Free Essay

Auditing Case

In:

Submitted By 2littletiger
Words 40141
Pages 161
A national laboratory of the U.S. Department of Energy Office of Energy Efficiency & Renewable Energy

National Renewable Energy Laboratory
Innovation for Our Energy Future

Preliminary Technical Risk Analysis for the Geothermal Technologies Program
J. McVeigh and J. Cohen
Princeton Energy Resources International

Technical Report
NREL/TP-640-41156 March 2007

M. Vorum, G. Porro, and G. Nix
National Renewable Energy Laboratory

NREL is operated by Midwest Research Institute ● Battelle

Contract No. DE-AC36-99-GO10337

Preliminary Technical Risk Analysis for the Geothermal Technologies Program
J. McVeigh and J. Cohen
Princeton Energy Resources International

Technical Report
NREL/TP-640-41156 March 2007

M. Vorum, G. Porro, and G. Nix
National Renewable Energy Laboratory
Prepared under Task No. GT04.1101

National Renewable Energy Laboratory
1617 Cole Boulevard, Golden, Colorado 80401-3393 303-275-3000 • www.nrel.gov Operated for the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy by Midwest Research Institute • Battelle Contract No. DE-AC36-99-GO10337

NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof. Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. Department of Energy and its contractors, in paper, from: U.S. Department of Energy Office of Scientific and Technical Information P.O. Box 62 Oak Ridge, TN 37831-0062 phone: 865.576.8401 fax: 865.576.5728 email: mailto:reports@adonis.osti.gov Available for sale to the public, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 phone: 800.553.6847 fax: 703.605.6900 email: orders@ntis.fedworld.gov online ordering: http://www.ntis.gov/ordering.htm

Printed on paper containing at least 50% wastepaper, including 20% postconsumer waste

Table of Contents
Page Executive Summary Introduction Summary of Method Consistency With Other DOE Risking Efforts Challenges and Benefits of Risk Estimation and Interpretation Conclusions Recommendations Risk Assessment Participants The Geothermal Risk Analysis Team The Geothermal Expert Team GETEM Reference Cases and Input Organization The GETEM Model Reference Cases The GETEM Model Input Variables Geothermal Technology Improvement Opportunities Risk Cases Considered Geothermal Expert Team Scoring Matrices Suggested Scoring Process for the Expert Team MYPP Cases Scoring Changes Made to Experts Inputs 1 4 5 5 5 7 8 9 9 9 11 11 11 13 19 19 27 27 28

iii

Summary of Results Case-Specific Results Hydrothermal Binary 2010 Experts Case Hydrothermal Flash 2010 Experts Case EGS Binary 2010 Experts Case EGS Flash 2010 Experts Case EGS Binary 2040 Evolutionary Experts Case Hydrothermal Binary 2010 MYPP Case EGS Binary 2010 MYPP Case Appendix A: Hydrothermal Binary Power System Case – Inputs Appendix B: Hydrothermal Flashed-Steam Power System Case – Inputs Appendix C: EGS Binary Power System Case – Inputs Appendix D: EGS Flashed-Steam Power System Case – Inputs Appendix E: Consensus Expert Team Scoring Matrices Appendix F: Cumulative Probability Distribution Functions of LCOE by Case

30 32 33 35 37 39 41 43 45 A-1 B-1 C-1 D-1 E-1 F-1

iv

Executive Summary
This report introduces the development and first use of a management tool for risk analysis for the Geothermal Technologies Program (GTP, “the Program”) of the U.S. Department of Energy (DOE). These first eight pages are an overview of a technical risk analysis task, leading into a presentation of comprehensive details of the task and its outcomes. The analysis task developed a probabilistic, quantitative risk assessment of potential success of research goals for the Program. The goals are outlined in the Program’s 2005 Multiyear Program Plan (MYPP). As context, the focus here is on technical risk analysis. This sets a stage for a necessary evolution of Program risk analysis into other areas. Risk can be considered in forms such as: ¾ Technical risk ¾ Market risk ¾ Political risk ¾ Management risk ¾ Financial risk

Technical risk analysis estimates a degree and a certainty to which research and development (R&D) work may fulfill goals of achieving technology improvements. Improvements may fall below, at, or above the goals. The approach used here expresses risk as pairs of values: a probability of success and a magnitude of technical effect or impact compared to a goal. The technical impact can be measured in terms of technology performance or its cost of utilization; and the probability is estimated as a percent likelihood of achieving the impact. Risk can further comprise one pair of values as a point estimate of risk, or be defined as a probability distribution function (PDF) comprising a range of varying impacts with respective probabilities of occurrence. Across the DOE offices, efforts are under way to integrate methods for analyzing, managing, and communicating risk. This technical risk analysis task for the Geothermal Program can evolve toward adding capabilities – for example, in the aspect of management risk – to include risk analysis of Program budgets and schedules. Those topics would address needs such as predicting variations of outcomes that may result from R&D work as functions of changes in budget or of schedules; and assessing tradeoffs in R&D results due to competition among research lines for constrained budget resources. These are topics of future risk analyses. Finally, each risk analysis task is one step in an iterative, ongoing cycle of progress management. This initial technical risk analysis has established a starting point as a template, which can be progressively filled in and expanded in risk-based reassessments of performance and goals.

1

The technical risk analysis approach examines estimates of variable risks assigned to performance and economic benefits that may be achieved via Program research work. Risk results are expressed in terms of a key Program metric: levelized cost of energy1 (LCOE), and associated statistical information. This first analysis assumes a flat budget trend over the term of future performance estimates, at funding levels sufficient to accomplish the work scope projected in the Program’s MYPP. That means that the risk team has considered technical challenges on the merits of being able to succeed in meeting goals in the projected time frames, but not on availability of R&D resources. This preliminary analysis indicates that the Program is on course toward meeting its portfolio of economic and performance goals for the near-term target in 2010. For the longer-term goals, projected improvements in technology cost and performance present a narrow window of probability for success. Very important, the analysis provides data with which to prioritize performance levels that are critical to reach long-term success with improved certainty. Specifically, the analysis employs a statistical sampling method using Monte Carlo simulation to drive a spreadsheet-based model named the Geothermal Electric Technology Evaluation Model (GETEM). GETEM is a techno-economic systems analysis tool for evaluating and comparing geothermal project cases. By itself, GETEM is a deterministic model; it computes LCOE values for a set of user-specified input variables that address about four dozen project criteria. A particular baseline geothermal project case is defined by allocating a profile of values to the input variables. A complementary feature of GETEM is an ability to examine “improved technology” cases derived from the baseline by applying potential benefits of research in terms of improvements to the baseline input variables. Each set of baseline and improvement data defines a profile of two related development cases. It compares the “present” with a conditional “future.” By combining Monte Carlo sampling with GETEM as a risk model, it evaluates multiple ranges of potential impacts of R&D, coupled with corresponding levels of probability of the occurrence of those impacts. The evaluation computes probability distributions of LCOE for geothermal power projects, rapidly assessing complex risk profiles for cases in great detail. The R&D impacts and probability distributions for this task were estimated by a risk team including independent experts, DOE laboratory researchers, and laboratory subcontractors. This GETEM-based risk analysis uses baseline data from the GTP Multiyear Program Plan (MYPP), and ranges of values of technology improvement opportunities 2 (TIOs). The baseline values of GETEM input variables were adjusted to define cases for “improved technology” that reflect the risk team’s estimates of improvements derived from the TIO values. Associated probabilities were proposed by the risk team. Combining the TIO inputs and probabilities enables the risk model to examine probabilistic implications of uncertain outcomes of technology R&D on the
1

The LCOE is a present value of a producer’s cost of electricity for commercial and industrial power systems, usually named “busbar cost.” It covers exploration, development, construction, and operating phases of a project. LCOE accounts for time-dependent values of equity, borrowed capital, operation and maintenance costs, and discounted values of other cash-flow terms such as taxes, insurance, escalation, etc. 2 A TIO is simply a specific capacity, characteristic, component, or function of a technology that may be improved by R&D. For the GTP context, it can be a remote exploration technique, a way of interpreting geologic data, a hightemperature electronics design for downhole drilling instruments, new materials for well casings, enhanced heat transfer surfaces for a power plant, a design of steam turbines to better withstand wet steam, etc. Project TIOs can be rolled up into higher-level TIOs as packaged, program-level research subjects.

2

LCOE of generated electrical power. The calculated results give management a picture of the likelihood of achieving GTP research goals. Starting with the MYPP baseline data, the team created profiles for seven risk cases. Table E1 summarizes the seven cases on their baseline LCOE values, the improved LCOE ranges (i.e., the minimum, mean, and maximum LCOEs determined by the risk analysis model), and the probabilities of meeting reduced LCOE values for each case. The “case year” identifies the year by which the improvements are expected to be achieved.
Table E1. Summary of LCOE Range and Probability of Meeting 5¢/kWh Goal by Case Baseline 2005 LCOE Improved-Case 3 LCOE Range Min Mean Max Probability of Meeting 5¢/kWh Goal 75% 100% N/A
4

Case and Year

Mean LCOE by Case Year 54% 54% 51% 53% 59%

Results of Expert Team Estimates HT Binary 2010 HT Flash 2010 EGS Binary 2010 EGS Flash 2010 Evolutionary EGS Binary 2040 8.54 4.73 28.5 29.3 28.5 3.80 2.94 5.71 8.39 3.85 4.73 3.43 11.5 15.6 6.29 6.13 4.13 18.9 23.0 13.8

N/A 14%

Results of MYPP Estimates HT Binary 2010 EGS Binary 2010 8.54 28.5 4.35 12.5 4.74 14.3 5.10 17.8 99% N/A 52% 52%

The “Min” and “Max” values of the calculated LCOE ranges correspond to 5% and 95% probabilities of occurrence, respectively.

To summarize some general conclusions from these numbers, the Program has good potential of achieving research goals to attain cost-effective power for hydrothermal systems in the 2010 time frame. This means that goals for hydrothermal technology development could be increased, in order to increase a scope of potential for growth in that industry sector. EGS technologies have an almost 60% probability of achieving an LCOE of 6.3¢/kWh by 2040, closely approaching a Program goal of 5¢/kWh. Therefore, the R&D plans should be examined to increase the composite probability of reaching the goal.

3 4

The LCOE mean values in Table E1 are calculated as probability-weighted averages. Three EGS entries in Table 2 are labeled “N/A” (not applicable). This is because Program goals project that technology improvements under DOE research will make it possible for new, greenfield power development projects to attain LCOE values of 5¢/kWh. This goal is further scheduled to occur by 2010 for hydrothermal resource power systems, and by 2040 for EGS power systems. Therefore, the EGS cases would not meet the 5¢/kWh threshold by 2010.

3

Introduction
This report explains the goals, methods, and results of a probabilistic analysis of technical risk for a portfolio of R&D projects in the DOE Geothermal Technologies Program (The “Program”). The analysis is a task by Princeton Energy Resources International, LLC (PERI), in support of the National Renewable Energy Laboratory (NREL) on behalf of the Program. The main challenge in the analysis lies in translating R&D results to a quantitative reflection of technical risk for a key Program metric: levelized cost of energy (LCOE). This requires both computational development (i.e., creating a spreadsheet-based analysis tool) and a synthesis of judgments by a panel of researchers and experts of the expected results of the Program’s R&D. For the computational development, NREL requested that PERI develop a probabilistic risk analysis method to evaluate ranges of potential impacts of R&D on LCOE for geothermal power development projects. The method uses Monte Carlo simulation in conjunction with GETEM, a recently developed systems analysis tool. GETEM is a deterministic model set up to evaluate one set of conditions at a time, comparing one baseline profile to one pattern of technology improvements as a case study. Each case study represents a development project with unique geologic, technical, and economic conditions. Adding a risk analysis capability to GETEM involves using a range (probability distribution) of input estimates to calculate probabilistic results for potential improvements to a case study baseline. For each risk case study, the Monte Carlo routines successively drive GETEM through the ranges of risk values for all improvements, called technology improvement opportunities (TIOs), that are considered. The model statistically tracks and integrates the calculated case outcomes as probability distribution functions (PDFs). To estimate risk parameters, the Program invited a team of laboratory and independent, privatesector experts to guide a group of DOE researchers in a task of quantifying potential impacts and success probabilities of R&D activities in geothermal technology. The task addresses technologies ranging from exploration, to geology and resource assessment, to well drilling and energy conversion. Program success is measured, in part, on R&D results that enable industry to reduce LCOE by using improved geothermal technologies to generate electrical power. This new risk analysis activity provides the Program a capability to assess and manage “risk” inherent in its unique work. This is achieved by quantifying and integrating the discrete potentials – i.e., probabilities – that specific lines of R&D may succeed, and the ranges of impacts that success may entail. Those values are used as inputs by the Monte Carlo/GETEM risk model to compute PDFs expressing LCOE vs. probability of occurrence. As a result, this task provides the Program with a capability to examine research work and associated risk, as it is currently known. Furthermore, that capability will enable the Program to progressively track work success and work risk. It enables staff at all levels of the Program to quickly and consistently adjust future analyses of risk, based on evolving estimates of research impacts and corresponding success probabilities.

4

Summary of Method GETEM is a system model for analysis of performance and economics of geothermal power projects. It enables users to quickly examine variables that characterize complex geothermal power systems, and quantify profiles of project phases from exploration through operation. Applying GETEM as a computation engine in risk analysis, the subject of this activity, requires adding statistical sampling features to GETEM to implement Monte Carlo simulation. This computer programming task is coupled with profiling a particular set of cases and risk probability characteristics as the bases for a preliminary technical risk analysis. This task is developmental by virtue of creating a GTP-specific risk analysis tool (i.e., GETEM coded with the Monte Carlo method integrated). For this development, the risk modeling uses a set of profiles for geothermal binary energy conversion case studies that are defined in the 2005 GTP Multiyear Program Plan (MYPP). Those cases, along with additional flashed-steam conversion cases defined for this analysis, serve as benchmarks from which to assess potential effectiveness of GTP research work. This developmental process is being done specifically to provide data and analyses to the Program management team for the annual DOE budget process. More generally, the risk methods and tools resulting from this task will serve ongoing Program oversight work. Consistency With Other DOE Risking Efforts The method of assigning risk parameters to a program’s R&D work – ranges of estimated degree of change in project cost and performance, and the likelihood of it occurring – is a high-profile topic within the evolving DOE approach to risk. The approach taken in this GTP-specific risk analysis study is consistent with the current state of DOE methods except as noted below. Challenges and Benefits of Risk Estimation and Interpretation The practice of assigning risk parameters is a critical step in examining individual and integrated risks across Program disciplines. Assigning risk probabilities combines science, analysis, and judgment. The team of experts for this task was asked to judge potential successes of Program research at project levels, and to also estimate how to roll up those judgments to higher-level performance metrics that comprise the GETEM input variables. This approach poses a dual challenge of, first, estimating unknown research outcomes and, second, translating those outcomes into composite improvements and probabilities of success for the GETEM inputs. While this dual challenge is well recognized for its difficulty, it offers a prospect of highly effective insight for Program management. In particular, this approach equips any management team with an ability to assess and manage tasks down their administrative chain with consistency, and to evaluate and communicate Program performance up the chain.

5

Specification of risk parameters in this type of study enables comprehensive comparison of the prospective effectiveness of different research activities under a set of assumptions concerning funding. This comparison can shed light on the weight of each technical subject’s relative risk compared to other discipline-specific successes or shortfalls. This study does not completely address all aspects of uncertainty associated with geothermal electricity generation. Rather, the study is focused on understanding the impact of the uncertainty associated with the effectiveness of Program R&D on lowering the levelized cost of electricity generation. Significant uncertainty is associated with the characterization of geothermal resources. This is a unique aspect of geothermal development when compared to other renewable technologies. Resource supply uncertainty is being reviewed in a separate, comprehensive study of geothermal technology. It would be fruitful to integrate the findings of that study, using this risk analysis methodology to provide a holistic understanding of all the major sources of uncertainty for geothermal electricity generation. As one example, a high level of uncertainty and consequent risk pertains to the assessment of geothermal resources that can be reliably and economically engineered to create Enhanced Geothermal Systems (EGS). These systems are characterized as heat reservoirs within geologic formations that may be artificially stimulated to increase naturally low permeabilities, resulting in fracture pathways that combine high flow rates and high energy recoveries using water circulation. While the uncertainty of successful EGS reservoir stimulation should be considered in comparison to other technology disciplines (e.g., the wellfield construction and energy conversion subprograms), the uncertainty associated with the abundance of EGS-type geothermal resources was not considered in this study.

6

Conclusions
The following conclusions are observations about the development of the risk methodology and its quantitative results. The results are particular outcomes of the case studies of this analysis, which was set up to specifically examine implications of the current GTP Multiyear Program Plan. Changing the input profiles for the cases would change the computed results and may lead to alternative conclusions. However, without this first step of evaluating MYPP risk, the results of other cases cannot logically be used to suggest changes to the MYPP. That reflects both the purpose and the consistency of the statistical risk analysis methods here. For details explaining and supplementing these general conclusions and the following recommendations, review the “Case-Specific Results” section on Page 32. In particular, the plots in Figures 2-15 give informative breakouts of discrete TIO impacts on LCOE. C-1. The Program has good potential of achieving research goals of attaining cost-effective power for hydrothermal systems in the near-term 2010 time frame. This means that goals for hydrothermal technology development could be increased, in order to increase a scope of technical and economic potential for growth in that industry sector. C-2. TIO levels that yield a mean LCOE of 6.3¢/kWh for EGS technologies in 2040 have almost 60% probability of success. Further examination of modeling results indicates that, while outcomes from currently planned R&D have a probability of resulting in LCOE close to the 5¢/kWh Program goal, the probability may be lower than desired. Therefore, the R&D plans should be closely examined to target objectives that increase the composite probability of reaching the goal. This illustrates a key benefit of quantifying probabilistic risk – developing data with which to rate and focus goals and tasks by uncertainties. C-3. This preliminary risk analysis focuses on what is technologically possible for planned activities under future budgets with level funding, assuming that level of funding is adequate to complete the work. This protocol may complement future methods to address budget and schedule risk; the technical risk analysis can be expanded to look at variable funding and schedule scenarios. Such refined analysis will require additional data and model development to incorporate R&D deliverables, effort, and budget. C-4. The TIOs for EGS and exploration technologies contribute a small portion of projected improvements for Hydrothermal 2010 cases, but they become important for EGS 2010 cases and even more important for EGS 2040 cases. By 2040, the EGS and exploration TIO contributions to LCOE reductions are noticeably greater than drilling cost reductions, and also much greater than conversion impacts. Their value warrants strong consideration of focused research and resource allocations. C-5. Energy conversion TIOs are important in the 2010 cases, but become less important in the 2040 cases, because EGS and exploration TIOs become more dominant. This suggests targeting the Program’s strategy and tactics to capture conversion technology gains early; and, thereafter, just tracking the technology (with associated reduced budget allocations) into the mid- and long-term time frames.

7

C-6. Although there are different timing and budget implications for the most effective realization of various TIOs, all TIOs are essential to capturing full long-term gains.

Recommendations
We recommend expanding the risk assessment activities to address these objectives: R-1. Focus the MYPP on those research activities that offer best success of meeting the 5¢/kWh LCOE target by 2040 for EGS systems. R-2. Complete the mapping of the GTP work breakdown structure (WBS) with respect to potential impacts, i.e., incorporate other information to determine which research areas/tasks give the most “bang for the buck” and in what time frame. This provides a basis to optimize program strategy, tactics, and activities. R-3. Investigate alternative budget, schedule, and competitive task funding scenarios. R-4. Develop better drilling cost models, especially those that can account for short-term perturbations due to oil and gas drilling demands. This may be as simple as incorporating additional parameters into the cost models, such as a ratio of open drilling permit applications to the number of available drill rigs. This will allow for investigation of issues such as determining most probable depths for optimizing LCOE for EGS systems as a function of geologic temperature gradients. R-5. Expand the technical risk analysis to include other resources, such as geopressured reservoirs and coproduction from oil and gas wells. R-6. Finally, this implementation of GTP technical risk analysis should be proposed as a platform to update data used by the Energy Information Administration (EIA) for the National Energy Modeling System (NEMS) program and database. Risk projections can be coupled with geologic resource data to generate periodically updated supply curves of geothermal resources. A resource supply curve provides energy costs as a function of installed capacity, and the data can be regionalized, whereas NEMS now uses a matrix of nominally site-specific energy and cost data to represent the U.S. geothermal energy potential on a restricted geographic basis. Addressing the NEMS database would be fundamentally beneficial in the near term, because the geothermal data in NEMS now are understood to be outdated. Furthermore, EIA has initiated some interpretations of commercial geothermal development potential, and this risk analysis tool may provide leverage by which to collaborate with EIA in better representing geothermal potential for NEMS. Preliminary discussions with EIA in this vein have been favorably received. Looking forward, by incorporating risk in the supply curve characterization of geothermal resources, the Program can support NEMS applications that also seek to incorporate risk into national economic modeling.

