site of the sport complex and almost in front of the Asian Development Bank Building. The lot has an area of approximately 30,000 SM. The proposed area has a relatively flat terrain which slopes towards the 30,00 M. wide Estero which is adjacent to the Manila Bay. THE REQUIRED DRAWINGS: On the tracing paper, draw all required illustrations of the following: 1. Master plan, scale 1 : 500 meters a. Based on the building to the surrounding area, roadway, parking, Landscaping and land uses, including
Words: 857 - Pages: 4
Management Information Systems: A Research Paper By Greg Butler Student ####### American Military University MC302 D002 Summer 07 October 23, 2007 Management Information Systems: A Research Paper Executive Summary. In April 2004, after a year of planning, preparation, and training, the City of La Quinta “went live” with an enterprise-wide, integrated information system for the first time in its 22-year history. For the roughly one hundred member staff, it was a revolutionary leap. Previously
Words: 2522 - Pages: 11
attended my first career fair as a sophomore, I did not expect much than to step my foot in the door. After weeks of preparation and studying the basics of setting yourself apart from the competition, I was able to receive my first internship with a building company. I have been with them for the past two summers doing project management for an $8 million community project. I have since returned to working with them for a third internship this summer. My time in the field has allowed me to effectively
Words: 327 - Pages: 2
local Planning Dept. for ordinance compliance. Complete, notarized Building Permit Packet including Notarized Owner/Builder Affidavit (if not using a licensed contractor) Recorded Notice of Commencement Signed “A” and “V” Flood Zone handout (Form B-16) Signed Driveway Affidavit (Form B08) Signed Statement of Water (Form B09) or Receipt from water provider Signed Florida Product Approval Affidavit (Form B-37) I affirm building is for residential use only (1&2) Family dwelling unit purposes or
Words: 3067 - Pages: 13
Floor systems The floor system is the primary horizontal building structure which must withstand both live loads and dead loads, (BCA Part B1.2) (AS 1170.1). Any flooring system consists of linear beams and joists to distribute floor loads evenly throughout floor surface, transferring horizontal loads down to vertical structures such as beams, columns or load bearing walls. Floor systems must safely support moving loads. A floor system should be relatively stiff while maintaining its elasticity
Words: 3311 - Pages: 14
MGT 434 Week 3 DQ 2 To Buy This material Click below link http://www.uoptutors.com/MGT-434/MGT-434-Week-3-DQ-2 You are the Office Manager of a consulting firm, which occupies a four story building in a suburban office park. One day Steve, who is in charge of photocopying, comes to you to tell you about a problem. He has had a diagnosed history of Anxiety NOS. He has recently seen his therapist, who recommended that he make use of a service dog to pet and comfort him during his anxiety attacks
Words: 267 - Pages: 2
investigate the circulation of the building and how it related to the spaces inside the building. Looking at how it opens to the public, creating an urban life inside and outside its surrounding. Studying this building, one of the key characters of this building is the three level of circulation within the space accessible to the public. The ground level offers a level of circulation that allows the public to walk through from all side. There are opening all around the buildings. The ground floors brings
Words: 385 - Pages: 2
organisation, society or system. What constitutes a disaster is the societies inability to cope rather than the event itself. There are a number of things besides poverty that can accentuate the effects of an earthquake such as the structure of the buildings, the population density, the education of the people but also more physical factors such as magnitude and the time of day when the earthquake hits. Poverty by itself can completely change the effects that the earthquake can have. If the money
Words: 1744 - Pages: 7
math classrooms, science labs, and the athletics stadium, other courses are either not getting touched or getting cut completely from the school campus. Unfortunately, child development is one of those programs getting cut. The child development building itself will no longer exist as a preschool for the local community or as a learning facility for high school students who seek experience in an education career field. Sam Barlow High School and
Words: 1262 - Pages: 6
survive. The game was released October 7th, 2009. It is a really famous game now. Everyday, at least one new player plays this game. When someone is new to Minecraft and they learn the controls, the most important thing to do is to build a house. Building a house is actually not that hard In this game, if it is a simple one. The basics for this special house in Minecraft is to have the base material, the floor material, and an indoor decoration. The base material is the main step for this house.
Words: 511 - Pages: 3