3
PLANNING AND CONTROL

O

ffering desirable customer service at a reasonable cost requires an efficient flow of materials and services while simultaneously managing the organization’s resources that direct and transform these flows. Effective planning and coordination ensures that all resources required to deliver services or produce goods are available in the right quantity and quality at the right time. Such planning and coordination, however, is often very complex. For example, a typical manufacturer is required to track hundreds or thousands of raw materials, components, and subassemblies for effective production. In a similar way, a service provider must ensure the appropriate employees and range of necessary materials are available to fill the needs of multiple market segments, often on very short notice. Effective internal planning and control represents the fundamental “block and tackling” underlying an organization’s efficient and effective operations. Operations planning and control is the second of the foundational blocks that contribute to the management of broader operational systems (see Figure 3.1). Forecasting customer demand based on a wide range of business factors is one critical input. Planning for operations then must cover both the long-term planning horizon for overall capacity and process-related resources, such as facilities, equipment, and personnel, as well as detailed schedules to match these to customer needs. And once plans are in place, management must actively control the use of resources to meet customer demands and against budgets. In practice, planning and control is a multistage process, often with iteration to refine the development or acquisition of particular resources (see Figure 3.2) (Vollmann, Berry, & Whybark, 1992). Although long-term forecasts and plans can stretch out over a number of years, a great deal of management attention is often focused on some form of annual plan. The medium-term, annual plan is then further broken down into detailed, short-term schedules for specific customer orders, equipment, and employees.

DEMAND MANAGEMENT
A critical input for much of the planning process is the challenge of forecasting customer demand. It is a difficult task because the demand for goods and services can vary greatly from year to year, month to month, and even hour to hour. For example, customer demand
135

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 136

136



CASES IN OPERATIONS MANAGEMENT

Operations strategy

Quality

Supply chain management

Process design

Planning & control

Project management

Figure 3.1

Operations Planning and Control

Demand management

Aggregate production planning

Long to Medium term

Detailed material and resource planning

Short term

Figure 3.2

Basic Components of Planning and Control Systems

for snow skis predictably increases in the autumn and early winter months; however, the particular demand in any particular region of the country varies to some extent based on the snowfall experienced. Sometimes, changes in demand are reasonably predictable. For example, in the fastfood industry, customer purchases are likely to be highest on days late in the week, such

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 137

Planning and Control



137

as Friday or Saturday. Moreover, demand at mealtime also routinely exceeds that during mid-afternoon. However, even here, it is much harder to predict how particular dietary factors, such as low-carbohydrate diets and food scares, affect overall demand for fast-food from year to year. These large-scale trends, combined with the actions of competitors, our own new product introductions, and other process changes, only add to the complexity of forecasting. A number of these issues are central to the Greaves Brewery case. For short-term fluctuations in demand, managers might be tempted to simply respond to this variability by rescheduling resources. However, in many situations, proactive actions can be taken to either encourage or attenuate demand. Customer buying patterns can also be shifted through prices or waiting time information, thereby smoothing demand. Reservation systems, promotional marketing, and price increases all affect both timing and quantity of demand. For example, as we experience firsthand in the American Airlines case, adjusting price as time passes can help to better match demand with available capacity.

AGGREGATE PLANNING
Given the anticipated demand and overall capacity levels, management develops an aggregate plan for its resources, which is a formal document describing future production rates, workforce levels, and inventory holdings, if any. An aggregate plan is developed before detailed material and resource plans, as it provides the general direction of the organization over the longer term, and it is usually more accurate to develop a forecast for a group of product lines rather than for individual goods or services. Thus, the aggregated plan offers projections for several periods, often with a time horizon extending up to a year. A manufacturing firm’s aggregate plan, called a production plan, generally focuses on production rates and inventory holdings, whereas a service firm’s aggregate plan, called a staffing plan, centers on staffing and other labor-related factors. Clearly, holding inventory may not be possible if the customer is the item being served within operations, and so a flexible workforce, material delivery, or facility configuration may be essential. For example, an auto repair center might carry a wide range of parts inventory and have quick distributor delivery and/or flexible employee skill sets to accommodate a diverse array of customer problems and vehicle models—all planned around offering same-day service. For both manufacturing and services, the plan must balance conflicting objectives involving customer service, workforce stability, cost, and profit (Ritzman, Krajewski, & Klassen, 2004). The cases in this chapter address multiple challenges faced in developing and implementing an aggregate production plan. MacPherson Refrigeration must access the pros and cons of three different alternatives that collectively illustrate the three basic archetype plans available to many manufacturing firms: chase, level, and mixed plans. However, improvement is possible, and any plan must always address multiple objectives that transcend individual functional concerns. In contrast, Lamson Corp. requires you, as the operations manager, to develop, live with, and change a plan for the coming production season. Over the course of 12 decision periods, you are able to see the strengths and weaknesses of your evolving plan, as well as how well your corrective actions performed.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 138

138



CASES IN OPERATIONS MANAGEMENT

MATERIAL AND RESOURCE PLANNING
Materials requirements planning (MRP) and resource (i.e., capacity) planning collectively form the bridge between large-scale, aggregate plans and day-to-day scheduling and fulfillment of particular customer orders. Much of this planning is enabled by the concept of dependent demand, where the need for particular items and/or associated resources is exactly related to the production or delivery of a specific final service or end item. For example, changing and balancing a new set of tires for an automobile at the previously described repair center might require the use of a service bay, 1.5 hours of a mechanic’s time, four tires, and four valve stems. If a customer phones several days in advance to make a service appointment, the resources (i.e., mechanic and service bay) can be immediately booked for the needed time, and appropriate-sized tires can be ordered from a distributor. Scheduling the pickup of the used tires for recycling is also possible. These concepts are developed further in the final two cases in this chapter. Martin Trailers considers both the complications surrounding the development of an aggregate production plan and its translation into materials and resources plans. However, the seasonal nature of the business, multiple product lines, and the necessity of hiring and laying off temporary workers compound the challenge. Illustrious Corp. moves down one level and focuses specifically on developing a detailed, though basic, MRP schedule for a product and a few of its component parts. In summary, by considering the integration of demand management, aggregate planning, and material and resource planning, managers encounter operational elements that are foundational for the effective and efficient delivery of goods and services.

GREAVES BREWERY: BOTTLE REPLENISHMENT
Early in 2004, Alex Benson was trying to determine how many returnable beer bottles to purchase in the coming year. During 2003, the market had leveled off, and sales for 2004 were proving very challenging to predict. Moreover, there was a possibility that the bottle’s design would change, in which case all bottle supplies would be scrapped. On one hand, Benson wished to be sure sufficient bottles were available to meet this year’s sales, yet he also wanted to minimize year-end inventories. Benson needed to forecast beer sales, estimate bottle replenishment needs, and recommend how many bottles to purchase. Key learning points: application of demand forecasting methodologies, such as moving averages and exponential smoothing, modeling dependent demand, order timing, and order quantities.

YIELD MANAGEMENT AT AMERICAN AIRLINES
American Airlines is a widely cited leader in the development and implementation of yield (or revenue) management practices. This case is based on a training exercise used at American Airlines to introduce managers to their yield management system. You are given the responsibility for a single flight from Dallas–Fort Worth, Texas, to Miami, Florida, and are required to make a series of sequential booking decisions in real time in class. The objective of the exercise is to maximize total revenue for the flight, after taking into account no-shows and penalties.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 139

Planning and Control



139

Key learning points: background theory underpinning yield management, key inputs needed and expected benefits, and linkages between demand forecasting and capacity utilization.

MACPHERSON REFRIGERATION LIMITED
Linda Metzler, newly appointed production planning manager, is drafting an aggregate production plan for the company’s refrigerators, freezers, and air conditioners for the next year. She has considered three plans, each of which must be evaluated from both a quantitative and qualitative perspective. In the end, Metzler is unsure of whether she might be missing a better alternative. Key learning points: identify the key inputs to an aggregate production planning, explore the inputs from and uses by different functions within the organization, and have quantitative approaches for improving the planning process.

LAMSON CORPORATION
This business game puts you in the position of Mr. Marino, who must develop and execute a plan for the coming production season. Your group of 3 to 5 participants must make 12 scheduling decisions under conditions of demand uncertainty, with an opportunity to revise future period plans as the season progresses. Key learning points: aggregate production planning with uncertain demand, rescheduling, and managing trade-offs between capacity and inventory.

MARTIN TRAILERS LIMITED
Martin Trailers, which is experiencing rapid growth, produces a line of camping trailers, which have a pronounced seasonal sales pattern. Details for the previous year’s planning process, staffing levels, production outputs, and costs are being reviewed by the owner, Kim Martin, with the objective of improving the management of materials in the year ahead. Based on this information, Martin is trying to assess how best to plan for the growth predicted for the coming year. Key learning points: develop an aggregate production plan in a highly uncertain, seasonal industry; understand the impact of productivity; and have a conceptual introduction to materials requirements planning.

ILLUSTRIOUS CORPORATION
This exercise briefly describes the assembly of a fictional product, X500. You must construct a structured bill of materials and an MRP plan for 10 weeks for a single product, X500, and seven components in four levels. Based on the results of this analysis, you must develop an action plan to deal with any shortcomings. Key learning points: define bill of materials, work through a basic materials requirements plan (MRP), and understand the managerial inputs for and implications of building and using an MRP system.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 140

140



CASES IN OPERATIONS MANAGEMENT

MANAGEMENT QUESTIONS ADDRESSED IN PRODUCTION PLANNING AND CONTROL CHAPTER
1. What factors determine the customer demand? Do these factors interact? 2. How might demand forecasts be generated? What are the advantages and disadvantages of each approach? 3. What are the benefits of developing an aggregate plan, from the perspective of operations, marketing, finance, and human resources? 4. How are chase, level, and mixed production plans defined? 5. What are the cost and productivity implications of various approaches to production planning, including chase, level, and mixed production plans? 6. How are inventory and capacity related for production planning purposes? 7. What is a master production schedule (MPS)? 8. What is materials requirements planning (MRP)? How can MRP be used to help improve operations performance? 9. How are operations controlled? What could be done to make planning and control systems more responsive?

