Free Essay

Network Design Proposal for Retail Technologies Corporation

In:

Submitted By enyaw815
Words 5466
Pages 22
Network Design Proposal for Retail Technologies Corporation

NETW410, Enterprise Network Design

Team Leader: Juba Cochran
Team Members: Brian Perez, Matthew Smith
November 18, 2010

Table of Contents
Executive Summary………………………………………………………………………….........2
Introduction……………………………………………………………….....................................3
Customer Introduction……………………………………………………………………….........4
Organizational Goals …………......5
Organizational Constraints...............................................................................................................6
Technical Goals of Existing Network..............................................................................................7
Technical Constraints of Existing Network.......………………………………………………..…8 Existing Network Design Analysis...……………………………………………………………...9
Technical Goals of New Network Design...……………………………………………………..10
Technical Constraints of New Network Design.....……………………………………………...11
New Network Design Analysis, Including Security………………………………….............12-19
Implementation Schedule……………………………………………………………….......…....20
Testing of The New Network……………………………………………………………............21
Budget............................................................................................................................................22
Detailed Summary.........................................................................................................................23
Detailed Components and Parts Summary Page............................................................................24
Physical Topology of the WAN.....................................................................................................25
Diagram of the Old Network Design.............................................................................................26
Diagram of the New Network Design...........................................................................................27
Atlanta Corporate Office LAN Diagram-Detailed........................................................................28
Orlando Corporate Office LAN Diagram-Detailed.......................................................................29
Conclusion……………………………………………………………………………………….30
Appendix......…………………....………………………………………………………........31-36 * Physical Visio Diagram of Old Network...........................................................................31 * Logical Visio Diagram of New Network...........................................................................32 * Physical Visio Diagram of each Network in the Company..........................................33-34 * Financial Charts and Stock Performance...........................................................................35 * Budget Matrix....................................................................................................................36 References………………………………………………………………………………………..37

Retail Technologies Corporation

Solution Management:
CEO

Industry: Retail Technologies

Number of Employees:
150
Financing Sought:
$302k

Use of Funds: Enterprise Network Upgrade

Solution Management:
CEO

Industry: Retail Technologies

Number of Employees:
150
Financing Sought:
$302k

Use of Funds: Enterprise Network Upgrade

Company Mission Statement: Provide and maintain service level agreement standards throughout our deep customer based relations. Customers are our success, and it is the customer whom we maintain our loyalty to by provide the skills and knowledge necessary to all who we may come in contact with.

Objectives: Upgrade and standardize the enterprise network infrastructure in the Atlanta office, Florida Office, and the retail stores in New York and Ontario, Canada.

Goals: Improve the security and performance of the network infrastructure of the corporate office, branch office and the stores, Duane Reade and Peavey Mart.
_________________________________________________________
Products/Services: RTC offers a full line of products and services that integrate seamlessly with Multimedia Systems, such as Store MS, MMSxTrend application suite, HTP-Link and RTC Gift Registry System.

Company Background: Retail Technologies Corporation (RTC) was founded in 1989 by a group dubbed the "Five Busy Guys." RTC evolved from the retail software division of a company with many years' experience in providing retail and restaurant solutions. RTC was created to specialize in providing retail POS solutions. Today, four of the original "Five Busy Guys" are still with RTC in the capacities of President, Director of Product Development, and Programmers.

How Proposal meets company mission statement: This proposal meets the company mission statement by honoring the service level agreement standard. Privacy and security is a major element in the SLA and our network upgrade is focused on security and other important network functions.

Budget:302k Hardware Cost | $214,794.28.00 | Labor Cost | $45,000.00 | Project Management | $25,500.00 | Employee Support | $15,000.00 | T3 Connections | $2,400.00 | Software: Microsoft Exchange Standard 2010 | $0.00 | Total Cost | $302,694.28 |

Introduction Since Retail Technologies Incorporated’s conception, we have witnessed a rapid growth both internally and externally. This includes providing support as well as multiple services to other organizations such as Duane Reade Corporation located in New York and Peavey Mart Stores, Inc. located in Canada. This sudden influx of added responsibility has certainly caused the IT department to take a closer look at our network as a whole. The Retail Technologies current network infrastructure consists of a basic LAN configuration which includes a non server based workgroup environment. Each PC can connect securely through the VPN via an IPSec and PPP connection. The PPP technology establishes a direct connection by utilizing serial cables, phone lines, trunk lines, cellular telephones, specialized radio links, or fiber optic links. In addition, a wireless connection is also available to execs which allow our employees the ability to gain access to the network from outside of the facility. The bandwidth capabilities include Circuit Switching technology as well as a T1 connection which accommodates a total of six departments within the organization. This includes our Project Management Team, Accounting, Customer Service, the Development Team, and the directors and executives. With regards to the security side of the network, very limited measures are implemented to ensure a safe business environment. A Cisco PIX 515E Security Appliance is used as a firewall to protect against any outside threats and maintains Application Layer policy enforcement. This particular device is the only preventative precaution we currently posses that ensures proper network safety. The telecommunication devices that we are presently using are the traditional land-line phone system. Network hardware consists of the Cisco SLM248G 48-Port 10/100 Gigabit Smart switch and the Cisco SR 520-T1 secure router.

