

...Unit 1: Introduction to the Capstone Project Recommended Activities for This Unit Instructor Functions|Student Tasks| • Discuss the course structure layout. • Present an overview of the capstonecase study or Request for Proposal (RFP).|Discuss the capstone project or Request for Proposal (RFP) to identify the following: o Objectives and scope o Requirements and specifications o The resources, such as human, time, funds, space, and tools, required to deliver the product o Tasks o Deliverables o Milestones• Identify major milestones and individual tasks.| • Explain how to launch and configure Microsoft Office Project 2003.|Explore Microsoft Office Project 2003.| • Discuss project planning and management using Microsoft Office Project 2003 and relate the software to the capstone project. o Define the basic terminology of project management. o Explain the project management life cycle. o Explain project management knowledge areas.|Define project management terminology and apply the terminology to the capstone project.| • Organize project teams. o Define team member roles and responsibilities.|Select teams.• Define team member roles and responsibilities.• Elect peers to fill appropriate roles.| Network Development Capstone Project Unit 1 Instructor Functions|Student Tasks| • Identify the key components of the capstone project. o Discuss the key requirements for the successful completion of the project. See Appendix...

Words: 2321 - Pages: 10

Premium Essay

Com 135 Uop Tutorial, Com 135 Uop Homework

...Writing COM 135 Week 1 Individual Assignment The Technical Writing Process COM 135 Week 2 CheckPoint Audience Analysis COM 135 Week 2 DQ 1 COM 135 Week 2 DQ 2 COM 135 Week 3 CheckPoint Communication Techniques COM 135 Week 3 CheckPoint Letter Writing Techniques COM 135 Week 3 Individual Assignment Written Communication In The Corporate Environment COM 135 Week 4 CheckPoint Article Summary COM 135 Week 4 DQ 1 And DQ 2 COM 135 Week 5 CheckPoint User Manual Criteria COM 135 Week 5 Individual Assignment Clear And Concise Technical Instructions COM 135 Week 6 CheckPoint Reports COM 135 Week 6 DQ 1 And DQ 2 COM 135 Week 7 CheckPoint RFP Analysis COM 135 Week 7 CheckPoint Rough Draft Of Final Project COM 135 Week 7 Individual Assignment Proposals COM 135 Week 8 CheckPoint Image Integration COM 135 Week 8 DQ 1 And DQ 2 COM 135 Week 9 Capstone Checkpoint COM 135 Week 9 Final Project User Manual For More Homework Goto http://www.homeworkbasket.com COM 135 Week 1 Individual Assignment The Technical Writing Process Click Below URL to Purchase Homework http://www.homeworkbasket.com/COM-135/COM-135-Week-1-Individual-Assignment-The-Technical-Writing-Process Resources: Pages 25-38 in Technical Writing: Process and Product (5th ed.) Read the following scenario: As a customer service manager for a local software development company, you want to create a user manual for one of the software applications your company develops. The purpose of the manual is to support...

Words: 576 - Pages: 3

Premium Essay

Project Charter

...______________________________________________________________________________ Capstone Project III: Labs for High School NSA Capstone Project Charter ______________________________________________________________________________ Prepared By: Date of Publication: 03/29/2014 Revision History Version | Date | Author(s) | Revision Notes | 1.0 | 03/29/14 | Nicholas Jones/ Jorge Lopez/ Robert Howell | Original Document | | | | | | | | | | | | | | | | | Table of Contents Project Description 3 Project Objectives 3 Project Scope 4 In Scope: 4 Out of Scope: 4 Deliverables Produced: 4 Stakeholders: 5 Requirements: 5 Acceptance Criteria:Project Estimated Effort/Cost/Duration 5 Estimated Cost: 6 Estimated Effort Hours: 6 Estimated Duration: 6 Project Assumptions 7 Project Risks 7 Project Constraints 8 Project Dependencies 8 Project Approach 8 Project Organization 9 Communication Plan: 9 Project Guidelines: 9 Project Approvals 10 Project Description The Technical Director for a local school district wants three functional labs for various high school students to use. The labs will be essential for supporting the education of the students. Because there will be various students and instructors using the lab, it will require access to email via client and mobile devices, as well as secure authentications. A user guide Web page will be necessary. Project Objectives This project will...

Words: 1298 - Pages: 6

Free Essay

Scope of Service

...[pic] STATE GOVERNMENT DEPARTMENT OF FINANCE AND ADMINISTRATION REQUEST FOR PROPOSALS FOR INFORMATION SECURITY ASSESSMENT SERVICES (ISAS) RFP NUMBER: 427.04-107-08 |CONTENTS | |SECTION | | |1 |INTRODUCTION……………………………………………………………………………….3 | |2 |RFP SCHEDULE OF EVENTS………………………………………………………………..................................6 | |3 |PROPOSAL REQUIREMENTS………………………………………………………………7 | |4 |GENERAL REQUIREMENTS & CONTRACTING INFORMATION………………….…..9 | |5 |PROPOSAL EVALUATION & CONTRACT AWARD…………………………………....13 | | | |RFP ATTACHMENTS: | | ...