8

Risk Assessment Participants
The Geothermal Risk Analysis Team The Risk Analysis Team included Joe Cohen and Jim McVeigh of PERI; Gerry Nix, Gian Porro, and Martin Vorum of NREL; and Pat Quinlan of Sentech, Inc. This team was responsible for coordinating the efforts of the Geothermal Expert Team, as well as collecting the individual technology improvement estimates from each of the experts, compiling a consensus of the expert team estimates, and reporting on these estimates. Additionally, PERI was responsible for developing the Monte Carlo simulation coding, using the estimates to run the probabilistic risk analyses, and compiling the detailed results for this report to DOE. PERI has extensive experience in designing and modifying probabilistic risk analyses models. For example, PERI had a lead role in developing the DOE Wind Technologies Program’s Wind Pathways risk model. PERI also supports DOE staff in the development of guidelines for risk analysis that are evolving within the Office of Energy Efficiency and Renewable Energy (EERE) and other branches. The Geothermal Expert Team Table 1 lists the experts who participated in this process of planning and implementing risk analysis for the Program. The Geothermal Expert Team was convened to assess the potential impacts and attendant probabilities of success of the Geothermal Research Program’s R&D activities on technology performance and cost. Members of the team performed their assessments and reviewed the consensus estimates between March 15, 2006, and March 31, 2006. The team was divided into three technology subgroups: 1) EGS and Exploration, 2) Wellfield and Drilling, and 3) Energy Conversion.
Table 1. Experts Participating in the Geothermal Risk Analysis Organization GETEM Development Team Sandia National Laboratory (SNL) SNL Livesay Consultants Black Mountain Idaho National Laboratory (INL) Advisers INL Lawrence Berkeley National Laboratory (LBNL) LBNL SNL SNL
5 5

Name

Subgroup

Chip Mansure Steve Bauer Bill Livesay Susan Petty Greg Mines

Wellfield/Drilling Wellfield/Drilling Wellfield/Drilling EGS/Exploration Energy Conversion

Joel Renner Carol Bruton Bill Bourcier Doug Blankenship Randy Norman

EGS/Exploration EGS/Exploration Energy Conversion Wellfield/Drilling Wellfield/Drilling

Includes participation in any of the teleconferences (including kickoff), submission of individual scoring, or review/comments on group scoring.

9

NREL NREL Barber Nichols BIBB & Associates Inc. Energy and Geoscience Institute (EGI), University of Utah EGI EGS Inc. Global Power Solutions Graphic Vision MIL-TECH UK Ltd Halliburton Massachusetts Institute of Technology (MIT) Ormat Technologies, Inc. Software Enterprises Inc. The Industrial Company (TIC) University of Massachusetts Dartmouth (Retired) Unocal (Retired)

Keith Gawlik Gerry Nix Ken Nichols John Brugman Joe Moore Phil Wannamaker Paul Brophy Gary McKay Kathy Enedy Roy Baria Porter Underwood Jeff Tester Daniel Schochet Ralph Veatch Richard Campbell Ron DiPippo D. Stephen Pye

Energy Conversion Energy Conversion Energy Conversion Energy Conversion EGS/Exploration EGS/Exploration EGS/Exploration Energy Conversion EGS/Exploration EGS/Exploration EGS/Exploration EGS/Exploration Energy Conversion EGS/Exploration Energy Conversion Energy Conversion Wellfield/Drilling

10

The remaining sections detail the bases, planning, and implementation of the risk analysis method. Results that are summarized above are described in detail below.

GETEM Reference Cases and Input Organization
The GETEM Model Reference Cases It is important to note that the cost and performance inputs in GETEM define a number of site and project characteristics, namely the temperature, type, and depth of the resource; and the type of energy conversion system. The Risk Analysis Team, with guidance from the GETEM Development team, assigned case-study baselines for the analysis using multiple “Reference Cases.” The Reference Cases were developed as performance benchmarks for the GTP Research Program. The following four cases are the Reference Cases from which improvements in technology cost and performance were projected. 1. Hydrothermal Binary6 3. EGS Binary Shallow 7 The GETEM Model Input Variables For this analysis, the input variables and calculated values on the GETEM model input sheets (see Appendices A through D) are defined as belonging to one of the four following categories: a. Plug Values - Inputs that remain fixed for the risk analyses and do not change regardless of “case” specification or as a result of R&D. b. Case Defining Plug Values - Inputs that define each “case” and were varied between cases, but are not used within a case to define R&D improvements. c. Model Calculations - performance and cost values that the model calculates; these were not varied by the experts, and could change as a result of changes in other inputs. d. Research-improved Technology Performance Metrics (TPMs) - inputs that are “risked,” or statistically sampled, by applying a distribution of improvements from R&D that were estimated by the Geothermal Expert Team. DOE EERE is developing a risk analysis methodology that defines TPMs as measures of a technology’s performance or costs that can be used both to track program performance and to specify improvements projected for the Program’s research efforts. For purposes of this analysis, the TPMs are a subset of the inputs to the GETEM model. The GETEM-based risk analysis uses the baseline data and ranges of improvements from the TIOs to examine probabilistic impacts of technology changes on the LCOE of generated electrical energy. The results portray ranges of probabilities of meeting the GTP research goals. GETEM estimates LCOE for geothermal power projects. In GETEM, a user assigns input values
6 7

2. Hydrothermal Flash 4. EGS Flash Deep

Corresponds to a reference case used to estimate Program research in the MYPP. Ibid.

11

to a profile of parameters to define geothermal resource development projects. Each time the GETEM program file (an Excel spreadsheet) is saved, it uniquely defines a case that comprises a profile of “baseline” parameter values. The model is configured to give the user a comparison of the “baseline” case with an “improved” case, such that the input parameters can uniquely and simultaneously be varied toward different goals. The goals may include reducing capital costs, examining varying resource decline implications, and increasing equipment performance characteristics, etc. The GETEM code is configured such that power conversion systems are separately defined, depending on the user’s application of either flashed-steam technology or binary energy conversion systems. The GETEM Development Team was responsible for establishing the baseline parameters (i.e., the current cost and performance parameters of the technology). The Geothermal Expert Team was responsible for estimating ranges of improvements that may result from the TIOs, as well as probabilities of success of these improvements (i.e., the probability that GTP R&D will result in a non-zero level of improvement, as defined by the improvement range). Appendices A through D list the GETEM model inputs, broken out by the input categories listed on the preceding page, and showing the baseline input data for Hydrothermal Binary, Hydrothermal Flash, EGS Binary and EGS Flash technologies, respectively. The baseline GETEM inputs are taken from the Reference Case runs used in the MYPP. The Expert Team was not asked to comment on the baseline values. However, the experts were asked to suggest revisions and their rationales if they thought the baseline numbers should be altered. As shown in the appendices, the GETEM model includes more than 50 individual inputs. The input categories are similar for the Binary and Flash Technology cases, although slight differences exist in some of the individual inputs. Table 2 lists the subset of GETEM inputs that were selected as TPMs for this risk analysis, and for which the Geothermal Expert Team was asked to estimate ranges and probabilities of improvement impacts.
Table 2. TPM Subset of the GETEM Model Inputs GETEM Inputs/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M Nonlabor Number of O&M staff Units % Watt-hour / pound $ / kilowatt (kW) $1,000 / well $1,000 / well $1,000 / well Ratio Ratio $1,000 / well gallons per minute / well % / year % #

12

Geothermal Technology Improvement Opportunities
The TIOs are the specific ways that program R&D can improve geothermal technology to affect the LCOE. To remain consistent with the developing DOE EERE Risk Analysis approach, we are using the TIO terminology instead of the Geothermal Program’s term, technology improvement potential (TIP), but these are the same entities. There are 75 individual TIOs identified by the Program, which have been grouped into 23 TIO Roll-ups by the GETEM Development Team. The 23 TIO Roll-ups are shown in Table 3 and are listed on the Geothermal Expert Team Scoring Matrices. The full TIO list, provided by NREL, is shown in outline format following Table 3.

13

Table 3. Technology Improvement Opportunity Roll-ups TIO No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Technology Subgroup EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration Wellfield/ Drilling TIOs Included* 1.1.1 1.2.1 1.2.2 1.2.3 1.2.4 1.3.1 1.3.2 1.3.3 1.4.1, 1.4.2, 1.5.1 2.1 2.2 2.3 2.4 3.9.1 - 3.9.3, 3.10.2, 3.11.2, 3.11.4 3.8.1, 3.8.2, 3.11.3, 3.12.1 3.10.1 3.1 - 3.6 3.7, 3.11.1 4.1.1 - 4.1.5

TIO Roll-up Name Target Temperature Prediction Fractures, Proppants, Rheology Fracture Control/Packers Fracture Prediction Modeling Subsurface Circulation System Reservoir Performance Modeling Artificial Lift Short Circuit Mitigation Technical Systems Analysis Remote Sensing Geophysics Geochemistry Resource Assessment Drilling Time Reduction

TIO Description Increase accuracy of target temperature prediction Improve fracture methods, proppants, and rheology Control of fracturing - new and improved borehole packers Develop numerical models that accurately predict fracture growth and permeability development Ability to create a subsurface circulation system as designed Develop numerical models that explain and extend reservoir performance Improve artificial lift technology Improve short-circuit mitigation methods Perform systems analysis and integration Remote sensing exploration methods (InSAR, hyperspectral imaging, GPS) Geophysical exploration methods (seismic, magnetotellurics) Geochemical exploration methods (isotopes, gases) National geothermal assessment and supply (EGS, hydrothermal) Reduction of drilling time and expense, especially in hard abrasive formations Reduction of time and expense to line the wellbore (including using less material and less costly material) Reduction of nonessential flat time Development of basic information through analysis and simulation efforts. Completion and production-related development projects Cycle Related

15 16 17 18 19

Wellbore Lining Reduction Flat Time Reduction Instrumentation, Testing, Simulation Completion and Production Cycle Related

Wellfield/ Drilling Wellfield/ Drilling Wellfield/ Drilling Wellfield/ Drilling Energy Conversion

14

TIO No. 20 21 22 23

TIO Roll-up Name Component Related Monitoring and Scaling Design/Construction Related Automation/Enhanced Controls

TIO Description Component Related Monitoring and Scaling Design/Construction Related Automation/Enhanced Controls

Technology Subgroup Energy Conversion Energy Conversion Energy Conversion Energy Conversion

TIOs Included* 4.1.6 - 4.1.9 4.10 4.11 - 4.13 4.14

* The individual TIOs are listed in more detail on the following pages.

15

The full TIO list for the Program is shown below, as provided by NREL: 1. TIOs for Enhanced Geothermal Systems 1.1. Resource Characterization and Exploration 1.1.1. Increase accuracy of target temperature prediction. Gradient and heat-flow data over entire United States at data density needed for firm conclusions of EGS potential 1.2. Reservoir Design and Development 1.2.1. Improved fracture methods, proppants, and rheology for EGS reservoirs 1.2.2. Control of fracturing in EGS reservoirs New and improved borehole packers, especially open-hole packers, for isolation of stimulation zones 1.2.3. Develop numerical models that accurately predict fracture growth and permeability development as a function of stimulation options and reservoir properties 1.2.4. Ability to create a subsurface circulation system as designed, and to control fracture growth and patterns for optimum fluid contact area and volume 1.3. Reservoir Operation and Management 1.3.1. Numerical models that explain reservoir performance and reliably extend predictions of performance into the future 1.3.2. Artificial lift technology - artificial lift equipment and methods with flexible setting depths, which can produce 200°C fluid at target flow rate of 54 kg/s for at least 1 year 1.3.3. Improved short circuit mitigation methods - successful short-circuit control for temperatures up to 200°C 1.4. Systems Analysis 1.4.1. Assemble, analyze, and interpret pertinent information on technologies relevant to EGS development from worldwide EGS research, petroleum reservoir development, mining operations, and other appropriate sources 1.4.2. Robust economic models to help guide EGS research and development 1.5. Technology Transfer 1.5.1. Collaborative relationships with industries large enough to move EGS development forward at desired rates to reach the 2040 goals. Involve at least one major energy company in the EGS Program by 2009 2. TIOs for Exploration 2.1. Remote Sensing 2.1.1. Show utility of InSAR for remote detection of systems 2.1.2. Integrate hyperspectral imaging with geophysical data 2.1.3. Show utility of GPS in detecting candidate sites 2.1.4. Improve modeling of permeability using remote sensing data 2.2. Geophysics 2.2.1. Improve resolution of magnetotellurics (controlled source audio, computer analysis) 2.2.2. Improve resolution of seismic (high frequencies, VSP, 3-D) 2.2.3. Integration of geophysical techniques (joint inversion modeling) 2.3. Geochemistry 2.3.1. Verify use of isotopes for identifying fluid source and deep permeability 2.3.2. Verify use of gases to identify hidden geothermal systems 2.3.3. Couple isotope and geochemistry data in transport models 2.3.4. Correlate geochemical interpretation with geophysical and geologic models

16

2.4. National Geothermal Assessment 2.4.1. Updated national geothermal assessment including EGS 2.4.2. Develop a supply curve for hydrothermal systems based on U.S. Geological Survey (USGS) assessment 2.4.3. Develop a supply curve for EGS based on USGS assessment 2.4.4. Maintain exploration data 3. TIOs for Wellfield Construction 3.1. Systems Analysis 3.1.1. Cost model predicting the impacts of drilling technology improvements (input into greater ¢/kWh model). 3.2. Numerical Simulation 3.2.1. Rock/bit interactions understanding 3.2.2. Drilling instability understanding 3.2.3. Drilling system performance and reliability understanding 3.3. Laboratory Testing 3.3.1. Drilling Dynamics Simulator capabilities 3.3.2. Autoclave testing capabilities 3.4. Field Testing 3.4.1. Field validation tests successfully supporting smart development efforts 3.5. High-Temperature Electronics 3.5.1. Successful demonstrations of geothermal tool electronics 3.5.2. Increased availability of high-temperature services to the geothermal industry 3.6. Development of Advanced Diagnostics 3.6.1. Diagnostics While Drilling (DWD) availability and functionality in geothermal temperature regimes 3.6.2. Increased bit life through real-time trouble avoidance 3.6.3. Mean-time to Failure of DWD system electronics 3.6.4. Adaptation of non-wireline telemetry technologies for DWD 3.6.5. Flat-time reduction 3.6.6. Adaptation of DWD capabilities to support new drilling technologies 3.6.7. Real-time telemetry/look-ahead technologies to locate and drill to targets cost effectively. 3.7. Engineering the Needed Infrastructure 3.7.1. Commercially available high-temperature electronics components (a gauge of the number of new high-temperature component manufacturers) 3.8. Well Design 3.8.1. Well designs optimizing steel and cement use through site-specific analyses 3.8.2. Well designs minimizing steel through lean designs (e.g., monobore technology) 3.9. Rock Reduction and Removal 3.9.1. Rate of Penetration – granite (ROP) 3.9.2. Bit life (run distance) 3.9.3. Normalized rock reduction cost 3.10. Wellbore integrity 3.10.1. Flat-time reduction 3.10.2. Shortened drill and completion time

17

3.11. Well Construction/Completion 3.11.1. Economic acid-resistant cements 3.11.2. Adaptation of Dual Tube Reverse Circulation (DTRC) drilling for use on generic rigs. 3.11.3. Wellbore/pump designs/deployment allowing pumps to be set at any depth without increasing casing diameter 3.11.4. Shoe-to-shoe drilling without stopping to plug each lost-circulation zone 3.12. Wellfield O&M 3.12.1. New corrosion-resistant casing materials/coating systems to reduce well life-cycle cost 4. TIOs for Energy Conversion 4.1. Mixed Working Fluid Plants 4.2. Other Innovative Cycles 4.3. Innovative Cycles 4.4. Non-Turbine Cycles 4.5. Alternative Working Fluids (non-hydrocarbons) with Improved Heat Transfer Characteristics 4.6. Advanced Air-Cooled Condensers 4.7. Hybrid Cooling Systems 4.8. Improved Non-condensable Gas Removal Subsystems 4.9. Increased Turbine Efficiency 4.10. Innovative Process Monitors 4.11. Chemistry and Physics of Geothermal Brines 4.12. Innovative Materials 4.13. Cost-effective Plant Design and Construction Strategies 4.14. Automation to Reduce Operating Labor

18

Risk Cases Considered
Seven cases were evaluated for this risk analysis. The Geothermal Expert Team scored the TIO­ TPM impacts for five separate cases: 1. 2. 3. 4. 5. Hydrothermal Binary 2010 Hydrothermal Flash 2010 EGS Binary 2010 EGS Flash 2010 EGS Binary Evolutionary 2040

Two additional cases were developed to evaluate the improvements projected by the GTP research teams in the MYPP: 6. 7. Hydrothermal Binary 2010 MYPP EGS Binary 2010 MYPP

The four GETEM reference cases displayed in Appendices A through D provided the baseline input data profiles for these seven risk cases. The baseline data in the appendix cases are allocated to the risk cases by title: e.g., hydrothermal binary, EGS flash, etc.

Geothermal Expert Team Scoring Matrices
For each of the 23 TIO Roll-ups that fell within their respective areas of expertise, the experts were asked to estimate minimum, most likely (or expected), and maximum improvements, as well as an estimated probability of success in achieving the “most likely” improvement, to assign to the 13 TPMs. Each range of improvements is expressed in percentage terms, relative to the baseline TPM value, except for the Utilization Factor, Exploration Success, and Confirmation Success TPMs, where the improvements are expressed as absolute additions to the baseline. A minimum improvement value is defined as the lowest possible non-zero value that might result from the R&D activities, and a maximum is defined as the largest possible advance that could be achieved through R&D. The experts were asked to consider a constant budget amount for each of the subgroup program areas, 8 but told that specific spending on TIO areas could be changed to what they considered optimal levels (e.g., if no projects are currently being funded in a given TIO, they were not precluded from estimating any potential R&D improvements in that area; and, in fact, were asked to give their estimates on potential improvements if funding for that TIO was realized). This approach to funding eliminated many but not all concerns as to whether a flat-budget funding assumption could, in practice, result in achieving impacts that the experts would assign in a technical assessment of the TIO risks. For some TIOs, experts still recognized a budget constraint in the 2010 time frame that limited the impact of the research on the given TPMs.

8

Consistent with the budget outlined in the 2005 MYPP.

19

The probability of success is a probability of achieving an advance at the expected value of the estimated range of improvements, regardless of the specific value assigned. This approach enables the expert to define a finite probability that R&D could generate no technological or economic improvement. In contrast, simply specifying zero as the minimum value in a triangular distribution would give result in very little statistical probability of a zero improvement result being selected in the Monte Carlo simulation. Accordingly, this made it possible to assign lower probabilities of success to higher-risk, more uncertain areas of R&D. In addition, impact limits reflecting experts’ inferences of practical budget constraints were also expressed in terms of lower probabilities of success. For a given TIO, the R&D might only yield improvements for one, or a few, of the TPMs. The experts were asked to fill in only the values for improvements where they thought the TIO would have impact. Table 4 identifies graphically those TPMs actually risked by the experts for each TIO. Furthermore, the experts were given a score sheet to record their estimates for the ranges and probabilities of improvements. Tables 5 through 7 show the score sheets that were used by the Expert Team subgroups for some of the TIOs in the EGS Binary 2010 Case (Appendix E provides the full scoring sheets for all of the TIOs in all of the cases). To assist in assessing risks for the TIOs and interpreting their roll-ups to the TPMs, the Expert Team was provided copies of the GTP Multiyear Program Plan.

20

Table 4. Mapping of Which TIOs Impact Each of the GETEM Input TPMs in All Cases.
GETEM Inputs/ TPMs Production Well Flow Rate Annual O&M non-labor (fraction of plant cost) Reservoir Temperature Decline Rate Number of O&M staff Confirmation Success Exploration Success Producer Well Cost Surface Equip Cost Brine Effectiveness Injector Well Cost Utilization Factor

TIO No.