Customer Introduction
Although the Retail Technologies overall network appears to be functioning at a satisfactory level, there are various reasons why the need for an improvement remains vital to this company’s future. As you may well know, in order to meet the demands of our clients, we must adapt to changing technological advances such as VOIP, video conferencing, and instant messaging as well as decreasing the strain on network utilization from all employees. In addition, the lack of outdated hardware such as Routers, Switches, and other devices make it that much more difficult to maintain superior performance, reliability, and resiliency to the network. The final reason for this upgrade pertains to network infrastructure security. Due to the limitations of how we can incorporate more advanced securable functionality and manageability to the system, has resulted in a vulnerable and compromised environment. Based on the various statements listed above in the previous paragraph, the following recommendations are necessary for the Retail Technologies network. They include increasing the bandwidth from a T1 line to a T3 which will certainly allow the network to be much more robust, not only for our present situation but also in the future and beyond. The second improvement that must be addressed is to conduct an up-grade to all network hardware such as routers, switches, and the integration of a VOIP phone system. The topology will consist of an Access Layer, distribution layer, and a core layer. In addition, a complete server based environment which includes an Avaya S8300D, AS400, and the utilization of a Windows Server 2003 application which would act as an Active directory and a domain controller. The final portion of this solution is to increase our network security.
Organizational Goals In a conscious effort to maintain customer satisfaction and network longevity, specific organizational goals must be outlined as well as enforced within all departments. Changing our current non-integrated hardware devices to a single piece of equipment that is capable of handling voice, video, and data, would ultimately reduce costs throughout the company. Many individuals from each department have recently complained about the lack of customer service we are supplying to our clients. Improving customer support remains to be an ongoing goal that must be monitored on a daily basis. By introducing document automation will allow the business to tailor to clients’ communication needs, simplify production, and maintain a high quality throughput. Another organizational goal is the daunting task of increasing our customer base which has been suffering at the hands of the sluggish economy. We must begin to take a worldwide approach with regards to advertising, which consists of aggressively using different search engines such as Yahoo, Google, or MSN. The final goal is to increase our cash flow and stray away from our traditional business practices which include designing products for temporary usage. We need to manufacture products that require the client to consistently utilize on a daily basis such as a highly sophisticated application and request the payment if full prior to offering services.

Organizational Constraints In today’s challenging economic times, many companies are facing various constraints that hinder their ability to succeed and remain profitable. Retail Technologies Inc. is no exception and is experiencing difficulties with regards to budget, personnel, policies, as well as scheduling. Our projected budget for the network upgrade is set at $250,000 but due to the lack of company funds, the probability of accepting a revised plan for $200,000 will most likely be inevitable. Another constraint on the horizon is a low level of personnel that will be needed for our expanded network. Several managers within each department are currently in the process of hiring an additional ten employees throughout the year. Choosing a reputable vendor to handle all network support requires a great deal of research and presents an issue for the IT department. I believe that due to the fact that our newly designed network will consist of primarily Cisco products, the obvious choice would have to be the equipment’s manufacturer. The final constraint that becomes apparent is deciding what applications we should implement as well as the time frame. We are currently planning on introducing all new applications such as IP telephony, video conferencing, and email from Microsoft within the next twelve months.

Technical Goals of Existing Network Although organizational goals and constraints provide vital information as to what our strengths and weaknesses are, the network criteria is just as important to the company’s future. There are various goals associated with our current infrastructure which must be adhered to as well as implemented before incorporating an upgraded system. This includes the performance, security, availability, modernization, scalability, and manageability. Network performance in both the LAN and WAN environments has a high priority level of importance and remains to be on the forefront within the design process. With regards to security goals, all inbound and outbound critical data must be protected at all costs. According to Kaminsky, W. (September 18, 2010), “Appropriate network security is achieved when a user has to go through several layers of security before being able to access the desired network. The more layers the system has, the more secure it is.” Availability is another goal which must be taken into account and plays a vital role in our network design. Although networks in general typically experience various problems, the overall objective is to ensure that our system remains as close to 100% as possible. The next goal we would need to consider is adapting the network to advanced technological innovations which include VOIP, multimedia and video conferencing. By keeping up with these changes will ensure that our system stays current and modernized. Scalability also remains to be top priority when integrating upgrades to our network as well as further expansion. Our current infrastructure certainly has reached its full capacity and provides no room for possible advancement or growth. The final goal for our current network is to provide an increase in manageability and reliable maintenance procedures. These steps must be continuously maintained in an effort to reduce any system failures as well as any other issues.

Technical Constraints of Existing Network Various technical constraints continue to exist throughout our current network and are beginning to affect not only each department but our company as a whole. Bandwidth availability as well as speed has always remained to be a thorn in our side for quite some time now. The current LAN environment is operating at 100Mbps and the WAN side is running at 1.544Mbps, all of which is putting an enormous strain on the entire data flow. In addition, the decrease in overall network speed is causing unwanted bottlenecking as well as latency. Application compatibility is another problem we are facing, which makes it very difficult to introduce any new software programs within the company. As a result of this, we cannot utilize the full potential of certain applications such as video and limited instant messaging capabilities. According to DiNicolo, D. (July 04, 2007), “The applications currently used by an organization can have a significant impact on a network design project. For example, the customer may rely upon a particular program that can only function using a specific protocol like NetBEUI.” The final constraint consists of a lack of technical knowledge among the company’s personnel to help ensure a safer network environment. This includes preventing virus attacks, e-mail safety, and proper security procedures. The company must provide additional training to each individual within all departments regarding these methods to protect against network mishaps.

Existing Network Design Analysis

The overall existing design consists of four separate networks which include the headquarters in Atlanta and branch offices located in Florida, New York, and Canada. Retail Technologies network design in Florida utilizes a T1 connection that supplies bandwidth to all departments within the organization. With regards to security, a Cisco PIX 515E appliance is used as a firewall to protect against any unwanted visitors. Wireless connectivity can be accessed by various employees from outside the corporation. Each computer system can connect securely with VPN, IPSec, and PPP connection. The network design located in Canada operates very much the same as the Retail Technologies LAN but has an inadequate amount of bandwidth which is caused by a 56k modem. In addition, the decreased connection is then magnified by 29 stores. The company located in New York implements the same design concept as the Retail Technologies network except for some minor modifications. They include using a domain name server as well as a traditional server as opposed to the Retail Technologies network which is based off a workgroup no server environment. An additional firewall is implemented as well for the New York branch for added security. After researching many aspects of this existing network design, my final analysis indicates that there are an increasingly amount of discrepancies which certainly requires improvement. The issues specifically include insufficient overall network speed, a significant lack of security measures, and no ability to incorporate more advanced technologies. It would seem like a T1 connection will suffice for this particular type of network design, due to the excessive number of computers and various branches throughout the WAN, the current speed will be quickly consumed by everyone in the infrastructure. . In addition, various types of advanced technologies will also be incorporated to this current design such as video and VOIP, all of which will require a much higher bandwidth.
Technical Goals of New Network Design

