Introduciton:

In this experiment, three differnet thermodynamic cycle scenaro’s were given. Each was to be determined via tables and graphs: cold air-standard Brayton cycle, an ideal steam Rankine cycle, an an ideal vapor-compression refrigeration cycle. In each question, their would be a constant set to perform different calculations. This was done the desired amount. In the cold air-standard Brayton cycle, the thermal efficiency and net specific work output was needed with constant compressor pressure ratios of 6, 9, 12, and 15; while the turbine inlet temperatures were 800ºC, 1000ºC, 1200ºC, and 1400ºC. Then, the turbine inlet temperatures remained constant at 800ºC, 1000ºC, 1200ºC, and 1400ºC; while the compressor pressure ratios was 6, 9, 12, and 15. After all data was collected, four graphs were to be created by plotting the turbine inlet temperatures and the compressor pressure ratio versus the cycle thermal efficiency and net specific work output. For the ideal steam Rankine cycle, needed was to plot the cycle thermal efficiency by first setting the turbine exhaust pressures at a constant of 10, 50, and 100 kPa; and going through the turbine inlet pressures at 1, 5, and 8 MPa. Secondaly, it was needed to set the turbine exhaust pressures constant and going through a turbine inlet temperature of 300ºC, 500ºC, 700ºC. After all data was collected, two graphs were to be created. The first was plotted: the cycle thermal efficiency versus the turbine inlet temperatures as the exhaust pressures were and turbine inlet pressures were constant. The second was plotted: the cycle thermal efficiency versus the turbine inlet pressure as each exhaust pressure and turbine inlet temperature were constant. Lastly, for the ideal vapor-compression refrigeration cycle, it was required to calculate and plot the COP as the condenser and evaporator pressures effected the COP. In order to do this, it was needed to set the condenser pressures constant and going through the different evaporator pressures. Then a graph was calculated by the condenser pressure versus the COP. Next, remained constant was the evaporator pressures and went through each of the condenser pressures. Also, a graph was calculated by evaporator pressure versus the COP.

Problem 1

Data (Part 1):

INPUTS k= 1.4 cp= 1.005
P1= 100 [KPa]
T1= 300 [K] PR = 6 T2 [K] wc,in [KJ/kg] qin [KJ/kg] T4 [K] wt,out [KJ/kg] w,net [KJ/kg] T3 [K] nth
500.6 201.6 575.3 643.1 432.1 230.5 1073 0.4007
500.6 201.6 776.3 763.0 512.6 311.0 1273 0.4007
500.6 201.6 977.3 882.8 593.1 391.6 1473 0.4007
500.6 201.6 1178.3 1002.7 673.7 472.1 1673 0.4007 PR = 9 T2 [K] wc,in [KJ/kg] qin [KJ/kg] T4 [K] wt,out [KJ/kg] w,net [KJ/kg] T3 [K] nth
562.0 263.3 513.5 572.7 502.8 239.4 1073 0.4662
562.0 263.3 714.5 679.5 596.5 333.1 1273 0.4662
562.0 263.3 915.5 786.3 690.2 426.8 1473 0.4662
562.0 263.3 1116.5 893.0 783.9 520.5 1673 0.4662 PR = 12 T2 [K] wc,in [KJ/kg] qin [KJ/kg] T4 [K] wt,out [KJ/kg] w,net [KJ/kg] T3 [K] nth
610.2 311.7 465.1 527.5 548.2 236.4 1073 0.5083
610.2 311.7 666.1 625.9 650.4 338.6 1273 0.5083
610.2 311.7 867.1 724.2 752.5 440.8 1473 0.5083
610.2 311.7 1068.1 822.5 854.7 543.0 1673 0.5083 PR = 15 T2 [K] wc,in [KJ/kg] qin [KJ/kg] T4 [K] wt,out [KJ/kg] w,net [KJ/kg] T3 [K] nth
650.4 352.1 424.8 495.0 580.9 228.8 1073 0.5387
650.4 352.1 625.8 587.2 689.2 337.1 1273 0.5387
650.4 352.1 826.8 679.5 797.5 445.4 1473 0.5387
650.4 352.1 1027.8 771.7 905.8 553.7 1673 0.5387

Graphs (Part 1):

Data (Part 2):

INPUTS OUTPUTS k= 1.4 cp= 1.005
P1= 100 [KPa]
T1= 300 [K]

T3 [K]

1073 T2 [K] wc,in [KJ/kg] qin [KJ/kg] T4 [K] wt,out [KJ/kg] w,net [KJ/kg] PR = nth
500.6 201.6 575.3 643.1 432.1 230.5 6 0.4007
562.0 263.3 513.5 572.7 502.8 239.4 9 0.4662
610.2 311.7 465.1 527.5 548.2 236.4 12 0.5083
650.4 352.1 424.8 495.0 580.9 228.8 15 0.5387

T3 [K] 1273 T2 [K] wc,in [KJ/kg] qin [KJ/kg] T4 [K] wt,out [KJ/kg] w,net [KJ/kg] PR = nth
500.6 201.6 776.3 763.0 512.6 311.0 6 0.4007
562.0 263.3 714.5 679.5 596.5 333.1 9 0.4662
610.2 311.7 666.1 625.9 650.4 338.6 12 0.5083
650.4 352.1 625.8 587.2 689.2 337.1 15 0.5387 T3 [K] 1473 T2 [K] wc,in [KJ/kg] qin [KJ/kg] T4 [K] wt,out [KJ/kg] w,net [KJ/kg] PR = nth
500.6 201.6 977.3 882.8 593.1 391.6 6 0.4007
562.0 263.3 915.5 786.3 690.2 426.8 9 0.4662
610.2 311.7 867.1 724.2 752.5 440.8 12 0.5083
650.4 352.1 826.8 679.5 797.5 445.4 15 0.5387 T3 [K] 1673 T2 [K] wc,in [KJ/kg] qin [KJ/kg] T4 [K] wt,out [KJ/kg] w,net [KJ/kg] PR = nth
500.6 201.6 1178.3 1002.7 673.7 472.1 6 0.4007
562.0 263.3 1116.5 893.0 783.9 520.5 9 0.4662
610.2 311.7 1068.1 822.5 854.7 543.0 12 0.5083
650.4 352.1 1027.8 771.7 905.8 553.7 15 0.5387

