Free Essay

Project Paper

In:

Submitted By jipun86
Words 1353
Pages 6
Is Antarctica Melting?
01.12.10

The continent of Antarctica has been losing more than 100 cubic kilometers (24 cubic miles) of ice per year since 2002.
Larger Image
There has been lots of talk lately about Antarctica and whether or not the continent's giant ice sheet is melting. One new paper 1, which states there’s less surface melting recently than in past years, has been cited as "proof" that there’s no global warming. Other evidence that the amount of sea ice around Antarctica seems to be increasing slightly 2-4 is being used in the same way. But both of these data points are misleading. Gravity data collected from space using NASA's Grace satellite show that Antarctica has been losing more than a hundred cubic kilometers (24 cubic miles) of ice each year since 2002. The latest data reveal that Antarctica is losing ice at an accelerating rate, too. How is it possible for surface melting to decrease, but for the continent to lose mass anyway? The answer boils down to the fact that ice can flow without melting.
The Antarctic ice sheet. East Antarctica is much higher in elevation than West Antarctica.
Larger Image
Two-thirds of Antarctica is a high, cold desert. Known as East Antarctica, this section has an average altitude of about 2 kilometer (1.2 miles), higher than the American Colorado Plateau. There is a continent about the size of Australia underneath all this ice; the ice sheet sitting on top averages at a little over 2 kilometer (1.2 miles) thick. If all of this ice melted, it would raise global sea level by about 60 meter (197 feet). But little, if any, surface warming is occurring over East Antarctica. Radar and laser-based satellite data show a little mass loss at the edges of East Antarctica, which is being partly offset by accumulation of snow in the interior, although a very recent result from the NASA/German Aerospace Center's Gravity Recovery and Climate Experiment (Grace) suggests that since 2006 there has been more ice loss from East Antarctica than previously thought 5. Overall, not much is going on in East Antarctica -- yet.

A Frozen Hawaii
West Antarctica is very different. Instead of a single continent, it is a series of islands covered by ice -- think of it as a frozen Hawaii, with penguins. Because it's a group of islands, much of the West Antarctic Ice Sheet (WAIS, in the jargon) is actually sitting on the floor of the Southern Ocean, not on dry land. Parts of it are more than 1.7 kilometer (1 mile) below sea level. Pine Island is the largest of these islands and the largest ice stream in West Antarctica is called Pine Island Glacier. The WAIS, if it melted completely, would raise sea level by 5 to 7 meter (16 to 23 feet). And the Pine Island Glacier would contribute about 10 percent of that.
West Antarctica is a series of islands covered by ice. Think of it as a frozen Hawaii, with penguins. (Image credit: National Science Foundation)
Larger Image
Since the early 1990s, European and Canadian satellites have been collecting radar data from West Antarctica. These radar data can reveal ice motion and, by the late 1990s, there was enough data for scientists to measure the annual motion of the Pine Island Glacier. Using radar information collected between 1992 and 1996, oceanographer Eric Rignot, based at NASA’s Jet Propulsion Laboratory (JPL), found that the Pine Island Glacier's "grounding line" -- the line between the glacier's floating section and the part of the glacier that rests on the sea floor -- had retreated rapidly towards the land. That meant that the glacier was losing mass. He attributed the retreat to the warming waters around West Antarctica 6. But with only a few years of data, he couldn't say whether the retreat was a temporary, natural anomaly or a longer-term trend from global warming.
Rignot's paper surprised many people. JPL scientist Ron Kwok saw it as demonstrating that "the old idea that glaciers move really slowly isn't true any more." One result was that a lot more people started to use the radar data to examine much more of Antarctica. A major review published in 2009 found that Rignot's Pine Island Glacier finding hadn't been a fluke 7: a large majority of the marine glaciers of the Antarctic Peninsula were retreating, and their retreat was speeding up. This summer, a British group revisited the Pine Island Glacier finding and found that its rate of retreat had quadrupled between 1995 and 2006 8.