The technical goals of this project are, to increase security in each AD site, increase the speed WAN bandwidth and increase the speed of the LAN while implementing redundancy where ever possible in accordance to our budget and the company’s needs. Priorities are centered around network securities such as firewall implementation at each site and proper configuration of domain controllers, active directory and user accounts. Switches and routers will also require proper configuration for security enhancements. Afterwards, network performance requires enhancement, streamline and improved scalability. Performance is particularly important at the corporate office due to the fact that most data will be sent to the corporate office from the branch office and from the stores. High availability will be implemented via redundancy of network devices. The network failover solutions will respond quickly to minimize loss of funds and communication due to downtime. To aid in lowered administration of the network, network management tools will be installed throughout the WAN. Out dated technologies will be replaced to make way for more economical and productive technology solutions. Outdated equipment will be scrapped or donated depending on its condition.
Technical Goals will be handled as the following: 1. Performance will be increased on the LAN/WAN. 2. Security will be increased. All outbound and inbound traffic will be scanned or configured for pass-through on the interior and exterior of the network 3. Availability will be increased via redundancy of all infrastructure devices. 4. Manageability will be implemented so that a Network Administrator can access and manage the network from one central location.

Technical Constraints of New Network Design
Security and performance must coexist on today's network due to threats from the internet and to guarantee the desired level of productivity. Network administrators must implement a broader set of security features yet improve application performance to meet the needs of the organization. This introduces major challenges; the implementation of numerous security platforms increases network latency, interface management and troubleshooting complexity. Additionally, treating Internet security and performance as opposing functions eliminates any hope of diagnosing Internet data stream issues or correlating the events that impact security and performance (Cymphonix). Security is primarily a layered function that requires scanning on multiple levels. Several other UTM appliance vendors, including Internet Security Systems Inc. (ISS), Secure Computing Corp. and Symantec Corp., are equally blunt in saying customers could experience as much as a 50% performance loss in speed. "In general, it's more like 10%, but 50% is possible," says Mark Butler, director of product marketing at ISS, which offers three multifunction security appliances in its Proventia line.
Urgent technical problems that need to be addressed are as follows: 1. Firewall's need to be upgraded and redundancy needs to be configured incase the primary firewall experiences any downtime. 2. Routers need to be upgraded and require an internal firewall as a second layer of security. 3. Switch redundancy, security, and QoS will be configured in the Corporate office and the Branch offices. 4. Bandwidth Availability needs to be dramatically increased over the WAN and LAN. 5. Microsoft Exchange 2010 is required on the in Atlanta, the Headquarters office.

New network Design Analysis, Including Security
The new network design has been implemented to increase data throughput, set high availability within each location serviced and owned by the company and to increase security across the WAN and LAN. We will look at the overall design and its advantages, then look at the individual sites and outline the technologies implemented.
WAN Topology Overview
RTC-Group, Inc. owns property in Atlanta, Florida, New York and Canada. The Organization requires that the headquarters offices in Atlanta intercepts all customer transactions from the stores in New York and Canada but can also share and administer the branch office in Orlando. Our team decided to use T3 connections using Frame Relay to route traffic between the sites. Frame Relay is widely used in companies that span internationally. The advantages of Frame relay are: * Reduced internetworking cost (in both hardware and carrier tariffs) * Increased performance with reduced network complexity * Increased interoperability via international standards
Since RTC has companies outside the continental United States Frame Relay was an obvious choice. Standards across borders and at home are imperative to have to ensure data flow and communication. Below is an IP table for the Corporate office, Branch Office and stores. WAN IP's/29 subnet | | | | | | Retail Technologies, Atlanta | 172.31.194.235, .244, .250, .236, .245, .252 | | | | | Branch Office, Orlando | 172.31.194.248 | | | | | Duane Reade, New York | 172.31.194.233 | | | | | Peavey Mart, Canada | 172.31.194.241 | | | | |
New routers were implemented to better server security and redundancy throughout the WAN. Initially, the WAN was configured with only one router at each site in the company. This is called a single point of failure and it is strongly discouraged in all IT configurations. We remedied this problem by setting up router failover on all networks within the company. Moreover, these routers have special security features enabled to help block unwanted traffic to the network.
To ensure that customer information and transactions are held to the highest standards of privacy and security RTC decided to configure Site-to-Site VPN tunnels with IPSec from Duane Reade and Peavey Mart to RTC headquarters offices. After customers have completed a transaction with our stores our AS400 server stores the transaction in our database to help research what customers are buying and how often. This and other company data is imperative to keep secure at all times. These configurations are made possible with the Sonicwall Firewall at the corporate office. Its configured for failover and have over 4000 VPN licenses for scalability.
The new WAN design will provide more security and speed compared to the old network design. Key points for WAN Topology: * Security * Redundancy * Bandwidth

LAN Topology Overview
Atlanta Corporate Office
The Corporate office is the central point of data communication within the company. Most WAN/LAN traffic is accessing the servers at this location. Customer transactions, email, VOIP, database queries and the web server are all located in this environment which is why most of the cost and premium technology was implemented on this side of the WAN. Analysis of this LAN will be reviewed by applications, security, performance and switch configuration.
Initially, the corporate office did not have a secure infrastructure for data to pass through, central user management, email solutions or share policy's. The new design has implemented these crucial servers and services. * Microsoft Windows Server 2008 R2 Enterprise -Managed Domain * Microsoft Windows Exchange 2010 SP1-Viable Email Solution * Active directory services-Manage Users * SSL Certificate configuration on all Web Servers-To secure external communications. * Avaya-VOIP management console * Solar Winds Orion- Network Management and Network Monitoring * MMSXTrend- Database console for customer transaction logging * SharePoint 2010-File and application sharing/communication
Security has been increased from the implementation of several systems, Microsoft Active Directory services, Firewall settings, VLANs, and VPN settings to New York and Canada. Active directory and proper domain configuration helps with security because only authenticated users can access network resources. Firewall settings have been configured to block and accept particular traffic based on the companies needs. Here is a template of basic pass/block settings for your internet facing firewall from Cisco.com:
NAT Policies:

Additionally, any DMZ traffic should be blocked from accessing the internal network. VPN site-to-site will be configured using IPSec+GRE and WFQ. Some quality of service (QoS) techniques, such as weighted fair queuing (WFQ), perform conversation hashing decisions based on the original source and destination IP address, which can be ubiquified after IPSec or GRE encapsulation. While DiffServ markings are copied to the outer IP header in tunnel mode IPSec, the original source and destination are not carried forward into outer IP header (Cisco press.com) This VPN configuration ensures that all packets sent are encrypted and are not fragmented.