Graphs (Part 2):

Sample Calculations:

Given rp= P_2/P_1 = P_3/P_4 =6
Specific heat (k) =1.005,
P1 = 100 KPa, T1= 300 K, T3=1073 K

T_2= T_1 (〖P_2/P_1 )〗^((k-1)/k) T_2= 100 K(〖6)〗^((1.4-1)/1.4)=500.6 K w_(c,in)=C_p (T_2- T_1) w_(c,in)=1.005(500.6- 300)=201.6 KJ/Kg q_in=C_p (T_3- T_2) q_in=1.005(1073- 500.6)=573.5 KJ/Kg
T_4s= T_3 (〖P_3/P_4 )〗^((k-1)/k) T_4= 1073(〖1/6)〗^((1.4-1)/1.4)=643.1 K w_(T,out)=C_p (T_3- T_4) w_(T,out)=1.005(1073- 643.1)=432.1 KJ/Kg
W_(net,out)= W_(T,out)- W_(c,in) W_(net,out)=432.1- 201.6=230.5 KJ/Kg
〖 η〗_th= W_(net,out)/q_in 〖 η〗_th= 230.5/573.5=.4007

Problem 2

Data (Part 1):
P1 (kpa) 10
T3 (°C) 300

Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
1.00 192.81 2858.7901 0.86 2257.23 2065.42 793.37 0.28
5.04 196.85 2728.8501 0.74 1965.85 1774.04 954.81 0.35
8.07 199.88 2586.6201 0.69 1832.72 1640.91 945.71 0.37
P1 (kpa) 50
T3 (°C) 300

Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
1.00 192.81 3286.2901 0.95 2461.24 2269.43 1016.86 0.31
5.04 196.85 3237.8501 0.84 2210.50 2018.69 1219.16 0.38
8.07 199.88 3199.6201 0.81 2130.28 1938.47 1261.15 0.39
P1 (kpa) 100
T3 (°C) 300

Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
1.00 192.81 3731.2901 1.02 2624.32 2432.51 1298.78 0.35
5.04 196.85 3703.4501 0.92 2381.30 2189.49 1513.96 0.41
8.07 199.88 3682.3201 0.88 2307.50 2115.69 1566.63 0.43 P1 (kpa) 10
T3 (°C) 500 Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
0.98 341.52 2710.0815 0.93 2479.17 2138.63 571.45 0.21
5.10 345.64 2580.0615 0.79 2155.37 1814.83 765.23 0.30
8.19 348.73 2437.7715 0.72 2007.41 1666.87 770.90 0.32
P1 (kpa) 50
T3 (°C) 500

Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
0.98 341.52 3137.5815 1.03 2705.89 2365.35 772.23 0.25
5.10 345.64 3089.0615 0.91 2427.24 2086.70 1002.36 0.32
8.19 348.73 3050.7715 0.87 2338.10 1997.56 1053.22 0.35
P1 (kpa) 100
T3 (°C) 500

Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
0.98 341.52 3582.5815 1.10 2887.13 2546.59 1035.99 0.29
5.10 345.64 3554.6615 0.99 2617.06 2276.52 1278.14 0.36
8.19 348.73 3533.4715 0.95 2535.04 2194.50 1338.97 0.38
P1 (kpa) 10
T3 (°C) 700

Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
0.94 418.45 3060.6513 1.07 2826.05 2408.54 652.11 0.21
5.11 422.62 3012.0793 0.94 2533.03 2115.52 896.56 0.30
8.24 425.75 2973.7503 0.90 2439.28 2021.77 951.98 0.32

P1 (kpa)

50
T3 (°C) 700

Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
0.94 418.45 2633.1513 0.96 2587.64 2170.13 463.03 0.18
5.11 422.62 2503.0793 0.81 2247.12 1829.61 673.47 0.27
8.24 425.75 2360.7503 0.74 2091.53 1674.02 686.73 0.29
P1 (kpa) 100
T3 (°C) 700

Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
0.94 418.45 3505.6513 1.15 3016.64 2599.13 906.52 0.26
5.11 422.62 3477.6793 1.03 2732.64 2315.13 1162.55 0.33
8.24 425.75 3456.4503 0.99 2646.38 2228.87 1227.58 0.36

Table Values
S 3=S4(KJ/Kg k) P1(Kpa) Sf Ssg Hf Hfg
7.1246 10 0.6492 7.4996 191.81 2392.1
7.7642 50 1.0912 6.5019 340.54 2304.7
8.2755 100 1.3028 6.0562 417.51 2257.5
6.2111
6.9781
7.5136
5.7937
6.7266
7.2822

Graph (Part 1):

Data (Part 2):

P1 (kpa) 10
P3 (kpa) 1000
T3 (°C) H1 (KJ/Kg) V1 (KJ/Kg K) Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
300 191.81 0.00101 1.00 192.81 2858.7901 0.86 2257.23 2065.42 793.37 0.28
500 191.81 0.00101 5.04 196.85 2728.8501 0.74 1965.85 1774.04 954.81 0.35
700 191.81 0.00101 8.07 199.88 2586.6201 0.69 1832.72 1640.91 945.71 0.37
P1 (kpa) 10
P3 (kpa) 5000
T3 (°C) H1 (KJ/Kg) V1 (KJ/Kg K) Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
300 191.81 0.00101 1.00 192.81 3286.2901 0.95 2461.24 2269.43 1016.86 0.31
500 191.81 0.00101 5.04 196.85 3237.8501 0.84 2210.50 2018.69 1219.16 0.38
700 191.81 0.00101 8.07 199.88 3199.6201 0.81 2130.28 1938.47 1261.15 0.39
P1 (kpa) 10
P3 (kpa) 8000
T3 (°C) H1 (KJ/Kg) V1 (KJ/Kg K) Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
300 191.81 0.00101 1.00 192.81 3731.2901 1.02 2624.32 2432.51 1298.78 0.35
500 191.81 0.00101 5.04 196.85 3703.4501 0.92 2381.30 2189.49 1513.96 0.41
700 191.81 0.00101 8.07 199.88 3682.3201 0.88 2307.50 2115.69 1566.63 0.43