Words: 40549 - Pages: 163

Premium Essay

Nothing

... Contact/Instructional hours: 56 (34 Theory Hours, 22 Lab Hours) Prerequisite(s) and/or Corequisite(s): Prerequisites: NT1210 Introduction to Networking or equivalent Course Description: This course examines industry standards and practices involving the physical components of networking technologies (such as wiring standards and practices, various media and interconnection components), networking devices and their specifications and functions. Students will practice designing physical network solutions based on appropriate capacity planning and implementing various installation, testing and troubleshooting techniques for a computer network. Where Does This Course Belong? | | | NT2799 | | | | | | | | NSA Capstone | | | | | | | Project | | | | | NT2580 | | | NT2670 | NT2640 | | PT2520 | | Introduction to | | | | | | | | | | | Email and Web | | | | | Information | | | | IP Networking | | Database Concepts | | | | | Services | | | | | Security | | | | | | | | | | | | | | | | NT1330 | | | NT1230 | NT1430 | | PT1420 | | Client-Server | | | Client-Server | | | Introduction to |...

Words: 10839 - Pages: 44

Premium Essay

Speed Dating Techniques in Mock Interviews: Lessons to Be Learned

...Speed Dating Techniques in Mock Interviews: Lessons to be Learned Sofia Vidalis, Ph.D. and Joseph J. Cecere, Ph.D., CPC Penn State Harrisburg Abstract A student seeking that professional position or practical summer experience has become enormous in their educational experience. A university provides the information and skills for the student so they can be successful in their job search. This may include resume preparation and cover letters towards the next step, the job interview. A mock interview is one way to prepare students for an actual employment interview. It allows students to gain experience and practice in answering questions similar to ones asked during an actual interview. It also helps students become more comfortable in the interview setting. Despite of the importance of mock interviews, most college students do not have that experience until their first job interview during a career fair, internship, or even after graduation. However, in today’s economic, interview preparation may be the determining factor to securing employment. One way in breaking the ice of interviewing jitters is to prepare the students in advance. The Civil Engineering/Structural Design and Construction Engineering Technology program at Penn State University held a Mock Interview and Panel Discussion event to help students better prepare for an interview as realistic as possible. This was accomplished by inviting professionals from the industry from the construction management and engineering...

Words: 4312 - Pages: 18

Premium Essay

Netw600 Capstone Paper

...NETW600 Telecommunications Capstone Table of Contents Executive Summary 3 Project Background 3 Industry 3 Trends and Projections 4 Competition 5 Strength 5 Weakness 5 Opportunity 5 Threats 5 Problem and Definition 6 Problem 1: Infrastructure 6 Problem 1.1 Cabling 6 Problem 1.2 Disaster Recovery 6 Problem 1.3 Equipment Life Cycles 6 Problem 2: Security 7 Problem 3: No Internal VoIP 7 Problem 4: Inability to Switch to Telecommute Employees 7 Project Overview 8 Goals & Objectives 8 Assumptions 9 Identification of Issues & Requirements 10 Findings and Recommendations 14 Budget Requirements 14 Recommended Approach – Telecommute 14 Alternative Approach 1 – High Availability (On-Site) 15 Alternative Approach 2 – Telecommute & Cloud 16 Network Design 17 Recommended Approach – Telecommute 18 Alternative Approaches 19 Alternative Approach 1 – High Availability (On-Site) 19 Alternative Approach 2 – Telecommute & Cloud 20 Implementation Plan 20 Project Plan 21 Milestones and Measurements 21 Implementation Strategy 22 Works Cited 23 Appendix A 24 Recommended Approach – Telecommute 24 Alternative Approach 1 – High Availability (On-Site) 27 Alternative Approach 2 – Telecommute & Cloud 30 Executive Summary Travel Agency, Inc. is a large travel firm that was founded in 1999. They pride themselves on personal relationships along with fast and accurate customer service. Travel Agency,...

Words: 4954 - Pages: 20

Premium Essay

Damsel

...2014-2015 Undergraduate Academic Calendar and Course Catalogue Published June 2014 The information contained within this document was accurate at the time of publication indicated above and is subject to change. Please consult your faculty or the Registrar’s office if you require clarification regarding the contents of this document. Note: Program map information located in the faculty sections of this document are relevant to students beginning their studies in 2014-2015, students commencing their UOIT studies during a different academic year should consult their faculty to ensure they are following the correct program map. i Message from President Tim McTiernan I am delighted to welcome you to the University of Ontario Institute of Technology (UOIT), one of Canada’s most modern and dynamic university communities. We are a university that lives by three words: challenge, innovate and connect. You have chosen a university known for how it helps students meet the challenges of the future. We have created a leading-edge, technology-enriched learning environment. We have invested in state-of-the-art research and teaching facilities. We have developed industry-ready programs that align with the university’s visionary research portfolio. UOIT is known for its innovative approaches to learning. In many cases, our undergraduate and graduate students are working alongside their professors on research projects and gaining valuable hands-on learning, which we believe is integral...