VLAN's have been configured to decrease broadcast domains within the LAN. This protects our network by only allowing certain traffic that is configured to access the switch network. All packets not configured with proper VLAN settings will be automatically dropped. VLAN configurations are highlighted below:

VLAN Number: | VLAN Name: | Configuration: | 100 | Retail | Fast Ethernet | 200 | Marketing | Fast Ethernet | 300 | IT Support | Fast Ethernet |

Performance has been increased greatly on the backbone of the network. Fiber is implemented from the servers to the core switches that service those servers. Speeds can reach up to 8GB per channel through the Cisco 9148 switch. This is an exponential increase of data throughput on the backbone with fiber configuration. The distribution and access layer switches are both configured for 1000MB transmission speeds. Between all three levels of switches are trunks, 802.1q for an even higher increase of data flow. See Trunk configuration below:

Switch Name | Tunneling w/ Trunk | VLAN | Cisco Fiber 9148-Core | 802.1q | 100,200,300 | Cisco 2048 Distribution SW | 802.1q | 100,200,300 | Cisco Catalyst WS-C3560E | 802.1q | 100,200,300 |

For failover, all switches are configured with their partner device which constantly monitors the primary switch for uptimes. Since VOIP is the primary mode of voice communication our team made several steps for optimization on the network. View these steps below: * Enable G.711 Codec * Configure QoS * Set the Qos bandwidth settings to 100 * Configure the Access Control List for Voice traffic * Set Qos Priority to Minimal-delay

LAN Topology Overview
Orlando Branch Office
The branch office has much lower overall network configuration than the corporate office. There is only one floor which is comprised of 50 users. Domain controllers are using Windows servers like in the corporate office. Microsoft offers features that can allow remote sites to share information in one site. This feature is used to access all the network data resources at the corporate office. Since this was such a small project we decided to cut cost where ever possible. On this side of the network, 2 switches that are configured for failover handle the roles of access, core and distribution layered switches. VOIP is configured and optimized for network traffic precedence. See configuration below: * Enable G.711 Codec * Configure QoS * Set the Qos bandwidth settings to 100 * Configure the Access Control List for Voice traffic
The firewall is able to protect the data that is being transmitted from the wireless devices on the network. Security for the wireless technology has been scrutinized thoroughly to ensure the best security offered. See configuration below: * Disable SSID broadcast * Enable MAC Address Filtering * Ensure password protection via ADES.

LAN Topology Overview
Stores: Duane Reade, New York and Peavey Mart, Canada
Duane Reade and Peavey Mart are stores that have the exact configurations. These sites are configured with extra security in mind due to the nature of business, point of sale. The network itself does not need to be very fast except for data transmission to the corporate office. Internet services connect via proxy server that are pointed to the corporate office as well as the ecommerce server database. If required these stores can access information in Atlanta through the VPN connection. The application server and the file server are all remotely administered from Atlanta.

Implementation Schedule
This system upgrade is estimated to be completed in 71 days. We will ensure our project manager will monitor the progress of this project and report to our lead IT manager. Below, we have listed all major milestones that accommodate the completion of this robust project. Each date as shown is an estimated approach and does not account for unforeseeable issues that may push the project beyond the scheduled completion date.
Estimated implementation schedule for entire project

Network Design Analysis | Estimated Date | Estimated Length | Network Analysis | 10/18/11 - 10/24/11 | 7 Days | Collect Hardware Requirements | 10/25/11 - 10/30/11 | 5 Days | Replace Headquarters Fiber Optic switches, firewalls | 11/1/11 – 11/26/11 | 25 Days | Replace Corporate and Branch NEC phones with Cisco IP phones | 11/28/11 – 12/9/2011 | 12 days | Configure VoIP gateway and phones | 12/10/2011 – 12/15/2011 | 5 Days | Install and Configure Windows Server 2003 DHCP/DNS/Active directory | 12/16/2011 – 12/21/2011 | 6 Days | Install and configure VPN server/firewall | 1/5/2012 – 1/8/2012 | 3 Days | Install and configure Microsoft Exchange Server 2010 | 1/9/2012 – 1/ 15/2012 | 5 Days | Install and Configure Sharepoint 2010 Server | 1/16/2012 – 1/19/2012 | 3 Days | Testing Phase and Error Correction | 1/23/2012 – 2/6/2012 | 15 Days |

Testing of the New Network
Our initial tests will be deployed on a pilot system. We will maintain the right to minimize down time during this robust upgrade and a pilot system will certainly accomplish this goal. Your existing T1 link will continue to operate while the new T3 line is being configured and I would like to add, during this configuration, your redundant link, cable internet, will remain as your backup link in case something goes array. Once this T3 link is established and meshed, it will be tested for connectivity, delay, and security. We estimate these upgrades to take up to 71 days until completion. I am also noting, the Headquarters office will first be upgraded so that each branch remains and has at least, 99.99% availability.