TIO Roll-up Name

Technology Subgroup

TIOs Included

1 2 3 4 5 6 7 8 9 10 11

Target Temperature Prediction Fractures, Proppants, Rheology Fracture Control/Packers Fracture Prediction Modeling Subsurface Circulation System Reservoir Performance Modeling Artificial Lift Short-Circuit Mitigation Technical Systems Analysis Remote Sensing Geophysics

EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration EGS/ Exploration

1.1.1 1.2.1 1.2.2 1.2.3 1.2.4 1.3.1 1.3.2 1.3.3 1.4.1, 1.4.2, 1.5.1 2.1 2.2

21

Stimulation Cost

Plant Cost

GETEM Inputs/ TPMs Production Well Flow Rate Annual O&M non-labor (fraction of plant cost) Reservoir Temperature Decline Rate Number of O&M staff Confirmation Success Exploration Success Producer Well Cost Surface Equip Cost Brine Effectiveness Injector Well Cost Utilization Factor

TIO No.

TIO Roll-up Name

Technology Subgroup

TIOs Included

12 13 14 15 16 17 18 19 20 21 22 23

Geochemistry Resource Assessment Drilling Time Reduction Wellbore Lining Reduction Flat-Time Reduction Instrumentation, Testing, Simulation Completion and Production Cycle Related Component Related Monitoring and Scaling Design/Construction Related Automation/Enhanced Controls

EGS/ Exploration EGS/ Exploration Wellfield/ Drilling Wellfield/ Drilling Wellfield/ Drilling Wellfield/ Drilling Wellfield/ Drilling Power Conversion Power Conversion Power Conversion Power Conversion Power Conversion

2.3 2.4 3.9.1 - 3.9.3, 3.10.2, 3.11.2, 3.11.4 3.8.1, 3.8.2, 3.11.3, 3.12.1 3.10.1 3.1 - 3.6 3.7, 3.11.1 4.1.1 - 4.1.5 4.1.6 - 4.1.9 4.10 4.11 - 4.13 4.15

Note: Diagonal lines identify the subset of TPMs risked for each TIO in the MYPP Cases.

22

Stimulation Cost

Plant Cost

Table 5. EGS/Exploration Subgroup Scoring Matrix- EGS Binary 2010 Case* Baseline in 2005 0.80 0.80 750 332 3% 0.80 0.80 750 332 3% 0.80 0.80 750 332 3% 0.80 0.80 750 332 3% -20% 10% 4% 10% 25% 10% 30% 50% 15% 10% 70% 40% -25% 10% 0% 17.5% 25% 35% 10% 25% -35% 5% 0% 13% +50% 25.% 60% 60% Improvement Range Min 1% 1% 5% 2% 7% 4% Expected Max Prob. of Success 90% 90% Expert Comments

TIO Categories TIO 1- Increase accuracy of target temperature prediction TIO 2- Improve fracture methods, proppants and rheology TIO 3- Control of fracturing new and improved borehole packers TIO 4- Develop numerical models that accurately predict fracture growth and permeability development

Metrics/TPMs Exploration Success Confirmation Success Stimulation Cost Production WellFlow Rate Temperature Drawdown Rate Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate

Units Ratio Ratio $K/well gpm/well %/year Ratio Ratio $K/well gpm/well %/year Ratio Ratio $K/well gpm/well %/year Ratio Ratio $K/well gpm/well %/year

*This example shows only four of the 13 TIOs in this subgroup. Negative improvement values indicate a potential degradation in a TPM resulting from improvement in one or more other TPMs.

23

Table 6. Wellfield/Drilling Subgroup Scoring Matrix- EGS Binary 2010 Case* Baseline in 2005 4,918 100 332 1.5% 4,918 100 332 1.5% 4,918 100 332 1.5% Research is more focused on rock mechanics than in rock formation for EGS case. 2% 4% 10% 50% 4% 10% 15% 50% Improvement Range Min 5% Expected 12% Max 20% Probability of Success 65% Expert Comments

TIO Categories TIO 14- Reduction of drilling time and expense, especially in hard abrasive formations TIO 15- Reduction time and expense to line the wellbore (including using less material and less costly material)

Metrics/TPMs Well Cost Surface Equipment Cost Production Well Flow Rate Annual O&M Non-labor Well Cost Surface Equipment Cost Production Well Flow Rate Annual O&M Nonlabor Well Cost Surface Equipment Cost Production Well Flow Rate Annual O&M Nonlabor

Units $K/well $K/well gpm/well % of field cost $K/well $K/well gpm/well % of field cost $K/well $K/well gpm/well % of field cost

TIO 16- Reduction of non-essential flat time

TIO 17- Development of basic information through analysis and simulation efforts.

Well Cost Surface Equipment Cost Production Well Flow Rate Annual O&M Nonlabor

$K/well $K/well gpm/well % of field cost

4,918 100 332 1.5%

4%

8%

12%

75%

*This example shows only four of the five TIOs in this subgroup.

24

Table 7. Energy Conversion Subgroup Scoring Matrix- EGS Binary 2010 Case.* TIO Categories Baseline in 2005 95% 10.86 2,140 1.5% 14.6 95% 10.86 2,140 1.5% 14.6 95% 10.86 2,140 1.5% 14.6 95% 10.86 2,140 1.5% 14.6 Improvement Range Min 1.0% 10% -10% Expected 3.0% 25.% 10% Max 4.0% 40.% 30% Probability of Success 90% 90% 30%

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Annual O&M Nonlabor Number of O&M Staff Utilization Factor Brine Effectiveness Plant Cost Annual O&M Nonlabor Number of O&M Staff Utilization Factor Brine Effectiveness Plant Cost Annual O&M Nonlabor Number of O&M Staff Utilization Factor Brine Effectiveness Plant Cost Annual O&M Nonlabor Number of O&M Staff

Units % W-h/lb $/kW % # % W-h/lb $/kW % # % W-h/lb $/kW % # % W-h/lb $/kW % #

Expert Comments There are opportunities to optimize plant configuration that would improve brine effectiveness

TIO 19Cycle Related

1% 3.3% 2% 0% 0.% 2.5% 2.8% 0% 6%

3% 8.% 5.% 5% 0.3% 6.5% 17% 2% 16%

TIO 20Component Related

4% 12.5 % 8% 8% 0.5% 10% 40% 5% 25%

80% 75% 75% 50% 30% 55% 65% 50% 75%

TIO 21Monitoring & Scaling

TIO 22Design/ Construction Related

*This example shows only four of the five TIOs in this subgroup. Negative improvement values indicate a potential degradation in a TPM resulting from improvement in one or more other TPMs. For example, a negative value in the minimum plant cost improvement entry can accommodate an increase in the plant cost in order to achieve improved brine effectiveness.

25

Because TIOs impact the TPMs differently for hydrothermal vs. EGS resources, and for binary vs. flashed-steam conversion technologies, the experts were asked to fill out the seven score sheets separately, but only for those cases and TIOs to which they felt comfortable and qualified to respond. The text box on the next page shows the suggested scoring process given to the Expert Team. In addition to the four 2010 cases, the experts were asked to consider the EGS Binary case for an “Evolutionary 2040” scenario. The evolutionary scenario sought to project mid- to long-term incremental changes to the current technology. Although stated as 2040, the exact year that the improvements would be achieved was not critical – the experts were asked to estimate potential improvements, assuming available time and budget would be adequate to achieve the research goals. Furthermore, the experts were asked to consider the relationships between and within the TIOs and how improvements in one area should relate to advancements or the probability of advancements in other areas. For each TPM that is affected by multiple TIOs, the impacts from each of the TIOs were added together and assumed to be equally weighted, unless the Expert Team specified other relationships (e.g., the Wellfield/Drilling subgroup used a multiplicative method of combining the impacts). Additionally, the team subgroups defined limits (or caps) to constrain the amounts of improvement achievable for most of the TPMs. The caps were added when it was recognized that simply summing the impacts of all TIOs affecting any given TPM could, in some instances, overstate the achievable values of technologic or economic improvements. In extreme cases, this might cause GETEM to calculate negative LCOE values. PERI compiled the individual experts’ scoring sheets, and recorded the consensus estimates from the subgroup phone conferences. That information has been documented for archival record of this work. The consensus estimates were then relayed to the entire Geothermal Expert Team for final comments or suggested changes to these values. The final subgroup consensus score sheets were combined into one set of score sheets, which are shown in Appendix E.

26

Suggested Scoring Process for the Expert Team 1. When estimating the range of impact a single TIO Roll-up may have on a GETEM input parameter, assume initially that the effects of all TIO Roll-ups that impact that parameter are additive and equally weighted. Equivalently, assume that the impact any TIO Roll-up may have on a GETEM input parameter is independent and additive with impacts of other TIO Roll-ups. 2. Document the rationale for your estimates in the “comments” column. Include as many references as possible as part of your rationale. This is a requirement imposed by the administration and Congress that is critical to building the Program’s credibility. 3. When assessing a TIO Roll-up, refer to the detailed list of TIOs to get an idea of the specific research topics involved. Make your best judgment on the combined impact of these specific TIOs on their respective TIO Roll-up. Refer as needed to the MYPP document for fuller descriptions of the specific research topics. 4. Start with the hydrothermal binary case. Once you have estimated a range of impact for a TIO Roll-up for this case, ask whether that range would change for any of the other cases; and, if so, enter those ranges on the proper scoring sheets. 5. Once assessments have been made for each of the TIO Roll-ups for a case, add the combined improvements for each GETEM input variable (assuming the R&D is successful), and do a litmus test on the combined impact. If the combined amount appears to be too high or too low, try to identify and note any relationships between the effects of the TIO Roll-ups that might argue against equal weighting and/or the additivity (i.e., consider the relationships between the TIO Roll-ups and how improvements in one area can increase, reduce, or preclude advancements or the probability of advancements in other areas). Adjust the initial ranges based on these considerations. 6. Leave cells blank when the TIO Roll-up does not impact a specific GETEM input (do not bother entering zeros). 7. Only address those TIOs and GETEM input variables that you feel you have the expertise to consider. Leave everything else blank.

MYPP Cases Scoring As noted above in identifying the seven risk cases considered in this task, two of them correspond to References Cases in the MYPP document. Paralleling the Expert Team improvement estimates for the other five risk cases, the improvements cited in the MYPP document were translated into comparable estimates of ranges of improvements and probabilities of success for these two risk cases: 1) Hydrothermal Binary MYPP 2010, and 2) EGS Binary MYPP 2010. These MYPP-based cases were included in the analysis to both test the Monte Carlo model formulation as well as to provide a point of reference to the Expert Team cases. MYPP estimates were culled from the MYPP report by Martin Vorum and Gian Porro. Further expert input was provided by Susan Petty, Joel Renner, and Chip Mansure. The following general approach was used:

27

1. In most cases, the improvement values identified for 2010 to 2016 were used and assumed to be expected (most likely) values. 2. Because the MYPP document does not generally specify improvement ranges for TPMs, minimum and maximum values for each input were calculated by decreasing and increasing the expected value by 25%. This narrow range centered on the expected value and was adopted as a conservative and neutral approach. 3. TIO improvement ranges for Hydrothermal and EGS reference cases were assumed to be the same for EGS/Exploration and Energy Conversion activities. TIO ranges for Wellfield/Drilling were made distinct and consistent with estimates of well cost improvements upon which the two MYPP cases were based. 9 4. As the LCOE improvements documented in the MYPP were inferred to have already incorporated to some extent a probability of success, the probability-of-success parameter was generally set to 75% or above. This parameter was set somewhat lower for Exploration-specific TIOs due to current funding and the inherently higher level of uncertainty that often characterizes exploration activity. 5. Weighting, additivity, and imposition of limits to TPM improvements across TIOs were made consistent with those in the Expert Team cases, as describe above. As indicated by the diagonal lines in Table 5, the TPMs for the MYPP cases often were applied less frequently than in the Expert Team cases. For Exploration and Drilling TIOs, improvement ranges for two TPMs were specified for each TIO, the same as in the Expert Team cases. Only one EGS-related variable was specified in the MYPP but not risked: the amount of power recoverable from the developed reservoir. Changes Made to Experts Inputs The following describes changes that were made to the consensus estimates that the Expert Team subgroups formulated, along with the rationale for making these changes: 1. Use of “old” well cost data for performing the risk analyses. When the process began, the experts noted that the baseline well costs were much lower than currently experienced in industry. In fact, well costs have increased significantly in recent years. This is due largely to increased demand for the limited stock of equipment used for drilling across the geothermal, oil, and gas businesses; and also to increased demand for commodity materials such as steel and concrete. Therefore, at the suggestion of Chip Mansure and Bill Livesay, GETEM was used to examine higher baseline well costs 10 for each of the cases. That resulted in increases in LCOE values, particularly for the cases with deeper wells, as would be expected. However, a key goal of this task is to examine risk implications, specifically using the MYPP projections. Therefore, it was decided by NREL to hold the well costs at the levels used in the GETEM Reference Cases. The percentage improvements that the Expert Team estimated in the context of “new” costs were applied to the original MYPP baseline.

As provided by Chip Mansure. MYPP baseline costs were increased to reflect the change in the Bureau of Labor Statistics Producer Price Index for the product “drilling oil, gas, dry, or service wells.”

10 9

28

There are arguments to be made that a persistent, past surplus of drilling capacity has abated to a degree that will support sustained, sellers’-market cost increases. While current expert opinion varies, that view remains to be substantiated and requires long-term data. The MYPP baseline costs are required for continuity in this task, regardless of whether a higher cost basis is eventually shown to be more reflective of the long-term market. Given more time and budget, this issue should be explored further. 2. Cost or performance parameters that are being reduced. Some of the subgroups gave improvements as values greater than 100% for parameters for which the improvements are defined in GETEM as reductions (e.g., Stimulation Cost, Temperature Drawdown Rate). That would result in negative input values that would cause errors. The experts expressed these as percentages, which have been assumed to be meant as “factors” of improvement. The values greater than 100% were converted in the following manner: a 200% improvement was converted to a 50% reduction, a 300% improvement converted to a 66% improvement, and a 400% improvement converted to a 75% improvement. 11 However, it should be noted that improvements that increased a TPM (i.e., Production Well Flow Rate) were not altered in this manner and were allowed to increase, sometimes well above 100%. 3. The plant cost input to GETEM. Initially, the actual “Plant Cost” input variable in GETEM was one of the parameters used as a TPM in the risk computations. However, it was observed that the GETEM model uses other TPMs to affect the total plant cost, such as increasing the size of the plant and increasing the brine effectiveness. This was inconsistent with the way in which the experts were asked to consider the various TIOs. Therefore, the risk method now varies the GETEM cell that applies a standalone “improvement” to the calculated plant cost in the “improved case” results. The same ranges for improvement were used, so this change is assumed minor. However, it should be noted that if the Expert Team specified, for example, a 25% improvement in plant costs from program R&D, the total reduction of plant costs that GETEM calculates will be more than 25% when there are also changes to plant size and brine effectiveness.

11

Subsequent to the completion of the risk analysis runs, a more precise conversion method was determined: Fractional improvement = 1 – [1 / (1 + original improvement factor)]. This approach yields slightly lower percentages than actually used.

29

Summary of Results
Table 8 provides a summary of the results of the risk analysis runs. This table lists the baseline LCOE, the improved LCOE range calculated by GETEM (i.e., the minimum, mean, and maximum LCOEs determined by the risk analysis model), and the probability of meeting the 5¢/kWh Program goal.
Table 8. Summary of LCOE Range and Probability of Meeting 5¢/kWh Goal by Case Baseline 2005 LCOE Improved-Case 12 LCOE Range Min Mean Max Probability of Meeting 5¢/kWh Goal 75% 100% N/A
13

Case and Year

Mean LCOE by Case Year 54% 54% 51% 53% 59%

Results of Expert Team Estimates HT Binary 2010 HT Flash 2010 EGS Binary 2010 EGS Flash 2010 Evolutionary EGS Binary 2040 8.54 4.73 28.5 29.3 28.5 3.80 2.94 5.71 8.39 3.85 4.73 3.43 11.5 15.6 6.29 6.13 4.13 18.9 23.0 13.8

N/A 14%

Results of MYPP Estimates HT Binary 2010 EGS Binary 2010 8.54 28.5 4.35 12.5 4.74 14.3 5.10 17.8 99% N/A 52% 52%

The “Min” and “Max” values of the calculated LCOE ranges correspond to 5% and 95% probabilities of occurrence, respectively.

As can be seen in Table 8, the Hydrothermal (HT) cases, for both the Binary and Flash technologies, have very high probabilities of meeting the 5¢/kWh goal by 2010, while the Enhanced Geothermal Systems (EGS) cases have practically no chance of meeting the 5¢/kWh goal by 2010. These results are not surprising, as the use of EGS resources is more of a longterm scenario, as evidenced by their very high Baseline 2005 LCOEs. Still, the EGS cases show significant reductions in LCOE by 2010 (about 50% or more), and have the potential to make the technology cost competitive by 2040. It should be noted that for all Binary technology cases, the number of independent power units was assumed to be three units in the baseline and improved to one unit by 2010 or 2040. This change was specified by NREL staff and leads, by itself, to a reduction in the LCOE of about 1¢/kWh in all improved Binary LCOEs, regardless of any impacts from the success of the TIOs.
The LCOE mean values in Table 8 are calculated as probability-weighted averages. Three EGS entries in Table 2 are labeled “N/A” (not applicable). This is because Program goals project that technology improvements under DOE research will make it possible for new, greenfield power development projects to attain LCOE values of 5¢/kWh. This goal is further scheduled to occur by 2010 for hydrothermal resource power systems, and by 2040 for EGS power systems. Therefore, the EGS cases would not meet the 5¢/kWh threshold by 2010.
13 12

30

However, in the Flash technology cases, the number of independent power units is one unit in both the baseline and improved cases; and, therefore, has no impact on the Flash LCOEs. The ranges in Table 8 represent key values from a cumulative probability distribution, and an example of such a cumulative probability distribution function (PDF) for the Hydrothermal Binary 2010 Experts Case is shown in Figure 1. Appendix F provides these cumulative PDFs for each of the seven risk cases of this task.

Distribution for Imp Bin- Total COE/L64
1.000
Mean=4.732055

0.800 0.600
Probability

0.400 0.200
LCOE (¢/kWh)

0.000

3.5
5%

4.5 4.1781
90%

5.5 5.4059
5%

6.5

Figure 1. Cumulative PDF for Total LCOE (¢/kWh) for the Hydrothermal Binary 2010 Experts Case.

Figure 1 shows the range of LCOE for the Hydrothermal Binary 2010 Experts Case (i.e., a minimum of 3.80¢/kWh, a mean of 4.73¢/kWh, and a maximum of 6.13¢/kWh), as well as showing the cumulative probability of achieving any value within that range. For example, to determine what LCOE had at least an 80% chance of being achieved, one would move horizontally from the 0.800 value on the y-axis until intersecting the curve, and then find the corresponding value on the x-axis (i.e., 5.06¢/kWh). Furthermore, the Cumulative PDF graphs show the 5% and 95% values (i.e., 4.18¢/kWh and 5.41¢/kWh, respectively), which are commonly used figures in statistical analysis but do not have any special significance in this study. The LCOE values at the 5% and 95% probabilities of occurrence are those values listed in Table 8 as minimum and maximum improved-case LCOEs.

31

Case-Specific Results The results summarized in Table 8 include the impacts of all of the TIOs combined. However, to assess the individual impacts of each of the 23 roll-up TIOs on a composite LCOE, the risk models were run independently for each roll-up TIO (i.e., zeroing out the impacts of all other TIOs to assess potential “standalone” improvements for each TIO). The following sections show vertical bar graphs for each case, itemizing the composite LCOE and selected LCOE component groups that GETEM gives as subtotals for the Baseline and Improved runs. Additionally, horizontal bar graphs for each case break out the integrated and standalone impacts of the 23 roll-up TIOs on the LCOE reduction. In these graphs, the heavy, main bars show the mean LCOE reductions, while the lighter error bars extending from the main bars show the maximum LCOE reductions, as determined by the probabilistic risk model. As stated earlier, the bars for each of the standalone TIOs reflect potential improvements under aggressive budget assumptions (i.e., optimal funding considered independently for each TIO within a fixed budget amount for each subprogram research area). As described on Page 26, the risk team selectively limited the model’s freedom to aggregate TIO contributions to each TPM to prevent the TIOs from being fully additive at all probabilities of occurrence. The need for the limitation reflects abstractions in the assessment process of quantifying the TIOs’ influences on the TPMs. This limitation ensured that combined TPM impacts in the integrative risk computation were not simply composites of standalone TIO contributions. Absent these constraints, TPM improvements would have been overestimated, resulting in erroneous calculated LCOE values. Using Figure 7 as an example, the composite mean LCOE improvement for all TIOs (top bar) is about 17¢/kWh, while the TIOs all have predicted individual mean gains of 1¢ to 5¢. Applying all of the individual gains cumulatively would give LCOE improvements greater than 17¢. These graphs are useful for helping to understand the potential technical and economic improvements of each TIO, and in judging the relative impacts of TIOs as a basis for allocating research funding. The point made here is that these should not be used to calculate potential improvements across the standalone TIO runs for projecting combined benefits, absent indications that such summing is at least approximately close to an integrated risk result. A useful next step in this process of developing risk analysis methodology and tools would be to elicit experts’ estimates of potential improvements that could be achieved under a truly fixed budget scenario. This would entail assessing potential tradeoffs in achievement as functions of variable task funding, and competition or synergy between achievements among tasks at fixed total funding. This moves in the direction of analyzing management risk. It would entail assessing a program work breakdown structure (WBS) by detailed tasks, making allocations to each task for level of effort, budget, schedule, and product (results) per unit of effort.