REFERENCES
Ritzman, L. P., Krajewski, L. J., & Klassen, R. D. (2004). Foundations of operations management. Toronto: Pearson Education. Vollmann, T. E., Berry, W. L., & Whybark, D. C. (1992). Manufacturing planning and control systems (3rd ed.). Homewood, IL: Irwin.

GREAVES BREWERY: BOTTLE REPLENISHMENT
Jim Erskine Michiel Leenders Chris Piper
Copyright © 2004, Ivey Management Services Version: (A) 2004–10–01

THE BOTTLE REPLENISHMENT DECISION
Early in 2004, Alex Benson, purchasing manager for Greaves Brewery, Trinidad, was trying to

determine how many bottles to purchase in the coming year. During 2003, the market had levelled off, and 2004 sales predictions were difficult. On the one hand, Benson wanted to be

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 141

Planning and Control



141

sure sufficient bottles were available to supply 2004 sales levels, yet also wanted to minimize year-end inventories. Covered storage space for empty bottles was tight, and a bottle design change seemed possible in 2005 or 2006.

COMPANY BACKGROUND
Greaves Brewery was located in the southern Caribbean Island of Trinidad. Founded by John Greaves in 1924, the company had established an excellent reputation. Greaves beer had become a favorite with tourists, and as a result, a modest export business to the United States had started in 2000. In February 2004, sales reached the highest level in the company’s history. However, in 2003, the sales increase had been well below the trend average (see Exhibits 1 and 2). Four sales peaks occurred during the year: Carnival,1 Christmas, Easter and Independence.2 Carnival was the highest sales period but each peak caused the company to operate on tight schedules and Greaves hired more labor and scheduled extra shifts.

then boiled with hops, producing a sterilized and concentrated solution. The resins extracted from the hops during boiling acted as a preservative and gave the beer its bitter flavor. The hops were then removed and the solution was cooled to optimum temperature (10C)3 for bottom fermentation lasting seven days, during which time the yeast converted the sugar to alcohol and carbon dioxide. After fermentation, the beer was cooled to (−1C) and stored for 10 days (during which time the yeast dropped out) and was then roughly filtered through diatomaceous earth. After 24 hours’ storage, the mixture was put through a polishfiltration process. By this time, the beer had been artificially carbonated, ready for bottling. After bottling and case packing, the beer was stored in the finished goods warehouse ready for delivery to retail outlets.

SALES PROJECTIONS FOR 2004
Benson had difficulty forecasting sales for 2004, particularly because of the 2003 slump, government excise taxes and other factors such as the number of tourists and U.S. sales. In November 1997, the government had placed an additional excise tax of $0.604 on each case of beer. The company passed this tax on to the consumer, raising the retail price from $9.90 to $10.50 per case, plus a bottle deposit of

BREWING PROCESS
Beer brewing started with extraction of sugar from malt by an enzymic process. This sugar was

Year Month
1999 2000 2001 2002 2003 2004

Jan
211 244 291 323 328 342

Feb
338 403 386 478 512 535

Mar
191 213 335 327 310

Apr
192 244 278 327 346

May
138 153 159 211 261

Jun
148 195 209 342 296

Jul
205 231 205 288 394

Aug
244 327 364 374 331

Sep
164 337 263 304 305

Oct
200 247 280 337 305

Nov
205 234 282 304 321

Dec
229 438 273 357 369

Total
2,465 3,266 3,325 3,972 4,078

Exhibit 1

Monthly Sales January 1999 to February 2004 (in thousands of cases)

Source: Company files.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 142

142



CASES IN OPERATIONS MANAGEMENT
“New Bottles Ordered in March”
96.0 70.0 123.0 71.0 73.0 66.0 182.0 195.0 122.0 To be decided

Year
1995 1996 1997 1998 1999 2000 2001 2002 2003 2004

Annual Sales
1,845 2,088 2,345 2,876 2,465 3,266 3,325 3,972 4,078

“Full Goods”
— 11.7 19.5 18.2 40.3 23.4 0.7 23.4 13.0 28.6

“Warehouse Empties”
5.2 10.4 10.4 18.2 9.1 7.8 0.1 29.9 62.4 33.8

“New Bottle Inventory”
N/A N/A N/A N/A 0.4 0.7 0.1 16.9 53.3 38.0

Exhibit 2

Sales and Inventory Position Ending February (in thousands of cases)

Source: Company files. *New bottle inventory equals inventory at beginning of February, plus deliveries, minus breakage, minus transfers to warehouse.

$0.90. During 1999, sales slumped 13 per cent below the 1997 level. Again, in July 2001, a further tax of $0.90 per case was levied, and the company raised the retail price to $11.40. Sales growth slumped to a 2.0 per cent increase. In July 2003, another tax of $1.20 raised the retail price to $12.60 per case. Benson was reasonably certain that the government would not levy additional taxes during 2005, but wondered whether the full effect of the tax had been reflected in 2003 sales.

BEER BOTTLE PURCHASES
Benson had joined the company in 1999 as purchasing manager. Benson was responsible for all goods and materials used in the company’s production processes, including the purchasing of new bottles and the scheduling of deliveries. Local bottle producers were equipped to manufacture only clear glass bottles. Greaves, therefore, had to import its standard 10 oz. dark amber, long-necked bottle. The company’s brand

name was etched in the glass, which eliminated replacing the label after each filling. For many years, Greaves had imported bottles from a German manufacturer. Benson had continued buying from this supplier and had found the service excellent. The German company was one of the largest glass companies in Europe and Greaves’ purchases represented less than two per cent of the supplier’s 30 per cent export sales. The supplier allowed a minimum order quantity of 15,000 cases per year, with minimum deliveries of 5,000 cases per month. Prices were always quoted cost, insurance and freight (CIF). The CIF price included transportation and insurance, but excluded import duties and local handling. The CIF price gave the supplier the option of shipping the deliveries by any number of freighters in any one month. Ownership passed to Greaves as soon as the shipment left the factory. Quantity discounts were not given on orders below 300,000 cases. Benson had always found the German company’s price to be competitive compared to quotes received from South American companies.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 143

Planning and Control



143

Benson was responsible for setting the delivery schedule, and the supplier was quite reliable in this regard. “If new bottle stocks are too low,” Benson said, “it’s my fault for not ordering in sufficient quantities or not scheduling properly.” When the freighters arrived at the docks in Portof-Spain, Greaves was responsible for wharfage charges plus transportation costs of the fourmile trip to the company premises. Wharfage charges varied based on space used and time held on the dock. Under normal circumstances, stock remained at the dock for three to four days while the company’s broker cleared the goods through customs. When the shipment needed to be expedited, the broker could clear the papers in less than a day if they arrived ahead of the shipment. For transportation from the port to Greaves, Benson used a local delivery service that charged $15 per truckload of 400 cases. To prepare for shipment, the supplier stacked the cartons on pallets and wrapped them with a plastic cover. The cover gave added protection in transit and during outside storage at Greaves. New bottle breakage prior to filling was less than one per cent per year.

time from being removed from storage through processing, finished goods, retailer, consumer, retailer again, and back to storage). The warehouse superintendent estimated turnaround time as being between two and three months. Empty bottle stocks were lowest just after Carnival, and did not build up to normal levels until late April or early May. One executive estimated that, every eight years, the total stock of in-service bottles was completely replaced with new bottles, but another thought that at least 80 per cent of the bottles were replaced in two to three years. The warehouse superintendent sent empty bottles into the bottling shop as production demanded. When the empty stocks were low and returns not sufficient to meet production requirements, the warehouse superintendent requested new bottles from Benson. When Benson received the warehouse order, a five-person crew “picked” the new bottles. Picking consisted of removing the plastic cover from the pallets, unpacking the new bottles from their plain cardboard shipping containers, and repacking the bottles in the printed company cases. The men placed the cases on pallets again, and a forklift truck transported the pallets to the warehouse.

EMPTY BOTTLE FLOW ORDER PROCEDURE
Empty bottles were either returns from the trade or new bottles. The warehouse superintendent was responsible for control and storage of all returned bottles. Every day, truckloads of empty cases returned from retailers. The printed, corrugated and reusable cardboard cases used by Greaves were imported from the United States. Each case contained 24 bottles. The warehouse crew ensured that each case was in reusable condition and contained 24 unbroken bottles. They then loaded 40 cases of empties on each pallet and delivered the loaded pallets to the covered warehouse. The printed cartons could deteriorate when exposed to the weather, so empty returns received priority over new bottles for covered space. Normally, space in the warehouse was barely sufficient to store the returned empties. Benson found it very difficult to determine the turnaround time for bottles (i.e. the elapsed Each year at the end of February, Benson reviewed the stock control sheets showing empty bottle stocks, finished goods stocks, new bottle purchases and delivery records (see Exhibits 2, 3 and 4). Benson then compared these stocks with the sales trends and projected the new bottle order quantities for the next year. Benson had to order four months ahead to allow for supplier and transportation lead times. Cancellation charges were high, thus it was not practical to try to reduce the order once it had been placed. Increases were possible, however, provided minimum order quantities and lead time were met. It had been standard practice to order 75 per cent of yearly requirements in March followed by another order in August. The situation would be different when Greaves requested a change in the bottle design.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 144

144



CASES IN OPERATIONS MANAGEMENT
Year

Month
2001 2002 2003 2004

Jan
N/A 17 48 —

Feb
N/A — — 28

Mar
— — —

Apr
— — —

May
— — —

Jun
— — —

Jul
18 8 21

Aug
18 20 —

Sep
13 15 17

Oct
61 26 12

Nov
36 58 9

Dec
18 18 35

Total
164 162 142

Exhibit 3

Monthly Deliveries of New Bottle Purchases (in thousands of cases)

Source: Company files. *Deliveries over 20,000 cases occurred in two to four shipments.