Budget
Our total Budget for this new network implementation is approximately $302,694.28. Knowing that this may seem high for initial costs, we must first understand that security in a network is vital to the operational status that this organization must maintain. We deal with issues concerning sensitive information every day. Due to the lack of internal security, we see a clear upbringing to establish a much more secure network. Our budget brings into light a clear objective that we must secure our network all while increasing productivity within this organization. As noted below, we have developed a table illustrating the total costs in our corporate office in Atlanta, GA. Your return will only lead this company, RTC Inc., to secure its status as an application service provider leader among the point of sale market.
Atlanta Headquarters Budget Hardware Costs | $214,794.28 | Labor Costs | $45,000.00 | Project Management | $25,500.00 | Employee Support | $15,000.00 | T3 Connections | $2,400.00 | Software: Microsoft Exchange Standard Ed. | $0 | Total Costs | $302,694.28 |

Detailed Material Summary: Purchase Inventory List | Product Model # | Name | Unit Price | Quantity | Subtotal | ASR 1002 – Cisco 100 Series Router | Cisco | $27,019.99 | 2 | $54,039.98 | Cisco 3825 Voice Bundle – Router | Cisco | $8,305.99 | 1 | $8,305.99 | Cisco Catalyst 2960-48TT 48 Port Switch | Cisco | $1,599.99 | 5 | $7,999.95 | Sonic E-class E5500 Security and routing | Sonic | $12,000.00 | 2 | $24,0000.00 | Cisco Catalyst WS-C3560E-48PD Switch 48 port | Cisco | $9,486.99 | 2 | $18,973.98 | Avaya G430 Media Gateway | Avaya | $1,182.99 | 2 | $2,365.98 | Avaya S8300D SVR PBX | Avaya | $2,839.99 | 2 | $5,679.98 | Cisco SLM2048 Distribution Switch | Cisco | $739.99 | 2 | $1,479.98 | Cisco MDS 9148 Optical Fabric Switch | Cisco | $24,173.99 | 2 | $48,347.98 | Microsoft Exchange 2010 | Microsoft | $0 | 1 | $0 | Cisco IP Phones 7911G – VoIP SCCG Phone | Cisco | $196.99 | 150 | $29,548.50 | | | | Total Price Incl Taxes: $214,794.28 |

Detailed Components and Parts Summary Page

For a closer view please see the Network Inventory List_Prices submitted with this document

Physical Topology of the WAN

Diagram of the Old Network Design

For a closer view please see the Old Network Design Visio diagram submitted with this document

Diagram of the New Network Design

For a closer view please see the WAN Topology Visio diagram submitted with this document

Atlanta Corporate Office LAN Diagram-Detailed

Orlando Corporate Office LAN Diagram-Detailed

Conclusion
Since Retail Technologies Incorporated’s conception, we have witnessed a rapid growth both internally and externally. This includes providing support as well as multiple services to other organizations such as Duane Reade Corporation located in New York and Peavey Mart Stores, Inc. located in Canada. This sudden influx of added responsibility has certainly caused the IT department to take a closer look at our network as a whole. Our IT team took the preverbal magnifying glass and researched every inch of our companies network and the stores that we service. After doing so all networks spanning from southern Florida to New York and across continental lines, to Ontario Canada have been upgraded to more secure systems. Moreover, all networks have had a significant boost in performance and reliability. No one device failure can cause a network black out or data interruption because in every LAN at least one point of failure with its switch network, firewalls and routers. Bandwidth has been increased across the WAN from a T1 line to a T3. Also, a more robust and widely used routing protocol is being used for data security and flexibility, Point-to-Point Protocol. For this upgrade of the network, the ROI will be, an enhanced security and performance network that handles disasters in a much less costly manner. Through these upgrades RTC can continue to honor their mission statement: Provide and maintain service level agreement standards throughout our deep customer based relations. Customers are our success, and it is the customer whom we maintain our loyalty to by provide the skills and knowledge necessary to all who we may come in contact with.

Appendix
Physical/Logical Visio Diagram of Old Network

Diagram of the New Network Design

Atlanta Corporate Office LAN Diagram-Detailed

Orlando Corporate Office LAN Diagram-Detailed

Financial Analysis of JDA Software Group, Inc– Three to four year view of revenues, expenses, and profits/earnings.

Stock performance for JDA Software Group, Inc

Atlanta Headquarters Budget Hardware Costs | $214,794.28 | Labor Costs | $45,000.00 | Project Management | $25,500.00 | Employee Support | $15,000.00 | T3 Connections | $2,400.00 | Software: Microsoft Exchange Standard Ed. | $0 | Total Costs | $302,694.28 |

References

CDW Inc. . (2010, December 7). CDW. Retrieved November 10, 2010, from CDW IT Products : http://www.cdw.com/
DiNicolo, D. (July 04, 2007). Network Design Step 1: Determining Technical Constraints. Retrieved December 05, 2010 from http://www.2000trainers.com/ccda-study-guide/network-design-technical-constraints/

Kaminsky, W. (September 18, 2010). What is Network Security? Retrieved December 05, 2010 from http://www.wisegeek.com/what-is-network-security.htm

Retail Technologies . (2010, December 2). About Us. Retail Technologies . Retrieved October 19, 2010, from Retail Technologies Inc. : http://rtc- group.com/content/view/56/101/Teare, D. (2008). Designing for Cisco Internetwork Solutions. Indianapolis : Ciscopress.com

Similar Documents

Free Essay

Siwsher

...Pramenković International Burch University, Sarajevo MARKETING PROBLEM DEFINITION In early 1996, Wayne Swisher, president and chief executive officer (CEO) of Swisher Mower and Machine Company (SMC) received a certified letter from a major national retail merchandise chain inquiring about a private brand distribution arrangement for SMC line of riding mowers. Wayne Swisher had only recently assumed his position as president and CEO from Max Swisher, his father and company founder. Wayne Swisher was previously vice president of sales, a position he held for six years following completion of the MBA program at Southern Methodist University in Dallas, Texas. Prior to graduate school he has worked in sales and marketing position for three years at a large Fortune 500 corporation. The private brand distribution proposal was the first major decision that he faced as president and CEO. He thought the inquiry presented an opportunity worth serious consideration, since unit volume sales of the SMC riding mower had plateau in recent years. The inquiry received by SMC concerning a private brand distribution arrangement requested a sample order of 700 standard riding mower units to be delivered in January 1997. The national retail merchandise chain expected to make an annual order of approximately 8200 units. The chain wanted to purchase the mowers at a price 5 percent lower than SMC manufacturer’s list price for its standard model. The chain wanted that the mower be different from...