32

Hydrothermal Binary 2010 Experts Case Figure 2 shows the components of the LCOE in the Hydrothermal Binary 2010 Experts Case. The Plant Capital portion of the LCOE is the largest component in the Baseline Case and remains so in the Improved Case, despite incurring the largest absolute LCOE reduction.
Figure 2. Hydrothermal Binary 2010 ExpertsCaseImproved 2010 COE Relative to 2005 Baseline COE
9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00
Baseline Case Improved Case

(cents/kWh)

Total COE

Exploration and Confirmation

Plant Capital

Field, Nonwell O&M

Plant O&M

Well Field Capital

Well Field O&M

Royalty

COE Component

Figure 3 shows the standalone impacts of each individual TIO on the overall LCOE improvement. Again, the power plant unit reduction (from three units in the baseline to one unit in the improved cases) results in a LCOE reduction, which is shown in the figures, of about 1¢/kWh in all Binary Cases. As can be seen in Figure 3, and in agreement with the results shown in Figure 2, the largest TIO impacts for this case occur in the Energy Conversion TIOs (TIOs 19, 20, and 22), which impact the Utilization Factor, Brine Effectiveness, and Plant Cost TPMs. The reader may judge the approximate extent to which the standalone TIO impacts are additive, based on whether and by how much their sum exceeds the composite impact on LCOE of all TIOs taken together.

33

Contingency

Field, Nonwell Capital

Figure 3. Hydrothermal Binary 2010 Experts- TIO Improvements to COE Range

ALL TIOs + Pow er Plant Unit Reduction Pow er Plant Unit Reduction ALL TIOs TIO 1 - Target Temperature Prediction TIO 2 - Fractures, Proppants, Rheology TIO 3 - Fracture Control/Packers TIO 4 - Fracture Prediction Modeling TIO 5 - Subsurface Circulation System TIO 6 - Reservoir Performance Modeling TIO 7 - Artificial Lift TIO 8 - Short Circuit Mitigation TIO 9 - Technical Systems Analysis TIO 10 - Remote Sensing TIO 11 - Geophysics TIO 12 - Geochemistry TIO 13 - Resource Assessment TIO 14 - Drilling Time Reduction TIO 15 - Wellbore Lining Reduction TIO 16 - Flat Time Reduction TIO 17 - Instrumentation, Testing, TIO 18 - Completion & Production TIO 19 - Cycle Related TIO 20 - Component Related TIO 21 - Monitoring & Scaling TIO 22 - Design/Construction Related TIO 23 - Automation/Enhanced Controls

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 COE Improvement (¢/kWh) Bar = Mean, Error Bar = Max

34

Hydrothermal Flash 2010 Experts Case Figure 4 shows that, for the Flash technology, while the Plant Capital component remains the largest portion of LCOE, it is much smaller than for the Binary technology of the preceding case, as shown in Figure 2. This is consistent with the simpler design of flashed-steam plant power systems. Also, the Well Field Capital portion of the LCOE, while remaining under 1¢/kWh, becomes a much higher percentage of the total COE than for the Binary technology, reflecting an increase in well depths from 5,000 to 8,000 feet.
Figure 4. Hydrothermal Flash 2010 ExpertsCaseImproved 2010 COE Relative to 2005 Baseline COE
5.00 4.50 4.00 3.50 3.00 2.50 2.00 1.50 1.00 0.50 0.00
Baseline Case Improved Case

(cents/kWh)

Total COE

Exploration and Confirmation

Plant Capital

Field, Nonwell O&M

Plant O&M

Well Field Capital

Well Field O&M

Royalty

COE Component

Figure 5 shows the standalone impacts of each TIO on the overall LCOE improvement. In this case, the EGS and Exploration TIOs have almost no impact, while the Energy Conversion TIOs again have the greatest potential impacts. Improvements from the standalone TIOs become more distinguishable and important in the other cases, as seen in the following case descriptions.

35

Contingency

Field, Nonwell Capital

Figure 5. Hydrothermal Flash 2010 Experts- TIO Improvements to COE Range

ALL TIOs TIO 1 - Target Temperature Prediction TIO 2 - Fractures, Proppants, Rheology TIO 3 - Fracture Control/Packers TIO 4 - Fracture Prediction Modeling TIO 5 - Subsurface Circulation System TIO 6 - Reservoir Performance Modeling TIO 7 - Artificial Lift TIO 8 - Short Circuit Mitigation TIO 9 - Technical Systems Analysis TIO 10 - Remote Sensing TIO 11 - Geophysics TIO 12 - Geochemistry TIO 13 - Resource Assessment TIO 14 - Drilling Time Reduction TIO 15 - Wellbore Lining Reduction TIO 16 - Flat Time Reduction TIO 17 - Instrumentation, Testing, TIO 18 - Completion & Production TIO 19 - Cycle Related TIO 20 - Component Related TIO 21 - Monitoring & Scaling TIO 22 - Design/Construction Related TIO 23 - Automation/Enhanced Controls

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 COE Improvement (¢/kWh) Bar = Mean, Error Bar = Max

36

EGS Binary 2010 Experts Case Figure 6 shows that, for the EGS Binary 2010 Case, the Well Field Capital and Field, Non-well O&M components of LCOE become much larger portions of the total LCOE than in the Hydrothermal cases. Because EGS resources are assumed to be much deeper (i.e., 13,000 to 19,000 feet for EGS compared to 5,000 to 8,000 feet for Hydrothermal), the drilling costs and field O&M costs are much higher. The dominance of wellfield costs also reflects the role of reservoir stimulation and faster reservoir decline for EGS systems than for the hydrothermal systems in the preceding two cases. Potential improvements in this case are greatest in the Well Field Capital and Field, Non-well O&M components of LCOE, which results in the Plant Capital component becoming one of the larger portions of the LCOE in the improved case.
Figure 6. EGS Binary 2010 Experts CaseImproved 2010 COE Relative to 2005 Baseline COE
30.00 25.00 (cents/kWh) 20.00 15.00 10.00 5.00
Total COE Exploration and Confirmation Plant Capital Field, Nonwell O&M Plant O&M

Baseline Case

Improved Case

0.00

Well Field Capital

Well Field O&M

Royalty

COE Component

Figure 7 shows that the EGS and Exploration TIOs (TIO 1 through 13) have much greater potential impacts in the EGS case than in the hydrothermal cases. Likewise, the error bars (i.e., indicating the maximum potential improvements) are much larger for these TIOs compared to drilling and conversion TIOs. This implies that, while the probability of success for these TIOs was deemed to be low in the 2010 time frame, they hold the greatest long-term potential impacts for this case. 14 While the EGS and Exploration TIOs tend to dominate potential impact, cyclerelated improvement in Energy Conversion, TIO 19, actually shows the largest expected impact by 2010 (more than 20% improvement in LCOE). This impact results from a significantly increased range of improvement and probability of success over the Hydrothermal Binary case reflecting the experts’ view that plant configuration can be optimized for the higher temperatures encountered at increased depths in this case.
Experts estimating improvement ranges for this discipline generally felt that the current funding level for EGS and Exploration activity, even if reallocated in entirety to each TIO, imposes a limit on the improvement that could be achieved by 2010. This limit, construed primarily as a reduction in the probability of success, is reflected in the large extent of the positive error bar associated with these TIOs.
14

37

Contingency

Field, Nonwell Capital

Figure 7. EGS Binary 2010 Experts- TIO Improvements to COE Range

ALL TIOs + Pow er Plant Unit Reduction Pow er Plant Unit Reduction ALL TIOs TIO 1 - Target Temperature Prediction TIO 2 - Fractures, Proppants, Rheology TIO 3 - Fracture Control/Packers TIO 4 - Fracture Prediction Modeling TIO 5 - Subsurface Circulation System TIO 6 - Reservoir Performance Modeling TIO 7 - Artificial Lift TIO 8 - Short Circuit Mitigation TIO 9 - Technical Systems Analysis TIO 10 - Remote Sensing TIO 11 - Geophysics TIO 12 - Geochemistry TIO 13 - Resource Assessment TIO 14 - Drilling Time Reduction TIO 15 - Wellbore Lining Reduction TIO 16 - Flat Time Reduction TIO 17 - Instrumentation, Testing, TIO 18 - Completion & Production TIO 19 - Cycle Related TIO 20 - Component Related TIO 21 - Monitoring & Scaling TIO 22 - Design/Construction Related TIO 23 - Automation/Enhanced Controls

0.00

5.00

10.00

15.00

20.00

25.00

30.00

COE Improvement (¢/kWh) Bar = Mean, Error Bar = Max

38

EGS Flash 2010 Experts Case Figure 8 shows that, for the EGS Flash 2010 Case, similar to the EGS Binary case, the Well Field Capital and Field, Non-well O&M components are the predominant components of the baseline LCOE, accounting for 14.1¢/kWh and 5.3¢/kWh, respectively, of the total 29.3¢/kWh. Again, the main improvements come from lowering these components, both of which are more than cut in half, to 7.0¢/kWh and 2.6¢/kWh, respectively.
Figure 8. EGS Flash 2010 Experts CaseImproved 2010 COE Relative to 2005 Baseline COE
35.00 30.00 (cents/kWh) 25.00 20.00 15.00 10.00 5.00
Total COE Exploration and Confirmation Plant Capital Field, Nonwell O&M Plant O&M

Baseline Case

Improved Case

0.00

Well Field Capital

Well Field O&M

Royalty

COE Component

Figure 9 shows that, while the Wellfield and Drilling TIOs (TIO 14 through 18) and the Energy Conversion TIOs (TIOs 19 through 23) generally have larger expected impacts in the 2010 time frame, the greatest potential lies in the EGS and Exploration TIOs. That is, there is large potential in some TIOs that cannot or may not be realized in the limitation of the 2010 time frame. For example, TIO 7, Artificial Lift, has a relatively low probability of success, resulting in a low mean improvement; but its maximum potential improvement (i.e., if this R&D is successful) is the largest of any TIO for this case. The estimated mean impacts of each individual TIO are more truly additive in this case, because the improvements are not hitting the caps specified in the model (i.e., the sum of all the individual TIO bars is close to the size of the All TIOs bar).

39

Contingency

Field, Nonwell Capital

Figure 9. EGS Flash 2010 Experts- TIO Improvements to COE Range

ALL TIOs TIO 1 - Target Temperature Prediction TIO 2 - Fractures, Proppants, Rheology TIO 3 - Fracture Control/Packers TIO 4 - Fracture Prediction Modeling TIO 5 - Subsurface Circulation System TIO 6 - Reservoir Performance Modeling TIO 7 - Artificial Lift TIO 8 - Short Circuit Mitigation TIO 9 - Technical Systems Analysis TIO 10 - Remote Sensing TIO 11 - Geophysics TIO 12 - Geochemistry TIO 13 - Resource Assessment TIO 14 - Drilling Time Reduction TIO 15 - Wellbore Lining Reduction TIO 16 - Flat Time Reduction TIO 17 - Instrumentation, Testing, TIO 18 - Completion & Production TIO 19 - Cycle Related TIO 20 - Component Related TIO 21 - Monitoring & Scaling TIO 22 - Design/Construction Related TIO 23 - Automation/Enhanced Controls

0.00

5.00

10.00

15.00

20.00

25.00

30.00

COE Improvement (¢/kWh) Bar = Mean, Error Bar = Max

40

EGS Binary 2040 Evolutionary Experts Case Figure 10 shows that the long-term EGS Binary 2040 Evolutionary Case is similar to the shortterm EGS Binary 2010 Case, except that the reductions of the Well Field Capital and Field, Nonwell O&M components of LCOE are even larger in this 2040 case (i.e., reductions from 8.27¢/kWh to 1.21¢/kWh in 2040 vs. 3.14¢/kWh in 2010 for the Well Field Capital component, and from 7.99¢/kWh to 0.59¢/kWh in 2040 vs. 2.45¢/kWh in 2010 for the Field, Non-well O&M component). This is to be expected for long-term GTP R&D work. Reductions to the Plant Capital component remain relatively constant, which leads to this portion becoming the largest component of the LCOE in the improved 2040 case.
Figure 10. EGS Binary 2040 Evolutionary Experts CaseImproved 2040 COE Relative to 2005 Baseline COE
30.00 25.00 (cents/kWh) 20.00 15.00 10.00 5.00
Total COE Exploration and Confirmation Plant Capital Field, Nonwell O&M Plant O&M

Baseline Case

Improved Case

0.00

Well Field Capital

Well Field O&M

Royalty

COE Component

Figure 11 again shows that, for the EGS cases, the maximum potential improvements are from the EGS and Exploration TIOs (TIOs 1 through 13), with the exception of TIO 19. However, in the 2040 time frame, even greater mean improvements are expected. In most cases, this increased improvement results from the experts’ perception that more time and money is needed to complete these activities than the 2010 time frame can realistically provide, and this is reflected primarily as an increase in the probability of success for the 2040 cases.

41

Contingency

Field, Nonwell Capital

Figure 11. EGS Binary 2040 Evolutionary Experts-TIO Improvements to COE Range

ALL TIOs + Pow er Plant Unit Reduction Pow er Plant Unit Reduction ALL TIOs TIO 1 - Target Temperature Prediction TIO 2 - Fractures, Proppants, Rheology TIO 3 - Fracture Control/Packers TIO 4 - Fracture Prediction Modeling TIO 5 - Subsurface Circulation System TIO 6 - Reservoir Performance Modeling TIO 7 - Artificial Lift TIO 8 - Short Circuit Mitigation TIO 9 - Technical Systems Analysis TIO 10 - Remote Sensing TIO 11 - Geophysics TIO 12 - Geochemistry TIO 13 - Resource Assessment TIO 14 - Drilling Time Reduction TIO 15 - Wellbore Lining Reduction TIO 16 - Flat Time Reduction TIO 17 - Instrumentation, Testing, TIO 18 - Completion & Production TIO 19 - Cycle Related TIO 20 - Component Related TIO 21 - Monitoring & Scaling TIO 22 - Design/Construction Related TIO 23 - Automation/Enhanced Controls

0.00

5.00

10.00

15.00

20.00

25.00

30.00

COE Improvement (¢/kWh) Bar = Mean, Error Bar = Max

42

Hydrothermal Binary 2010 MYPP Case Figure 12 shows that the Hydrothermal Binary 2010 MYPP Case is very similar to the Hydrothermal Binary 2010 Experts Case. While the mean LCOE reduction is nearly identical in both cases (i.e., reducing from a baseline of 8.54¢/kWh to 4.74¢/kWh in the MYPP Case vs. 4.73¢/kWh in the Experts Case), as shown in Figures F1 and F6 in Appendix F, the range around the mean is much narrower in the MYPP Case (i.e., a minimum and maximum of 4.35¢/kWh and 5.10¢/kWh in the MYPP Case, vs. 3.80¢/kWh and 6.13¢/kWh in the Experts Case). Although this might imply that the Expert Team thought there was greater uncertainty in the LCOE improvements and in meeting the 5¢/kWh goal, it more likely results from the assumptions on which the MYPP cases were based – a set improvement range of +/- 25% around the expected value.
Figure 14. Hydrothermal Binary 2010 MYPP CaseFigure 12. Hydrothermal Binary 2010 MYPP CaseImproved 2010 COE Relative 2005 Baseline COE Improved 2010 COE Relative to to 2005 Baseline COE
9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00
Baseline Case Improved Case

(cents/kWh)

Total COE

Exploration and Confirmation

Plant Capital

Field, Nonwell O&M

Plant O&M

Well Field Capital

Well Field O&M

Royalty

COE Component

Figure 13 reinforces the notion that the MYPP Case shows little uncertainty above and below the expected LCOE improvements, as reflected in the small differences between the mean and maximum improvements. Again, the issue of hitting the caps implemented in the model limits the apparent additivity of the individual TIOs, as previously discussed.

43

Contingency

Field, Nonwell Capital

Figure 13. Hydrothermal Binary 2010 MYPP - Improvements Figure15 Hydrothermal Binary 2010 MYPP- TIO Improvements to COE to COE Range Range

ALL TIOs + Pow er Plant Unit Reduction Pow er Plant Unit Reduction ALL TIOs TIO 1 - Target Temperature Prediction TIO 2 - Fractures, Proppants, Rheology TIO 3 - Fracture Control/Packers TIO 4 - Fracture Prediction Modeling TIO 5 - Subsurface Circulation System TIO 6 - Reservoir Performance Modeling TIO 7 - Artificial Lift TIO 8 - Short Circuit Mitigation TIO 9 - Technical Systems Analysis TIO 10 - Remote Sensing TIO 11 - Geophysics TIO 12 - Geochemistry TIO 13 - Resource Assessment TIO 14 - Drilling Time Reduction TIO 15 - Wellbore Lining Reduction TIO 16 - Flat Time Reduction TIO 17 - Instrumentation, Testing, TIO 18 - Completion & Production TIO 19 - Cycle Related TIO 20 - Component Related TIO 21 - Monitoring & Scaling TIO 22 - Design/Construction Related TIO 23 - Automation/Enhanced Controls

0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 COE Improvement (¢/kWh) Bar = Mean, Error Bar = Max

44

EGS Binary 2010 MYPP Case Figure 14 shows that the EGS Binary 2010 MYPP Case is very similar to the EGS Binary 2010 Experts Case, but the MYPP case has a much narrower distribution of LCOE improvements (as seen in Figures F3 and F7 in Appendix F). As with the preceding MYPP Hydrothermal Binary case, this results from the assumptions governing the construction of the ranges of improvements for the MYPP case. Despite the fact that the Expert Case predicts greater improvements for both the mean and maximum improvements, neither the MYPP estimates nor the Experts estimates for the EGS Binary 2010 Cases suggests that 5¢/kWh is reachable by 2010. However, both the MYPP and Experts estimates suggest substantial (i.e., about 50% or more) improvements can be made in by the 2010 time frame. Figure 14. EGSEGS Binary 2010 MYPP CaseFigure 16. Binary 2010 MYPP CaseImproved2010 COE Relative to 2005 Baseline COE Improved 2010 COE Relative to 2005 Baseline COE
30.00 25.00 (cents/kWh) 20.00 15.00 10.00 5.00
Total COE Exploration and Confirmation Plant Capital Field, Nonwell O&M Plant O&M

Baseline Case

Improved Case

0.00

Well Field Capital

Well Field O&M

Royalty

COE Component

Figure 15, similar to Figure 13, shows that the MYPP cases have less uncertainty in the LCOE reductions than the matching ranges for the Expert Case. This applies to the composite TIOs, as well as to the standalone TIO improvements.