P1 (kpa)
50
P3 (kpa) 1000
T3 (°C) H1 (KJ/Kg) V1 (KJ/Kg K) Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
300 340.54 0.00103 0.98 341.52 2710.0815 0.93 2479.17 2138.63 571.45 0.21
500 340.54 0.00103 5.10 345.64 2580.0615 0.79 2155.37 1814.83 765.23 0.30
700 340.54 0.00103 8.19 348.73 2437.7715 0.72 2007.41 1666.87 770.90 0.32
P1 (kpa) 50
P3 (kpa) 5000
P3 (Kpa) H1 (KJ/Kg) V1 (KJ/Kg K) Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
300 340.54 0.00103 0.98 341.52 3137.5815 1.03 2705.89 2365.35 772.23 0.25
500 340.54 0.00103 5.10 345.64 3089.0615 0.91 2427.24 2086.70 1002.36 0.32
700 340.54 0.00103 8.19 348.73 3050.7715 0.87 2338.10 1997.56 1053.22 0.35
P1 (kpa) 50
P3 (kpa) 8000
T3 (°C) H1 (KJ/Kg) V1 (KJ/Kg K) Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
300 340.54 0.00103 0.98 341.52 3582.5815 1.10 2887.13 2546.59 1035.99 0.29
500 340.54 0.00103 5.10 345.64 3554.6615 0.99 2617.06 2276.52 1278.14 0.36
700 340.54 0.00103 8.19 348.73 3533.4715 0.95 2535.04 2194.50 1338.97 0.38
P1 (kpa) 100
P3 (kpa) 1000
T3 (°C) H1 (KJ/Kg) V1 (KJ/Kg K) Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
300 417.51 0.001043 0.94 418.45 2633.1513 0.96 2587.64 2170.13 463.03 0.18
500 417.51 0.001043 5.11 422.62 2503.0793 0.81 2247.12 1829.61 673.47 0.27
700 417.51 0.001043 8.24 425.75 2360.7503 0.74 2091.53 1674.02 686.73 0.29
P1 (kpa) 100
P3 (kpa) 5000
T3 (°C) H1 (KJ/Kg) V1 (KJ/Kg K) Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
300 417.51 0.001043 0.94 418.45 3060.6513 1.07 2826.05 2408.54 652.11 0.21
500 417.51 0.001043 5.11 422.62 3012.0793 0.94 2533.03 2115.52 896.56 0.30
700 417.51 0.001043 8.24 425.75 2973.7503 0.90 2439.28 2021.77 951.98 0.32
P1 (kpa) 100
P3 (kpa) 8000
T3 (°C) H1 (KJ/Kg) V1 (KJ/Kg K) Wp,in (KJ/Kg) H2(KJ/Kg) qin(KJ/Kg) X4 (KJ/Kg) H4(KJ/Kg) qout(KJ/Kg) Wnet nth
300 417.51 0.001043 0.94 418.45 3505.6513 1.15 3016.64 2599.13 906.52 0.26
500 417.51 0.001043 5.11 422.62 3477.6793 1.03 2732.64 2315.13 1162.55 0.33
700 417.51 0.001043 8.24 425.75 3456.4503 0.99 2646.38 2228.87 1227.58 0.36

Values
P (KPa) T (°C) H3 (KJ/Kg) S 3=S4(KJ/Kg k) P1(Kpa) Sf Ssg Hf Hfg
1000 300 3051.6 7.1246 10 0.6492 7.4996 191.81 2392.1 500 3479.1 7.7642 50 1.0912 6.5019 340.54 2304.7 700 3924.1 8.2755 100 1.3028 6.0562 417.51 2257.5
5000 300 2925.7 6.2111 500 3434.7 6.9781 700 3900.3 7.5136
8000 300 2786.5 5.7937 500 3399.5 6.7266 700 3882.2 7.2822

Graph (Part 2):

Sample Calculations:
Turbine Exhaust Pressures of 10, 50, and 100 kPa
Turbine Inlet Pressures of 1, 5, and 8 MPa
Turbine Inlet Temperatures 300C, 500C, 700C
Process 1 - 2 State 1 P1 = 10 kPa => h1 = 191.81 KJ/Kg v1 = 0.00101 m3/Kg wp,in = V1 (P2 – P1) = (0.00101 m3/Kg)*(1000-10) = .9999 KJ/Kg h2 = h1 + wp,in = 191.81 + .9999 = 192.8099 KJ/Kg

Process 2 – 3 State 3 P3 = 1000 kPa, T3 = 300C => h3 = 3051.6 KJ/Kg s3 = 7.1246 KJ/Kg . K
Energy Balance:
2q3 + h2 – h3 = 0 => 2q3 = h3 – h2 => qin = h3 – h2 = 0 = (3051.6 – 192.8099) = 2858.7901 KJ/Kg

Process 3 – 4 State 4 P4 = 10 kPa, s3 = s4 => h4 = hf – x4hfg = 191.81 + (.8634327164)*(2392.1) = 2257.227401 KJ/Kg

Process 4 – 1
Energy Balance:
4q1 + h1 – h4 = 0 => 4q1 = h4 – h1 => qout = h4 – h1 = 0 = (2257.227401 – 191.81) = 2065.417401 KJ/Kg wnet = qin – qout = (2858.7901 - 2065.417401) = 793.372699 KJ/Kg th = = 