Words: 1508 - Pages: 7

Free Essay

Green Systems Mobile Tablet Proposal

...Inc. Mobile sales tablet proposal Charles Brooks, Willy Almazan, Nathan Gass, Christian Hawkins, Matthew Chau University of Phoenix CIS/207 11/06/2012 The Mobile sales tablet by Green Systems Inc is an amazing solution to the retail experience. By putting the mobility in employees’ hands to walk around and spend the entire experience with the customer it creates more of a bond that that customer will remember the next time they want to purchase. Employees can look up a multitude of things with the mobile devices and save time from having to do price checks, stock checks, and looking for product information. Employees are freed up to do other tasks they might not have been able to accomplish if they were stuck to a register. And the devices have many more applications for use than just that. Mobile device payment offers a way to inexpensively change the way your business develops. By removing the costly register systems and switching everything over to mobile units you free up space in the store that otherwise would have been taken up by registers, lines, and “in a hurry” Customers. Now we go to them. They don’t have to come to us. We bring not only our own knowledge in our heads, but so much more. With a few other additions to this system we can change the way retail is done. Not a moment is wasted to build an excellent customer relationship that keeps that customer coming back every time. Welcome to The Mobile Sales Tablet. In This proposal we will be discussing the following...

Words: 3820 - Pages: 16

Premium Essay

Apple Inc Background

...well-known in America is multinational company which are working in the development of computer hardware and software. The founders of the corporation are Steve Jobs, Steve Wozniak, and Ronald Wayne. The vision statement of the company is “Man is the creator of change in the world. As such be should be above systems and structures, and not subordinate to them”. In Juli 2011, Apple Inc has provided spread-wide 357 retail stores in ten countries and has developed online store for customer to buy software and its update. Apple Inc has developed into one of the biggest trading company in the world market which is overtopping the Exxon Company by $60 billion. Apple Inc also has become a big competitor for Google and Microsoft cooperation. Products We are going to make a development of the previous product of Iphone that we named Iphone X. Strengths - Transparent developed product innovation that attract the users to use the new imbedded technology. - The imbedded multi-colored LED that can be changed to user’s will. - Using the double retina display resolution which can be up to 500 pixels per inch. - New network development that integrated 4G full implementation. - Removed camera hardware at the top of the phone to the middle-area camera. - Multitasking. - Finger print technology to lock/unlock the phone. - Solar panel or wifi charger. - Using the environmental friendly materials (recycleable). ...

Words: 569 - Pages: 3

Premium Essay

Infrastructure and Systems Implementation Plan

...Contact | Name | Rosanne Moran | | Phone | 732-930-3800 | | Email | rmoran@wint.net | Backup Contact | Name | Sabrenna Anderson | | Phone | 732-656-3575 | | Email | sanderson@wint.net | Proposal Type | Idea To Be Explored Potentially Identified Solution | Project Type | New Project Enhancement to Existing or Former Project | Working Title of Project | Infrastructure and Systems Implementation Plan | Project Sponsors | WInt IT department, Rosanne Moran, IT Director. | ------------------------------------------------- ------------------------------------------------- Introduction Widgets International, Inc. currently consists of Widgets USA, LLC and Widgets-R-Us, LTD. Combined Widgets International, Inc. has 50 years of experience in providing function critical assembly and machinery solutions. WUSA has cornered the Business to Business market while WRU has grown in leaps and bounds in the retail market. Together as Widgets International, Inc., they stand to increase their market share substantially by creating and offering innovative and cost effective assembly solutions globally. (Anderson, Unit1, 2014) ------------------------------------------------- ------------------------------------------------- Purpose and Justification This proposal will explore the requirements for the application and implementation of an easily manageable information system that will be an effective and efficient agent in expanding the organization internationally...

Words: 2927 - Pages: 12

Premium Essay

Managment Control System

...Main Strategies 9 4.1 Risk reduction 9 4.2 Enlargement of access to banking and payment services 14 4.3 Enlargement of electronic networks of individual banks and interoperability 17 5 Business Process Modeling and Architecture of the New NPS 19 5.1 The central role of electronic data exchange in the new NPS 19 5.2 Centralized clearing of large value payments 21 5.3 Centralized versus decentralized clearing of retail payment instruments other than cheques 22 5.4 Centralized versus decentralized clearing of cheques 24 5.5 Overall architecture of the NPS 25 5.6 The NPS communication network 31 6 Outline of the Strategic Plan 38 6.1 Core elements of the strategic plan 38 6.2 Systems and facilities to be acquired 39 6.3 Efficient use of modern technology to reduce investment costs and to avoid possible underutilization of the systems 39 7 Working out of the Core Elements 43 7.1 Development of a legal framework and physical infrastructure that will Support the new NPS 43 7.2 The communication network 46 7.3 The infrastructure for large value and time critical payments 48 7.4 Payment instrument mix and access to payment services 52 7.5 The upgrading of the systems for payment processing of commercial banks and connection of branches to the head office 54 7.6 The infrastructure for clearing and settlement of retail payments 55 7.7 Cross border payments 60 7.8 The infrastructure for the clearing and settlement of securities 62 7.9 The oversight...

Words: 27170 - Pages: 109

Free Essay

Information System

...Topic 1 a) Discuss any 3 key skills and characteristic should an information system manager posses. b) Today’s Point of Sales – Electronic Fund Transfer (POS-EFT) system requires several components to function. List and discuss the function for these components. a) An Information System (IS) manager has two principle roles within an organization. He has to be able to manage the change processes that are inevitably initiated by the introduction of technology into his workplace, and he has to manage the operational aspects of business and organizational activities founded on computing and communication technology. Hence an IS manager is a leading figure in both organizational change and performance. From this definition, it is a natural deduction that for IS manager to work effectively, they must have or need to be: * Detailed knowledge of the organization’s mission and vision, its peculiar business strategies and implementation skills. With these understanding, the IS manager will then be able to design an information system which can help the organization to achieve its goal. * Skilled in inter-personal management. This consists of communication skills both written and oral, people oriented and also negotiation skill. Regardless of how an organization structures its information system department, system development is a team effort. So learning how to work and communicate effectively with other team members is important for any information system professionals...