How the Ice Shelf Crumbles
The retreat of West Antarctica's glaciers is being accelerated by ice shelf collapse. Ice shelves are the part of a glacier that extends past the grounding line towards the ocean they are the most vulnerable to warming seas. A longstanding theory in glaciology is that these ice shelves tend to buttress (support the end wall of) glaciers, with their mass slowing the ice movement towards the sea, and this was confirmed by the spectacular collapse of the Rhode Island-sized Larsen B shelf along the Eastern edge of the Antarctic Peninsula in 2002. The disintegration, which was caught on camera by NASA's Moderate Resolution Imaging Spectroradiometer (MODIS) imaging instruments on board its Terra and Aqua satellites, was dramatic: it took just three weeks to crumble a 12,000-year old ice shelf. Over the next few years, satellite radar data showed that some of the ice streams flowing behind Larsen B had accelerated significantly, while others, still supported by smaller ice shelves, had not 9. This dynamic process of ice flowing downhill to the sea is what enables Antarctica to continue losing mass even as surface melting declines.
Michael Schodlok, a JPL scientist who models the way ice shelves and the ocean interact, says melting of the underside of the shelf is a pre-requisite to these collapses. Thinning of the ice shelf reduces its buttressing effect on the glacier behind it, allowing glacier flow to speed up. The thinner shelf is also more likely to crack. In the summer, meltwater ponds on the surface can drain into the cracks. Since liquid water is denser than solid ice, enough meltwater on the surface can open the cracks up deeper down into the ice, leading to disintegration of the shelf. The oceans surrounding Antarctica have been warming 10, so Schodlok doesn't doubt that the ice shelves are being undermined by warmer water being brought up from the depths. But he admits that it hasn't been proven rigorously, because satellites can’t measure underneath the ice.
Glaciologist Robert Bindschadler of NASA's Goddard Space Flight Center intends to show just that. He's leading an expedition scheduled to start in 2011 to drill through the Pine Island Glacier and place an automated buoy into the water below it. According to Bindschadler, Pine Island Glacier "is the place to go because that is where the changes are the largest. If we want to understand how the ocean is impacting the ice sheet, go to where it's hitting the ice sheet with a sledgehammer, not with a little tack hammer."
Meanwhile, measurements from the Grace satellites confirm that Antarctica is losing mass 11. Isabella Velicogna of JPL and the University of California, Irvine, uses Grace data to weigh the Antarctic ice sheet from space. Her work shows that the ice sheet is not only losing mass, but it is losing mass at an accelerating rate. "The important message is that it is not a linear trend. A linear trend means you have the same mass loss every year. The fact that it’s above linear, this is the important idea, that ice loss is increasing with time," she says. And she points out that it isn’t just the Grace data that show accelerating loss; the radar data do, too. "It isn't just one type of measurement. It's a series of independent measurements that are giving the same results, which makes it more robust."
For more information about this topic, visit NASA's Global Climate Change website.

Similar Documents

Free Essay

Cis 333 Wk 10 Technical Project Paper

...CIS 333 WK 10 TECHNICAL PROJECT PAPER To purchase this visit here: http://www.activitymode.com/product/cis-333-wk-10-technical-project-paper/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 333 WK 10 TECHNICAL PROJECT PAPER CIS 333 WK 10 Technical Project Paper - Information Systems Security Write a ten to fifteen (10-15) page paper in which you: 1. Identify and analyze any potential physical vulnerabilities and threats that require consideration. 2. Identify and analyze any potential logical vulnerabilities and threats that require consideration. 3. Illustrate in writing the potential impact of all identified physical vulnerabilities and threats to the network and the pharmacy. 4. Identify all potential vulnerabilities that may exist in the documented network. 5. Illustrate in writing the potential impact of all identified logical vulnerabilities to the network and the pharmacy. More Details hidden... Activity mode aims to provide quality study notes and tutorials to the students of CIS 333 WK 10 Technical Project Paper in order to ace their studies. CIS 333 WK 10 TECHNICAL PROJECT PAPER To purchase this visit here: http://www.activitymode.com/product/cis-333-wk-10-technical-project-paper/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 333 WK 10 TECHNICAL PROJECT PAPER CIS 333 WK 10 Technical Project Paper - Information Systems Security Write a ten to fifteen (10-15) page paper in which you: 1. Identify and analyze any potential physical vulnerabilities...

Words: 496 - Pages: 2

Premium Essay

Senior Project Self Evaluation Research Paper

...Senior Project Self-Evaluation When it comes to my senior project I wanted to complete a project that I would absolutely be proud of. At first I decided that I would write a short story which would consist of about 20 pages (full length). I brainstormed one morning and decided that it would be best and most creative for me to create a children’s book. Right away when I came to this conclusion that I would create a children’s book, I knew right away that I wanted Mrs. Butler to assist me in my project. Mrs. Butler gladly accepted, and she played a huge part in making my book the way that it is. At first I did not know a lot about dialogue and other aspects that make a story more complex. With the help of Mrs. Butler, she and I sat down and she went through what I needed to do to make the dialogue help. At some point within the project I would take a stumble and she would give me that nodding head of approval to keep going, and to...