45

Contingency

Field, Nonwell Capital

Figure 17. EGS Binary 2010 MYPP - Improvements to COE Figure 15. EGS Binary 2010 MYPP- TIO Improvements to COE Range Range
ALL TIOs + Pow er Plant Unit Reduction Pow er Plant Unit Reduction ALL TIOs TIO 1 - Target Temperature Prediction TIO 2 - Fractures, Proppants, Rheology TIO 3 - Fracture Control/Packers TIO 4 - Fracture Prediction Modeling TIO 5 - Subsurface Circulation System TIO 6 - Reservoir Performance Modeling TIO 7 - Artificial Lift TIO 8 - Short Circuit Mitigation TIO 9 - Technical Systems Analysis TIO 10 - Remote Sensing TIO 11 - Geophysics TIO 12 - Geochemistry TIO 13 - Resource Assessment TIO 14 - Drilling Time Reduction TIO 15 - Wellbore Lining Reduction TIO 16 - Flat Time Reduction TIO 17 - Instrumentation, Testing, TIO 18 - Completion & Production TIO 19 - Cycle Related TIO 20 - Component Related TIO 21 - Monitoring & Scaling TIO 22 - Design/Construction Related TIO 23 - Automation/Enhanced Controls

0.00

5.00

10.00

15.00

20.00

25.00

30.00

COE Improvement (¢/kWh) Bar = Mean, Error Bar = Max

46

Appendix A: Hydrothermal Binary Power System Case - Inputs
Global Economic Parameters Fixed Charge Rate Utilization Factor Contingency Input parameters Temperature of GT Fluid in Reservoir Plant Size (Exclusive of Brine Pumping) Number of independent power units Brine Effectiveness (exclusive of brine pumping) If N (no), enter value in cell C19 and/or E19 Calculated Brine Effectiveness Brine Effectiveness Apply improvement to reducing flow requirement or increasing power output Plant Cost If N (no), enter value in cell C24 and/or E24 Calculated Plant Cost Plant Cost Wells Cost Curve: 1=Low, 2=Med, 3=High PRODUCTION WELL Depth Estimated Cost, from SNL Curve User's Cost Curve Multiplier Producer, Final Cost INJECTION WELL Depth Estimated Cost, from SNL Curve Injector, Final Cost Surface Equip Cost/Well Exploration Success Power Found Number of Confirmation wells Confirmation Success Injector/Producer Spare Prods Well stimulation Stimulation cost GF Pump Efficiency Pump type S=submersible gpm/well Flow per LINESHAFT pump Unit Ratio Ratio % Baseline 0.128 0.95 5% Input Category Plug TPM Plug

Deg-C MW(e) Calculate Y or N W-h/lb W-h/lb W-h/lb F - flow or P - power Calculate or N $/kW $/kW $/kW Feet $K/well ratio $K/well Feet $K/well $K/well $K/well Ratio MW(e) Count Ratio Ratio Count Y- yes or N - no $K/well L=lineshaft;

150 30.0 3 Y 4.63 4.63 P Y $2,445 $2,445 2 5,000 $1,222 1.00 $1,222 5,000 $1,222 $1,222 $100 0.20 50 3 0.60 0.50 N $500 80% L 2,000

Case Case Case Case Case Calc TPM Case Case Case Calc TPM Case Case Calc Case TPM Case Calc TPM TPM TPM Case Case TPM Case Case Case TPM Case Case TPM

A-1

Global Economic Parameters Inputted pump depth Lineshaft pump cost Flow per SUBMERSIBLE pump Additional drawdown for flow>1500 gpm Pump depth Submersible pump cost Injection pump dP Injection pump cost Temperature Drawdown Rate: Input Result A: Life of nominal reservoir Result B: Loss of discounted revenue Annual O&M non-labor (fraction of plant cost) Annual O&M non-labor (fraction of field cost) Number of O&M staff

Unit ft $K gpm/well ft/100 gpm ft $K psi $/hp %/year years % % % #

Baseline 1,000 $250 2,250 1,000 $250 100 $700 0.30 30 8.1% 1.5% 1.0% 14.6

Input Category Case Case Case Case Calc Plug Plug Plug TPM Calc Calc TPM Plug TPM

A-2

Appendix B: Hydrothermal Flashed-Steam Power System Case - Inputs
Global Economic Parameters Fixed Charge Rate Utilization Factor Contingency Input parameters Temperature of GT Fluid in Reservoir ncg level ( based on total flow) H2S level (based on total flow) Number of flashes Plant Size (Exclusive of Brine Pumping) Number of independent power units Condenser type NCG Removal Brine Effectiveness (exclusive of brine pumping) If N (no), enter value in cell C24 and/or E24 Calculated Brine Effectiveness (net, no pumping) Brine Effectiveness (net) Apply improvement to reducing flow requirement or increasing power output Plant Cost If N (no), enter value in cell C29 and/or E29 Equipment cost multiplier for installed cost Calculated Plant Cost Plant Cost Wells Cost Curve: 1=Low, 2=Med, 3=High PRODUCTION WELL Depth Estimated Cost, from SNL Curve User's Cost Curve Multiplier Producer, Final Cost INJECTION WELL Depth Estimated Cost, from SNL Curve Injector, Final Cost Surface Equip Cost/Well Exploration Success Power Found Number of Confirmation wells Unit Ratio Ratio % Baseline 0.128 0.90 5% Input Category Plug TPM Plug

Deg-C ppm ppm 1= 1 flash, 2= 2 flash MW(e) S=surface; DC= direct contact J = jet; VP=vac pump Calculate Y or N W-h/lb W-h/lb W-h/lb F - flow or P - power Calculate Y or N $/kW $/kW $/kW Feet $K/well ratio $K/well Feet $K/well $K/well $K/well Ratio MW(e) Count

200 200 2 2 50.0 1 S VP Y

Case Case Case Case Case Case Case Case Case Case

9.40 9.40 P Y 2.53 $995 $995 2 8,000 $1,910 1.00 $1,910 8,000 $1,910 $1,910 $100 0.20 100 4

Calc TPM Case Case Case Plug Calc TPM Case Case Calc Case TPM Case Calc TPM TPM TPM Case Case

B-1

Global Economic Parameters Confirmation Success Injector/Producer Spare Prods Well stimulation Stimulation cost Wells Pumped Unpumped well flow rate GF Pump Efficiency

Unit Ratio Ratio Count Y- yes or N - no $K/well Y- yes or N - no lb/h

Baseline 0.60 0.50 N $300 N 500,000 9999% L 900 2,000 $300 2,250 2,000 $250 100 $700 2.00 1.3 5.5% 1.5% 1.0% 16.3

Input Category TPM Case Case Case TPM Case Case Case Case TPM Case Case Case Case Calc Plug Plug Plug TPM Calc Calc TPM Plug TPM

L=lineshaft; Pump type S=submersibl e gpm/well Flow per LINESHAFT pump ft Inputted pump depth $K Lineshaft pump cost gpm/well Flow per SUBMERSIBLE pump ft/100 gpm Additional drawdown for flow>1500 gpm ft Revised pump depth $K Submersible pump cost psi Injection pump dP $/hp Injection pump cost %/year Drawdown Rate for Flow/Well: Input: number Result A: Discounted No. of Makeup Wells % Result B: Loss of discounted revenue Annual O&M non-labor (fraction of plant % cost) Annual O&M non-labor (fraction of field % cost) # Number of O&M staff

B-2

Appendix C: EGS Binary Power System Case - Inputs
Global Economic Parameters Fixed Charge Rate Utilization Factor Contingency Input parameters Temperature of GT Fluid in Reservoir Plant Size (Exclusive of Brine Pumping) Number of independent power units Brine Effectiveness (exclusive of brine pumping) If N (no), enter value in cell C19 and/or E19 Calculated Brine Effectiveness Brine Effectiveness Apply improvement to reducing flow requirement or increasing power output Plant Cost If N (no), enter value in cell C24 and/or E24 Calculated Plant Cost Plant Cost Wells Cost Curve: 1=Low, 2=Med, 3=High PRODUCTION WELL Depth Estimated Cost, from SNL Curve User's Cost Curve Multiplier Producer, Final Cost INJECTION WELL Depth Estimated Cost, from SNL Curve Injector, Final Cost Surface Equip Cost/Well Exploration Success Power Found Number of Confirmation wells Confirmation Success Injector/Producer Spare Prods Well stimulation Stimulation cost GF Pump Efficiency Pump type Unit Ratio Ratio % Baseline 0.128 0.95 5% Input Category Plug TPM Plug

Deg-C MW(e) Calculate Y or N W-h/lb W-h/lb W-h/lb F - flow or P - power Calculate Y or N $/kW $/kW $/kW Feet $K/well ratio $K/well Feet $K/well $K/well $K/well Ratio MW(e) Count Ratio Ratio Count Y- yes or N - no $K/well L=lineshaft; S=submersible

200 30 3 Y 10.86 10.86 P Y $2,140 $2,140 2 13,123 $4,098 1.20 $4,918 13,123 $4,098 $4,918 $100 0.80 600 2 0.80 0.33 Y $750 80% L

Case Case Case Case Case Calc TPM Case Case Case Calc TPM Case Case Calc Case TPM Case Calc TPM TPM TPM Case Case TPM Case Case Case TPM Case Case

C-1

Global Economic Parameters Flow per LINESHAFT pump Inputted pump depth Lineshaft pump cost Flow per SUBMERSIBLE pump Additional drawdown for flow>1500 gpm Pump depth Submersible pump cost Injection pump dP Injection pump cost Temperature Drawdown Rate: Input Result A: Life of nominal reservoir Result B: Loss of discounted revenue Annual O&M non-labor (fraction of plant cost) Annual O&M non-labor (fraction of field cost) Number of O&M staff

Unit gpm/well ft $K gpm/well ft/100 gpm ft $K psi $/hp %/year years % % % #

Baseline 332 2,000 $300 395 2,000 $250 100 700 3.0 6 18.4% 1.5% 1.0% 14.6

Input Category TPM Case Case Case Case Calc Plug Plug Plug TPM Calc Calc TPM Plug TPM

C-2

Appendix D: EGS Flashed-Steam Power System Case - Inputs
Global Economic Parameters Fixed Charge Rate Utilization Factor Contingency Input parameters Temperature of GT Fluid in Reservoir ncg level ( based on total flow) H2S level (based on total flow) Number of flashes Plant Size (Exclusive of Brine Pumping) Number of independent power units Condenser type NCG Removal Brine Effectiveness (exclusive of brine pumping) If N (no), enter value in cell C24 and/or E24 Calculated Brine Effectiveness (net, no pumping) Brine Effectiveness (net) Apply improvement to reducing flow requirement or increasing power output Plant Cost If N (no), enter value in cell C29 and/or E29 Equipment cost multiplier for installed cost Calculated Plant Cost Plant Cost Wells Cost Curve: 1=Low, 2=Med, 3=High PRODUCTION WELL Depth Estimated Cost, from SNL Curve User's Cost Curve Multiplier Producer, Final Cost INJECTION WELL Depth Estimated Cost, from SNL Curve Injector, Final Cost Surface Equip Cost/Well Unit Ratio Ratio % Baseline 0.128 0.90 5% Input Category Plug TPM Plug

Deg-C ppm ppm 1= 1 flash, 2= 2 flash MW(e) S=surface; DC= direct contact J = jet; VP=vac pump Calculate Y or N W-h/lb W-h/lb W-h/lb F - flow or P - power Calculate Y or N $/kW $/kW $/kW

250 200 2 2 50 1 S VP Y

Case Case Case Case Case Case Case Case Case Case

16.28 16.28 P Y 2.53 $940 $940 2 19,685 $10,895 1.15 $12,530 19,685 $10,895 $12,530 $100

Calc TPM Case Case Case Plug Calc TPM Case Case Calc Case TPM Case Calc TPM TPM

Feet $K/well ratio $K/well Feet $K/well $K/well $K/well

D-1

Global Economic Parameters Exploration Success Power Found Number of Confirmation wells Confirmation Success Injector/Producer Spare Prods Well stimulation Stimulation cost Wells Pumped Unpumped well flow rate GF Pump Efficiency Pump type Flow per LINESHAFT pump Inputted pump depth Lineshaft pump cost Flow per SUBMERSIBLE pump Additional drawdown for flow>1500 gpm Revised pump depth Submersible pump cost Injection pump dP Injection pump cost Drawdown Rate for Flow/Well: Input: Result A: Discounted No. of Makeup Wells Result B: Loss of discounted revenue Annual O&M non-labor (fraction of plant cost) Annual O&M non-labor (fraction of field cost) Number of O&M staff

Unit Ratio MW(e) Count Ratio Ratio Count Y- yes or N - no $K/well Y- yes or N - no lb/h L=lineshaft; S=submersible gpm/well ft $K gpm/well ft/100 gpm ft $K psi $/hp %/year number % % % #

Baseline 0.80 600 2 0.80 0.33 Y $750 Y 118,000 80% L 332 2,000 $300 395 2,000 $250 100 700 15.0 11.8 10.2% 1.5% 1.0% 16.3

Input Category TPM Case Case TPM Case Case Case TPM Case Case Case Case TPM Case Case Case Case Calc Plug Plug Plug TPM Calc Calc TPM Plug TPM

D-2

Appendix E: Consensus Expert Team Scoring Matrices
Risk Cases Considered Seven cases were evaluated for this risk analysis. The Geothermal Expert Team scored the TIO-TPM impacts for five separate cases: 1. 2. 3. 4. 5. Hydrothermal Binary 2010 Hydrothermal Flash 2010 EGS Binary 2010 EGS Flash 2010 EGS Binary Evolutionary 2040

Analysts also specifically sought to compare the projections of the Expert Team initiating this risk assessment protocol with the prior planning projections of the GTP. To do this, two additional cases were developed to evaluate the improvements projected by the GTP research teams in the 2005 MYPP: 6. Hydrothermal Binary 2010 MYPP 7. EGS Binary 2010 MYPP The following Excel printout lists the five sets of the Expert Team’s consensus scoring on expected research gains for geothermal technology. The scoring derived from the MYPP also is listed in the last two sets of printout sheets. The four GETEM reference cases displayed in Appendices A through D provided the baseline input data profiles for these seven risk cases. The baseline data in Appendices A through D are allocated to the risk cases by corresponding subject: e.g., Hydrothermal Binary, EGS Flash, etc.

E-1

Appendix E- Expert Team Consensus Estimates

TIO Categories

TIO 1- Increase accuracy of target temperature prediction

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 2- Improve fracture methods, proppants and rheology

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 3- Control of Surface Equipment Cost fracturing - new and Exploration Success improved borehole Confirmation Success packers

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 4- Develop numerical models that accurately predict fracture growth and permeability development

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

1.0% 1.0%

5.0% 2.0%

7.0% 4.0%

90% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case. 90% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case.

-9.0% 1.3%

0.0% 4.3%

12.5% 6.3%

Assumed that this EGS TIO impacts the HT case at 25% of the EGS case. 60% Might lead to more expensive fluids and proppants 60% Better diagnostic tools for evaluating candidates

-6.3% 2.5%

0.0% 4.4%

6.3% 8.8%

Assumed that this EGS TIO impacts the HT case at 25% of the EGS case. 10% Uncertain whether there would be a reduction of materials and equipment 25% More effective fracture placement

-20.0% 10.0% 4.0%

10.0% 25.0% 10.0%

30.0% 50.0% 15.0%

Assumed that this EGS TIO impacts the HT case at 100% of the EGS case. 10% HHP and Materials may Increase or Decrease 70% More effective fracture optimization 40%

E-2

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 5- Ability to Surface Equipment Cost create a subsurface Exploration Success circulation system Confirmation Success as designed

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-2.5% 1.3%

7.5% 7.3%

12.5% 18.8%

20% Assumed that this EGS TIO impacts the HT case at 25% of the EGS case. 20% Assumed that this EGS TIO impacts the HT case at 25% of the EGS case.

TIO 6- Develop numerical models that explain and extend reservoir performance

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.0%

10.0%

20.0%

30% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 7- Improve artificial lift technology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

20.0%

50.0%

75.0%

75%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 8- Improve short Surface Equipment Cost circuit mitigation Exploration Success Confirmation Success methods
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 1.0%

12.5% 12.5%

25.0% 25.0%

10% 10%

E-3

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 9- Perform systems analysis and integration

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Team notes that this is for technical systems analysis and not program systems analysis 10.0% 1.0% 1.0% 15.0% 5.0% 25.0% 20.0% 10.0% 75.0% 50% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case. 70% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case. 40% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case.

TIO 10- Remote sensing exploration methods (InSAR, hyperspectral imaging, GPS)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 1.0%

7.0% 5.0%

10.0% 8.0%

25% Group feels that the Power Found variable should be risked 12%

TIO 11- Geophysical Surface Equipment Cost exploration methods Exploration Success (seismic, Confirmation Success magnetotellurics)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

4.0% 7.0%

6.0% 10.0%

8.0% 14.0%

60% 60%

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 12- Geochemical Surface Equipment Cost exploration methods Exploration Success Confirmation Success (isotopes, gases)
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.0% 1.0%

15.0% 8.0%

20.0% 15.0%

50% Group feels that the Power Found variable should be risked 50%

E-4

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100

HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 13- National geothermal assessment and supply (EGS, hydrothermal)

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 14- Reduction of Injector Well Cost drilling time and Surface Equipment Cost expense, especially Exploration Success Confirmation Success in hard abrasive Stimulation Cost formations
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost TIO 15- Reduction Production Well Cost time and expense to Injector Well Cost line the wellbore Surface Equipment Cost (including using less Exploration Success Confirmation Success material and less Stimulation Cost costly material)
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

Really an enabling TIO that allows the other improvements to be made. Needs to be done to support or condemn the program. Industry has been pushing for this (thinking that it would be the program going out and actually drilling wells).

5.0% 5.0%

8.0% 8.0%

12.0% 12.0%

65% ROP improvements only. Budget too low. 65%

ROP improvements only. Budget too low.

2.0% 2.0%

6.0% 6.0%

11.0% 11.0%

Titanium could be used in the Salton Sea wells, and others, but not in all, so limiting impact to account from 50% limited resource base. 50%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 16- Reduction of Surface Equipment Cost non-essential flat Exploration Success Confirmation Success time
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.0% 2.0%

5.0% 5.0%

11.0% 11.0%

40% Experts would like to see more budget and effort geared towards this TIO 40% Experts would like to see more budget and effort geared towards this TIO

E-5

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

3.0% 3.0%

7.5% 7.5%

15.0% 15.0%

TIO 17- Development Injector Well Cost of basic information Surface Equipment Cost through analysis Exploration Success and simulation Confirmation Success efforts.

80% Electronics development will be important for advances under this TIO. Only one expert considered improvements to Production Well Flow rate, but other experts thought that is 80% being handled under the EGS/Exploration TIOs.

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 18- Completion and production related development projects
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.0% 2.0%

4.0% 4.0%

6.0% 6.0%

70% According to GETEM the best we can do is 1 well equivalent. Changes wellbore configuration. 70% According to GETEM the best we can do is 1 well equivalent. Changes wellbore configuration.

One expert thought this TIO might have a small impact on fields in terms of life cycle costs, with the exception of very corrosive or very hot fields. 1.0% 4.6% 3.0% 10.0% 4.0% 17.4% 90% 80% Experts used the average of their independent estimates to form the consensus estimate. Experts assumed the impact would be cost-neutral.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 19- Cycle Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 20- Component Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 3.3% 2.0%

3.0% 8.0% 5.0%

4.0% 12.5% 7.8%

80% 75% Experts strongly indicated that lower temperature resources need to be addressed in research. 75%

0.0%

5.0%

8.0%

50% Experts assumed the impact would be cost-neutral.

E-6

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments
0.0% 2.5% 0.3% 6.5% 0.5% 10.0% 30% 55%

TIO 21- Monitoring & Exploration Success Scaling

Surface Equipment Cost Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.8% 0.0% 6.0%

17.0% 2.0% 16.0%

40.0% 5.0% 25.0%

65% 50% 75% One expert felt that a 50% reduction could be done by the 2010 to 2015 timeframe.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 22Surface Equipment Cost Design/Construction Exploration Success Confirmation Success Related
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Experts assumed the impact would be cost-neutral. Experts assumed the impact would be cost-neutral. 0.5% -2.0% 1.7% -1.0% 2.7% -0.5% 75% 75%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 23Surface Equipment Cost Automation/Enhance Exploration Success Confirmation Success d Controls
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-5.0% 20.0%

0.0% 35.0%

5.0% 50.0%

65% 75% Cap value at 100% for Util Factor for combined impacts of TIO 19, 21, 22 and 23 (put if statements into model to limit improvements to 5% increase from 95% baseline). TIO 20 can add to that and go over 100%. Cap value at 25% improvement Cap value at 50% improvement Mulitplicative combination of % improvements as per Chip Mansure suggestion Mulitplicative combination of % improvements as per Chip Mansure suggestion Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 75% improvement Cap value at 75% improvement Cap value at 40% improvement Cap value at 50% improvement

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost Sum of TIOs
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

2.5% 10.4% 6.0% 13.3% 13.3% 0.0% 11.0% 10.0% -26.8% 35.8% 11.3% -2.3% 20.0%

10.0% 24.5% 20.0% 27.0% 27.0% 0.0% 33.0% 25.0% 45.0% 101.2% 52.3% 22.0% 35.0%

16.2% 39.9% 32.3% 44.3% 44.3% 0.0% 45.0% 41.0% 106.3% 175.0% 128.8% 53.0% 50.0%

65% 70% 75% 61% 61% 56% 53% 27% 52% 33% 60% 75%

E-7

Appendix E- Expert Team Consensus Estimates

TIO Categories

TIO 1- Increase accuracy of target temperature prediction

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 2- Improve fracture methods, proppants and rheology

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 3- Control of Surface Equipment Cost fracturing - new and Exploration Success improved borehole Confirmation Success packers

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 4- Develop numerical models that accurately predict fracture growth and permeability development

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3

HYDROTHERMAL FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

1.0% 1.0%

5.0% 2.0%

7.0% 4.0%

90% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case. 90% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case.