Words: 1563 - Pages: 7

Free Essay

Project Proposal

...for all network structures. This will require the company to operate globally. Contingent upon the case study provided by the CEO, we would begin an aggressive proposal to design and implement a DSS. The DSS will create cooperative and collaborative relationships with all shareholding companies globally. This design will include implementation of tools, application, data warehousing, and current DSS available. There are solid recommendations with justifications of current market products. The experience I have as a technical analyst will be present, showing my knowledge and understanding of technology requirements; integrate them into this proposal for the CEO, which supports the objective of this project. The components chosen will support current and future initiatives of the organization. There have been logical assumptions declared based on the objective of the case study that will bring global success to this organization. The Challenge The challenge as the new Strategic Center Firm (SCF), we must be the foundation for all the network’s structures. We must build a decision support structure that satisfies formal reporting relationships and procedures, manage complex cooperative interactions among network partners, align incentives among networked partners to have a reason to stay connected, and manage the strategic network and control its operations. In addition to the previously mention challenges, the organization must currently provide network access...

Words: 3941 - Pages: 16

Premium Essay

Strategy Analysis

...Successes Road ahead and Conclusion Background Significant bus operator in Singapore with 25% market share Leader in the world’s rail Industry in train service quality Growing revenue from retail, Advertising and Consulting services Dominant rail Operator in Singapore with 23 yrs operating Experience SMRT Second largest Taxi operator in Singapore with 3000 Taxis Mission, Vision & Core Values Excellence, Respect, Responsibility and Recognition, Commitment to the public, shareholders and employees Corporate Structure SMRT Trains Ltd • Incorporated on 6 August 1987 as Singapore MRT Ltd • Renamed as Singapore Mass Rapid Transit (SMRT) Corporation in 2004 • Main and only competitor: SBS Transit SMRT Buses Ltd • • • • Previously Trans Island Bus Services (TIBS) Incorporated as TIBS on 31 May 1982 Renamed to SMRT Buses Ltd on 10 May 2004 Main and only competitor: SBS Transit Ltd Milestones Geographic Footprint 10 Operating Model Group Information Financials Share Holding Pattern License and Operating Agreement 16 Critical success factors • Turnaround time – Shorter waiting time • Cost effective and sustainable transport – through integrated information • Network Span -Seamless travel across wider network • Modular transportation growth approach to offer better connectivity for future • Safety and Security regulations Industry Drivers in Singapore • Economic growth of Singapore • Population growth...

Words: 948 - Pages: 4

Premium Essay

Aravind Eye Care

...Compliments of ISBN-13: 978-1-4221-8965-8 8961BC Copyright 2012 Harvard Business School Publishing Corporation All rights reserved Printed in the United States of America This chapter was originally published as chapter 5 of Judgment Calls: Twelve Stories of Big Decisions and the Teams That Got Them Right, copyright 2012 Harvard Business School Publishing Corporation. No part of this publication may be reproduced, stored in or introduced into a retrieval system, or transmitted, in any form, or by any means (electronic, mechanical, photocopying, recording, or otherwise), without the prior permission of the publisher. Requests for permission should be directed to permissions@hbsp.harvard.edu, or mailed to Permissions, Harvard Business School Publishing, 60 Harvard Way, Boston, Massachusetts 02163. You can purchase Harvard Business Review Press books at booksellers worldwide. You can order Harvard Business Review Press books and book chapters online at www.hbr.org/books, or by calling 888-500-1016 or, outside the U.S. and Canada, 617-783-7410. 5 Cognizant How Will All These Daily Decisions Get Made? E M P LO Y E E S AT COG NI ZANT T ECHNOLOG Y SOLU T I ONS , a large provider of information technology services, had a minor but annoying problem to solve on behalf of their client. It was the type of nagging issue often faced by multinational corporations. Cognizant’s client, a global manufacturing company with its headquarters in the United States, had adopted...

Words: 4835 - Pages: 20

Premium Essay

Media in Business

...in the business place Proposal Topic This proposal discusses the use of mobile devices including phones and tablets in the business place, the impact that has affected all corporations and shows a promise to a bright future for many companies. Technology today keeps everyone in touch 24/7. Many business professionals are required to carry a smart phone or depending on the company are provided with a smart phone for company purposes only. The accessibility of a person 24/7 makes it easy for companies to get in contact with its employees quickly for emergency situations. According to the article offices go mobile, “66% expect to be able to use any devise-personal or company owned—to access corporate networks, 66% would take a job with less pay if they got more flexibility in their access to and use of mobile devises and 60% believe it’s not necessary to be in the office to be productive. Problem Many companies are still new to using primarily mobile devices to conduct all business ventures for a company. Companies also want to make sure that the mobile devices being used are completely secure so that no information is going to be accidently released. Companies may want to go to using mobile devices for the easy access of the employees and the customer but may not be able to afford the type of technology that is needed to have a business run from mobile devices. Some companies may not know where to get started and the type of technologies that they will need to run the...

Words: 2513 - Pages: 11

Premium Essay

Managing High Growth Brand-Starbucks

... | Mr. Mahbub Hossain Course Instructor Brand and Product Management, sec-A Subject: STARBUCKS CORPORATION: Managing high growth brand. Dear Sir, We are grateful to you for giving us the chance to work on this case study. We would also like to express gratitude to you for your gracious cooperation and valuable guidance for preparing the report. Sincerely, Khan Samara Salsabeel (07-09162-2) Sadia Rezwana (07-09013-2) Kazi Masum (08-09933-1) Mohammad Abdul Kader (08-11783-2) In 1971, Seattle entrepreneurs Jerry Baldwin, Gordon Bowker and Zev Siegl first opened Starbucks in Pike Place Market. At that time, Country’s major coffee brands were engaged in price war, therefore they were forced to use cheaper beans in their blends to reduce costs. As a result there was a decline in coffee consumption. To harness the potential of the gourmet coffee trend in the Seattle area, the founders of Starbucks experimented with the new concept of a store dedicated to selling only the finest coffee beans and coffee brewing machines. This emphasis on quality whole-bean coffee retail was fairly unique. Starbucks placed quality as its top priority. The Starbucks management dedicated a great deal of their time and financial resources to establishing strong relationships with coffee...