Words: 907 - Pages: 4

Premium Essay

Project Management Paper

...I received full credit for this paper - 100 % Project Management Paper MGT/437 July 8, 2013 Jenny Kirgis, MBA Project Management Paper The purpose of this paper is to define the concepts that are involved in project management. Organizations across the globe utilize a particular kind of organized methodology to manage business projects. Project management is a means that brings significant benefits and discipline to organizations because it helps to define goals and objectives, it highlights the areas of success, and it accesses risk factors involved in the project. In addition it helps to manage change within an organization and it ensures that the corrected resources are available to complete project. The paper will discuss in detail the importance of project management and why organizations utilize it to accomplish project tasks. In addition it will discuss and define a project and it will describe the phases of a project life cycle and their functions. What is a Project? A project is reviewed as any series of tasks and activities that is directly linked to a specific assignment that must be completed by a specified deadline. A project will usually have a concrete start and completion date with a set amount of money allocated to fund the project. Projects are multifunction which consists of both human and nonhuman resources such as equipment, budgets and people (Kerzner, 2006). Project development, planning and implementation...

Words: 1197 - Pages: 5

Premium Essay

Project Management Paper

...Project Management Paper MGT 437 October 24, 2011 Michael Koma Project Management Paper Before anyone can understand what it is to manage a project, he or she must first understand what a project is and how it goes through its lifecycle. This paper will help the reader understand not only what a project is, but also how each phase of the lifecycle comes into play. It will conclude by explaining to the reader why it is important for organizations to use project management to accomplish tasks. What is a project? A project can be simply explained as a set of tasks that need to be accomplished for a particular goal. A little more complicated explanation is that a project is a set of tasks that exist to produce deliverables. So, what is it that makes up a project or how does an organization determine they have a project to complete? There are several questions that if they are answered correctly show an organization that they do have a project. For example, do they have something that has a specific objective to be completed within certain specifications or do they have something that needs to be completed with a defined start and end date. If a company comes to determine that they do have a project, then they must set up a project manager and a team. The project manager will have the task of ensuring that the phases of the project lifecycle are completed within the time frame that the company has given him or her. There are four basic phases to...

Words: 1067 - Pages: 5

Premium Essay

Project Management Paper

...Project Management Paper MGT/437 Project Management Paper Projects can be short term or long term and range from small to large. The one thing about a project is they are always temporary and consist of a group of people. Due to the nature of projects they should never be mistaken or taken lightly. Projects involves investigation of information, compiling what was discovered, arranging the information, and using a team of experts from different backgrounds. Because project have a beginning and end time the project management team has to make sure everything is accounted for and completed within that time when putting the project together. Some people will mistake a task for a project. Task on things that go on day after day as a routine. In order to complete the project in a manner which is successful a team of people who specialized in different areas to bring their knowledge, techniques and skills to the table are assembled. The project management draws from a wide variation of areas like integration, quality, time, cost, risk management, communications, stock holders, scope, and human resources (Project Management Institute, 2015). These backgrounds help to execute the project within cost for the fixed period of time set. Projects have a life cycle with phases and each phase of the project has parts to be completed within that phase of the project. The basic phases of the project life cycle are the initiating, planning, executing, monitoring, and the closing...

Words: 1136 - Pages: 5

Premium Essay

Project Management Paper

...University of Phoenix MGT/437: Project Management Project Management Paper November 4, 2012 Project Management Paper Introduction Many would say that the United States is a great place to live. This country gives people choices and many crave the independence of owning their own business. However, owning a business is not as easy as it sounds, it takes hard work and strategic planning. To manage a business you have to have a sound direction in what expertise you would like to tackle. Project management can play an integral role in implementing these plans and attaining these goals. This system is “one of the integral parts of the contemporary management system due to its ability to make sure that the goals set in the beginning of a project correspond exactly to the goals that were achieved later on. It goes without saying that the primarily aim of any project is a certain definite result. Since a project can be applied to various spheres of activity of a company, it automatically gets a wide range of usage (Reynolds, 2009).” The primary purpose of this document is to achieve an enhanced perceptive of project management and to provide information on key elements that is the core of most officially run projects. This document will answer three general questions necessary in the construction of project management. These questions are:  What is project management?  What are the basic phases of the project lifecycle and their purposes?  Why is it important for...