-8.8% 1.3%

0.0% 3.3%

12.5% 6.3%

Assumed that this EGS TIO impacts the HT case at 25% of the EGS case. 60% Might lead to more expensive fluids and proppants 60% Better diagnostic tools for evaluating candidates

-6.3% 2.5%

0.0% 4.4%

6.3% 8.8%

Assumed that this EGS TIO impacts the HT case at 25% of the EGS case. 10% Uncertain whether there would be a reduction of materials and equipment 25% More effective fracture placement

-20.0% 10.0% 4.0%

10.0% 25.0% 10.0%

30.0% 50.0% 15.0%

Assumed that this EGS TIO impacts the HT case at 100% of the EGS case. 10% HHP and Materials may Increase or Decrease 70% More effective fracture optimization 40%

E-8

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3

HYDROTHERMAL FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 5- Ability to Surface Equipment Cost create a subsurface Exploration Success circulation system Confirmation Success as designed

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-2.5% 1.3%

7.3% 7.3%

12.5% 18.8%

20% Assumed that this EGS TIO impacts the HT case at 25% of the EGS case. 20% Assumed that this EGS TIO impacts the HT case at 25% of the EGS case.

TIO 6- Develop numerical models that explain and extend reservoir performance

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.0%

10.0%

20.0%

30% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 7- Improve artificial lift technology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0%

50.0%

100.0%

10%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 8- Improve short Surface Equipment Cost circuit mitigation Exploration Success Confirmation Success methods
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 1.0%

12.5% 12.5%

25.0% 25.0%

10% 10%

E-9

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3

HYDROTHERMAL FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 9- Perform systems analysis and integration

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Team notes that this is for technical systems analysis and not program systems analysis 10.0% 1.0% 1.0% 15.0% 5.0% 25.0% 20.0% 10.0% 75.0% 50% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case. 70% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case. 40% Assumed that this EGS TIO impacts the HT case at 100% of the EGS case.

TIO 10- Remote sensing exploration methods (InSAR, hyperspectral imaging, GPS)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 1.0%

7.0% 5.0%

10.0% 8.0%

25% Group feels that the Power Found variable should be risked 12%

TIO 11- Geophysical Surface Equipment Cost exploration methods Exploration Success (seismic, Confirmation Success magnetotellurics)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

4.0% 7.0%

6.0% 10.0%

8.0% 14.0%

60% 60%

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 12- Geochemical Surface Equipment Cost exploration methods Exploration Success Confirmation Success (isotopes, gases)
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.0% 1.0%

15.0% 8.0%

20.0% 15.0%

50% Group feels that the Power Found variable should be risked 50%

E-10

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 9.40 995 1,910 1,910 100

HYDROTHERMAL FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 13- National geothermal assessment and supply (EGS, hydrothermal)

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 14- Reduction of Injector Well Cost drilling time and Surface Equipment Cost expense, especially Exploration Success Confirmation Success in hard abrasive Stimulation Cost formations
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 15- Reduction time and expense to Surface Equipment Cost line the wellbore Exploration Success (including using less Confirmation Success material and less Stimulation Cost costly material)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 16- Reduction of Surface Equipment Cost non-essential flat Exploration Success Confirmation Success time
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3

Really an enabling TIO that allows the other improvements to be made. Needs to be done to support or condemn the program. Industry has been pushing for this (thinking that it would be the program going out and actually drilling wells).

5.0% 5.0%

8.0% 8.0%

12.0% 12.0%

65% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case. 65% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case.

2.0% 2.0%

6.0% 6.0%

11.0% 11.0%

50% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case. 50% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case.

2.0% 2.0%

5.0% 5.0%

11.0% 11.0%

40% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case. 40% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case.

E-11

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3

HYDROTHERMAL FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 17- Development Injector Well Cost of basic information Surface Equipment Cost through analysis Exploration Success Confirmation Success and simulation Stimulation Cost efforts.
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

3.0% 3.0%

7.5% 7.5%

15.0% 15.0%

80% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case. 80% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 18- Completion and production related development projects
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.0% 2.0%

4.0% 4.0%

6.0% 6.0%

70% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case. 70% Experts assumed this TIO would impact the HT Flash case the same as the HT Binary case.

One expert thought this TIO might have a small impact on fields in terms of life cycle costs, with the exception of very corrosive or very hot fields. 1.0% 1.0% 3.0% 5.0% 4.0% 10.0% 90% 90%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 19- Cycle Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 20- Component Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 2.3%

3.0% 6.7%

5.0% 10.0%

80% 70% include comments on lower temp resources needing to be addressed

E-12

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3 90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3

HYDROTHERMAL FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments
0.3% 3.3% 6.7% 60%

TIO 21- Monitoring & Exploration Success Scaling

Surface Equipment Cost Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.8%

16.3%

26.8%

70%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 22Surface Equipment Cost Design/Construction Exploration Success Confirmation Success Related
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

8.3%

18.3%

25.0%

80%

5.0%

10.0%

15.0%

80%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 23Exploration Success Automation/Enhance Confirmation Success d Controls
Surface Equipment Cost

1.3%

2.5%

4.0%

50%

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.5% 20.0%

10.0% 40.0%

15.0% 50.0%

80% Ambiguity in the methodology, in that no attempt to optimize the program funding. Greg Mines initially said 80% 10% prob of success b/c no funding is currently on this area Cap value at 100% for Util Factor for combined impacts of TIO 19, 21, 22 and 23 (put if statements into model to limit improvements to 5% increase from 95% baseline). TIO 20 can add to that and go over 100%. Cap value at 25% improvement Cap value at 50% improvement Mulitplicative combination of % improvements as per Chip Mansure suggestion Mulitplicative combination of % improvements as per Chip Mansure suggestion Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 75% improvement Cap value at 75% improvement Cap value at 40% improvement Cap value at 50% improvement

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost Sum of TIOs
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

90% 9.40 995 1,910 1,910 100 0.20 0.60 300 900 2.00% 1.5% 16.3

2.0% 4.9% 8.3% 13.3% 13.3% 0.0% 11.0% 10.0% -26.5% 16.8% 11.3% 13.3% 20.0%

6.0% 17.5% 18.3% 27.0% 27.0% 0.0% 33.0% 25.0% 44.8% 100.2% 52.3% 36.3% 40.0%

9.0% 30.7% 25.0% 44.3% 44.3% 0.0% 45.0% 41.0% 106.3% 200.0% 128.8% 56.8% 50.0%

85% 68% 80% 61% 61% 56% 53% 27% 41% 33% 77% 80%

E-13

Appendix E- Expert Team Consensus Estimates

TIO Categories

TIO 1- Increase accuracy of target temperature prediction

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 2- Improve fracture methods, proppants and rheology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

1.0% 1.0%

5.0% 2.0%

7.0% 4.0%

90.0% Experts were assuming some indication of temp (spring or alteration) 90.0% Group feels that the Power Found variable should be risked

-35.0% 5.0%

0.0% 13.0%

50.0% 25.0%

Driven by petroleum industry. % improvement likely to be very small in 2010 time frame. Might lead to more 60.0% expensive fluids and proppants. Driven by petroleum industry. % improvement likely to be very small in 2010 time frame. Better diagnostic 60.0% tools for evaluating candidates. Technology Transfer task for petroleum to geothermal techs.

TIO 3- Control of Surface Equipment Cost fracturing - new and Exploration Success improved borehole Confirmation Success packers

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-25.0% 10.0%

0.0% 17.5%

25.0% 35.0%

No field work currently going on for this. 10.0% Uncertain whether there would be a reduction of materials and equipment 25.0% More effective fracture placement

TIO 4- Develop numerical models that accurately predict fracture growth and permeability development

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-20.0% 10.0% 4.0%

10.0% 25.0% 10.0%

30.0% 50.0% 15.0%

10.0% HHP and Materials may Increase or Decrease 70.0% More effective fracture optimization 40.0% Haven't been able to do the testing to see if models match reality

E-14

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 5- Ability to Surface Equipment Cost create a subsurface Exploration Success circulation system Confirmation Success as designed

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-10.0% 5.0%

30.0% 30.0%

50.0% 75.0%

20.0% Low prob of success because of no budget for testing 20.0% Low prob of success because of no budget for testing

TIO 6- Develop numerical models that explain and extend reservoir performance

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.0%

10.0%

20.0%

30.0% Low prob of success because of no budget for long term testing of at least 1-2 field projects

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 7- Improve artificial lift technology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0%

50.0%

200.0%

15.0% Low prob of success because of no budget for testing Team thinks this TIO will have an impact on non-labor O&M, but don't know how much

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 8- Improve short Surface Equipment Cost circuit mitigation Exploration Success Confirmation Success methods
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 1.0%

25.0% 50.0%

50.0% 100.0%

10.0% Enabling TIO that will allow other TIOs to improve technology. 10.0% Low prob of success because of no budget for testing

E-15

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 9- Perform systems analysis and integration

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Team notes that this is for technical systems analysis and not program systems analysis 10.0% 1.0% 1.0% 15.0% 5.0% 25.0% 20.0% 10.0% 75.0% 50.0% 70.0% 40.0% Low prob of success because of no budget for testing

TIO 10- Remote sensing exploration methods (InSAR, hyperspectral imaging, GPS)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 1.0%

7.0% 5.0%

10.0% 8.0%

25% Group feels that the Power Found variable should be risked 12%

TIO 11- Geophysical Surface Equipment Cost exploration methods Exploration Success (seismic, Confirmation Success magnetotellurics)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

4.0% 7.0%

6.0% 10.0%

8.0% 14.0%

60% 60%

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 12- Geochemical Surface Equipment Cost exploration methods Exploration Success Confirmation Success (isotopes, gases)
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.0% 1.0%

15.0% 8.0%

20.0% 15.0%

50% Group feels that the Power Found variable should be risked 50%

E-16

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100

EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 13- National geothermal assessment and supply (EGS, hydrothermal)

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 14- Reduction of Injector Well Cost drilling time and Surface Equipment Cost expense, especially Exploration Success Confirmation Success in hard abrasive Stimulation Cost formations
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 15- Reduction time and expense to Surface Equipment Cost line the wellbore Exploration Success (including using less Confirmation Success material and less Stimulation Cost costly material)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 16- Reduction of Surface Equipment Cost non-essential flat Exploration Success Confirmation Success time
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

Really an enabling TIO that allows the other improvements to be made. Needs to be done to support or condemn the program. Industry has been pushing for this (thinking that it would be the program going out and actually drilling wells).

5.0% 5.0%

12.0% 12.0%

20.0% 20.0%

65% 65%

4.0% 4.0%

10.0% 10.0%

15.0% 15.0%

50% 50%

2.0% 2.0%

4.0% 4.0%

10.0% 10.0%

50% 50%

E-17

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 17- Development Injector Well Cost of basic information Surface Equipment Cost through analysis Exploration Success Confirmation Success and simulation Stimulation Cost efforts.
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

4.0% 4.0%

8.0% 8.0%

12.0% 12.0%

75% 75.0% More interested in rock mechanics in EGS case then in rock formation

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 18- Completion and production related development projects
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.5% 2.5%

4.0% 4.0%

7.0% 7.0%

60% 60%

One expert thought this TIO might have a small impact on fields in terms of life cycle costs, with the exception of very corrosive or very hot fields. Some experts were concerned that a 200C resource is too high for binary technology, and that it might be better for flashed-steam technology, but another expert said that 200C is needed because super-high 90% pressure must be maintained. 90% There are opportunities to optimize plant configuration that would improve brine effectiveness. 30%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 19- Cycle Related

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 20- Component Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

1.0% 10.0% -10.0%

3.0% 25.0% 10.0%

4.0% 40.0% 30.0%

1.0% 3.3% 2.0%

3.0% 8.0% 5.0%

4.0% 12.5% 8.0%

80% 75% 75%

0.0%

5.0%

8.0%

50%

E-18

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments
0.0% 2.5% 0.3% 6.5% 0.5% 10.0% 30% 55%

TIO 21- Monitoring & Exploration Success Scaling

Surface Equipment Cost Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.8% 0.0% 6.0%

17.0% 2.0% 16.0%

40.0% 5.0% 25.0%

65% 50% 75%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 22Surface Equipment Cost Design/Construction Exploration Success Confirmation Success Related
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 23Surface Equipment Cost Automation/Enhance Exploration Success Confirmation Success d Controls
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

0.5% -2.0%

1.7% -1.0%

2.7% -0.5%

75% 75%

-5.0% 20.0%

0.0% 35.0%

5.0% 50.0%

65% 75% Cap value at 100% for Util Factor for combined impacts of TIO 19, 21, 22 and 23 (put if statements into model to limit improvements to 5% increase from 95% baseline). TIO 20 can add to that and go over 100%. Cap value at 25% improvement Cap value at 50% improvement Mulitplicative combination of % improvements as per Chip Mansure suggestion Mulitplicative combination of % improvements as per Chip Mansure suggestion Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 75% improvement Cap value at 75% improvement Cap value at 40% improvement Cap value at 50% improvement

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost Sum of TIOs
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

2.5% 15.8% -4.0% 16.3% 16.3% 0.0% 11.0% 10.0% -79.0% 28.0% 15.0% -2.3% 20.0%

10.0% 39.5% 30.0% 32.8% 32.8% 0.0% 33.0% 25.0% 80.0% 160.5% 75.0% 22.0% 35.0%

16.2% 62.5% 62.5% 49.9% 49.9% 0.0% 45.0% 41.0% 225.0% 420.0% 185.0% 53.0% 50.0%

65% 73% 64% 60% 60% 56% 53% 27% 42% 33% 60% 75%

E-19

Appendix E- Expert Team Consensus Estimates

TIO Categories

TIO 1- Increase accuracy of target temperature prediction

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 2- Improve fracture methods, proppants and rheology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3

EGS FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

1.0% 1.0%

5.0% 2.0%

7.0% 4.0%

90% Assumed that this EGS TIO impacts the EGS Flash case at 100% of the EGS Binary case. 90% Assumed that this EGS TIO impacts the EGS Flash case at 100% of the EGS Binary case.

-8.8% 1.3%

0.0% 3.3%

12.5% 6.3%

Assumed that this EGS TIO impacts the EGS Flash case at 25% of the EGS Binary case. Driven by petroleum industry. % improvement likely to be very small in 2010 time frame. Might lead to more 60% expensive fluids and proppants. Driven by petroleum industry. % improvement likely to be very small in 2010 time frame. Better diagnostic 60% tools for evaluating candidates.

TIO 3- Control of Surface Equipment Cost fracturing - new and Exploration Success improved borehole Confirmation Success packers

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-6.3% 2.5%

0.0% 4.4%

6.3% 8.8%

Assumed that this EGS TIO impacts the EGS Flash case at 25% of the EGS Binary case. 10% Uncertain whether there would be a reduction of materials and equipment 25% More effective fracture placement

TIO 4- Develop numerical models that accurately predict fracture growth and permeability development

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-20.0% 10.0% 4.0%

10.0% 25.0% 10.0%

30.0% 50.0% 15.0%

Assumed that this EGS TIO impacts the EGS Flash case at 100% of the EGS Binary case. 10% HHP and Materials may Increase or Decrease 70% More effective fracture optimization 40% Haven't been able to do the testing to see if models match reality

E-20

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3

EGS FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 5- Ability to Surface Equipment Cost create a subsurface Exploration Success circulation system Confirmation Success as designed

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-2.5% 1.3%

7.3% 7.3%

12.5% 18.8%

20% Assumed that this EGS TIO impacts the EGS Flash case at 25% of the EGS Binary case. 20% Assumed that this EGS TIO impacts the EGS Flash case at 25% of the EGS Binary case.

TIO 6- Develop numerical models that explain and extend reservoir performance

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.0%

10.0%

20.0%

30% Assumed that this EGS TIO impacts the EGS Flash case at 100% of the EGS Binary case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 7- Improve artificial lift technology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0%

50.0%

100.0%

5%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 8- Improve short Surface Equipment Cost circuit mitigation Exploration Success Confirmation Success methods
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 1.0%

12.5% 12.5%

25.0% 25.0%

10% 10% Assumed that this EGS TIO impacts the EGS Flash case at 25% of the EGS Binary case.

E-21

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3

EGS FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 9- Perform systems analysis and integration

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

10.0% 1.0% 1.0%

15.0% 5.0% 25.0%

20.0% 10.0% 75.0%

50% Team notes that this is for technical systems analysis and not program systems analysis 70% 40%

TIO 10- Remote sensing exploration methods (InSAR, hyperspectral imaging, GPS)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 1.0%

7.0% 5.0%

10.0% 8.0%

25% Group feels that the Power Found variable should be risked 12%

TIO 11- Geophysical Surface Equipment Cost exploration methods Exploration Success (seismic, Confirmation Success magnetotellurics)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

4.0% 7.0%

6.0% 10.0%

8.0% 14.0%

60% 60%

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 12- Geochemical Surface Equipment Cost exploration methods Exploration Success Confirmation Success (isotopes, gases)
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.0% 1.0%

15.0% 8.0%

20.0% 15.0%

50% Group feels that the Power Found variable should be risked 50%

E-22

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW

Baseline in 2005
90% 16.28 940 12,530 12,530 100

EGS FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 13- National geothermal assessment and supply (EGS, hydrothermal)

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 14- Reduction of Injector Well Cost drilling time and Surface Equipment Cost expense, especially Exploration Success Confirmation Success in hard abrasive Stimulation Cost formations
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost TIO 15- Reduction Production Well Cost time and expense to Injector Well Cost line the wellbore Surface Equipment Cost (including using less Exploration Success material and less Confirmation Success costly material)

0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940

Really an enabling TIO that allows the other improvements to be made. Needs to be done to support or condemn the program. Industry has been pushing for this (thinking that it would be the program going out and actually drilling wells).

5.0% 5.0%

12.0% 12.0%

20.0% 20.0%

65% Experts assumed this TIO would impact the EGS Flash case the same as the EGS Binary case. 65% Experts assumed this TIO would impact the EGS Flash case the same as the EGS Binary case.

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 16- Reduction of Surface Equipment Cost non-essential flat Exploration Success Confirmation Success time
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

$K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3

6.0% 6.0%

13.0% 13.0%

18.0% 18.0%

One expert thought that "robust hard rock under-reamer for use with expandable tubular casing, casing drilling, minimum clearance casing design" is not a long range process to develop and it is in the MYPP, but it 50% is not currently being funded. 50% Experts assumed this TIO would impact the EGS Flash case the same as the EGS Binary case.

2.0% 2.0%

4.0% 4.0%

10.0% 10.0%

50% Experts assumed this TIO would impact the EGS Flash case the same as the EGS Binary case. 50% Experts assumed this TIO would impact the EGS Flash case the same as the EGS Binary case.

E-23

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3

EGS FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 17- Development Injector Well Cost of basic information Surface Equipment Cost through analysis Exploration Success Confirmation Success and simulation Stimulation Cost efforts.
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

4.0% 4.0%

8.0% 8.0%

12.0% 12.0%

75% Experts assumed this TIO would impact the EGS Flash case the same as the EGS Binary case. 75% Experts assumed this TIO would impact the EGS Flash case the same as the EGS Binary case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 18- Completion and production related development projects
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.0% 2.0%

3.5% 3.5%

6.0% 6.0%

60% 60%

One expert thought this TIO might have a small impact on fields in terms of life cycle costs, with the exception of very corrosive or very hot fields. 1.0% 1.0% 3.0% 5.0% 4.0% 10.0% 90% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case. 90% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 19- Cycle Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 20- Component Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 2.3%

3.0% 6.7%

5.0% 10.0%

80% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case. 70% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case.

E-24

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3 90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3

EGS FLASH 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments
0.3% 3.3% 6.7% 60% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case.

TIO 21- Monitoring & Exploration Success Scaling

Surface Equipment Cost Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

3.0%

16.3%

26.8%

70% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 22Surface Equipment Cost Design/Construction Exploration Success Confirmation Success Related
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

8.3%

18.3%

25.0%

80% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case.

5.0%

10.0%

15.0%

80% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 23Surface Equipment Cost Automation/Enhance Exploration Success Confirmation Success d Controls
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.3%

2.5%

4.0%

50% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case.