Problem 3

Data (Part 1): Pc = 400 Pe (Kpa) H1 (KJ/Kg) S1 (KJ/Kg K) H2 (KJ/Kg) Win (KJ/Kg) H3 (KJ/Kg) QH (KJ/Kg) COP
100 234.44 0.95183 262.71 28.27 63.94 198.77 7.03
180 242.86 0.93965 259.21 16.35 63.94 195.27 11.94
240 247.28 0.93458 257.75 10.47 63.94 193.81 18.51
360 253.81 0.92836 255.94 2.13 63.94 192.00 90.22 Pc = 600 Pe (Kpa) H1 (KJ/Kg) S1 (KJ/Kg K) H2 (KJ/Kg) Win (KJ/Kg) H3 (KJ/Kg) QH (KJ/Kg) COP
100 234.44 0.95183 271.40 36.96 81.51 189.89 5.14
180 242.86 0.93965 267.74 24.88 81.51 186.23 7.48
240 247.28 0.93458 266.22 18.94 81.51 184.71 9.75
360 253.81 0.92836 264.36 10.55 81.51 182.85 17.33 Pc = 800 Pe (Kpa) H1 (KJ/Kg) S1 (KJ/Kg K) H2 (KJ/Kg) Win (KJ/Kg) H3 (KJ/Kg) QH (KJ/Kg) COP
100 234.44 0.95183 277.67 43.23 95.47 182.20 4.21
180 242.86 0.93965 273.87 31.01 95.47 178.40 5.75
240 247.28 0.93458 272.31 25.03 95.47 176.84 7.06
360 253.81 0.92836 270.39 16.58 95.47 174.92 10.55 Pc = 1000 Pe (Kpa) H1 (KJ/Kg) S1 (KJ/Kg K) H2 (KJ/Kg) Win (KJ/Kg) H3 (KJ/Kg) QH (KJ/Kg) COP
100 234.44 0.95183 282.53 48.09 107.32 175.21 3.64
180 242.86 0.93965 278.64 35.78 107.32 171.32 4.79
240 247.28 0.93458 277.03 29.75 107.32 169.71 5.70
360 253.81 0.92836 275.04 21.23 107.32 167.72 7.90 Pc = 1200 Pe (Kpa) H1 (KJ/Kg) S1 (KJ/Kg K) H2 (KJ/Kg) Win (KJ/Kg) H3 (KJ/Kg) QH (KJ/Kg) COP
100 234.44 0.95183 286.50 52.06 117.77 168.73 3.24
180 242.86 0.93965 282.51 39.65 117.77 164.74 4.15
240 247.28 0.93458 280.85 33.57 117.77 163.08 4.86
360 253.81 0.92836 278.81 25.00 117.77 161.04 6.44 TABLE VALUES NEEDED
P (KPa) T (°C) H (KJ/Kg) S (KJ/Kg k) P (KPa) T (°C) H (KJ/Kg) S (KJ/Kg k)
400 sat 255.5 0.9269 1000 40 271.71 0.9179 10 256.58 0.9305 50 282.74 0.9525 20 265.86 0.9628 1200 50 278.27 0.9267
600 sat 262.4 0.9218 60 289.64 0.9614 30 270.81 0.9499 40 280.58 0.9816
800 sat 267.29 0.9183 40 276.45 0.948 50 286.69 0.9802

Grpah (Part 1):

Data (Part 2):

Pe 100 (KPa) Pc (Kpa) H1 (KJ/Kg) S1 (KJ/Kg K) H2 (KJ/Kg) Win (KJ/Kg) H3 (KJ/Kg) QH (KJ/Kg) COP
400 234.44 0.95183 262.71 28.27 63.94 198.77 7.03
600 234.44 0.95183 271.40 36.96 81.51 189.89 5.14
800 234.44 0.95183 277.67 43.23 95.47 182.20 4.21
1000 234.44 0.95183 282.53 48.09 107.32 175.21 3.64
1200 234.44 0.95183 286.50 52.06 117.77 168.73 3.24 Pe 180 (KPa) Pc (Kpa) H1 (KJ/Kg) S1 (KJ/Kg K) H2 (KJ/Kg) Win (KJ/Kg) H3 (KJ/Kg) QH (KJ/Kg) COP
400 242.86 0.93965 259.21 16.35 63.94 195.27 11.94
600 242.86 0.93965 267.74 24.88 81.51 186.23 7.48
800 242.86 0.93965 273.87 31.01 95.47 178.40 5.75
1000 242.86 0.93965 278.64 35.78 107.32 171.32 4.79
1200 242.86 0.93965 282.51 39.65 117.77 164.74 4.15 Pe 240 (KPa) Pc (Kpa) H1 (KJ/Kg) S1 (KJ/Kg K) H2 (KJ/Kg) Win (KJ/Kg) H3 (KJ/Kg) QH (KJ/Kg) COP
400 247.28 0.93458 257.75 10.47 63.94 193.81 18.51
600 247.28 0.93458 266.22 18.94 81.51 184.71 9.75
800 247.28 0.93458 272.31 25.03 95.47 176.84 7.06
1000 247.28 0.93458 277.03 29.75 107.32 169.71 5.70
1200 247.28 0.93458 280.85 33.57 117.77 163.08 4.86 Pe 360 (KPa) Pc (Kpa) H1 (KJ/Kg) S1 (KJ/Kg K) H2 (KJ/Kg) Win (KJ/Kg) H3 (KJ/Kg) QH (KJ/Kg) COP
400 253.81 0.92836 255.94 2.13 63.94 192.00 90.22
600 253.81 0.92836 264.36 10.55 81.51 182.85 17.33
800 253.81 0.92836 270.39 16.58 95.47 174.92 10.55
1000 253.81 0.92836 275.04 21.23 107.32 167.72 7.90
1200 253.81 0.92836 278.81 25.00 117.77 161.04 6.44