Year Month
2002 2003 2004

Jan
N/A 32 35

Feb
N/A 16 22

Mar
5 —

Apr
— —

May
— —

Jun
— —

Jul
10 27

Aug
8 16

Sep
19 18

Oct
32 —

Nov
18 —

Dec
9 18

Total
101 127

Exhibit 4

Monthly New Bottle Warehouse Transfers (in thousands of cases)

Source: Company files.

In this case mold design costs increased, and the supplier would require a minimum of six months’ notice. Benson was aware that there was a 50 per cent possibility the company would change the bottle design at the end of 2005, and if not, it certainly would change in 2006. At change-over time, all remaining old-type bottles, new or used, would be scrapped.

PAST BOTTLE PURCHASES
Prior to 1999, because of a tight working capital situation, the plant manager controlled expenditures for new bottles closely so that just enough were available to meet demand. In 2000, extra funds became available and this policy was relaxed. Because of an unexpectedly large increase in sales during 2001, however, Benson’s

new bottle order of 66,000 cases in 2000 was barely large enough. By mid-February of 2001, the company ran out of finished goods and empty bottles in the warehouse. Bottling operations were cut back in the plant, and capacity depended on the speed at which daily empty returns were washed. Delivery salesmen waited for the finished goods to load their trucks. February sales suffered with this bottle shortage crisis and were 17,000 cases less than in February of 2000. In 2001, Benson made sure sufficient bottles would be available and ordered 182,000 cases; in 2002, 195,000 cases were ordered. Empty bottle stocks at the end of February 2003 were the highest in the company’s history, and Benson reduced the 2003 order to 122,000 cases. Benson always met with the plant manager and the sales manager before placing the bottle

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 145

Planning and Control



145

order. The forecast problem had already been informally discussed with both, and neither was confident in Benson’s predictions. Benson wanted to suggest a buying strategy that made sense to both production and sales, but could not delay ordering past March 4, 2004. Benson had, therefore, requested a meeting with both executives for March 2, 2004. Regardless of the uncertainties, the proposals would have to be ready by then.

NOTES
1. Carnival took place two days before Ash Wednesday, which normally occurred during February or occasionally in early March. 2. Trinidad gained its Independence from Britain on August 31, 1962. 3. The temperatures in Fahrenheit corresponding to Celsius temperatures of 10C and −1C are 40F and 10F, respectively. 4. All monies in US$ unless otherwise specified.

YIELD MANAGEMENT AT AMERICAN AIRLINES
P. Fraser Johnson Robert Klassen John Haywood-Farmer
Copyright © 2000, Ivey Management Services Version: (B) 2002–01–29

AMERICAN AIRLINES
One of the largest passenger airlines in the world, with sales of $15 billion in 1998, American Airlines provided scheduled service to destinations throughout North America, the Caribbean, Latin America, Europe and the Pacific. Each day the company’s employees processed more than 340,000 reservation calls, and operated over 2,200 flights carrying approximately 200,000 passengers. Faced with an expanding service network, a costly fleet of aircraft and an increasingly diverse group of customers, American Airlines began research in the 1960s on how to improve its reservation system to ensure greater capacity utilization. Natural seasonal fluctuations in demand could be partially offset by altering ticket prices. Moreover, some customer groups could plan trips well in advance, while others often booked days, or even hours, before a flight. Combined, management recognized that both supply and demand could be actively changed to alter dynamic competitive markets and to improve business performance.

American Airlines’ yield management system, sometimes termed revenue management, attempted simultaneously to combine demand management, by changing fares, and supply management, by controlling availability. It took into account aircraft capacity, historical customer bookings, pricing, cancellations and no-show rates, costs of oversales and costs of spoilage. Its purpose was to fill seats on each flight with the highest paying passengers by determining the optimal mix of fares to sell on each flight to obtain the highest possible revenue. By the late 1990s, the company, through its Sabre division, used its expertise in a variety of service industries, such as hotels and car rental agencies. The following exercise is based on the training program used at American Airlines to introduce managers to their yield management system.

HOW TO PLAY THE EXERCISE
In the Yield Management Exercise, your team will take on the role of a yield management analyst

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 146

146



CASES IN OPERATIONS MANAGEMENT

responsible for a single flight from Dallas-Fort Worth, Texas (DFW) to Miami, Florida (MIA). Over the course of the exercise, you will be making the actual booking decisions for the flight as customers make travel inquiries and decisions. Your objective is to maximize the flight’s total revenue, taking into account penalties. Under normal circumstances, these decisions are made using American Airlines’ yield management system. The objective of the exercise is to maximize revenue on your flight (prorated fares paid, less spoilage or oversales penalties). You are scheduled to use a Super 80 jet for your flight, with a capacity of 125 seats. Over the course of the exercise, you will be given 20 to 25 booking opportunities. To simplify this exercise, all tickets are fully refundable. Before each booking opportunity, you will have a chance to set a new bid price. After all groups have set their bids for the next booking, the instructor will announce the actual passenger booking price and the number of passengers (pax) for the booking. Your bid price is used only to trigger accepting or rejecting the booking. If the passengerrequested booking price (prorated fare) for the

DFW to MIA flight is equal to or greater than your bid price, you must accept the entire number of passengers at the prorated fare requested by the customer. For example, if your bid price is $100 and you receive a request for booking for 10 passengers with a prorated fare of $110, then you must take all 10 passengers at a price of $110. If the prorated fare is less than $100, then you cannot accept the booking. Consequently, final revenue is calculated based on the prorated fare, not on your bid price. You are responsible for setting the bid price before each bidding opportunity through whatever means you wish. Historically, fares for this flight have ranged from $170 to $750 per seat. As you might expect, there is far more demand at the lower end of the price range than the top end. As the flight starts to fill up, you normally increase your bid price to hold for more lucrative bookings. If the flight is lightly booked, you can lower your bid price to allow for more bookings. Exhibit 1 shows average historical data for the Dallas to Miami flight. The final part of the exercise is the day of departure (DOD). Not every passenger that books a flight will show up on the day of departure.

Historical Cumlative Booking: DFW-MIA

Cumulative Bookings

20

10

0

350

300

250

200

150

100

50

0

Days from Departure

Exhibit 1

Historical Cumulative Bookings: Dallas-Fort Worth (DFW) To Miami (MIA)

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 147

Planning and Control



147

Historically, the no-show rate for local passengers has been 15 per cent. This figure has been 20 per cent for flow passengers (those with connecting flights). At the conclusion of the exercise, the instructor will identify the passengers that arrive for the flight, after which you will be asked to calculate your total revenues and penalties for this Dallas to Miami flight. If passengers fail to show up for the flight, no revenue is obtained for their booking.

Costs Involved
Two additional costs are normally incurred: spoilage and oversales. The penalty for unsold seats (spoilage) is $150 each, which is an estimate of the opportunity cost of the lost contribution on this flight as well as on connecting flights from flow passengers.

Penalties for oversales escalate as the number of disappointed passengers increases. If five or fewer passengers are oversold, the cost is $100 per passenger. Costs increase to $250 per passenger for six to 10 oversales, and to $500 per passenger for 11 or more oversales. All oversales penalty costs are calculated on a per seat basis (e.g., for seven oversales the penalty would be $1,750). These amounts are to cover out-ofpocket costs for passengers and subsequent rebooking, as well as the inevitable “badwill” incurred when a passenger is disappointed. A glossary of terms that you might find useful is provided in Exhibit 2 and a list of airport codes is provided in Exhibit 3. A Yield Management Exercise Score Sheet to be used by you to keep track of your progress during the exercise is provided in Exhibit 4.

Bid Price: The minimum acceptable fare for a reservation to be accommodated on a flight. The prorated fare value must equal or exceed the bid price in order for the passenger-requested booking to be accepted. Cancellation: A passenger who makes a booking for a flight and later cancels the reservation (before departure). Capacity: The physical number of seats on the aircraft. Coach capacity is often referred to as Y capacity (as Y is the code for the coach cabin). DOD: Day of departure. Fare: The price the customer pays for the flight. Typically, the fare refers to the ticket price only, and does not include taxes, departure fees or passenger facility charges (PFCs). Flow Passenger: A passenger travelling behind or beyond the city pair. In this example, boarding in DEN, connecting in DFW and then deplaning in MIA. Or, boarding in DFW, connecting in MIA and then travelling to GRU. Itinerary: The complete trip taken by a passenger, including all flights. Local Passenger: A passenger travelling only between the city pair. In this example, a passenger boarding in DFW and deplaning in MIA. Market: Any given pair of cities between which a flight operates. No Show: A passenger who does not show up for the flight in which he or she was holding a reservation. No Show Factor: The percentage of passengers who do not show up for their flight as a percentage of total reservations at departure. Oversales: Occurs when the airline has to deny boarding to a revenue passenger because too many seats have been sold for the flight. This does not include revenue passengers booked on earlier/later flights but standing by for a different flight. Pax: passenger(s). Prorated Fare: The portion of the fare for a complete itinerary that is attributed to a particular flight within the itinerary. Spoilage: Occurs when a flight departs with empty seats and at any point prior to departure, the flight was closed for sale or a booking was turned away. This would indicate sub-optimal yield management of the flight. Voucher: Also known as denied boarding compensation. This is a future travel credit is some amount that is compensation for having been an oversale on a previous flight.

Exhibit 2

Glossary of Terms

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 148

148



CASES IN OPERATIONS MANAGEMENT

START OF EXERCISE
The only decision that you will be asked to make during the class is setting the bid price for

each booking opportunity. In preparation for the class, you should develop a bid-price strategy for the exercise and decide on your opening bid price.