Words: 1360 - Pages: 6

Premium Essay

Project Management Paper

...Project Management According to Kerzner (2009), "A project can be considered to be any series of activities and tasks that have a specific objective to be completed within certain specifications, have a start/end dated, and have funds, human/non-human resources, and are multifunctional.” All projects have a beginning, the embryonic stage and at some point they come to an end which is the death of a project. However before a project can reach the final stage of death there is a life cycle that occurs which will be discussed as the understanding of a project is the focus of this paper. The life cycle of a project undergoes five major phases, and in order for a phase to be reached it must move in a sequential order. The five life cycle phases are conceptual, planning, testing, implementation and project closeout. The initiation phase also referred to as the conception of the project is the first of the five phases. The initiation phase in its most simplistic definition is starting the project. At the start of the project there are key elements that are identified such as the basics of who, what, when, where, and the proposed budget. The scope of work would also be presented at this conceptual phase. The second phase is the planning phase is basically a recap of the first phase but focuses more on the fine details. Those details would include but not limited to project milestones, how the resources will be allocated, the financial plan, how the communication will take place...

Words: 781 - Pages: 4

Premium Essay

Project Management Paper

...MGT/437 Project Management Paper In the vastly changing business world, many organizations have found that it is important to implement project management into the organizational strategy. Environmental conditions like a hike in salaries, lack of borrowing power, increasing prices for raw materials, stockholder pressure, and inflation are contributors to the environmental condition. Executives in the past have ease the impact of environmental conditions by implementing cost reduction programs but have found that obtaining better control and better use of the organizations resources, and looking internally for solutions works best in solving organizational problems. What is a Project? A project is any planned set of interrelated tasks identifiable and essential pieces of a job serving as a unit of work that differentiates between the various components of a project. The interrelated tasks involved means completion within a fixed time, and maintained within the costs of an organizations materials, resources, time, and utility consumption, risks, and forgone opportunities of production and delivery of a good or service. A project requires functions lines of the organization to be multifunctional in successful completion of a project. What are the Basic Phases of the Project lifecycle and their purposes? The project lifecycle includes five basic phases. The first is the defining or conceptualization of a project phase. The objective of this phase...

Words: 1142 - Pages: 5

Premium Essay

Project Management Paper

...Mission/ purpose What is your project going to accomplish? How does this project relate to overall goals and objectives of the company? It is part of a program or larger project? ERP Incorporated has been in business since 1997 and is the recognized leader in providing world-class emergency and security planning services and systems. ERP is well equipped to meet clients initial planning needs as well as maintaining and upgrading emergency response plans as the need arises. Safety and security is not only our business but is also our passion. We have successfully completed emergency response plan projects for over 200 clients ranging from small companies to state wide emergency response plans. Some of our accomplishments include implementing an emergency response plans for Brazoria County Texas with a population of over four million people and were able to successfully reduce response times from seven days to two days. This project was completed two months earlier than required and was delivered well within the required budget. We have also created ERP’s for McMasters Elementary for a school of less than 150 staff and students. We pride ourselves in the diversity or our projects and our ability to rise to the demand of any challenge. Our team has conducted a thorough site assessment and the results have determined that the City of Loganville, South Carolina is in need of a detailed emergency response plan. Currently emergency response planning is being provided...

Words: 2610 - Pages: 11

Premium Essay

Project Estimating Paper

...Project Estimating Project Estimating and Control Techniques CPMGT/303 July 12, 2014 Project Estimating Cost management planning happens early on in the project planning phase and should be refined throughout the project’s life cycle as additional details become available. The project’s cost management plan sets the framework for all of the project’s cost management processes. The accuracy of estimating a project’s cost is essential to the successful or failure of the project. This makes choosing the right estimating techniques crucial for a project. Expert judgment provides an insight to past experiences, environments, and historical information from past similar projects. This information is compared and analyzed against the new project and helps the project management team determine if they should combine similar methods of estimating or not, and, if so, how they will reconcile the gaps between them (Project Management Institute, 2008). Analogous cost estimating is similar to expert judgment in the way it uses information from similar past projects. However, instead of using a person’s memories and knowledge, it uses the actual costs from the past project by using the values of parameters such as scope, cost, budget, and measurable scales of things such as, size, weight, and complexity. Analogous cost estimating is mainly used when there is not enough detailed information about the project. For example, when a project is just beginning this is a less...

Words: 702 - Pages: 3

Free Essay

Project Management Paper

...| |with information pertaining to multiple professionals in the | | | |field. Not boring though. | |How much time did it take to realize the purpose of the site? |1 minute |3 minutes | |What is the target audience for the site? |Individuals pursing this field and existing professionals to |Beginners and Project Managers with certifications. | | |find out the latest news for the Project Management field | | |Did the site look the same in multiple browsers, if multiple |Yes |Yes | |browsers were available?...