Table Values Needed
P (KPa) T (°C) H (KJ/Kg) S (KJ/Kg k) P (KPa) T (°C) H (KJ/Kg) S (KJ/Kg k)
400 sat 255.5 0.9269 600 sat 262.4 0.9218 10 256.58 0.9305 30 270.81 0.9499 20 265.86 0.9628 40 280.58 0.9816
800 sat 267.29 0.9183 1000 40 271.71 0.9179 40 276.45 0.948 50 282.74 0.9525 50 286.69 0.9802
1200 50 278.27 0.9267 60 289.64 0.9614

Graph (Part 2):

Sample Calculations:

Process 1 - 2 State 1 Pe = 100 kPa sat vapor => h1 = 234.44 KJ/Kg S1 = 0.95183 KJ/Kg k State 2 Pc = 400 kPa S1 = S2 = 0.95183 KJ/Kg k h_2=256.58+(.95183- .9305) ((256.86-256.58))/((9628- .9305))=262.71 KJ/Kg Energy Balance: Q ̇-W ̇+ ∑▒〖(m_in ) ̇(θ ̇_in+∑▒(m_out ) ̇ ((θ_out ) ̇= 0) ̇ ) ̇ 〗 -1w2=h_2- h_1=28.27 KJ/Kg win = 28.27 KJ/Kg
Process 2 – 3 State 2 h2 = 262.71 KJ/Kg State 3 Pc = 400 kPa sat liq. => h3 = 64.94 KJ/Kg Energy Balance: Q ̇-W ̇+ ∑▒〖(m_in ) ̇(θ ̇_in+∑▒(m_out ) ̇ ((θ_out ) ̇= 0) ̇ ) ̇ 〗 2q3=h_3- h_2=-198.77 KJ/Kg Qh = 198.77 KJ/Kg COP = q_h/w_in =7.03

Observations:

For the first cycle, cold air-standard Brayton, the thermal efficiency and net specific work output was needed with constant compressor pressure ratios of; while the turbine inlet temperatures cycled. Then the turbine inlet temperatures remained constant, while the compressor pressure ratios was cycled. After all data was collected, four graphs were created by plotting the turbine inlet temperatures and the compressor pressure ratio versus the cycle thermal efficiency and net specific work output. Overlooking the data, as the compressor pressure ratio increased from 6 to 15, the work output also increased. This also occured as the turbine inlet temperatures increased. Also, as the compressor pressure ratio increased, the work of the compressor increased. However, for a pressure ratio of 6 and temperature of 1073 K, the cycle thermal efficiency remained the same. This occured for each of the pressure ratios cycling through the turbine inlet temperatures.
The second cycle was the ideal steam Rankine cycle. The cycle thermal efficiency was needed and two plots were to be determined by the the data. This was done by first setting the turbine exhaust pressures constant and going through the turbine inlet pressures, and secondaly setting the turbine exhaust pressures constant and going through the turbine inlet temperatures. The first was plotted: the cycle thermal efficiency versus the turbine inlet temperatures as the exhaust pressures were and turbine inlet pressures were constant. The second was plotted: the cycle thermal efficiency versus the turbine inlet pressure as each exhaust pressure and turbine inlet temperature were constant. Observing the table, whenever the turbine exhaust pressure would increase, 10 to 100 kPa, the cycle thermal efficiency would decrease. However, as the turbine inlet temperatures increased while the pressures of the turbine at the inlet and exit remained constant, the cycle thermal efficiency increased. Also Qin decreased for every inlet and exhaust pressure; while going through different temperatures.
Last was the ideal vapor-compression refrigeration cycle. It was required to calculate and plot the COP. This was done by setting the condenser pressure constant and going through the different evaporator pressures. A graph was calculated by the condenser pressure versus the COP. Then the evaporator pressure was constant as the condenser pressure was cycled through. Also, a graph was calculated by evaporator pressure versus the COP. Noting from the table, the COP increased as the condenser pressure increased while going through the evaporator pressures. However, the COP decreased for a constant evaporator pressure, while going through the condenser pressure.

Conclusion:

In this experiment, three differnet thermodynamic cycle scenaro’s were given. The first was the ideal, cold air-standard Brayton cycle. It was noted that in order to increase the the work output, the compressor pressure ratios and the turbine inlet temperatures were to be increased. Also, the cycle thermal efficiency would reamin the same as the pressure ratio and temperature were constant. Each of the pressure ratios cycling through the turbine inlet temperatures showed this happening. For the Rankine cycle, the cycle thermal efficiency would decrease whenever the turbine exhaust pressure would increase. Also, in order to increase the cycle thermal efficiency, the turbine inlet temperatures needed to be increased. While cycling through different temperatures, Qin would decreased for every inlet and exhaust pressure. The last cycle was the refrigeration cycle. As the condenser pressure increased while going through the evaporator pressures, the COP would also increase. But, while going through the condenser pressure the COP decreased.

Similar Documents

Free Essay

Parabolic Trough

...January 2003 • NREL/CP-550-33209 A Parabolic Trough Solar Power Plant Simulation Model Preprint H. Price To be presented at the ISES 2003: International Solar Energy Conference Hawaii Island, Hawaii March 16–18, 2003 National Renewable Energy Laboratory 1617 Cole Boulevard Golden, Colorado 80401-3393 NREL is a U.S. Department of Energy Laboratory Operated by Midwest Research Institute • Battelle • Bechtel Contract No. DE-AC36-99-GO10337 NOTICE The submitted manuscript has been offered by an employee of the Midwest Research Institute (MRI), a contractor of the US Government under Contract No. DE-AC36-99GO10337. Accordingly, the US Government and MRI retain a nonexclusive royalty-free license to publish or reproduce the published form of this contribution, or allow others to do so, for US Government purposes. This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation...