ABQ ANU AUS DEN DFW EYW GIG GRU HNL LAS LAX LIM MAD MCO MIA MSP NAS NRT PDX SCL SFO SJO SJU TUS YYC YYZ

— — — — — — — — — — — — — — — — — — — — — — — — — —

Albuquerque, New Mexico Antigua, West Indies Austin, Texas Denver, Colorado Dallas/Fort Worth, Texas Key West, Florida Rio de Janeiro, Brazil Sao Paulo, Brazil Honolulu, Hawaii Las Vegas, Nevada Los Angeles, California Lima, Peru Madrid, Spain Orlando, Florida Miami, Florida Minneapolis/St. Paul, Minnesota Nassau, Bahamas Tokyo, Japan (Narita Airport) Portland, Oregon Santiago, Chile San Francisco, California San Jose, Costa Rica San Juan, Puerto Rico Tucson, Arizona Calgary, Alberta Toronto

Exhibit 3

Airport Codes Used in Exercise

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 149

Planning and Control



149

Bid Price?

Booking Code

Prorated Fare

Pax

Running Total Pax

DOD Show-up

Revenue Value

______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______

______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______

______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______

______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______

______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______ ______

_____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________

_____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________

Total Booked Passengers:

Enter total in Enter total “Total DOD Pax” in “Total at lower left Revenue”below
Total Revenue: _________ _________

Total DOD Pax:

_____ _____

Oversales? or

________ × penalty ________ ________ × $150/pax _______

Final Capacity:

Spoilage?

Total Flight Exhibit 4 Yield Management Exercise Score Sheet

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 150

150



CASES IN OPERATIONS MANAGEMENT

MACPHERSON REFRIGERATION LIMITED
Bill Rankin John Haywood-Farmer
Copyright © 1993, Ivey Management Services Version: (A) 2002–12–16

In October, Linda Metzler, newly appointed production planning manager of MacPherson Refrigeration Limited (MRL) of Stratford, Ontario, was formulating the production plan for the year beginning on January 1. She had to submit the plan to the plant’s general manager by the end of the month.

THE PLANNING PROCESS
Each year in September the marketing and sales department produced a forecast of appliances by month for the next year. The production planning department used these forecasts to plan production for the next year. The first step in the planning process was to construct an aggregate production plan. This plan consisted of planned gross production by month for the year and did not indicate numbers of specific appliance types, sizes, or models to be made each month but, as the name indicates, was an aggregate. Linda Metzler’s task in October was to construct this aggregate plan. As the production periods approached later in the year, master production plans would be formulated which would be specific regarding appliance type, model number, etc. Exhibits 1–4 present the September forecast showing the expected seasonal fluctuations and the aggregate number of appliances to be shipped each month. Linda knew that, although there would be significant variation of specific appliance types within each month, each type of appliance required roughly similar materials and labour resources. Thus, for aggregate planning purposes, the number of appliances to be shipped would be sufficient.

BACKGROUND
MRL had sales of about $28.5 million. The company began in Stratford almost 30 years ago, specializing in commercial refrigeration. Ten years ago the company opened a new 300,000 square foot plant in Stratford and diversified into consumer refrigeration. Subsequently, MRL added air conditioners to its freezer and refrigerator lines. The company sold its Hercules brand appliances through independent furniture and appliance stores in southern Ontario.

THE STRATFORD PLANT
In the past 20 years, manufacturing efficiency at the plant had increased dramatically through changes in both process design and assembly technology. During this time, annual output per worker had increased from about 240 to 450 appliances; it was expected to be about 480 appliances next year. Although the Canadian market was too small to allow the productivity levels of American appliance manufacturers, MRL was considered to be relatively efficient by Canadian standards.

THE AGGREGATE PLAN
In preparation for her decision, Linda gathered the following information:
1. The Stratford plant had the physical capacity to make only 13,000 appliances per month.

03-Klassen-4641.qxd

Month

Dec

Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Totals

4/1/2005

Production Plan

Shipment Forecast Production Plan Shipments Inventory1 240

4,400 8,440 4,400 4,280

4,400 6,000 8,000 8,440 8,440 8,440 4,400 6,000 8,000 8,320 10,760 11,200

6,600 8,440 6,600 13,040

11,800 8,440 11,800 9,680

13,000 11,200 10,800 8,440 8,440 8,440 13,000 11,200 10,800 5,120 2,360 0

7,600 8,440 7,600 840

6,000 8,440 6,000 3,280

5,600 95,400 8,440 101,280 5,600 95,400 6,120 75,000

6:06 PM

Extraordinary Labour Costs 160 211 51 0 0 211 0 0 0 211 0 0 0 211 0 0 0 211 0 0 0 211 0 0 0 211 0 0 0 211 0 0 0 211 0 0 0 211 0 0 0 211 0 0 0 211 0 0 0 2,532 51 0 0

Page 151

Number of Workers2 Hirings Layoffs Worker Months Overtime

Cost of Alternative 1 = = = 91,800 0 600,000 = 6,076,800 0

Hiring Costs 51 × 1,800 Layoff Costs 0 Inventory Holding Costs 75,000 × 8 Labour Costs Regular 2,532 × 2,400 0 = $6,768,600

Overtime

Total Costs

Exhibit 1

Level Production to Meet Peak Demand

1. On December 31, finished goods inventory was predicted to be 240 units.

2. On December 31, the workforce was predicted to be 160 workers.

151

03-Klassen-4641.qxd

152
Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Totals
240 4,400 4,160 4,400 0 4,400 4,400 4,400 0 6,000 6,000 6,000 0 8,000 6,600 8,000 6,600 8,000 6,600 0 0 11,800 11,800 11,800 0 13,000 11,200 10,800 13,000 11,200 10,800 13,000 11,200 10,800 0 0 0 7,600 7,600 7,600 0 6,000 6,000 6,000 0 5,600 5,600 5,600 0 95,400 95,160 95,400 0 160 199 39 0 0 199 0 0 0 199 0 0 0 199 0 0 1 199 0 0 0 199 0 0 96 199 0 0 126 199 0 0 81 199 0 0 71 199 0 0 0 199 0 0 0 199 0 0 0 2,388 39 0 375 39 × 1,800 = 0 = 0 = 70,200 0 0 2,388 × 2,400 = 5,731,200 375 × 3,300 = 1,237,500 $7,038,900

Month

4/1/2005

Production Plan

Shipment Forecast Production Plan Shipments Inventory1

6:06 PM

Extraordinary Labour Costs

Page 152

Number of Workers2 Hirings Layoffs Worker Months Overtime

Cost of Alternative 2

Hiring Costs Layoff Costs Inventory Holding Costs Labour Costs Regular Overtime

Total Costs

Exhibit 2

Chase Production Plan With Constant Workforce and Overtime

1. On December 31, finished goods inventory was predicted to be 240 units.

2. On December 31, the workforce was predicted to be 160 workers.

03-Klassen-4641.qxd

Month

Dec

Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Totals

4/1/2005

Production Plan

Shipment Forecast Production Plan Shipments Inventory1 240

4,400 4,160 4,400 0

4,400 4,400 4,400 0

6,000 6,000 6,000 0

8,000 6,600 8,000 6,600 8,000 6,600 0 0

11,800 11,800 11,800 0

13,000 11,200 10,800 13,000 11,200 10,800 13,000 11,200 10,800 0 0 0

7,600 7,600 7,600 0

6,000 6,000 6,000 0

5,600 5,600 5,600 0

95,400 95,160 95,400 0

6:06 PM

Extraordinary Labour Costs 160 199 0 56 0 110 6 0 0 150 40 0 0 200 50 0 0 165 0 35 0 295 130 0 0 325 30 0 0 280 0 45 0 270 0 10 0 190 o 80 0 150 0 40 0 140 0 10 0 2,379 256 276 0

Page 153

Number of Workers2 Hirings Layoffs Worker Months Overtime

Cost of Alternative 3 = = = 460,800 331,200 0 = 5,709,600 = 0 $6,501,600

Hiring Costs 256 × 1,800 Layoff Costs 276 × 1,200 Inventory Holding Costs 0 Labour Costs Regular 2,379 × 2,400 Overtime 0

Total Costs

Exhibit 3

Chase Production Plan With Varying Workforce

1. On December 31, finished goods inventory was predicted to be 240 units.

2. On December 31, the workforce was predicted to be 160 workers.

153

03-Klassen-4641.qxd

154
Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Totals
240 4,400 ____ ____ ____ 4,400 ____ ____ ____ 6,000 ____ ____ ____ 8,000 6,600 ____ ____ ____ ____ ____ ____ 11,800 ____ ____ ____ 13,000 11,200 10,800 ____ ____ ____ ____ ____ ____ ____ ____ ____ 7,600 ____ ____ ____ 6,000 ____ ____ ____ 5,600 ____ ____ ____ 95,400 ____ ____ ____ 160 ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ = _________ = _________ = _________ = _________ = _________ $ _________

Month

4/1/2005

Production Plan

Shipment Forecast Production Plan Shipments Inventory1

6:06 PM

Extraordinary Labour Costs

Page 154

Number of Workers2 Hirings Layoffs Worker Months Overtime

Cost of Alternative 4

Hiring Costs ____ × 1,800 Layoff Costs ____ × 1,200 Inventory Holding Costs ____ × 8 Labour Costs Regular ____ × 2,400 Overtime ____ × 3,300

Total Costs

Exhibit 4

Aggregate Plan for Macpherson Refrigeration Limited

1. On December 31, finished goods inventory was predicted to be 240 units.

2. On December 31, the workforce was predicted to be 160 workers.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 155

