Scope of Glass Solution in the Middle East Countries Objective: The objective of the research is to know about the market that is prevailing in the Gulf Co-operation Council (GCC) countries and to know about the scope of the glass in these countries in the near future. Executive Summary: It is inevitable that infrastructure is one of the main criteria for a country’s GDP growth. Infrastructure includes construction of airports, ports and rails. Real Estate is a booming market in Middle East especially
Words: 1894 - Pages: 8
2014 INTEGRATED BUILDING SERVICES INSTALLATION IN FLOORS TAYO O. ADEYEMI The Builders Mind. Vol. 1 No. 1 9/28/2014 Integrated Building Services installation in Floors INTEGRATED BUILDING SERVICES INSTALLATION IN FLOORS 1 Integrated Building Services installation in Floors 1.0 Floor Systems Floor structures comprise beams and slabs. The beams are attached to Columns that are placed in the optimum locations for effective use of the space. Column-free space has become an important
Words: 1004 - Pages: 5
Nations Environmental Programme (UNEP) Sustainable Building and Construction Initiative (SBCI) have shown that the building and construction industry worldwide is responsible for a third of total energy use and in most parts of the world, the greatest contributor of greenhouse gas (GHG) (UNEP-SBCI, 2009). One would therefore think that the efforts resulting from the Kyoto protocol which sets binding targets to reduce GHG emissions would focus on the Building and Construction industry, and this is an opinion
Words: 1247 - Pages: 5
Cost estimate for Precast cladding systems Name: Institution: Cost estimate for Precast cladding systems Introduction The precast cladding system is one of the newest building systems in the construction industry in which it has been found to be very economical and flexible. The system came into a large-scale operation in the 1960s where many architects realized its benefits and started using it for a wider scope. It can give an exquisite aggregate finish that is almost the same as cast in the
Words: 1065 - Pages: 5
two story commercial building for Wentworth Institute of Technology. The project location is at Sweeny Field, Boston Massachusetts. The proposed building will be 2 stories high with a basement. The entire building will total 3636 square feet. It will be constructed out perimeter CMU wall using 8” x 16” CMU’s, concrete masonry face brick will be used as a veneer. The floors will be made out of 8” pre-stressed concrete slabs and open web joists will span the ceilings of the building. The NTP for this
Words: 654 - Pages: 3
refurbishment of a building and the way it is to be used will change. What is the key thing to consider from a life safety perspective? When a fire detection system is first commissioned it is configured around a specific building layout and occupancy patterns. If these change for any reason it is crucial to ensure that it continues to do the job it was originally designed to do, so that occupants are protected and can egress the building safely in an emergency. Changes to the way a building or a room
Words: 877 - Pages: 4
This shift in inventory and the subsequent down turn had a broad ripple effect on the entire industry. Not only were builders impacted, but the housing and real estate segment as a whole experienced the negative effects of this shift. Once the builders could no longer sell the speculative inventory they had built and ceased any new construction, there was a drastic decrease in the amount of work for the contractors. This drives down the price of labor and put many construction tradesmen out of
Words: 297 - Pages: 2
agreeing to complete a new home every 45 days building a total of 6 homes. Countryside has also decided to include a strict penalty if the contractors fail to deliver a home within the 45 day time period. Moore House has completed a time line of events in which they hope all homes will be completed. The contractors need to be confident they can complete the job within the allotted amount of time otherwise they are going to raise the bid on the building of the 6 houses in order to cover potential penalties
Words: 1517 - Pages: 7
Therme Vals is built from layer upon layer of locally quarried Valser Quarzite slabs. This stone became the driving inspiration for the design, and is used with great dignity and respect. “Mountain, stone, water – building in the stone, building with the stone, into the mountain, building out of the mountain, being inside the mountain – how can the implications and the sensuality of the association of these words be interpreted, architecturally?” Peter Zumthor This space was designed for visitors
Words: 1096 - Pages: 5
PSZ 19:16 ( Pind. 1 / 97 ) UNIVERSITI TEKNOLOGI MALAYSIA BORANG PENGESAHAN STATUS TESIS JUDUL : CLIENT SATISFACTION ON CONTRACTORS’ ______________________________________________ WORK PERFORMANCE ______________________________________________ 2005 / 2006 SESI PENGAJIAN : _______________________ Saya I HADIATUL AIDA BINTI ADANAN ______________________________________________ ( HURUF BESAR ) mengaku membenarkan tesis (PSM /Sarjana/ Doktor Falsafah )* ini disimpan di perpustakaan Universiti
Words: 16065 - Pages: 65