Words: 7222 - Pages: 29

Free Essay

Solar Trough

...most proven solar thermal electric technology. This is primarily due to nine large commercial-scale solar power plants, the first of which has been operating in the California Mojave Desert since 1984. These plants, which continue to operate on a daily basis, range in size from 14 to 80 MW and represent a total of 354 MW of installed electric generating capacity. Large fields of parabolic trough collectors supply the thermal energy used to produce steam for a Rankine steam turbine/generator cycle. Figure 1. Solar/Rankine parabolic trough system schematic [1]. Plant Overview Figure 1 shows a process flow diagram that is representative of the majority of parabolic trough solar power plants in operation today. The collector field consists of a large field of single-axis tracking parabolic trough solar collectors. The solar field is modular in nature and is composed of many parallel rows of solar collectors aligned on a north-south horizontal axis. Each solar collector has a linear parabolic-shaped reflector that focuses the sun’s direct beam radiation on a linear receiver located at the focus of the parabola. The collectors track the sun from east to west during the day to ensure that the sun is continuously focused on the linear receiver. A heat transfer fluid (HTF) is heated as it circulates through the receiver and returns to a series of heat exchangers in the power block where the fluid is used to 5-24 SOLAR PARABOLIC TROUGH generate high-pressure superheated steam...

Words: 10011 - Pages: 41

Premium Essay

Service Marketing

...Lünen – State-of-theArt Ultra Supercritical Steam Power Plant Under Construction Dr. Frank Cziesla Siemens AG, Energy Sector Dr. Jürgen Bewerunge Trianel Kohlekraftwerk Lünen GmbH & Co.KG Andreas Senzel Siemens AG, Energy Sector POWER-GEN Europe 2009 – Cologne, Germany May 26-29, 2009 Copyright © Siemens AG 2009. All rights reserved. Copyright © Siemens AG 2009. All rights reserved. 1 Abstract Clean and cost-effective power generation is of paramount importance to cope with the challenges imposed by an increasing energy demand throughout the world. Investment cost and fuel costs are the main contributors to the cost of electricity. In recent years, costs associated with CO2 emissions have attracted more and more attention due to its political awareness. The efficiency of the power plant as one key value affects both the fuel costs and the amount of CO2 emitted to the environment. As coal is more abundant in many parts of the world, coal prices are less volatile and more stable than natural gas prices. But larger CO2 emissions increase the need for more efficient coal-based power generation. Ultra supercritical (USC) steam power plants meet notably the requirements for high efficiencies to reduce both fuel costs and emissions as well as for a reliable supply of electric energy at low cost. Recent developments in steam turbine technology and high-temperature materials allowed for significant efficiency gains. Siemens has more than fifteen years of...

Words: 1682 - Pages: 7

Premium Essay

My Paper

...SALEH EBN SHARIF Address : 1st Floor, House no-27,Road no-1, Jharul Islam City, Dhaka Mobile : +8801674867383 Email :saleh.ebn.sharif@gmail.com; saleh.sharif@omsltd.net OBJECTIVE To devise a career based on my sound inter-personal skills and technical background. Self-motivation, co-operative mind, excellent analytical skills, enthusiastic attitude, good work ethics are some of my outstanding qualities.  EDUCATIONAL QUALIFICATIONS  Bachelor of Science , Electrical & Electronics Engineering (2013) Major: Power system Bangladesh University of Engineering and Technology CGPA:2.88 out 0f 4.00 Higher Secondary Certificate (2007) Rajshahi New Govt. Degree College GPA: 5.00 out of 5.00 Secondary School Certificate (2005) Govt. Laboratory High School, Rajshahi GPA: 5.00 out of 5.00 March, 2013 to present O&M Solutions Bangladesh Limited, Dhaka, Bangladesh A Subsidiary of O&M Solutions, Mauritius Electrical Engineer   EMPLOYMENT RECORD    Duration: Employer: Position: Working to develop Business and provide technical consultancy services in the industrial sector of Bangladesh for O&M Solutions Bangladesh Limited includes:        Energy Audit Electrical Safety Audit Clean Energy Cleaner Production Electrical Design review Network Design and Installation IT development Power sector business development experiences:      Assist in the Independent Engineering (IE) project works Inspection, Testing &Commissioning of Electrical Systems Preparation...

Words: 681 - Pages: 3

Premium Essay

Project Charter

...Project Management Assignment #1 MGT5164 City of Thunder Bay/Environment Division Digital SCADA Network Project Student Name: Joe Doe PROJECT INTRODUCTION ....................................................................................................... 2 Project Name........................................................................................................................................... 2 Scope and Objectives.............................................................................................................................. 2 Major Deliverables ................................................................................................................................. 2 OUTLINE OF WORK ................................................................................................................... 3 Resources................................................................................................................................................. 3 Customer Requirements ........................................................................................................................ 3 Key Attributes......................................................................................................................................... 3 PROJECT METHODOLOGY....................................................................................................... 4 Project Manager ......................................

Words: 1268 - Pages: 6

Premium Essay

Project

...NT1310 : Project Page 1 PROJECT DESCRIPTION As the project manager for the Cable Planning team, you will manage the creation of the cable plan for the new building that will be built, with construction set to begin in six weeks. The deliverables for the entire Cable Plan will consist of an Executive Summary, a PowerPoint Presentation and an Excel Spreadsheet. You will develop different parts of each of these in three parts. The final organization should contain these elements: The Executive Summary: o Project Introduction o Standa rds and Codes  Cable Standards and Codes  Building Standards and Codes o Project Materials o Copper Cable, Tools, and Test Equipment o Fiber - Optic Cable, Tools, and Test Equipment o Fiber - Optic Design Considerations o Basement Server Complex Design o First Floor Design o Security and Safety o Component Cost, Picture, and source The Excel Spreadsheet: Component Names Component Descriptions Component Costs Total Project Costs The PowerPoint Presentation: Introductory Slide Component Slides with Component Name, Quantity Needed, Description, Price, Picture, and Reference (where to buy the component) Description of the Basement Telecommunications and Network Server Space Network Equipment Required for the Server Farm Cable Plant Design for the Basement NT1310 : Project Page 2 Standard Floor Desig n for Computers and Network Equipment Cable Plant for the Standard Floor Course Objectives Tested: ...