Planning and Control 2. On October 1, MRL employed 160 hourly paid unionized production workers. Their two year contract, signed in February of last year, called for an increase of $0.75 per hour effective next January 1, bringing the average hourly rate to $10.50. With fringe benefits, the monthly cost to MRL would be about $2,400 per worker. Under the agreement, overtime was 1.5 times the regular hourly rate but, because not all fringes were affected, a worker-month of overtime cost about $3,300. The standard work week was 40 hours. The aggregate plan in effect until December 31 called for a total production workforce of 160 at that time. 3. The personnel department estimated that hiring, training, and related expenses would amount to $1,800 per worker. It also estimated that severance and other layoff expenses would cost a total of $1,200 per worker. 4. The accounting department predicted that it would cost about $8 to hold an appliance in inventory for a month during the next year. Raw materials were readily available from regional sources on short notice. The current aggregate plan, supported by marketing’s most recent revised forecasts and the master production schedule, predicted an inventory of 240 finished units on December 31. 5. Although MRL manufactured some parts and subassemblies, the plant was primarily a final assembly operation with a throughput time of about three days. The company used an MRP-based planning system. For aggregate planning purposes, management had found that it was adequate to assume that all worker hours scheduled in a particular month would contribute directly to output in the same month. Similarly, they had learned from experience that they would not have to consider any special allowances for learning. 6. There appeared to be three basic tools available to meet demand fluctuations, each of which involved both quantitative and qualitative tradeoffs: • building inventory to meet peaks • using overtime • hiring and laying off workers



155

THE ALTERNATIVES
Linda identified three alternatives the company could follow to meet forecasted demand:
1. The production level and the workforce could be held constant throughout the year at a level sufficient to meet the peak demand period. In periods of low demand inventory would be accumulated and would be drawn down during peak demand periods. Linda was attracted by the protection this plan offered against unforeseen demand changes. This plan is one example of a level strategy and is shown in Exhibit 1. 2. The production level could vary to meet demand with a constant workforce by the use of overtime in peak months and restricted output in slow months; it is an example of a chase strategy and is shown in Exhibit 2. The workforce would be held at just the number to meet average monthly requirements. MRL would incur no inventory carrying costs with such a scheme. However, Linda wondered if excessive overtime might lead to lower efficiency, or if restricted production might promote poor work habits and low morale. 3. Some of these potential problems could be overcome by a strategy that met demand by varying workforce levels. Linda’s calculations showed this to be the cheapest of the three alternatives (see Exhibit 3). However, she was well aware that union relations and employee morale could be adversely affected by frequent layoffs. As well, hiring and training new employees brought their own headaches, especially in a limited labour market such as existed in Stratford.

THE DECISION
Linda knew that these three very different plans were by no means the only feasible ones available. She realized that her decision on an aggregate plan would involve both quantitative and qualitative trade-offs. One thought nagged in the back of her mind: no matter which plan she chose, how would she know if a better one existed? She decided to start by filling out her blank form (Exhibit 4) one more time.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 156

156



CASES IN OPERATIONS MANAGEMENT

LAMSON CORPORATION (R)
M.R. Leenders
Copyright © 1994, Ivey Management Services Version: (A) 2001–07–20

In this game you will have the chance to try your skill at inventory and operations planning using the information similar in type to that available to Mr. Marino, the operations manager of Lamson Corporation, a large multi-plant manufacturer of sewer pipes. Every two weeks in the summer sales period, Mr. Marino had to decide how many tiles of each type and size should be produced during the coming two weeks. In doing this planning, he took into account sales trends, the time of the year, the capacity of Lamson’s tile making machinery, the stock of the various sizes of tiles on hand, the cost of overtime production and the cost of missed deliveries. In this game you will be able to make similar decisions, although the game will be a simplified version of the actual situation. The most important feature of this simplification is that you will be dealing with only two sizes of sewer tile—the 18" diameter size and the 36" diameter size. Mr. Marino, in contrast, had to decide on production levels for 13 different sizes of tile and which plants would produce what mix.

sales in any particular year. The curve shown is only the average of the experiences of many years. In any given year, biweekly sales might vary ± 25 per cent from levels they would assume if a smooth sales curve existed. Last year, the maximum number of 18" tiles sold in any two week period between April and October was 4,500. The similar figure for 36" tiles was 2,000. Major fluctuations in annual sales and mix levels were caused by economic conditions.

Oct - Apr

May - Jun

July

Sept

SALES PATTERNS
Company sales, and industry sales in general, were very much influenced by general economic and seasonal factors. Since weather affected tile laying conditions and the number of construction starts, sales of sewer tiles exhibited a yearly sales trend of the following general shape (Figure 1). Sales were low for six months, from October to April 1, and rose rapidly in the spring to a summer peak and then tapered off again. About one-third of all annual sales were made in the two middle months of the year, while about three-quarters were made in the summer sales season. However, there was not necessarily a smooth rise and fall in

Figure 1

In the game you are about to play, Period 1 refers to the first two weeks in April. Thus, company sales are just leaving the low part of the annual swing. The game culminates in Period 12, the last two weeks in September, when sales are reentering the low winter period. Between Periods 1 and 12, sales follow the general shape of the curve shown in Figure 1. All sales made by Lamson are booked for delivery within the period being considered.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 157

Planning and Control



157

That is, there is no advance ordering. Mr. Marino has no idea what the sales for any coming period will be other than from judgement of the sales level of prior periods and from consideration of the general shape of the sales trend curve.

PRODUCTION CONSTRAINTS
The most popular sizes of concrete tile sold by Lamson were the 18" diameter and the 36" diameter sizes. Mr. Marino had found that together, these tiles accounted for a large part of tile sales; in fact, roughly one half of each period’s production was devoted to one or other of these sizes. The other half of each period’s production was used to manufacture the other sizes of tile produced by Lamson. In order to simplify the game, it has been assumed that Mr. Marino will continue to schedule the production of the less popular 11 tile sizes and that he will use half the production time each period for these sizes. Each participating group will be asked to schedule the number of 18" and 36" tiles to be produced during each period. Thus, each group will, in fact, schedule the production of a summer season’s supply of 18" and 36" diameter tiles.

There were nine possible volume combinations of 18" and 36" tiles. Four of these output values were based on the normal capacity output of the plants. The other five values represented the maximum output possible at Lamson, which required 50 per cent overtime. The nine production levels possible for 18" and 36" tiles in each two week period are shown in Exhibit 1.

COST INVOLVED
Inventory Costs
In deciding on production alternatives, Mr. Marino bore in mind several costs which he knew were fairly accurate. For instance, storage costs of an 18" tile for one period were an average of $2. This amount took into account interest on tied-up capital, insurance against breakage, and direct handling expense. The inventory carrying costs of each 36" tile were higher and averaged $6 per tile per period. Mr. Marino had found that, over the period of a season, inventory carrying charges could be reasonably calculated on the basis of inventory on hand at the end of each period.

Normal Capacity Option
1 2 3 4

50% Overtime 36" Tiles
0 600 1,200 1,800

18" Tiles
6,000 4,000 2,000 0

Option
5 6 7 8 9

18" Tiles
9,000 7,000 5,000 3,000 1,000

36" Tiles
0 600 1,200 1,800 2,400

Exhibit 1

The Nine Possible Production Choices Open to Mr. Marino Each Two Week Period

Please notice that trade-offs are involved in choosing a production level for a period. If the number of 18" tiles to be produced is increased, the number of 36" tiles that can be produced will necessarily decrease unless overtime is used.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 158

158



CASES IN OPERATIONS MANAGEMENT

Stock-Out Costs
Stock-out costs also had to be considered by Mr. Marino. A stock-out occurred whenever sales in a particular period could not be filled because there were insufficient tiles of the required diameter on hand or in production during that period. For instance, if 100 tiles were on hand at the beginning of a period, 2,000 tiles were produced during the period, and sales during the period totalled 2,200, then a stock-out of 100 tiles would occur. When such a stock-out occurred, there was a chance that a future customer of Lamson would be lost. Furthermore, Lamson lost the profit potential on the missed order. Mr. Marino had assessed the risks and costs involved and thought that a stock-out cost Lamson $20 for each 18" tile and $60 for each 36" tile. These figures took into account the fact that the larger the number of tiles that could not be delivered, the more apt the customer was to take future business elsewhere. Stock-outs could not be made up in subsequent periods. If a stockout occurred, the sale was lost forever to the firm and the above costs were incurred.

After each team has decided on the production level it desires for the coming period, the instructor will announce the actual sales levels for the period. Given this information, teams will then be able to calculate inventory on hand, and inventory, stock-out, and overtime costs. These costs will be added to a total period cost which will then be added to a cumulative total of costs. The objective of the game is to keep the total costs incurred over 12 periods to a minimum. This objective means that teams will have to decide whether it would be cheaper in the long run to incur overtime costs, inventory carrying costs, or stock-out costs. It is impossible to avoid all three. At the end of the Period 12 the game will be stopped and final costs calculated. Your team’s results will be compared to those of other teams. During subsequent discussions the merits of various inventory and production policies can be evaluated. Teams will probably find it advantageous to split the work of making sales estimates, calculating costs and keeping records among the various members. To make the keeping of results easier for all teams, Exhibit 2 will be used.

Overtime Costs
If overtime was used in any period, a fixed charge of $20,000 was incurred, mainly to pay extra wages to the employees. The amount was fixed because the employees had been guaranteed a minimum amount each period overtime was used.