5.5% 20.0%

10.0% 40.0%

15.0% 50.0%

80% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case. 80% Experts assumed the same improvements and probabilities as the hydrothermal flash 2010 case. Cap value at 100% for Util Factor for combined impacts of TIO 19, 21, 22 and 23 (put if statements into model to limit improvements to 5% increase from 95% baseline). TIO 20 can add to that and go over 100%. Cap value at 25% improvement Cap value at 50% improvement Mulitplicative combination of % improvements as per Chip Mansure suggestion Mulitplicative combination of % improvements as per Chip Mansure suggestion Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 75% improvement Cap value at 75% improvement Cap value at 40% improvement Cap value at 50% improvement

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost Sum of TIOs
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

90% 16.28 940 12,530 12,530 100 0.80 0.80 750 332 15.0% 1.5% 16.3

2.0% 4.9% 8.3% 17.7% 17.7% 0.0% 11.0% 10.0% -26.5% 16.8% 11.3% 13.5% 20.0%

6.0% 17.5% 18.3% 34.7% 34.7% 0.0% 33.0% 25.0% 44.8% 100.2% 52.3% 36.3% 40.0%

9.0% 30.7% 25.0% 51.2% 51.2% 0.0% 45.0% 41.0% 106.3% 200.0% 128.8% 56.8% 50.0%

85% 68% 80% 60% 60% 56% 53% 27% 40% 33% 77% 80%

E-25

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 1- Increase accuracy of target temperature prediction

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

Evolutionary EGS Binary 2040 4000m at 200C- SYSTEM SCORING SHEET TIO Improvements in 2040 in % Prob. of Minimum % Expected % Maximum % Success % Comments

2.0% 2.0%

10.0% 4.0%

14.0% 8.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 90% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 90% be atleast 60%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 2- Improve fracture methods, proppants and rheology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-17.5% 10.0%

0.0% 25.0%

75.0% 50.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 3- Control of Exploration Success fracturing - new and Confirmation Success improved borehole Stimulation Cost packers
Surface Equipment Cost

-12.5% 20.0%

0.0% 35.0%

50.0% 70.0%

Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

TIO 4- Develop numerical models that accurately predict fracture growth and permeability development

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

-10.0% 20.0% 8.0%

20.0% 50.0% 20.0%

60.0% 100.0% 30.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 70% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

E-26

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

Evolutionary EGS Binary 2040 4000m at 200C- SYSTEM SCORING SHEET TIO Improvements in 2040 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 5- Ability to Exploration Success create a subsurface Confirmation Success circulation system Stimulation Cost as designed

Surface Equipment Cost

-5.0%

60.0%

75.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

10.0%

60.0%

75.0%

TIO 6- Develop numerical models that explain and extend reservoir performance

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

10.0%

20.0%

40.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 7- Improve artificial lift technology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.0%

100.0%

400.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost

TIO 8- Improve short Exploration Success circuit mitigation Confirmation Success methods
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.0% 2.0%

50.0% 100.0%

75.0% 200.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

E-27

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

Evolutionary EGS Binary 2040 4000m at 200C- SYSTEM SCORING SHEET TIO Improvements in 2040 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 9- Perform systems analysis and integration

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

20.0% 2.0% 2.0%

30.0% 10.0% 50.0%

40.0% 20.0% 75.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 70% be atleast 60% 60%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 10- Remote Surface Equipment Cost sensing exploration Exploration Success methods (InSAR, hyperspectral Confirmation Success imaging, GPS)
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.0% 2.0%

14.0% 10.0%

20.0% 16.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 11- Geophysical exploration methods Exploration Success (seismic, Confirmation Success magnetotellurics)
Surface Equipment Cost

8.0% 14.0%

12.0% 20.0%

16.0% 28.0%

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost

TIO 12- Geochemical Exploration Success exploration methods (isotopes, gases)

10.0% 2.0%

30.0% 16.0%

60.0% 30.0%

Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60% Experts assumed double improvement ranges from EGS Binary 2010 Case, and Probability of Success would 60% be atleast 60%

E-28

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100

Evolutionary EGS Binary 2040 4000m at 200C- SYSTEM SCORING SHEET TIO Improvements in 2040 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 13- National geothermal assessment and supply (EGS, hydrothermal)

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 14- Reduction of drilling time and expense, especially in hard abrasive formations Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 5.0% 5.0% 15.0% 15.0% 20.0% 20.0%

Really an enabling TIO that allows the other improvements to be made. Needs to be done to support or condemn the program. Industry has been pushing for this (thinking that it would be the program going out and actually drilling wells).

Experts assumed for this TIO there would be a greater chance of success and higher range of improvements 80% for the 2040 timeframe relative to EGS Binary 2010 case. Experts assumed for this TIO there would be a greater chance of success and higher range of improvements 80% for the 2040 timeframe relative to EGS Binary 2010 case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 15- Reduction time and expense to Injector Well Cost line the wellbore Surface Equipment Cost (including using less Exploration Success material and less Confirmation Success costly material)

4.0% 4.0%

15.0% 15.0%

20.0% 20.0%

Experts assumed for this TIO there would be a greater chance of success and higher range of improvements 75% for the 2040 timeframe relative to EGS Binary 2010 case. Experts assumed for this TIO there would be a greater chance of success and higher range of improvements 75% for the 2040 timeframe relative to EGS Binary 2010 case.

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 16- Reduction of Injector Well Cost non-essential flat Surface Equipment Cost Exploration Success time
Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.0% 2.0%

4.0% 4.0%

10.0% 10.0%

Experts assumed for this TIO there would be the same chance of success and range of improvements for the 50% 2040 timeframe relative to EGS Binary 2010 case. Experts assumed for this TIO there would be the same chance of success and range of improvements for the 50% 2040 timeframe relative to EGS Binary 2010 case.

E-29

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

Evolutionary EGS Binary 2040 4000m at 200C- SYSTEM SCORING SHEET TIO Improvements in 2040 in % Prob. of Minimum % Expected % Maximum % Success % Comments

Production Well Cost TIO 17- Development of basic information Injector Well Cost through analysis Surface Equipment Cost Exploration Success and simulation Confirmation Success efforts.
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

4.0% 4.0%

12.0% 12.0%

15.0% 15.0%

Experts assumed for this TIO there would be the same chance of success, but a higher range of 75% improvements for the 2040 timeframe relative to EGS Binary 2010 case. Experts assumed for this TIO there would be the same chance of success, but a higher range of 75% improvements for the 2040 timeframe relative to EGS Binary 2010 case.

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 18- Completion Injector Well Cost and production Surface Equipment Cost related development Exploration Success projects

2.5% 2.5%

4.0% 4.0%

7.0% 7.0%

Experts assumed for this TIO there would be a greater chance of success, but the same range of 70% improvements for the 2040 timeframe relative to EGS Binary 2010 case. Experts assumed for this TIO there would be a greater chance of success, but the same range of 70% improvements for the 2040 timeframe relative to EGS Binary 2010 case.

Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 10.0% -10.0%

3.0% 25.0% 10.0%

4.0% 40.0% 30.0%

Experts assumed the same improvements and probabilities as the EGS Binary 2010 case, unless otherwise 90% noted. 90% Can always add thermal efficiency at increased cost - but usually not economic Experts suggested the need to focus on lower cost and better economics rather than efficiency gains. Also, 30% plant cost baseline may be too high.

TIO 19- Cycle Related

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 20- Component Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.0% 3.3% 2.0%

3.0% 8.0% 5.0%

4.0% 12.5% 7.8%

80% 75% 75%

0.0%

5.0%

8.0%

50%

E-30

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

Evolutionary EGS Binary 2040 4000m at 200C- SYSTEM SCORING SHEET TIO Improvements in 2040 in % Prob. of Minimum % Expected % Maximum % Success % Comments
0.0% 2.5% 0.3% 6.5% 0.5% 10.0% 30% 55%

TIO 21- Monitoring & Exploration Success Scaling

Surface Equipment Cost Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

2.8% 0.0% 6.0%

17.0% 2.0% 16.0%

40.0% 5.0% 25.0%

65% 50% 75%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 22Surface Equipment Cost Design/Construction Exploration Success Confirmation Success Related
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 23Surface Equipment Cost Automation/Enhance Exploration Success Confirmation Success d Controls
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

0.5% -2.0%

1.7% -1.0%

2.7% -0.5%

75% 75%

-5.0% 20.0%

0.0% 35.0%

5.0% 50.0%

65% 75% Cap value at 100% for Util Factor for combined impacts of TIO 19, 21, 22 and 23 (put if statements into model to limit improvements to 5% increase from 95% baseline). TIO 20 can add to that and go over 100%. Cap value at 25% improvement Cap value at 50% improvement Mulitplicative combination of % improvements as per Chip Mansure suggestion Mulitplicative combination of % improvements as per Chip Mansure suggestion Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 75% improvement Cap value at 75% improvement Cap value at 40% improvement Cap value at 50% improvement

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost Sum of TIOs
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

2.5% 15.8% -4.0% 16.3% 16.3% 0.0% 22.0% 20.0% -23.0% 56.0% 30.0% -2.3% 20.0%

10.0% 39.5% 30.0% 41.4% 41.4% 0.0% 66.0% 50.0% 160.0% 320.0% 150.0% 22.0% 35.0%

16.2% 62.5% 62.3% 54.5% 54.5% 0.0% 110.0% 82.0% 375.0% 840.0% 220.0% 53.0% 50.0%

65% 73% 64% 70% 70% 68% 68% 60% 63% 60% 60% 75%

E-31

Appendix E- Expert Team Consensus Estimates

TIO Categories

TIO 1- Increase accuracy of target temperature prediction

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 2- Improve fracture methods, proppants and rheology

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 3- Control of Surface Equipment Cost fracturing - new and Exploration Success improved borehole Confirmation Success packers

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 4- Develop numerical models that accurately predict fracture growth and permeability development

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

MYPP HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

6.0% 6.0%

8.0% 8.0%

10.0% 10.0%

65% 65%

9.8%

13.0%

16.3%

85%

3.8%

5.0%

6.3%

85%

3.6%

4.8%

6.0%

85%

E-32

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

MYPP HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 5- Ability to Surface Equipment Cost create a subsurface Exploration Success circulation system Confirmation Success as designed

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

6.8%

9.1%

11.4%

85%

TIO 6- Develop numerical models that explain and extend reservoir performance

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

4.2%

5.7%

7.1%

85%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 7- Improve artificial lift technology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

7.5%

10.0%

12.5%

85%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 8- Improve short Surface Equipment Cost circuit mitigation Exploration Success Confirmation Success methods
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

6.8%

9.1%

11.4%

85%

E-33

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

MYPP HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 9- Perform systems analysis and integration

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

3.0%

4.0%

5.0%

85%

TIO 10- Remote sensing exploration methods (InSAR, hyperspectral imaging, GPS)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.5% 1.5%

2.0% 2.0%

2.5% 2.5%

65% 65%

TIO 11- Geophysical Surface Equipment Cost exploration methods Exploration Success (seismic, Confirmation Success magnetotellurics)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

12.0% 11.9%

16.0% 15.8%

20.0% 19.8%

65% 65%

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 12- Geochemical Surface Equipment Cost exploration methods Exploration Success Confirmation Success (isotopes, gases)
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.5% 1.5%

2.0% 2.0%

2.5% 2.5%

65% 65%

E-34

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

MYPP HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 13- National geothermal assessment and supply (EGS, hydrothermal)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 14- Reduction of Injector Well Cost drilling time and Surface Equipment Cost expense, especially Exploration Success Confirmation Success in hard abrasive Stimulation Cost formations
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

6.2% 6.2%

15.4% 15.4%

75% 75%

TIO 15- Reduction time and expense to Surface Equipment Cost line the wellbore Exploration Success (including using less Confirmation Success material and less Stimulation Cost costly material)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

1.0% 1.0%

4.4% 4.4%

75% 75%

Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 16- Reduction of Surface Equipment Cost non-essential flat Exploration Success Confirmation Success time
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

5.2% 5.2%

11.0% 11.0%

75% 75%

E-35

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

MYPP HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 17- Development Injector Well Cost of basic information Surface Equipment Cost through analysis Exploration Success Confirmation Success and simulation Stimulation Cost efforts.
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 18- Completion Surface Equipment Cost and production Exploration Success related development Confirmation Success projects

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 19- Cycle Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

10.1%

13.5%

16.9%

100%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 20- Component Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

4.9%

6.5%

13.1%

100%

E-36

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6 95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

MYPP HYDROTHERMAL BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 21- Monitoring & Exploration Success Scaling

Surface Equipment Cost Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

46.4%

58.0%

72.5%

100%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 22Surface Equipment Cost Design/Construction Exploration Success Confirmation Success Related
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

15.0%

18.0%

22.6%

100%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 23Surface Equipment Cost Automation/Enhance Exploration Success Confirmation Success d Controls
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

40.0%

50.0%

62.5%

100% Cap value at 100% for Util Factor for combined impacts of TIO 19, 21, 22 and 23 (put if statements into model to limit improvements to 5% increase from 95% baseline). TIO 20 can add to that and go over 100%. Cap value at 25% improvement Cap value at 50% improvement Mulitplicative combination of % improvements as per Chip Mansure suggestion Mulitplicative combination of % improvements as per Chip Mansure suggestion

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost Sum of TIOs
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

95% 4.63 2,445 1,222 1,222 100 0.20 0.60 500 2,000 0.30% 1.5% 14.6

0.0% 15.0% 15.0% 12.0% 12.0% 0.0% 21.0% 20.9% 0.0% 24.0% 21.5% 46.4% 40.0%

0.0% 20.0% 18.0% 0.0% 0.0% 0.0% 28.0% 27.8% 0.0% 32.0% 28.6% 58.0% 50.0%

0.0% 30.0% 22.6% 28.0% 28.0% 0.0% 35.0% 34.8% 0.0% 40.0% 35.8% 72.5% 62.5%

100% 100% 75% 75%

65% Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. 65% Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 75% improvement 85% 85% Cap value at 75% improvement 100% Cap value at 40% improvement 100% Cap value at 50% improvement

E-37

Appendix E- Expert Team Consensus Estimates

TIO Categories

TIO 1- Increase accuracy of target temperature prediction

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 2- Improve fracture methods, proppants and rheology

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 3- Control of Surface Equipment Cost fracturing - new and Exploration Success improved borehole Confirmation Success packers

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 4- Develop numerical models that accurately predict fracture growth and permeability development

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

MYPP EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

6.0% 6.0%

8.0% 8.0%

10.0% 10.0%

85% 85%

9.8%

13.0%

16.3%

85%

3.8%

5.0%

6.3%

85%

3.6%

4.8%

6.0%

85%

E-38

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

MYPP EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 5- Ability to Surface Equipment Cost create a subsurface Exploration Success circulation system Confirmation Success as designed

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

6.8%

9.1%

11.4%

85%

TIO 6- Develop numerical models that explain and extend reservoir performance

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

4.2%

5.7%

7.1%

85%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 7- Improve artificial lift technology
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

7.5%

10.0%

12.5%

85%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 8- Improve short Surface Equipment Cost circuit mitigation Exploration Success Confirmation Success methods
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

6.8%

9.1%

11.4%

85%

E-39

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

MYPP EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 9- Perform systems analysis and integration

Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

3.0%

4.0%

5.0%

85%

TIO 10- Remote sensing exploration methods (InSAR, hyperspectral imaging, GPS)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.5% 1.5%

2.0% 2.0%

2.5% 2.5%

65% 65%

TIO 11- Geophysical Surface Equipment Cost exploration methods Exploration Success (seismic, Confirmation Success magnetotellurics)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

12.0% 11.9%

16.0% 15.8%

20.0% 19.8%

65% 65%

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 12- Geochemical Surface Equipment Cost exploration methods Exploration Success Confirmation Success (isotopes, gases)
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

1.5% 1.5%

2.0% 2.0%

2.5% 2.5%

65% 65%

E-40

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

MYPP EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 13- National geothermal assessment and supply (EGS, hydrothermal)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 14- Reduction of Injector Well Cost drilling time and Surface Equipment Cost expense, especially Exploration Success Confirmation Success in hard abrasive Stimulation Cost formations
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

8.2% 8.2%

15.4% 15.4%

75% 75%

TIO 15- Reduction time and expense to Surface Equipment Cost line the wellbore Exploration Success (including using less Confirmation Success material and less Stimulation Cost costly material)

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

1.0% 1.0%

8.8% 8.8%

75% 75%

Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 16- Reduction of Surface Equipment Cost non-essential flat Exploration Success Confirmation Success time
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

3.1% 3.1%

6.6% 6.6%

75% 75%

E-41

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

MYPP EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost TIO 17- Development Injector Well Cost of basic information Surface Equipment Cost through analysis Exploration Success Confirmation Success and simulation Stimulation Cost efforts.
Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

TIO 18- Completion Surface Equipment Cost and production Exploration Success related development Confirmation Success projects

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 19- Cycle Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

10.1%

13.5%

16.9%

100%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 20- Component Related
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

4.9%

6.5%

13.1%

100%

E-42

Appendix E- Expert Team Consensus Estimates

TIO Categories

GETEM INPUTS/TPMs Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost

Units % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % # % W-h/lb $/kW $K/well $K/well $K/well Ratio Ratio $K/well gpm/well %/year % #

Baseline in 2005
95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6 95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

MYPP EGS BINARY 2010- SYSTEM SCORING SHEET TIO Improvements in 2010 in % Prob. of Minimum % Expected % Maximum % Success % Comments

TIO 21- Monitoring & Exploration Success Scaling

Surface Equipment Cost Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

46.4%

58.0%

72.5%

100%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 22Surface Equipment Cost Design/Construction Exploration Success Confirmation Success Related
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

15.0%

18.0%

22.6%

100%

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost TIO 23Surface Equipment Cost Automation/Enhance Exploration Success Confirmation Success d Controls
Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

40.0%

50.0%

62.5%

100% Cap value at 100% for Util Factor for combined impacts of TIO 19, 21, 22 and 23 (put if statements into model to limit improvements to 5% increase from 95% baseline). TIO 20 can add to that and go over 100%. Cap value at 25% improvement Cap value at 50% improvement Mulitplicative combination of % improvements as per Chip Mansure suggestion Mulitplicative combination of % improvements as per Chip Mansure suggestion

Utilization Factor Brine Effectiveness Plant Cost Production Well Cost Injector Well Cost Sum of TIOs
Surface Equipment Cost Exploration Success Confirmation Success Stimulation Cost Production Well Flow Rate Temperature Drawdown Rate Annual O&M non-labor Number of O&M staff

95% 10.86 2,140 4,918 4,918 100 0.80 0.80 750 332 3.00% 1.5% 14.6

0.0% 15.0% 15.0% 12.0% 12.0% 0.0% 21.0% 20.9% 0.0% 24.0% 21.5% 46.4% 40.0%

0.0% 20.0% 18.0% 0.0% 0.0% 0.0% 28.0% 27.8% 0.0% 32.0% 28.6% 58.0% 50.0%

0.0% 30.0% 22.6% 28.0% 28.0% 0.0% 35.0% 34.8% 0.0% 40.0% 35.8% 72.5% 62.5%

100% 100% 75% 75%

70% Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. 70% Cap value at 95%, if it goes over limit, prorate new amount back to each TIO. Cap value at 75% improvement 85% 85% Cap value at 75% improvement 100% Cap value at 40% improvement 100% Cap value at 50% improvement

E-43

Appendix F: Cumulative Probability Distribution Functions of LCOE by Case

Distribution for Imp Bin- Total COE/L64
1.000
Mean=4.732055

0.800 0.600 0.400 0.200 0.000

3.5
5%

4.5 4.1781
90%

5.5 5.4059
5%

6.5

Figure F1. Hydrothermal Binary 2010 Experts Case LCOE (¢/kWh)

Distribution for Imp FL- Total COE/L71
1.000
Mean=3.426597

0.800 0.600 0.400 0.200 0.000

2.8
5%

3.15 3.1327

3.5
90%

3.85 3.7698
5%

4.2

Figure F2. Hydrothermal Flash 2010 Experts Case LCOE (¢/kWh)

F-1

Distribution for Imp Bin- Total COE/L64
1.000
Mean=11.53538

0.800 0.600 0.400 0.200 0.000

4
5%

8 7.97

12
90%

16 15.3293
5%

20

Figure F3. EGS Binary 2010 Experts Case LCOE (¢/kWh)

Distribution for Imp FL- Total COE/L71
1.000
Mean=15.56329

0.800 0.600 0.400 0.200 0.000

8
5%

12 11.9952

16
90%

20 19.5671
5%

24

Figure F4. EGS Flash 2010 Experts Case LCOE (¢/kWh)

F-2

Distribution for Imp Bin- Total COE/L64
1.000
Mean=6.289409

0.800 0.600 0.400 0.200 0.000

3
5% 4.5882

5.75
90%

8.5 8.8342

11.25
5%

14

Figure F5. Evolutionary EGS Binary 2040 Experts Case LCOE (¢/kWh)

F-3

Distribution for Imp Bin- Total COE/L64
1.000
Mean=4.735013

0.800 0.600 0.400 0.200 0.000

4.3
5%

4.525 4.5489

4.75
90%

4.975 4.9193
5%

5.2

Figure F6. Hydrothermal Binary 2010 MYPP Case LCOE (¢/kWh)

Distribution for Imp Bin- Total COE/L64
1.000
Mean=14.31604

0.800 0.600 0.400 0.200 0.000

12
5% 13.0433

14
90%

16 15.8276
5%

18

Figure F7. EGS Binary 2010 MYPP Case LCOE (¢/kWh)

F-4

REPORT DOCUMENTATION PAGE

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ORGANIZATION. 1. REPORT DATE (DD-MM-YYYY) 2. REPORT TYPE

3.