Words: 1510 - Pages: 7

Free Essay

Solar Thermal Hybrid

...our customers integrate solar thermal power with power generation assets to deliver high-value, sustainable power: • Gas Turbine Combined Cycle • Coal-fired • Waste-to-Energy • Biomass • Geothermal • Desalination • Enhanced oil recovery applications Integrating Solar for Increased Economic and Environmental Sustainability WorleyParsons provides solar energy as a solution to increase economical and environmental value of both existing and new fossil based assets. Hybridizing concentrated solar power (CSP) with conventional power generation technology can provide high-value, dispatchable power. Applications and Benefits Combining solar thermal energy with traditional power generation plants can develop a number of key benefits: • Solar thermal energy can be converted to electric energy at higher efficiencies than in stand-alone CSP plants • Incremental costs of a larger steam turbine generator and associated balance of plant equipment needed for a hybrid plant are less than a stand-alone CSP • Daily start-up and shutdown energy losses can be eliminated and reduce overall costs • Incremental operational and maintenance (O&M) costs incurred for a solar addition are lower than stand-alone CSP O&M costs WorleyParsons provides a full range of services to support the development of both new and retrofit solar hybrid systems. Our staff provides assistance from planning and benefits analysis, to project management, execution and plant operations. Our full service engineering...

Words: 577 - Pages: 3

Premium Essay

Nuclear Power in the Uae

...Nuclear Power Plant Design for the United Arab Emirates The United Arab Emirates (also referred to as the UAE or the Emirates) is a relatively young country that has established a powerful world economy in a short period of time. After breaking ties from the United Kingdom just over four decades ago, the UAE has quickly developed one of the most appealing economies for foreign investment in Western Asia. The Emirates’ largest cities, Dubai and Abu Dhabi, are significant business gateways between the Middle East, Africa and Asia. Leveraging its prime geographical location and plentiful oil and natural gas reserves, the UAE has endeavored to develop its economy to the point that “today, [the Emirates] feels proud of [its] world-class and highly-ranked sea and air ports, which have strongly positioned the UAE as a main hub for trade and travel worldwide,” according to UAE Prime Minister Sheikh Mohammed. This improvement-centric mindset coupled with strategic reinvestment in infrastructure sets the United Arab Emirates on a path towards long-term global impact in many business indices. Figure [ 1 ] http://data.worldbank.org/country/united-arab-emirates S S Figure [ 1 ] http://data.worldbank.org/country/united-arab-emirates S S Over the past decade foreign direct investment (FDI) has swelled around the attractive business sector of the United Arab Emirates. Since its inception in 1971, the Emirates’ economy has grown exponentially, with gross domestic...

Words: 1844 - Pages: 8

Free Essay

Human Resource Mgt

...Bharat Heavy Electricals Limited (BHEL) owned by the Government of India, is a power plant equipment manufacturer and operates as engineering and manufacturing company based in New Delhi, India. Established in 1964, BHEL is India's largest engineering and manufacturing company of its kind. The company has been earning profits continuously since 1971-72 and paying dividends uninterruptedly since 1976-77. Bharat Heavy Electricals Limited (BHEL) (www.bhel.com) is a premier engineering and manufacturing organization with majority share holding by Govt. of India. BHEL offers a wide spectrum of products and services to the core infrastructure sectors of Indian economy viz. Power Generation, Transmission, Industry, Transportation and Renewable Energy. BHEL has been in this business for more than five decades now. In India, BHEL has 14 manufacturing units, 4 power sector regions, 8 service centers and 15 regional offices besides host of project sites spread all over India and abroad. BHEL-supplied equipments account for more than 65% of the total installed generating capacity in India and contribute approximately to 73% of the total power generation in the country. COMPANY PROFILE: Stock price: BHEL (NSE) Rs. 106.00 -1.60 (-1.49%) 8 Mar, 2:17 PM IST - Disclaimer Headquarters: New Delhi CEO: AtulSobti Founder: Government of India Founded: 1964 Revenue: 411.9 billion INR (2014) Net income: 35.03 billion INR (2014) Total assets: 752.4 billion INR (2014 HISTORY: BHEL was established...

Words: 1889 - Pages: 8

Premium Essay

Impact of Nuclear Power Plant in Kudankulam

...NUCLEAR POWER PLANT IN KUDANKULAM What is Nuclear Power?  Nuclear power, or Nuclear energy, is the use of exothermic nuclear processes, to generate useful heat & electricity. The term includes the following heat producing processes – nuclear fission, nuclear decay and nuclear fusion. Uses 1.   Nuclear power is a low carbon method of producing electricity & in 2011 nuclear power provided 10% of the world's electricity. 2.   Many military and some civilian (such as some icebreaker) ships use nuclear marine propulsion, a form of nuclear propulsion. 3.   A few space vehicles have been launched using full-fledged nuclear reactors: the Soviet RORSAT series and the American SNAP -10 A. 4.   Both Fission and fusion appear promising for space propulsion applications, generating higher mission velocities with less reaction mass. (Due to the much higher energy density of nuclear reactions: some 7 orders of magnitude (10,000,000 times) more energetic than the chemical reactions which power the current generation of rockets). 5.   International research is continuing into the use of nuclear fusion, and additional uses of process heat such as hydrogen production (in support of a hydrogen economy), desalinizing sea water, and for use in district heating systems. What is Nuclear Reactor? A nuclear reactor is a device to initiate and control a sustained nuclear chain reaction. Nuclear reactors are used at nuclear power plants for generating...