THE EARLY SEASON
Each team member should carefully trace the steps Mr. Marino followed already this year to understand fully all of the steps involved in playing and recording the game. Mr. Marino has already used the form to record the operating results of the two periods prior to the first period for which you will be required to decide the production level (Period 1). Lamson started Period –1 with 400 – 18" tiles (Column B) and 100 – 36" tiles on hand (Column K). Because he knew that a special, large order for 18" tiles would be placed in Period –1, (a most unusual size of order at this time of year), Mr. Marino decided to go to overtime and to produce 7,000 – 18" tiles (Column A) and 600 – 36" tiles (Column J). Thus, 7,400 – 18" tiles (Column C) and 700 – 36" tiles (Column L) were available for sales during Period –1. In actual fact, the special order was smaller than Mr. Marino had anticipated and total sales

HOW TO PLAY THE GAME
In the actual conduct of this game, teams will make the production decisions normally made by Mr. Marino regarding the 18" and 36" diameter tiles. Before each period, each team will be required to decide on the production level that will be used in the plant. This decision will be made by the team by whatever means it chooses. Thus, a prediction from a plot of past period sales might be used by some teams, a pure guess by others. In making the decision, teams should consider both the possibilities of future sales and the inventories of tiles now on hand.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 159

159
−1 10 12 11 9 8 7 6 5 4 3 2 1 0 Total

Exhibit 2

Period Month

Jul

Jul

May

May

Aug

Jun

Jun

Apr

Apr

Aug

Sep

Sep

Mar 2,000 1,400 3,400 1,400 2,000 4,000 0 0 1,200 0 1,200 500 700 4,200 0 0 8,200 0 0 8,200 (37,000)

Mar A B C D E F G H J K L M N 0 O P Q R S T U V 0 100 6,000 2,800 6,000 20,000 28,800 (28,800) 7,000 400 7,400 6,000 1,400 2,800 0 0 600 100 700 800

Number Produced

Stock on Hand at Start of Period Total Available for Sale C = A + B

18" Tiles

Sales in Period Inventory Remaining at end of Period E = C − D (Minimum = 0) Inventory Carrying Cost $2 × E Number of Stock-Outs G = D − C if Greater than 0 Stock-Out Cost H = $20 × G Number Produced Stock on Hand at Start of Period Total Available for Sale L=J+K Sales in Period Inventory Remaining at end of Period N = L − M (Minimum 0) Inventory Carrying Cost $6 × N Number of Stock-Outs P = M − L if Greater than 0 Stock-Out Cost Q = $60 × P Total Inventory Cost R = F + O Total Stock-Out Cost S = H + Q Overtime Cost $20,000 (if used) Total Period Cost U=R+S+T Cumulative Total to Date

36" Tiles Totals

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 160

160



CASES IN OPERATIONS MANAGEMENT

turned out to be 6,000 for the 18" tiles (Column D) and 800 for the 36" tiles (Column M). Because 18" inventory available for sale exceeded sales, Mr. Marino entered 1,400 in Column E to show there was inventory remaining at the end of the period, and then entered zero in Column G to show that there had been no stock-out of 18" tiles on hand at the end of the period. He then calculated the carrying cost in Column F ($2 × 1,400 = $2,800) and the stockout cost in Column H ($20 × 0 = $0). Column H shows that no stock-out cost was incurred. Because demand for the 36" tiles (800) exceeded the total available for sale (700), a stock-out of 100 occurred and no tiles were left in inventory at the end of Period –1. To show this occurrence, zero was entered in Column N and 100 was entered in Column P while a stock-out cost of $6,000 was entered in Column Q ($60 × 100 = $6,000). The total inventory carrying cost was entered in Column R ($2,800 + 0 = $2,800) and the total stock-out cost in Column S (0 + $6,000 = $6,000). $20,000 was entered in Column T because overtime was used. The total period cost was calculated to be $2,800 + $6,000 + $20,000 = $28,800. This amount was then entered in Column U and also Column V. Lamson began Period 0 with 1,400 – 18" tiles (Column B) and zero 36" tiles on hand (Column K). These totals had been brought down from Columns E and N respectively of Period –1. At the beginning of Period 0, Mr. Marino elected to produce 2,000 – 18" tiles (Column A) and 1,200 – 36" tiles (Column J). No overtime was called for. Thus there were 3,400 – 18" tiles (Column C) and 1,200 – 36" tiles (Column L) available for sale in Period 0. In Period 0, sales totalled 1,400 – 18" tiles (Column D) and 500 – 36" tiles (Column M). Thus the inventory remaining at the end of the period was 2,000 – 18" tiles (Column E) and 700 – 36" tiles (Column N). There were zero stockouts (Columns G and P). Inventory carrying costs were computed to be $2 × 2,000 = $4,000 (Column F) and $6 × 70 = $4,200 (Column 0).

There were no stock-out costs (Column H and Q) because stock-outs equalled zero in this period. The total inventory carrying cost for Period 0 was $8,200 ($4,000 + $4,200). This amount was entered in Column R, while zero was entered in Column S since there had been no stock-outs in the period. There was no overtime used, and consequently a zero was entered in Column T. The Column U entry shows that the total period costs incurred were $8,200. The Column V entry was $28,800 + $8,200 = $37,000. Since your team did not incur these costs, we will wipe them off the slate and have you start with a zero cost at the beginning of Period 1 in Column V.

A FEW OPERATING RULES DURING THE GAME
1. The only production combinations your team may choose are those given in Exhibit 1. 2. If your team makes a calculation mistake, a penalty of $25,000 will be assessed and all figures will be corrected. 3. If your team is unable to reach a decision by the end called for by the instructor, it will automatically be decided that you produce 2,000—18" tiles and 1,200—36" tiles. 4. Normally, at the beginning of the game, each team will have approximately 10 minutes to make a decision. This time will decrease as the game progresses.

START OF GAME
The game proper starts in Period 1. At the beginning of the game there are 2,000 – 18" tiles on hand (brought down from Column E of Period 0) and 700 – 36" tiles on hand (brought down from Column N of Period 0). It is now up to each team to pick the production level most appropriate for Period 1 and thus start the playing of the game.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 161

Planning and Control



161

MARTIN TRAILERS LIMITED
Chris Piper
Copyright © 1996, Ivey Management Services Version: (A) 2001–06–01

In early July, Kim Martin was reviewing Martin Trailer’s production performance. Although sales this year had grown by 40 per cent, Martin wondered what could be done to improve the management of operations.

MARKETING
Trailers were sold under both the Martin label and under the private labels of major customers such as department stores. Private label trailers were ordered in November for delivery in January through June. Also, in November a one-year sales forecast was prepared by Martin. Last year’s orders are shown in Exhibit 1, according to the month in which shipment was requested. The selling season for the Martin brand began with a trailer show in early February, at which each Martin dealer estimated how many of each model trailer could be sold. Martin then prepared a schedule of the expected number of each trailer model that would be required from the plant each month. This schedule was given to the production manager.

13 per cent and 20 per cent respectively. The longest intervals between order placement and receipt of goods were for painted steel and springs, each of which required eight to 10 weeks for delivery. Last November, Martin hired a clerk to maintain a perpetual inventory of raw materials. The clerk was informed when shipments arrived, and entered the amounts in a control ledger. Production figures for each model of trailer were received once a week and used to calculate the numbers of each part that must have been used. These were then subtracted from the previous balances. Since this was a new procedure, and had proven to be inaccurate on several occasions, the purchasing agent tended to rely on requests from the production manager. Workers usually told the production manager when they were just about out of a part.

MANUFACTURING
Camping trailers were produced from December until the end of June. (Last year’s camping trailer manufacturing results are shown in Exhibit 1.) The company closed for vacation in July, then reopened to produce a line of snowmobile trailers (using the same production facilities) until the end of November. The production manager attempted to meet the monthly forecast requirements established by Martin. An attempt was made to schedule trailers in lots of at least 100. If the warehouse supply became very low (five or six), more would schedule into production. In January and February, the production manager kept a mental schedule for the following three weeks. Typically, parts were manufactured for the trailers to be assembled the following week. At the same time, the production manager determined which trailers were most urgently required for the

MATERIALS MANAGEMENT
The purchasing agent was told in early December of the forecast made by Martin, and purchased enough parts to produce the total number of trailers estimated. The purchasing agent usually established a schedule for each supplier, requesting at least half the total order immediately with one or two later deliveries. Each trailer was made from about 100 different parts that ranged from pieces of precut plywood to nuts and bolts. Materials constituted about twothirds of Martin’s manufacturing cost, while labor (at $20 per hour) and overhead accounted for

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 162

162



CASES IN OPERATIONS MANAGEMENT
Activity
O M O M O M O M O M O M O M O M O M O M O M O M O M O M O M

Trailer
T10 T12 T15 T15 MarkII & T20 T40 T41 Martin Brand Totals Mark IV Crown Regal Viceroy Quality Discount Private Brand Totals Grand Totals Workers Hours/Week/Worker

Dec
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 0 0 5 0 5 0 0 0 60 0 75 0 75 40 202

Jan
55 0 28 0 19 0 40 0 8 0 3 0 153 0 100 127 25 1 25 0 25 0 35 0 40 0 250 128 403 128 40 40

Feb
−29 15 −12 87 −5 24 −10 27 6 0 1 0 −49 153 250 131 25 0 50 44 0 55 90 12 100 103 515 345 466 498 40 40

Mar
34 36 14 0 13 50 27 50 24 0 5 0 117 136 250 132 50 31 50 17 25 0 85 232 105 175 565 587 682 723 40 603

Apr
61 97 43 42 15 9 32 0 26 0 6 0 183 148 400 171 100 111 50 100 10 0 140 97 165 132 865 611 1,048 759 40 60

May
122 104 28 25 41 83 30 94 48 56 −1 0 268 362 400 481 100 0 65 50 0 0 140 87 200 140 905 758 1,173 1,120 801 60

Jun
14 0 11 1 12 0 12 0 14 39 2 3 65 43 100 203 0 137 0 23 0 0 36 0 0 0 136 363 201 406 80 202

Exhibit 1

Record of Trailers Ordered (O) and Manufactured (M)

1. Second shift was hired for the months of May and June. 2. Short work weeks were used at the beginning and end of the season. 3. Overtime was used during March, April and May

second week ahead. If parts were not available for this model, another model was chosen. Priorities were influenced largely by the importance of the customer, i.e., the demands of the largest buyers were filled first. In May and June, the tentative schedule was shortened to only one week ahead. This schedule was often upset by late demands from dealers. If a rush order were received, the trailers could be manufactured in three or four weeks, if no purchases were necessary.

Parts shortages presented persistent problems and upset the production manager’s schedules several times a year. When this happened, the production manager quickly scheduled a different model into production, rather than allow the workforce to become idle. It was clear to Martin that there were major problems in the operation of the plant, but wondered which were the most serious, and what should be done about them.