Words: 3244 - Pages: 13

Premium Essay

Annual Report

...The UNIQLO Business Fashionable and high-quality clothes that anyone can wear anywhere, any time—that’s what UNIQLO is all about. Our global operating systems weave together all processes from product design to final sales, including global R&D, procurement of world-class quality materials, production focused in China, and the operation of 750 stores around the globe. This seamless system allows UNIQLO to consistently offer its customers high-quality products at reasonable prices. b FAST RETAILING CO., LTD. b UNIQLO(U.K.)LTD. b FAST RETAILING (JIANGSU) APPAREL CO., LTD. b UNIQLO USA, Inc. b FRL Korea Co., Ltd. b UNIQLO HONG KONG, LIMITED b G.U. CO., LTD. b CABIN CO., LTD. (Listed on First Section of the TSE) b Créations Nelson S.A.S. b COMPTOIR DES COTONNIERS JAPAN CO., LTD. b PETIT VEHICULE S.A. b ONEZONE CORPORATION b ASPESI Japan Co., Ltd. b LINK THEORY HOLDINGS CO.,LTD. (Listed on TSE Mothers, Equity-method affiliate) b VIEWCOMPANY CO.,LTD. (Listed on JASDAQ Securities Exchange, Equity-method affiliate) FAST RETAILING ANNUAL REPORT 2006 13 The UNIQLO Business Overview of the UNIQLO Business In Japan’s highly competitive retail market, UNIQLO has positioned large-format stores as its growth driver and is accelerating their opening. Overseas, UNIQLO is carrying on its campaign to become a global brand and opened its first flagship store in New York’s Soho district in 2006. Market Environment In the Japanese economy...

Words: 5399 - Pages: 22

Premium Essay

Wal Mart Turnover Rate

...Wal Mart A Proposal on How Wal-Mart Can Reduce High Employee Turnover Tiffanie Jenkins GM 591 Wal-Mart Stores, Inc. branded as Wal-Mart since 2008 and Wal-Mart before then, is an American public multinational corporation that runs chains of large discount department stores and warehouse stores. The company is the world's 18th largest public corporation, according to the Forbes Global 2000 list, and the largest public corporation when ranked by revenue. It is also the biggest private employer in the world with over 2 million employees. The company was founded by Sam Walton in 1962, incorporated on October 31, 1969, and publicly traded on the New York Stock Exchange in 1972. It is headquartered in Bentonville, Arkansas. Wal-Mart is also the largest grocery retailer in the United States. In 2009, it generated 51% of its US$258 billion sales in the U.S. from grocery business. It also owns and operates the Sam's Club retail warehouses in North America. Wal-Mart has 8,500 stores in 15 countries, under 55 different names. The company operates under its own name in the United States, including the 50 states and Puerto Rico. Walton was extremely successful in running the store in Newport, far exceeding expectations. However, when the lease came up for renewal, Walton could neither come to agreement on the existing store's lease renewal nor find a new location in Newport. Instead, he opened a new Ben Franklin franchise in Bentonville, Arkansas, but called it "Walton's Five...

Words: 6103 - Pages: 25

Premium Essay

Proposal on Wal Mart Turnover

...Wal Mart A Proposal on How Wal-Mart Can Reduce High Employee Turnover Tiffanie Jenkins August 21, 2011 Wal-Mart Stores, Inc. branded as Wal-Mart since 2008 and Wal-Mart before then, is an American public multinational corporation that runs chains of large discount department stores and warehouse stores. The company is the world's 18th largest public corporation, according to the Forbes Global 2000 list, and the largest public corporation when ranked by revenue. It is also the biggest private employer in the world with over 2 million employees. The company was founded by Sam Walton in 1962, incorporated on October 31, 1969, and publicly traded on the New York Stock Exchange in 1972. It is headquartered in Bentonville, Arkansas. Wal-Mart is also the largest grocery retailer in the United States. In 2009, it generated 51% of its US$258 billion sales in the U.S. from grocery business. It also owns and operates the Sam's Club retail warehouses in North America. Wal-Mart has 8,500 stores in 15 countries, under 55 different names. The company operates under its own name in the United States, including the 50 states and Puerto Rico. Walton was extremely successful in running the store in Newport, far exceeding expectations. However, when the lease came up for renewal, Walton could neither come to agreement on the existing store's lease renewal nor find a new location in Newport. Instead, he opened a new Ben Franklin franchise in Bentonville, Arkansas, but called it "Walton's...

Words: 6104 - Pages: 25

Free Essay

Maple Retreat

...991 - HCL Technologies Limited was originally incorporated on 12th November, as "HCL Overseas Limited". The certificate of commencement of business was received on 10th February, 1992. On July 14, 1994, the name of the Company was changed to "HCL Consulting Limited". The Company changed its name to "HCL Technologies Limited" on 6th October 1999 to better reflect the line of activities of the Company. - HCL provides new technology development services to its clients. 1996 - The 50:50 joint venture with Perot Systems Corporation in the year, provided access to high value client base of Perot Systems. - The Company has one of the largest software development infrastructures in India. This state-of-the-art infrastructure, which comprises seven software factories, is designed to take advantage of the high productivity and scalability as well as the relatively lower cost of software development in India. 1998 - The Company started addressing the markets in Europe and Asia Pacific. - The company has a rich heritage in technologies like the Internet and e-Commerce, networking and internetworking, Internet telephony, telecom, embedded software, ASIC/VLSI design and testing, satellite communication, wireless communication and component based object technologies like COM, DCOM and CORBA. - The Company has the capability to work with a wide variety of computing platforms ranging from Open Client Server systems comprising all flavors of UNIX, Microsoft platforms, AS/400...

Words: 4787 - Pages: 20