Words: 4508 - Pages: 19

Premium Essay

Project Management

...Assistance to India for the Uttaranchal Power Sector Capacity Building Project August 2005 CURRENCY EQUIVALENTS (as of 1 August 2005) Currency Unit Re1.00 $1.00 ADB DEA EA EMP HR IA IPDF IT kV kWh MOP MW O&M PIU PMO PTCUL RF RMU RP SGU SHP TA UEID UJVNL UPCL UREDA v – – – – – – – – – – – – – – – – – – – – – – – – – – – – – – Rupees (Re/Rs) $0.0231 Rs43.3800 ABBREVIATIONS Asian Development Bank Department of Economic Affairs executing agency environmental monitoring plan human resources implementing agency Indigenous People’s Development Framework information technology kilovolt kilowatt-hour (1,000 watt-hours) Ministry of Power megawatt (1,000,000 watts) operation and maintenance project implementation unit project management office Power Transmission Corporation of Uttaranchal, Ltd. resettlement framework rehabilitation, modernization, and upgrading resettlement plan State Government of Uttaranchal small hydropower plant technical assistance Uttaranchal Energy and Irrigation Department Uttaranchal Jal Vidyut Nigam, Ltd. Uttaranchal Power Corporation, Ltd. Uttaranchal Renewable Energy Development Agency volts TECHNICAL ASSISTANCE CLASSIFICATION Targeting Classification Sector Subsectors Themes Subthemes – – – – – General intervention Energy Hydropower generation, transmission and distribution Sustainable economic growth, environmental sustainability Fostering physical infrastructure development, cleaner industrial production [power] NOTE In this report, “$” refers...

Words: 4369 - Pages: 18

Free Essay

Africa

...thermal energy Wind energy IV- Research and Development V- Legal Framework and Incentives Legal framework Incentives and fiscal measures Regulatory measures VI- Glossary CONTENT 4 Renewable Energies: a priority in Algeria Algeria has created a green momentum by launching an ambitious program to develop renewable energies (REn) and promote energy efficiency. This program leans on a strategy focussed on developing and expanding the use of inexhaustible resources, such as solar energy in order to diversify energy sources and prepares Algeria of tomorrow. Through combining initiatives and the acquisition of knowledge, Algeria is engaged in a new age of sustainable energy use. The program consists of installing up to 22 000 MW of power generating capacity from renewable sources between 2011 and 2030, of which 12 000 MW will be intended to meet the domestic electricity demand and 10 000 MW destined for export. This last option depends on the availability of a demand that is ensured on the long term by reliable partners as well as on attractive external funding. In this...

Words: 5252 - Pages: 22

Premium Essay

Pm 598

...Design and Construction of an Army Reserve Center Proposal Project name: Design and Construct a 150-member Army Reserve Center (ARC) in Rockford, Illinois. Primary facilities consist of three buildings: 1. Training Building of approximately 31,239 SF; 2. Organizational Maintenance Shop (OMS) of approximately 5,294 SF; and 3. Unheated Storage (UHS) of approximately 1,520 SF. All buildings are located in Winnebago County, IL. Solicitation Number: W912QR-12-R-0025 Agency: Department of the Army Office: U.S. Army Corps of Engineers Location: USACE District, Louisville Introduction Thank you for allowing Lucky Construction CO the opportunity to bid this project fo you. Based on the Project plans dated February 9, 2012 and specifications dated January 6, 2012, Lucky Construction CO has put together a proposal with a breakdown of work included. The project ws priced based on the plans and specs unless other wise noted in below breakdown. Project Summary The project will be to design and construct a 150-member Army Reserve Center (ARC) in Rockford, Illinois. Primary facilities consist of three buildings: Training Building of approximately 31,239 SF Organizational Maintenance Shop (OMS) of approximately 5,294 SF Unheated Storage (UHS) of approximately 1,520 SF. All buildings are located in Winnebago County, IL. The project also includes privately owned vehicle (POV) and military equipment (MEP) parking. The Training building provides administrative and training...

Words: 3635 - Pages: 15

Free Essay

Corporate Sustaninability

...venture between  DEWA (Dubai Electricity and Water Authority) and TECOM (Dubai Technology and Media Free Zone) to provide efficient District Cooling Services (DCS) to developments in Dubai and the surrounding region. The purpose of existence of Empower is to achieve Dubai’s goal towards sustainability. According to share holders, Empower formation was mainly to play an important role in the growth sustainability of Dubai which is modern era fastest developing city of the world. Empowers district cooling services significantly reduces both energy costs and the environmental impact by reducing the amount of power required and increasing efficiency. Empower is formed with the vision to save energy for future generations to come. When Dubai started working towards it Strategic Goals of 2015, lots of initiatives are taken by Government of Dubai towards construction of prestigious projects. In Middle East Air conditioning is not a luxury rather a need & necessary. Dubai predicted increase in population and need for A/c was increasing which in turn was creating demand of Electrical Energy, but Dubai wants to save energy in its growth towards sustainability. Since major energy consumption was predicted through A/C Empower was created to Save Energy on a Special Decree from the ruler of Dubai. What is District Cooling? District cooling means the centralized production and distribution of cooling energy. Chilled water is delivered via an underground insulated pipeline to office, industrial...

Words: 1650 - Pages: 7

Free Essay

Renewable Energy

...ABTRACT This project paper studies the potential of hydroelectric energy as a way to effectively generate, use and store renewable energy through the clean gravitational potential energy of stored water. Nuclear and coal fired plants could do change power output to achieve demand but at extremely high maintenance cost. Nuclear plants also being a good source of continuous energy has a high chance of posing hazard to the environment. Coal and fossil fuel fired power plants on the other hand cannot be depended on because the source will diminish someday. Therefore, alternative methods have to be explored in order to find a renewable and sustainable energy for the future generations. This project paper will study the benefits of hydroelectric energy as a potential and important energy source for a sustainable future. INTRODUCTION 1.0 Hydropower Hydropower is a renewable energy source based on the natural water cycle. Hydropower is the most mature, reliable and cost-effective renewable power generation technology available. Hydropower schemes often have significant flexibility in their design and can be designed to meet base-load demands with relatively high capacity factors, or have higher installed capacities and a lower capacity factor, but meet a much larger share of peak demand. Hydropower is the largest renewable energy source, and it produces around 16 % of the world’s...

Words: 7562 - Pages: 31