DATES COVERED (From - To)

March 2007
4. TITLE AND SUBTITLE

Technical Report
5a. CONTRACT NUMBER

Preliminary Technical Risk Analysis for the Geothermal Technologies Program

DE-AC36-99-GO10337
5b. GRANT NUMBER

5c. PROGRAM ELEMENT NUMBER

6.

AUTHOR(S)

5d. PROJECT NUMBER

J. McVeigh and J. Cohen (PERI); M. Vorum, G. Porro, and G. Nix (NREL)

NREL/TP-640-41156
5e. TASK NUMBER

GT04.1101
5f. WORK UNIT NUMBER

7.

PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES)

8.

National Renewable Energy Laboratory 1617 Cole Blvd. Golden, CO 80401-3393
9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES)

PERFORMING ORGANIZATION REPORT NUMBER

NREL/TP-640-41156
10. SPONSOR/MONITOR'S ACRONYM(S)

NREL
11. SPONSORING/MONITORING AGENCY REPORT NUMBER 12. DISTRIBUTION AVAILABILITY STATEMENT

National Technical Information Service U.S. Department of Commerce 5285 Port Royal Road Springfield, VA 22161
13. SUPPLEMENTARY NOTES 14. ABSTRACT (Maximum 200 Words)

This report explains the goals, methods, and results of a probabilistic analysis of technical risk for a portfolio of R&D projects in the DOE Geothermal Technologies Program (The “Program”). The analysis is a task by Princeton Energy Resources International, LLC (PERI), in support of the National Renewable Energy Laboratory (NREL) on behalf of the Program. The main challenge in the analysis lies in translating R&D results to a quantitative reflection of technical risk for a key Program metric: levelized cost of energy (LCOE). This requires both computational development (i.e., creating a spreadsheet-based analysis tool) and a synthesis of judgments by a panel of researchers and experts of the expected results of the Program’s R&D.
15. SUBJECT TERMS

NREL; geothermal; Geothermal Technologies Program; risk analysis; research; levelized cost of energy; LCOE; Geothermal Electric Technology Evaluation Model; GETEM; technology improvement opportunities; PERI; Princeton Energy Resources International
16. SECURITY CLASSIFICATION OF:
a. REPORT b. ABSTRACT c. THIS PAGE 17. LIMITATION 18. NUMBER OF ABSTRACT OF PAGES 19a. NAME OF RESPONSIBLE PERSON

Unclassified

Unclassified

Unclassified

UL

19b. TELEPHONE NUMBER (Include area code) Standard Form 298 (Rev. 8/98)
Prescribed by ANSI Std. Z39.18

F1146-E(12/2004)

Similar Documents

Premium Essay

Auditing Cases

...Litigation, and Auditor Liability instructor resource Manual — do not coPy or redistribute instructor resource Manual — do not coPy or redistribute enron corporation and andersen, llP analyzing the fall of two giants inS tr uc t ional o b je c t ive S [1] c a s e 4.1 Mark S. Beasley · Frank A. Buckless · Steven M. Glover · Douglas F. Prawitt [2] [3] To help students understand what happened at Enron Corporation and how Andersen’s involvement with Enron led to the accounting firm’s downfall. To enhance students’ appreciation of the importance of understanding an audit client’s core business strategies. To develop students’ understanding of the role of confidence, reputation, and trust both in the corporate and auditing professions. [4] [5] [6] To provide a venue for exploring professional issues relating to auditor independence and the provision of non-audit services for clients. To introduce students to the current debate on rules- versus principles-based accounting standards and related...

Words: 33542 - Pages: 135

Premium Essay

Auditing Cases

...Auditing Cases instructor resource Manual f our th e d itio n Mark S. Beasley Frank A. Buckless Steven M. Glover Douglas F. Prawitt do not coPy or redistribute Prentice hall Upper Saddle River, New Jersey ta b l e s e ct ion o f co n t e n t s 1 2 client acceptance . . . . . . . . . . . . . . . . . . . . . . . . . . . S o l u tionS inc lu de d in t h iS Section 1.1 Ocean Manufacturing, Inc. 3 The New Client Acceptance Decision s e ct ion Understanding the Client’s Business and assessing risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 S o l u tionS inc lu de d in t h iS Section 2.1 Your1040Return.com Evaluating eBusiness Revenue Recognition, Information Privacy, and Electronic Evidence Issues . . . . . . . . . . . . . . . . . . . . . . . . . . 25 2.2 2.3 2.4 Dell Computer Corporation Evaluation of Client Business Risk Flash Technologies, Inc. Asher Farms Inc. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39 Risk Analysis and Resolution of Client Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49 Understanding of Client’s Business Environment s e ct ion 3 Professional and ethical issues . . . . . . . . . . . . . . . . . . . . . . . 59 S o l u tio nS inc lu de d in t h iS Section 3.1 3.2 3.3 3.4 3.5 A Day in the Life of Brent Dorsey Staff Auditor Professional Pressures Nathan Johnson’s Rental Car Reimbursement Solving Ethical Dilemmas–Should...

Words: 162000 - Pages: 648

Premium Essay

Auditing Case

...what it will always be present. Within the course we have discussed some of the factors that will help the auditor evaluate inherent risk and with that the amount of sufficient and appropriate evidence needed to be collected. Below are a couple more of the more relevant ones to the Comptronix’s Case. The first factor to consider is the industry of the client’s business operations. When conducting an audit the auditor should understand the company and how day to day operations are run. Also they should understand the direct risk associated with the industry the company deals in. With Comptronix they produce circuit boards, a great deal of electronics have a very fast lifespan and an auditor should watch how the company values and accounts for such boards in their inventory. The more risky the business looks based on the results collected, the hire the inherent risk should be set for that type of company in the industry. Another factor that can influence inherent risk is the client’s motivation and presence of related parties. The auditor should always look at transactions that go n between related parties to ensure that the transactions have been recorded correctly. In this case Comptronix had a member of the board of directors’ who was the VP of manufacturing at a major customer the company did business...

Words: 1909 - Pages: 8

Premium Essay

Auditing Case Study

...AUDITING CASE STUDY ACCT: 407-01 3/31/2010 The general definition of an audit is an evaluation of a person, organization, system, process, enterprise, project or product. Audits are performed to ascertain the validity[->0] and reliability[->1] of information; also to provide an assessment of a system's internal control[->2]. The goal of an audit is to express an opinion on the person / organization/system (etc) in question, under evaluation based on work done on a test basis. Due to practical constraints, an audit seeks to provide only reasonable assurance that the statements are free from material error. Hence, statistical sampling is often adopted in audits. In the case of financial audits[->3], a set of financial statements are said to be true and fair when they are free of material misstatements - a concept influenced by both quantitative and qualitative factors. Audit is a vital part of accounting[->4]. Traditionally, audits were mainly associated with gaining information about financial systems and the financial records of a company or a business (see financial audit[->5]). However, recent auditing has begun to include other information about the system, such as information about security risks, information systems performance (beyond financial systems), and environmental performance. As a result, there are now professions conducting security audits, IS audits, and environmental audits[->6]. In financial accounting[->7], an audit is an independent assessment...

Words: 2038 - Pages: 9

Premium Essay

Auditing Case 12.4

...Requirements 1 What are Mark’s options? Mark is able to ask George for his plans on continuing the company for over a year. The plans must be shared in the form of a financial statement and assuming the plans are adequate, Mark can provide feedback through notes on the mitigating factors. If the disclosed information does not meet the criteria Mark was looking for then he should ask George to provide notes on the shared financial statements, which identify the doubts that he has in particular about the going concern assumption. Assuming the disclosures are sufficed, George is entitled to give unqualified feedback and ensure to specify notes on the financial statement. If George neglects to efficiently disclose information in the financial statement, then Mark must provide qualified or adverse feedback. Whether it’s a qualified or adverse opinion depends on the conclusion of the additional procedures that were committed by Mark as he evaluated the evidence related to the concerning assumptions. 2 How might a going-concern explanatory paragraph become a “self-fulfilling prophecy” for Surfer Dude? The going-concern explanatory paragraph may become a self-fulfilling prophecy for Surfer Dude because like George stated, creditors will not lend Surfer Dude money, vendors will not allow Surfer Dude to buy things on account, and customers may not buy from Surfer Dude because they can’t be sure that Surfer Dude can stand behind their return policy. In addition...

Words: 844 - Pages: 4

Premium Essay

Auditing: Case Study

...Audit Procedures for Account Balances Substantive procedures for disclosures and account balances are necessary to acquire enough evidence as there are many restrictions on internal controls. The auditor's judgments based on opinions when preparing risk assessment concerning the business and its scope can be a limitation to obtaining enough audit evidence (Clatworthy & Peel, 2013). Therefore, the auditor must perform essential procedures applicable in different transaction classes and account balances without directing any attention to the risk assessment of misstatement of material (Gantz, 2014). Substantive Audit Procedures Wages and Salaries Account Balances Interim Audit This type of audit test relies on the particular structure of the system of wages and the evaluation controls of the auditor. Type of test procedures for each control objective are the following: * To make sure that the workers are paid only for the work they have done. The substantive procedure involves the selection of a random sample of workers from the payroll and the agreed hours of payment according to the time recorder that tracks the number of hours worked by an employ in an entity. * To make sure that only valid laborers receive wages. This is tested by attending the payout of salaries and a sample selection of workers' payroll and take the responsibility of the contracts of the individuals employment in the department of HR * To ensure authorization of all wages. Overtime...

Words: 1074 - Pages: 5

Premium Essay

Auditing and Assurance Case 1.2

...Auditing & assurance Case 1.2 1. Consider the principles, assumptions and constraints of Generally Accepted Accounting Principles. Define the revenue recognition principle and explain why it is important to users of financial statements. According to the revenue recognition principle, revenues are recognized when they are realized or realizable, and are earned. Thus, it does not matter when the cash is received. To break that definition down, revenues are realized when products are exchanged for cash or claims to cash. Revenues are realizable when related assets received are readily convertible to cash or claims to cash. Revenues are earned when the products are delivered or services are performed. It is important for a company to abide by this principle as it is will help investors. By not recognizing revenues when the goods or services are delivered or performed, investors are given false information. If a company is paid before they deliver a good, they have not technically earned that revenue yet. By deferring revenue in such a way, investors are provided with overstated numbers, which makes the company seem like they are performing better than they actually are. 2. Provide one example of how WorldCom violated the revenue recognition principle in this situation. WorldCom violated the revenue recognition principle when they made “top-side adjusting journal entries, often very large, that were allegedly made during the quarterly closing process in order to hit revenue...

Words: 1059 - Pages: 5

Premium Essay

Contemporary Auditing Solutions to Case 1.7

...Answers to Questions 1. The substance-over-form principle states that the true economic nature of a transaction should determine how it is reported on a company’s accounting records, rather than its legal form (Donaldson, 1964). This concept aims to undercut certain transactions such as related party transactions that are solely to distort profitability, rather than a true economic transaction between two parties. The auditor is responsible for the review and testing of the client’s accounting records to see that the substance of their transactions are reflected in their records. If the substance-over-form concept is violated and the financial statements are materially misstated as a consequence, the auditor is required to issue an opinion on the client’s financial statements. 2. In accepting large, high-risk audit clients for relatively high audit fees, an audit firm may become overly dependent on this client and revenue stream. The loss of such a client may be so detrimental to the audit firm itself that the behavior of auditors may change completely. Auditors know the risk of losing this client, and may become more flexible during audit engagements. The only way to figure out if such prospective clients be avoided is to process each unique situation, and use professional judgment in deciding whether to take on a client or not. 3. This issues goes back to the substance-over-form concept. The audit should consider whether economic substance was used in accounting for...

Words: 832 - Pages: 4

Premium Essay

Advanced Auditing Final Review Case Note

...Final Exam Review Practice Case IPI Case: Required: 1. Identify Accounting System Issues * System implementation * Lack of training * I: people try to override the system, inaccurate reporting * R: The company who installed the system needs to be contacted and hold training session for employees * Glitches * I: inaccurate reporting, create room for error * R: Contact the company again and get them back and give them responsibility to fix the glitches 2. Identify Control Issues: * Understaffing people are overworked, may get sloppy * R: Hire more staff * Lack of segregation of duties, bookkeeper does the bank rec and A/R ledger * R: Get someone else to do one of those duties * Mismatch b/w what’s shipped and what’s recorded as revenue since sales reported based on what they are supposed (when order is confirmed for shipment) but Louis goes down to the shipping department and adds a few more COGS is correct but revenue is not * R: Base revenues on actual quantities shipped * Year end cut-off error – Revenue: Takes 3 weeks to get the orders out but actg department records sales based orders * R: System is changed so that revenue is recorded only when shipment is confirmed, send shipping log to the actg department so they know 3. Policy compliance * Costs capitalized to inventory * IPI’s accounting policies state that only the rental cost...

Words: 1267 - Pages: 6

Premium Essay

Auditing Case

...Keith Parkinson 2/3/15 Auditing Case 1: Merry-Go-Round Merry-Go-Round (MGR) is a clothing retailer that was founded in 1968. The company’s locations were in malls that targeted the youth and teen market. In the late 1980s, the company was listed by Forbes magazine as one of the top 25 companies. By the early 1990s, sales fell due to stiff competition from other retailers. Facing bankruptcy, the company hired turnaround specialists from Ernst and Young (E&Y) to help overcome the financial crisis. However, the company filed for Chapter 11 reorganization and due to that a group of 9,000 creditors filed a lawsuit against E&Y saying they were the main reason for MGR’s decline. First of all, E&Y violated GAAS first standard that states, “The audit is to be performed by a person or persons having adequate technical training and proficiency as an auditor.” The turnaround team included inexperienced personnel that included a retired consultant, a partner with little experience in the U.S. and with retail firms, and two recent college graduates. I would say the first standard of Field Work was violated because the work wasn’t adequately planned and there was no supervision. The leader of the team took an eight-day vacation at critical point during the engagement. Also, while store closing were key to MGR’s survival, only 230 of 1,434 stores had been closed and MGR still operated two stores in some malls. Last, the cost-cutting strategy called for only $11 million in...

Words: 611 - Pages: 3

Premium Essay

Auditing Case

...Smackey Dog Foods, Inc. started in the kitchen of Sarah, Kim, and Jillian’s family home in the suburbs of Chicago. The three sisters initially bought the ingredients for their natural dog food recipes from the local grocery store. They used their dogs and the neighborhood dogs as their taste testers. Their dog food products were so good, the local kennels and veterinary offices were glad to distribute the sisters' products to their customers. Local demand increased significantly. Local pet stores and small grocery stores discovered the products and became distributors. The sisters moved the expanding business into a larger facility and hired a few more workers. While their competitors’ sales were flat or declining, Smackey Dog Food, Inc.’s sales were on a vertical climb! Sales were so good last year, that the sisters opened a boutique division named Best Boy Gourmet, specializing in freshly manufactured, one-serving packages meant for consumption no later than 3 days after production. They sell this product at 3 times the cost of their other products and by special order only through their new website. Demand is high, but waste has been an issue. Sarah is the president and general manager of the operation. Sarah has been very proactive in growing the business. She has met with her banker to discuss expanding the facilities and equipment with another $150,000 loan. Their first loan for $150,000 was secured by the industrial size, food production equipment...

Words: 500 - Pages: 2

Free Essay

Auditing Corruption Case

...Corruption Case The case study “Why is this Furniture Falling Apart?” is about Art Metal U.S.A., a furniture manufacture, that had put out “$200 millions of worth of defective and useless that the General Services Administration (GSA) bought.” (Wells, 2011, p. 237) Federal agencies and GSA customers put in several complaints but nothing was done to investigate. After many years of complaints and suspicion of a corruption scheme there were articles written that instigated a congressional investigation. This type of investigation is more thorough than a regular audit and looks into all areas of the financials and operations. The investigation found that there was indeed corruption going on between top management at Art Metals and GSA inspectors. They revealed several unusual payments by reviewing cancelled checks. There were payments in whole numbers to a subcontractor that was cashed rather than deposited and made out to 3 different names. There were also many checks that were made out to “Auction Express” that was all in large and whole amounts. This provided enough reasoning to now look for evidence of a bribery which is when they began looking into GSA inspectors. This is where they discovered a previous inspector’s financial life-style was more than his income. After interviewing an past bookkeeper of Art Metals they had testimony that they did in fact bribe GSA inspectors and they even had a petty cash fund that they used to pay for their meals and hotels. According...

Words: 745 - Pages: 3

Premium Essay

Auditing Case Study

...JUST FOR FEET, INC. 19981 1997 1996 Current assets: Cash .02 .19 .37 Marketable securities .00 .00 .09 Accounts receivable .03 .04 .02 Inventory .58 .46 .35 Other current assets .03 .01 .01 Total current assets .66 .70 .84 Property and equipment .23 .21 .14 Goodwill, net .10 .08 .00 Other .01 .01 .02 Total assets 1.00 1.00 1.00 Current liabilities: Short-term borrowings .00 .20 .27 Accounts payable .14 .12 .10 Accrued expenses .04 .02 .01 Income taxes payable .00 .00 .00 Current maturities of LT debt .01 .01 .01 Total current liabilities .19 .35 .39 ...

Words: 463 - Pages: 2

Free Essay

Case Advanced Auditing

...PENYELESAIAN AUDIT Sebagai bagian dari tahap IV proses audit, auditor mengevaluasi bukti yang mereka peroleh selama tiga tahap pertama dalam audit untuk menentukan apakah mereka mesti melaksanakan prosedur prosedur tambahan untuk tujuan-tujuan penyajian dan pengungkapan. Auditor melakukan pendekatan untuk memperoleh bukti untuk tujuan audit yang berkaitan dengan transaksi dan saldo. · Melaksanakan prosedur untuk memahami pengendalian yang berkaitan dengan tujuan penyajian dan pengungkapan sebagai bagian dari prosedur penilaian resiko. · Melakukan uji pengendalian yang berhubungan dengan pengungkapan ketika penilaian awal atas resiko pengendalian berada di bawah maksimum. · Melaksanakan prosedur substantive untuk memperoleh assurance bahwa semua tujuan audit dicapai untuk informasi dan jumlah yang disajikan dan diungapkan dalam laporan keuangan. TABEL 24-1 Tujuan Audit Penyajian dan Pengungkapan| Tujuan Audit|Contoh Prosedur Substantif| Keterjadian serta hak dan kewajiban|Mereview kontrak | Kelengkapan|Menggunakan daftar pengungkapan| Klasifikasi dan kemampuan untuk dipahami|Mereview laporan keuangan| Ketepatan dan penilaian |Merekonsiliasi jumlah yang dimasukkan dalam catatan kaki utang panjang dengan informasi yang diperiksa dan didukung dalam kertas kerja audit utang jangka panjang auditor.| II. REVIEW KEWAJIBAN KONTIJEN DAN KOMITMEN Kewajiban kontijen (contingent liability) adalah potensi kewajiban di masa mendatang kepada pihak luar untuk jumlah yang tidak diketahui...

Words: 3034 - Pages: 13

Premium Essay

Case 3 Auditing

...Prefab Sprout Construction Company You have been approached about auditing Prefab Sprout Construction Company, a family-run general contracting company which is publicly traded on the New York Stock Exchange. The president of Prefab is Jack Warner. His wife, Joan, is the vice president and his son, John, is the treasurer. The Warner family owns about 40 percent of all outstanding shares and no other investor owns more than 1 percent. The company has been previously audited (receiving standard unqualified opinions) by a sole practitioner who closed his practice and is now the controller of Prefab. The company has an audit committee consisting of Joan, John and a local college professor. The company also has a compensation committee consisting of Jack, the company’s lawyer and an employee selected on a rotating basis. Prefab specializes in modular home developments located in areas of South Florida that are densely populated by retirees and recent immigrants from the Caribbean basin. Prefab acquires land, builds streets and other land improvements, builds modular homes on the land and then sells the entire development to limited partnerships that are set up as tax shelters. Prefab finances most of its construction costs through the Sun Atlantic Bank in Fort Lauderdale. Prefab's condensed financial statements for 2013 (audited) and 2014 (un-audited) are presented below. 2013 2014 Cash Receivables Projects in progress Total assets Bank loans payable ...

Words: 867 - Pages: 4