Words: 195394 - Pages: 782

Free Essay

Capstone Final Documentation

...CNS Capstone A COMPREHENSIVE NETWORK DEVELOPMENT PROJECT SUBMITTED TO THE IT / COMPUTER NETWORKS SYSTEMS PROGRAM IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE ASSOCIATE DEGREE By Instructor – Roman Danyew Table of Contents Introduction to Cornerstone Communications………………………….................. 3 STAR MEDICAL’s Proposal Overview ……………………………….................. 4 Executive Summary………………………………………………………………... 6 Assumptions and Constraints………………………………………………………. 7 Deliverables………………………………………………………………………... 8 Project Details Implementation and Timeline……………………………………………… 9 Network Topology........................................................................................ 11 IP Schema…………………………………………………………………. 16 Security…………………………………………………………………….. 17 Active Directory Structure…………………………………………………………. 18 Active Directory and Exchange……………………………………………………..19 Website hosting and developing…………………………………………………… 20 Maintenance and Training Plan …………………………………………………….22 Risk Analysis………………………………………………………………………. 23 Backup Plan…………………………………………………………………………24 Cost Analysis………………………………………………………………………. 25 Appendix…………………………………………………………………………… 26 Appendix A: Cost Analysis…………………………………………………27 Appendix B: Hardware…………………………………………………….. 29 Introduction to Cornerstone Cornerstone Communications has been providing networking and data communications...

Words: 7795 - Pages: 32

Premium Essay

Try to Read It

...Syllabus Certified General Accountants Association of Canada 100 – 4200 North Fraser Way Burnaby, British Columbia Canada V5J 5K7 www.cga-canada.org © CGA-Canada, 2013 All rights reserved. These materials or parts thereof may not be reproduced or used in any manner without the prior written permission of the Certified General Accountants Association of Canada. Printed in Canada ISBN for an individual volume: 978-1-55219-599-4 About CGA-CANADA _________________________________________ CGA-Canada today The CGA designation focuses on integrity, ethics, and the highest education requirements. Recognized as the country’s accounting business leaders, CGAs provide strategic counsel, financial leadership, and overall direction to all sectors of the Canadian economy. The Certified General Accountants Association of Canada — CGA-Canada — sets standards, develops education programs, publishes professional materials, advocates on public policy issues, and represents CGAs nationally and internationally. The Association represents 75,000 CGAs and students in Canada, Bermuda, the Caribbean, Hong Kong, and China. Mission CGA-Canada advances the interests of its members and the public through national and international representation and the establishment of professional standards, practices, and services. A proud history CGA-Canada was founded in Montréal in 1908 under the leadership of John Leslie, vicepresident of the Canadian Pacific Railway. From the beginning, its objective...

Words: 39811 - Pages: 160

Free Essay

Cams

...Study Guide for the Certification Examination Fifth Edition ACAMS.org ACAMS.org/español ACAMSToday.org MoneyLaundering.com Study Guide for the Certification Examination Fifth Edition a publication of the association of certified anti-money laundering specialists Study Guide for the Certification Examination Fifth Edition Executive Vice President John J. Byrne, CAMS Editor Robert S. Pasley, CAMS Co-Editor Kevin M. Anderson, CAMS Contributors Joyce Broome, CAMS Heather Brown, CAMS Aub Chapman, CAMS Vasilios Chrisos, CAMS David Clark, CAMS Jurgen Egberink, CAMS Michael D. Kelsey, CAMS Saskia Rietbroek, CAMS Nancy J. Saur, CAMS Mansoor Siddiqi, CAMS Daniel Soto, CAMS Timothy White CAMS Production Assistant Catalina Martinez We would like acknowledge the following individuals for their contributions to the CAMS Exam, and the Online and Live Preparation Seminars: Kevin M. Anderson, CAMS Joyce Broome, CAMS Aub Chapman, CAMS David Clark, CAMS Josue Garcia, CAMS Hoi Luk, CAMS Ira Morales Mickunas, CAMS Robert S. Pasley, CAMS Karim Rajwani, CAMS Mansoor Siddiqi, CAMS Saskia Rietbroek, CAMS Ed Rodriguez, CAMS Nancy J. Saur, CAMS Wendy Steichen, CAMS Brian J. Stoeckert, CAMS Charles Taylor, CAMS Will Voorhees, CAMS Natalie Ware, CAMS Peter Warrack, CAMS Amy Wotapka, CAMS Crispin Yuen, CAMS Copyright © 2012 by the Association of Certified Anti-Money Laundering Specialists (ACAMS). Miami, USA. All rights...