Words: 628 - Pages: 3

Premium Essay

Project Management Paper

...days Activity 3: expected time = (7[OT] + 15 [MT] + 23[PT]) / 6 expected time = 45 / 6 expected time = 7.5 days Activity 4: expected time = (13[OT] + 16 [MT] + 28[PT]) / 6 expected time = 57 / 6 expected time = 9.5 days Activity 5: expected time = (17[OT] + 20 [MT] + 35[PT]) / 6 expected time = 72/ 6 expected time = 12 days Activity 6: expected time = (20[OT] + 32 [MT] + 50[PT]) / 6 expected time = 102/ 6 expected time = 17 days Activity 7: expected time = (5[OT] + 6 [MT] + 13[PT]) / 6 expected time = 24 / 6 expected time = 4 days The total project completion time is 42.5 days. The probability that McGee Carpet and Trim will finish the project in 40 days or less is low. Because she has unreliable workers and expected time frame...

Words: 313 - Pages: 2

Premium Essay

Project Management Final Paper

...1. Project Definition Form 1.1 Project Title Biaño’s Pizzaderia Inventory Management System 1.2 Project Context On March 27, 2007, the friends and neighbors of Alberto Biaño in Cebu City were treated to the first serving of Mr. Biaño's famous pizza.  This core group became his first loyal customers, as news spread far and wide of the pizza with the great homemade taste that everyone could afford.  Inspired by the resounding success of his initial offering, Alberto Biaño continued to develop his recipes to improve his pizzas' quality and taste until a perfect blend of crispy dough and aromatic sauce was achieved for everyone to enjoy. Another innovation was the concept of the “pizzaderia”, which  combined the words “pizza” and “carenderia”, to describe the little streetside eateries where Biaño’’s delicious but affordable pizzas were enjoyed by  people from all walks of life. Whether for birthdays, anniversaries, celebrations and get-togethers, everyone wanted to make a Biaño’s pizza part of their special treat. From that little pizzaderia in Mabolo, Mr. Biaño soon branched out to Capitol, Tabunok, USC Main, Mandaue and Mactan, making Biaño's pizza a truly well-loved snack in Cebu.  Realizing the potential for such great value in an affordable price, many franchisers from different places all over the country such as Cagayan de Oro, Oroquieta City, Butuan soon became part of the Biaño's Pizzaderia family 1.3 Statement of the Problem As of now, Biano’s Pizzaderia only...

Words: 3731 - Pages: 15

Premium Essay

Technical Paper It Project Management

...Technical Paper Project Information Technology Project Management (CIS517) Date: Introduction There is an old adage which insists “time is money.” While simple, in concept, it has been proven true, in fact. In a global, technologically driven society, however, the very idea of time has changed. Having once implied a spanning space between the hours of “nine to five” relative to the person or organization from whose vantage money was viewed, time is now irrespective of person, organization, or location; it is, literally, “24/7.” With this shift in perception, organizations, especially, have taken on the greater challenge of ensuring efficiency in their operations, allowing their customers the freedom and peace of mind to have access to the products or services they purchased without interruption. Working behind the scenes, as it were, are the IT companies that make the realization of this freedom and peace of mind possible. In the scenario with Fiction Corporation, it is quite evident that the role of IT is paramount to the success of the business, in general, and to the company’s decision to- move, in particular. Big-Proj will receive the “big break” for which it is looking by ensuring compliance with the goals set forth in regards to the scope of the project, the timeline projections, and the budgetary requirement of $500,000.00. Scope Big-Proj has chosen to name this project “Fiction Corporation’s Data-Center Move” to avoid any confusion with possible...

Words: 2587 - Pages: 11

Premium Essay

Ifsm 370 Project 2: White Paper Instructions

...IFSM 370 Project 2: White Paper Instructions Follow Below Link to Download Tutorial https://homeworklance.com/downloads/ifsm-370-project-2-white-paper-instructions/ For More Information Visit Our Website ( https://homeworklance.com/ ) Email us At: Support@homeworklance.com or lancehomework@gmail.com Introduction This is an individual project. Each student must complete a White Paper that proposes a telecommunications solution to address a communications problem for a business organization. The target audience will be the organization’s Chief Information Officer (CIO). The White Paper deliverable is an MS Word document. If you have never written a white paper, you should conduct some research and review sample white papers to understand the content and format associated with these professional documents. The completed White Paper deliverable is due by 11:59 PM Eastern Time on the due date shown in the Course Schedule. See the Additional Information section of the syllabus for the penalty for late or missed assignments and projects. The White Paper is valued at 12% of the course grade. Scenario Ullman, Manly, & Ulysses Corporation With 75,000 customers worldwide, 250 employees working in four locations in the United States and three European offices, and a catalog of more than 100,000 parts, Ullman, Manly & Ulysses Corporation (UMUC) relies on its network for its survival. In the past decade, UMUC has seen its business grow from just one location...

Words: 1357 - Pages: 6