DEVELOPMENT: Software prototyping refers to the activity of creating prototypes of software applications, i.e., incomplete versions of the software program being developed. In this a prototype is made first and based on it final product is developed. A prototype is a model or a program which is not based on strict planning, but is an early approximation of the final product or software system. This type of System Development Method is employed when it is very difficult to obtain exact requirements from the
Words: 978 - Pages: 4
an interesting anomaly for the software engineer. During earlier software engineering activities, the engineer attempts to build software from an abstract concept to a tangible product. Now comes testing. The engineer creates series of test cases that are intended to “demolish” the software that has been built. In fact, testing is the one step in the software process that could be viewed (psychologically, at least) as destructive rather than constructive. Software engineers are by their nature constructive
Words: 1678 - Pages: 7
Index : Technical Specification Sections Finalised by SRS Commiittee for Restructured APDRP under 11th Plan Page-1 Section – G1 :: General Technical requirements Sl. No. Title Page No. / Section No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Introduction Intent of specification Scope of work Other Services and Items Specific Exclusions Utility’s Current IT Infrastructure Arrangement by the Contractor Software tools Warranty, operational guarantee and system reliability with
Words: 90558 - Pages: 363
Software Testing What is testing? Testing is the process of evaluating a system or its component(s) with the intent to find that whether it satisfies the specified requirements or not. This activity results in the actual, expected and difference between their results. In simple words testing is executing a system in order to identify any gaps, errors or missing requirements in contrary to the actual desire or requirements. Who does testing? It depends on the process and the associated stakeholders
Words: 6175 - Pages: 25
Systems Analysis and Design Seventh Edition End of Chapter Solutions Chapter NINE System Architecture ANSWERS TO CASE-SIM: SCR ASSOCIATES CASE-SIM: SCR ASSOCIATES Assignments 1. Jesse wants me to recommend a vendor who offers an ERP strategy. I need to review SAP and Oracle Web sites, and at least two others that offer ERP solutions, and reply to her with the results and the reasons for my recommendations. Answers will vary. Students should realize that SCR foresees
Words: 8699 - Pages: 35
testing • Integration Testing • Validation Testing • System Testing • Regression Testing • Load Testing • Stress Testing • White Box Testing • Black Box Testing Unit Testing Unit testing focuses verification effort on the smallest unit of software design the software component or module. The relative complication of tests and uncovered errors is limited by the constrained scope established for unit testing. The unit test is white-box concerned with, and the step can be conducted in parallel for multiple
Words: 1167 - Pages: 5
CSE308_Miki Juice Specification Page 2 of 9 Contents 1. Introduction ..................................................................................................................................... 3 2. Project Objective .............................................................................................................................. 3 3. Success Criteria .................................................................................................................
Words: 1872 - Pages: 8
methodology is the waterfall approach. The waterfall follows the belief that all user requirements needed for the design can be collected upfront. This is referred to method makes the assumption that all requirements can be gathered up front during the requirements phase (Hughey, 2009). During this approach, the project manager tries their best to establish the user requirements. Once the user requirements are obtained the process starts. This process is known as downhill. The process goes
Words: 1031 - Pages: 5
Project Plan For NORSU Electronic Library Card Catalog System Researchers: Project Leader: Medura, Jess Linguaje, Ed Lorence Los Baños, Marilyn Maquiling, Marres Contents 1. Overview…………………………………………………………………………………………………………………………...3 2. Goals and scope………………………………………………………………………………………………………….….….4 2.1 Project Goals…………………………………………………………………………………………………………4 2.2Project Scope…………………………………………………………………………………………..……….……5 2.2.1 Included………………………………………………………………………………………………………….….5 2.2.2
Words: 4136 - Pages: 17
3.0 Methodology 3.1 Requirements Specifications This section explains the project requirements in terms of functional requirements, software requirements and hardware requirements that will be used during the development of the system. 3.1.1 Functional Requirements 3.1.2 Software Requirements ------------------------------------------------- Software Development Minimum Recommended ________________________________________________________________________ Operating Windows 7 Windows
Words: 1251 - Pages: 6