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 163

Planning and Control



163

ILLUSTRIOUS CORPORATION
John Haywood-Farmer
Copyright © 1993, Ivey Management Services Version: (A) 2002–12–16

Nancy Barfield, production planner at Illustrious Corporation, a small assembly shop, was preparing the operating plan for the next 10 weeks as she did each Friday. One of the products she had to deal with almost every week was X500, a product assembled for a regular customer. Even though the customer gave Nancy a forecast of required shipments of X500 every two weeks, the forecasts frequently changed. The manufacturing and assembly process for X500 began with part H590, which Illustrious bought from another local company. The H590s came with a number of holes. Illustrious first had to tap the holes on some of the H590s for mounting screws. Illustrious carried the tapped H590s as part P712. Just this last week Illustrious had returned a shipment of 900 H590s to its supplier because of poor quality. Nancy did not expect the shipment to be replaced until the following Monday, 10 days hence.

The P712 was then attached to a G418 to form part Q307. In a similar operation an untapped H590 was attached to a G418 to form L600, which Illustrious carried as a separate part number even though the only difference between it and Q307 was its untapped holes. Nancy knew inventory was tight on G418 because of a recently settled strike at the supplier’s plant. Illustrious workers next mounted an F416 on each Q307 to make the subassembly L477. Illustrious purchased the F416 in kit form; the kits included all the necessary mounting screws and accessories. X500s were formed by screwing two L600s onto one L477 in a final assembly operation. Nancy reviewed the projected week-ending inventory levels for X500 and each of its components, the latest shipment forecast, and the standard lead times. The relevant figures were:

Part Inventory (units) Lead time (weeks)

X500 400 0

H590 210 1

P712 115 1

G418 290 2

Q307 490 3

L600 620 3

F416 750 2

L477 310 2

Week 1 2 3 4 5

Demand 205 395 100 295 265

Week 6 7 8 9 10

Demand 300 215 50 600 310

Week 11 12 13 14 15

Demand 150 525 425 0 120

Week 16 17 18 19 20

Demand 200 150 450 0 350

03-Klassen-4641.qxd

4/1/2005

6:06 PM

Page 164

Similar Documents

Premium Essay

Planning and Control

...Email: Course: Module: Assignment Title: Date: For the attention of: Course tutor Number of pages: Jeremy Marker ID No 0908954 0908954@rgu.ac.uk Jeremy.marker@shawgrp.com MSc Project Management SU235: Project Planning and Control Project Delays and Over-Run 18th April 2010 Bassam Bjeirmi Bassam Bjeirmi 22 (Including front Section) Contents Introduction 1.0 Lack of Risk Management Systems 2.0 Design and Project Changes 3.0 Unreasonable Project scope 4.0 Over-ambitious estimates and task assessment 4.1 Delay Analysis Technique 4.2 Critical, Non-Critical Delay and Float 4.3 Excusable and Non-Excusable Delays 4.4 Compensable and Non-Compensable Delays 4.5 Concurrent Delays 4.6 Methodology Types of Delay Analysis 5.0 Inappropriate Contractors 6.0 Conclusion 7.0 References Page 1 2 4 5 6 7 8 9 9 9 10 11 13 14 Executive Summary The purpose of this assignment is to provide a report that shows evidence of the student’s understanding and the ability to apply the contents of Module SU235: Project planning and control Management, by digesting the course literature and applying the course specifics. By functionally discussing project planning and control methods on the course website forum, the student absorbed the methodology and processes of project planning and control. With this knowledge the student composed the following assignment based on “Cost Overrun” and “Delays” in projects, annotating methods and processes to overcome these problems. The student delineates the importance...

Words: 3932 - Pages: 16

Premium Essay

Planning and Control

...Air traffic control: a world-class juggling act case exercise Air traffic controllers have one of the most stressful jobs in the world. They are responsible for the lives of thousands of passengers who fly every day in and out of the worlds airports. Over the last 15 years, the number of planes in the sky has doubled, leading to congestion at many airports and putting air traffic controllers under increasing pressure. The controllers battle to maintain separation standards that set the distance between planes as they land and take off. Sheer volume pushes the air traffic controllers skills to limit. Jim Courtney, an air traffic controller at LaGuardia Airport in New York, says: there are half a dozen moments of sheer terror in each year when you did something else for a living. New York – the worlds busiest airspace The busiest airspace in the world is above New York. Around 7500 planes arrive and depart each day at new yorks three airports, John F. Kennedy , LaGuardia and Newark. The three airports form a triangle around Newyork and are just 15 miles from each other. This requires careful coordination of traffic patterns, approach and take-off routes, using predetermined corridors in the sky to keep the planes away from each others. If the wind changes, all three airports work together to change the flight paths. Sophisticated technology fitted to most of the bigger planes creates a safety zone around the aircaraft so that when two aircrafts...

Words: 1105 - Pages: 5

Premium Essay

Production Planning & Control

...PRODUCTION PLANNING AND CONTROL Assignment A Marks 10 Answer all questions. 1. a) Explain the forecasting process? What are the techniques for monitoring forecasts? b) Explain various forecasting models. a) A planning tool that helps management in its attempts to cope with the uncertainty of the future, relying mainly on data from the past and present and analysis of trends. Forecasting starts with certain assumptions based on the management's experience, knowledge, and judgment. Qualitative & Quantitative techniques are the two techniques used for monitoring forecasts. b) There are two types of forecasting models which are : Time Series Models Causal Models or Associative Models 2. a) What is aggregate production plan? What are the pure strategies for APP? a) Aggregate production planning refers to the process of deciding the overall quantities of products to be manufactured or produced in a plant or other manufacturing facility during a medium term planning period such as a month, or a quarter. The aggregate plan output consist of the total quantities of each product or a group of product to be manufactured in the plan period of going into details of scheduling of different manufacturing activities required to achieve the planned production levels. The aggregate production will also not specify details such as the dates when material ordered against individual customer...

Words: 3903 - Pages: 16

Premium Essay

The Manufacturing Planning and Control

...1.0 Introduction The manufacturing planning and control (MPC) system is concerned with arranging and controlling all parts of assembling, including overseeing materials, booking machines and individuals, and planning suppliers and customers. Since these activities change after some time and react contrastingly to various markets and organization strategies, this assignment provides a model to assessing reactions to changes in the competitive environment Bower, (2006). We believe that the advancement of an effective manufacturing planning and control system is vital to the accomplishment of any merchandise producing company. In addition, truly effective MPC system coordinate supply chains, joint efforts across company limits. Manufacturing planning and control (MPC) system have existed subsequent to the earliest days of the industrial revolution. To look on historical point of view, it is useful to look at the development of these systems. Five major stages were included: 1. Reorder Point System (ROP) 2. Materials Requirement Planning System (MRP) 3. Manufacturing Resource Planning System (MRP) 4. Manufacturing Execution System (MES) 5. Enterprise Resource Planning (ERP) At the point when examined in detail, every stage represents the next logical step in manufacturing philosophy and technological innovation over the preceding stage. Maybe more than some other single factor, information technology has changed the basis of production economics by automating...

Words: 1306 - Pages: 6

Premium Essay

Budget for Planning and Control

...Budget For Planning and Control An integral part of the modern business enterprise, budgeting not only aids in the planning process, but it also provides an array of accounting measures that can be used to hold managers accountable for the firm's performance. By Richard Sansing A budget is a projected set of consequences of carrying out planned activity. Firms use budgets to facilitate the communication of specialized information from throughout the firm so that an internally consistent production plan can be devised. The budgeted numbers are then used to record certain transactions. Differences between budgeted and actual performance then appear in the accounting records, and can be analyzed so as to evaluate the performance of the firm. The budgeting process interacts with the operations research process in two ways. First, the budget process facilitates the transfer of both accounting and non-accounting information to those involved in operations. This information provides a basis for the formulation of the firm's production plan. Second, the budget reflects the production plan, and becomes a benchmark for subsequent performance evaluation. An analysis of deviations from the budget provides additional information that can be used when formulating the next period's production plan. The Planning Stage Feldman Toy Company makes two types of toys, regular and deluxe. Each toy requires the use of machine time in the production process. To illustrate the way the budget...

Words: 4699 - Pages: 19

Premium Essay

Audit Planning and Control

...Jessica Ganyuma Audit Planning and Control Professor: August 23, 2015 Ernst & Young is an accounting firm founded by Arthur Young (1863-1948) and Alwin C Earnest ((1881- 1948). Alwin started Ernst and Ernst with his brother Theodore in 1903. Arthur formed his accounting firm with his brother Stanley named Arthur Young and Company in 1906. Both companies were a success and quickly emerge into the global marketplace. Around 1924 both firms “ allied with prominent British firms”( ). Ernst and Young never met one anther and died days of each other. Their firms combined in 1989 forming Ernst &Young. Ernst & Young provides audit, tax, business risk, technology and security risk services and human capital services worldwide. Ernst & Young is one of the “Big Four” accounting firms. The company has over 190,000 employees and operates in over 150 companies. There are steps in planning an audit and designing an effective audit program. When it comes to planning the auditor must first decide whether or not to accept a new client. The audior must identify “ whey the client wants or needs and audit” (p 209). The auditor must obtain an understanding with the firm about the terms of engagement to avoid any misunderstanding and the auditor must develop “an overall strategy for the audit, including engagemetnet staffing and any required audit specialists” (209). When it comes to designing an effective audit program the auditor...

Words: 979 - Pages: 4

Free Essay

Production Planning and Control

...Production planning control function The main functions of PPC are the coordination of all the activities, which exist during production or manufacturing. Materials : This function is concerned with ensuring that the Raw material, standard finished parts, finished parts of products must be available while starting the operation within the time. Methods : This function is concerned with the analysis of all methods of manufacturing and selecting the best appropriate method according to the given set of circumstances and facilities. Machines and Equipments: It is important that methods of manufacturing should to be related to the available production facilities coupled with a detail study of equipment replacement policy. This function is concerned with the detailed analysis of the production facilities, maintenance procedures and equipment policy. Routing: It refers to the flow of sequence of operation and processes to be followed in producing a particular finish product. It determines manufacturing operation and their sequence. Estimating: This function is concerned with estimation of operations time. The operation time can be worked Out once the overall method and sequence of operation is fixed and process sheet for each operation is available. Loading & Scheduling: It is important that machine should be loaded according to their capabilities performance the given and according to the capacity. It is concerned with preparation of machine loads and fixation...