Words: 105184 - Pages: 421

Premium Essay

Customer Relationship Management

...Customer Relationship Management VSF This book is dedicated to my children Emma and Lewis of whom I am enormously proud. Customer Relationship Management Concepts and Technologies Second edition Francis Buttle AMSTERDAM • BOSTON • HEIDELBERG • LONDON • NEW YORK • OXFORD PARIS • SAN DIEGO • SAN FRANCISCO • SINGAPORE • SYDNEY • TOKYO Butterworth-Heinemann is an imprint of Elsevier Butterworth-Heinemann is an imprint of Elsevier Linacre House, Jordan Hill, Oxford OX2 8DP 30 Corporate Drive, Suite 400, Burlington, MA 01803, USA First edition 2009 Copyright © 2009, Francis Buttle Published by Elsevier Ltd. All rights reserved. The right of Francis Buttle to be identified as the author of this work has been asserted in accordance with the Copyright, Designs and Patents Act 1988 No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means electronic, mechanical, photocopying, recording or otherwise without the prior written permission of the publisher. Permissions may be sought directly from Elsevier’s Science & Technology Rights Department in Oxford, UK: phone ( 44) (0) 1865 843830; fax: ( 44) (0) 1865 853333; email: permissions@elsevier.com. Alternatively you can submit your request online by visiting the Elsevier web site at http://elsevier.com/locate/ permissions, and selecting Obtaining permission to use Elsevier material. Notice No responsibility is assumed by the publisher for any injury and/or damage...

Words: 171161 - Pages: 685

Premium Essay

Cost

...COST AND VALUE MANAGEMENT IN PROJECTS Ray R. Venkataraman and Jeffrey K. Pinto John Wiley & Sons, Inc. This book is printed on acid-free paper. Copyright  2008 by John Wiley & Sons, Inc. All rights reserved. Published by John Wiley & Sons, Inc., Hoboken, New Jersey. Published simultaneously in Canada. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning, or otherwise, except as permitted under Section 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, Inc., 222 Rosewood Drive, Danvers, MA 01923, 978-750-8400, fax 978-646-8600, or on the web at www.copyright.com. Requests to the Publisher for permission should be addressed to the Permissions Department, John Wiley & Sons, Inc., 111 River Street, Hoboken, NJ 07030, (201) 748-6011, fax (201) 748-6008, or online at http://www.wiley.com/go/permissions. Limit of Liability/Disclaimer of Warranty: While the publisher and author have used their best efforts in preparing this book, they make no representations or warranties with respect to the accuracy or completeness of the contents of this book and specifically disclaim any implied warranties of merchantability or fitness for a particular purpose. No warranty may be created...

Words: 94122 - Pages: 377

Premium Essay

Mba Syllabus

...SRM UNIVERSITY (Under section 3 of UGC Act, 1956) FACULTY OF MANAGEMENT SCHOOL OF MANAGEMENT MBA FULL TIME CURRICULUM AND SYLLABUS - 2013-14 1 Code MB 13101 MB 13102 MB 13103 MB 13104 MB 13105 MB 13106 SRM University MBA - Revised Curriculum - 2013-14 Semester –I Thinking and Communication Skills (Practical) Accounting for Decision Making Philosophy for Management Economics for Managers Managerial Statistics Managerial Skills (Practical) Semester-II Financial Management Management Information System Marketing Human Resource Management Production And Operation Management Legal Aspects of Business Semester- III Summer Internship (8 weeks)(Practical) Entrepreneurship Strategic Management Business Analytics (Practical) Elective-1 Elective-2 Elective-3 Elective-4 Semester- IV Elective-5 Elective-6 Industrial Elective (Practical) Total Credit L 0 2 3 2 2 0 T 0 4 0 2 4 0 P 4 0 0 0 0 6 C 2 4 3 3 4 3 19 4 3 4 2 4 3 20 2 3 3 2 3 3 3 3 22 3 3 5 11 72 MB 13207 MB 13208 MB 13209 MB 13210 MB 13211 MB 13212 MB 13313 MB 13314 MB 13315 MB 13316 2 2 3 2 3 2 0 2 2 0 2 2 2 2 2 2 0 4 2 2 0 2 2 0 2 2 0 2 2 2 2 2 2 0 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 10 MB 13417 Functional Electives Marketing Finance Systems Human Resource Operations Vertical Electives Pharma Hospitality Enterprise Resource Planning Agriculture Hospital and Health Care Retailing Auto Industry Project Management Media and Communication Banking Financial Service Insurance   2 MB...

Words: 53231 - Pages: 213