Words: 384 - Pages: 2

Premium Essay

Accounting for Planning and Control

...Name: Professor’s name: Dr. Wright Course: AF 211 Accounting for Planning and Control Managers in making investment decisions are faced with the problem of limited resources. This, therefore, necessitates an understanding of the topic of capital budgeting. Capital budgeting is the process of determining and pursuing investments which cash flows are expected in the future period usually more than a year. It entails the decision on the acquisition of new assets or equipment that is to be utilized by the business to increase its future cash flows and profitability. Managers are, therefore, faced with the challenge of determining which project to invest in order to avert the adverse effect on the financial performance. In making investment decisions, various factors must be considered. Managers have to know that the success of the business entirely depends on how best the investments are analyzed before they are undertaken. First, capital budgeting requires large capital outlay (Dugdale 16). Most of the capital budgeting decisions require a large proportion of business funds. It, thus, implies that failure to make proper investment decisions will lead to losses for the organization. Secondly, investment decisions are irreversible. After deciding on what projects to invest in, managers will lack the ability to reverse their decisions, i.e., equipment once acquired cannot be easily disposed of. The managers must therefore be careful before settling on a particular investment...

Words: 946 - Pages: 4

Premium Essay

Budget Planning and Control

...Budget Planning and Control Anita Wright Professor Mohamed Gurey ACC556 – Financial Accounting for Managers December 11, 2015 Introduction A company I started working for a couple of months ago as a Finance manager is Home Depot. Since I own a home, I know how expensive it is to maintain. I do a lot of shopping there for various items and appreciate the reasonable prices as well as the valuable advice from my associates. The store has everything one could possibly need to help turn a house into a home. Also, during the holiday season you can find items that will make your home festive and cheerful. Home Depot was founded in 1978 by Bernie Marcus and Arthur Blank. Investment banker Ken Langone and merchandising guru Pat Farrah soon joined the founders in 1979 and that year, the first two Home Depot stores opened in Atlanta, GA (Our History, 2015). They were 60,000 square feet and stocked 25,000 items, much more than the average hardware store at that time. The vision for these stores was to have a place where the do-it-yourselfers could experience one-stop shopping for all of their home project needs (Our History, 2015). From the start, associates offer the best customer service in the industry. Not only do they go through rigorous product knowledge training, but they offer clinics to customers that want to learn to do it themselves (Our History, 2015). Today, with over 2200 stores, Home Depot has revolutionized the home improvement industry by bringing the...

Words: 1378 - Pages: 6

Free Essay

Operations Planning & Control

...Submission Date: 25-03-2014 Submission Time: 5:00PM Operations Planning & Control A Project On Operations at Nadikattu Cotton Industries [pic] Submitted to Mr.Syed Habeeb, School of Management, NIT Warangal. Submitted By Arjun S – 138906 Heeralal B - 138907 Asha Latha Balivada-138908 Suresh Bandaru-138909 Himaja-138910 CERTIFICATE This is to certify that the project report “Operations at Nadikattu Cotton Industries” submitted by Arjun S, Heeralal B, Asha Latha B, Suresh B and Himaja B students of “NIT WARANGAL” MBA 1st year, batch 2013-2015, bonafide work carried out by them. During their tenure at the project, they were found to be sincere and meticulous in their work. I appreciate their enthusiasm and dedication towards the work assigned to them. I am hopeful that they will prove to be a good professional and wish them grand success for the future. DATE: 25.03.2014 COURSE INSTRUCTOR: Syed Habeeb Faculty, NIT Warangal. INDEX ABSTRACT 1. INTRODUCTION 6 1.1 PRODUCTION PROCESS 1.2 INVENTORY MANAGEMENT 2. ABOUT NADIKATTU COTTON INDUSTRIES 7 3. INFRASTRUCTURE 7 3.1 INFRASTRUCTURE AND QUALITY 3.2 FACT SHEET 3.3 NEWS 4. ENUMAMULA VILLAGE, WARANGAL 10 4.1 ABOUT ENUMAMULA 4.2 DEMOGRAPHICS OF ENUMAMULA 5. OPERATIONS AT NADIKATTU COTTON INDUSTRIES...

Words: 1957 - Pages: 8

Premium Essay

Management Planning and Control

...The rapid economical development and civilization progress, as well as technological innovation and globalization have encouraged the need for mgt control arising to give companies the opportunity of greater growth and expansion than what have been possible earlier. Since Weber's golden age, the strong belief in bureaucracies has been torn down. Burns & Stalker (1961) suggested that bureaucracies limited effectiveness and flexibility of post-industrial and fast-pace businesses. This reform in organizational structures has also exerted significant influence on the evolution of management control system (henceforth MCS). The development of the modern capitalism economy provides a rich experience base for discussing the concept of MCS and the methods of enabling the firm succeed in future. Management control can be understood as the complete package which steers the organization to its objectives while MCS can be described as a device which is employed to achieve the control. It is increasingly acknowledged that in order to be successful in the long-term, a company is required not only to achieve alignment in its current operations but also to adapt effectively to the changing environmental demands (Gibson & Birkinshaw, 2004; Raisch & Birkinshaw, 2008). In other words, future’s successful organisations are ambidextrous (Tushman & O’Reilly, 1996). It can offer some comprehensive understanding of MCS by studying how a company like Taiwan Moongod Lamp Co., Ltd.(henceforth TML), which...

Words: 1410 - Pages: 6

Free Essay

Production & Planning Control

...TUGAS PERENCANAAN DAN PENGENDALIAN PRODUKSI ASSIGNMENT 2 A. Kalender Perusahaan Untuk Satu Tahun Kedepan |Januari 2013 | |21 | | | | |PRODUK A |PRODUK B |PRODUK C |PRODUK D | |1 |I |105 |113 |270 |405 | | |II |210 |225 |270 |405 | | |III |245 |263 |225 |338 | | |IV |140 |150 |135 |202.5 | |2 |I |113 |116 |279 |419 | | |II |225 |232 |279 |419 | | |III |263 |270 |233 |349 | | |IV |150 |155 |140 |209 | |3 |I |116 |124 |288 |431 | | |II |231 |249 |288 |431 | | |III |270 |290 |240 |359 | | ...

Words: 1286 - Pages: 6

Premium Essay

Action Planning and Performance Control

...Introduction Action planning and performance control systems regulate the outputs of the organization unit and relate to the concept of coordination by standardization of outputs. Planning specifies the standard of desired outputs and control systems assess whether or not that standard has been achieved. Budgets, schedules, specifications are all plans. Budgets are plans that specify the costs of outputs, and schedules are plans that establish time frames for outputs. Specifications are plans that establish the quality of materials, workmanship and execution standards. Control systems, which are highly dependent on the use of effective information systems, regulate and measure the overall results. The planning and control systems provide further means of coordination through. (a) Performance control imposing general performance standards (b) Action planning, defining specific decisions, actions and schedules Action planning Planning is a process of determining the vision, mission, and goals of an organization and the strategies for achieving those goals. Moreover, this action plan should clearly spell out which employees will do what to help reach those goals in a timely manner. Having an action plan in place ensures that each employee in a company understands where their energy should be focused each day, regardless if that employee is a mail room worker, administrative assistant or the CEO of the company. It involves choosing a course...

Words: 497 - Pages: 2

Premium Essay

Planning, Organisationa and Control of a Project

...The planning, organisation and control of a project is lengthy because of the many stages from inception to completion and handover. There are various stages and temporary infrastructure in construction which take the project from design to completion. Inception is the very first stage of a construction process, as this is where the client has a general outline/idea of the requirements and a plan for future action. It is at this stage that an architect is appointed and the client is given a briefing. The next stage is feasibility, where the client’s representative, architects and engineers will discuss the form in which the project is to proceed and whether it is feasible both functionally and financially. At this stage the architect will carry out studies of user requirements, planning and design costs in order to reach decisions to base the design. An outline proposal is developed by the architect in order to determine the general layout and design of the project. The purpose of this is to obtain approval by the client and develop the brief further in accordance with user requirements, planning, design and cost. The scheme design is the final design that is agreed with the client and the architect. The brief is fully developed and there is a full design drawn up by the architect. This is the design that is submitted to Building Regulations for approval. Engineers may also produce preliminary designs. After this point the brief should not be modified. The next stage...

Words: 747 - Pages: 3

Premium Essay

Design Cost Planning and Control

...The School of the Built Environment SUBMISSION OF COURSEWORK COVER SHEET Session 2011/12 This sheet should be TYPEWRITTEN or completed in BLOCK CAPITALS and submitted with each course assignment. PLEASE TICK UG PGT Surname Lammy Forename Student ID Programme e.g. BSc Quantity Surveying Year of study Course code (available on timetable) e.g. D17AA Lecturer Prince Arthur H00112430 Construction Project Management 2011 to2012 D39CC Andrew Jackson Coursework title Design Cost Planning and Control Coursework hand-in deadline (date specified for hand- in) June 22 2012 All students are advised to keep a duplicate copy of all work submitted for reference. DECLARATION I certify that this assignment is my original work expressed in my own words. Any reference made to the work of other authors in any form (eg ideas, figures, text, tables) are acknowledged at their point of use. Signature/s of student ……………………………… Date of submission: ……………………… Below this line for office use only ………………………………………………………………………………………………………………………………………… School of the Built Environment Heriot-Watt University Edinburgh EH14 4AS Scotland UK Tel: 0131 449 5111 Fax: 0131 451 3161 Date Stamp Assignment: A high –level report, advising the client on the viability of the proposed project, a three storey Health Center, 4500 m2 Gross Floor Area (GFA). 1 Table of Contents Introduction………………………………………………………………………………………………………………3 BCIS Analysis Data………………………………………………………………………………………………………4...

Words: 3580 - Pages: 15