The biggest challenge for the project manager is to develop an integrated planning and control tool. Critically discuss this statement with the aid of practical examples.
To develop an integrated planning and control tool is the biggest challenge for a Project Manager because of many uncertainties in any project. One of the most vital issues is ensuring that all the planning steps are adhered to, namely, the Project Charter; Feasibility Study; Scope Management; Build Method; Execution Strategy; Work Breakdown Structure; Organisational Breakdown Structure; Critical Path Method; Schedule Barchart; Procurement Schedule; Resource Histogram; Budgets and Cash flow; Communication, Project Quality, Risk Management and Baseline Plan. Failure to do this could have a detrimental effect on the other role players of the project team and this could upset the course of action in the control phase of the project. The Project Manager has his hands full and has a major responsibility to ensure the project is a success, otherwise failure is eminent.
Due to the limited answering space available, I will concentrate on the Baseline Plan because according to Rory Burke, “it may be considered as a portfolio of documents which outline how to achieve the project objectives... and guide the project through the execution and project control phase.” and according to Michele McDonough , “scheduling a baseline plan is something project managers should have in place before a project goes forward from the "drawing board". The baseline plan is a projection that will set the course of a project and provides estimates of project factors that any changes can be measured against, before the final deadlines are met and the project is completed.”
Clearly defining the project objectives is vital because your project's success will be determined by how strictly you meet them. A clear project

Similar Documents

Premium Essay

Implementing the Balanced Scorecard in Greece: a Software Firm's Experience

...Range Planning 37 (2004) 351–366 long range planning www.lrpjournal.com Implementing the Balanced Scorecard in Greece: a Software 5 Firm’s Experience Alexandros Papalexandris, George Ioannou à and Gregory P. Prastacos The Balanced Scorecard (BSC) is a relatively new approach to strategic management and performance measurement and control, which has generated substantial interest in the academic and industrial communities. This paper presents the experience from the implementation of a specific BSC model at a large software development company in Greece. The study illustrates and evaluates the main obstacles and shortcomings, as well as the critical success factors that characterise such BSC projects, while offering managerial insights and guidelines for similar implementations. Q 2004 Elsevier Ltd. All rights reserved. Introduction The shortcomings of traditional management control and performance measurement motivated the development of the Balanced Scorecard (BSC), a management system incorporating all quantitative and abstract measures of true importance to an enterprise.1 The two key elements of the BSC are: (a) Clustering of similar types of measures into groups (perspectives); (b) Limiting the measures and linking their values to improve clarity, allow for transparent communication throughout the organisation, and effectively manage change. 5 An earlier and compact version of this paper was presented at the IEEE International Engineering Management Conference...

Words: 7930 - Pages: 32

Premium Essay

Enterprise Resource

...Enterprise resource planning success An exploratory study of the financial executive perspective Alan R. Peslak Penn State University, Dunmore, Pennsylvania, USA Abstract Purpose – To explore the views of top corporate financial executives on the success of implementation of enterprise resource planning (ERP) systems as well as the variables associated with ERP project success. Specifically, relationships between dependent variables cost and budget performance on the independent variable overall project success are studied. Variables influencing cost and time performance are also explored. Design/methodology/approach – An analysis of secondary data obtained from the 2003 financial executives international comprehensive survey-based research on technology issues for financial executives. Multiple regression analysis and other statistical methods are used. Findings – The findings indicate that ERP implementations are generally viewed as moderately successful by top financial executives. In addition, both cost and time were significantly correlated with an overall view of success with cost performance holding higher influence. Several variables were found to significantly correlate with cost and time performance. Research limitations/implications – The study can be used as a basis for further exploration on the influences on ERP success as well as serve as a preliminary model to analyze any IT project success. Practical implications – The findings can be used to guide management teams in emphasizing...

Words: 6621 - Pages: 27

Premium Essay

Project Development and Implementation of Strategic Managers

...Implementation of Strategic Planning on Farm Businesses: Lessons from Danish projects Mogens Lund and Johannes Christensen Danish Research Institute of Food Economics Rolighedsvej 25 DK-1958 Frederiksberg (Copenhagen) The article contains a survey and review of the Danish projects directed the development and implementation of strategic management on farm firms. The aim of strategic management in agriculture, formulation and implementation of the long-term farm strategy and the functioning of research, consultancy and learning are the key issues addressed in the article Correspondent author: Mogens Lund, Danish Research Institute of Food Economics, Rolighedsvej 25, 1958 Frederiksberg (Copenhagen), Denmark. Email: mogens@foi.dk JEL Classification codes: Q12 & Q16 Keywords: Strategic management, farm firms, strategy formulation, strategy implementation, action research, strategic consultancy, learning 1. Introduction In the recent decades we have been working with the development and implementation of strategic planning in Danish agricultural research and consultancy. In this article we will evaluate the obtained experiences and draw some important lessons. The content of the article focus on the questions: • • • • What is the aim of strategic management in agriculture How to develop the vision and long-term strategy on business farms How to implement the formulated business strategy How can research assists in the development and implementation of strategic planning • How can...

Words: 8354 - Pages: 34

Premium Essay

Performance

...Critical Failure Factors in ERP Implementation Ada Wong The University of Hong Kong The University of Warwick, UK isada@business.hku.hk Patrick Y.K. Chau The University of Hong Kong pchau@business.hku.hk Harry Scarbrough The University of Warwick, UK Harry.Scarbrough@wbs.ac.uk Robert Davison City University of Hong Kong isrobert@cityu.edu.hk Abstract This study firstly examines the current literature concerning ERP implementation problems during implementation phases and causes of ERP implementation failure. A multiple case study research methodology was adopted to understand “why” and “how” these ERP systems could not be implemented successfully. Different stakeholders (including top management, project manager, project team members and ERP consultants) from these case studies were interviewed, and ERP implementation documents were reviewed for triangulation. An ERP life cycle framework was applied to study the ERP implementation process and the associated problems in each phase of ERP implementation. Fourteen critical failure factors were identified and analyzed, and three common critical failure factors (poor consultant effectiveness, project management effectiveness and poo555îr quality of business process re-engineering) were examined and discussed. Future research on ERP implementation and critical failure factors is discussed. It is hoped that this research will help to bridge the current literature gap and provide practical advice for both...

Words: 6716 - Pages: 27

Premium Essay

Pdm Assignment

...Q-1: Evaluate the roles of key agencies related to project development and management across the project life cycle. Q-2: How does the government finance the development project? Please discuss some of the characteristics of the planning process which cause low utilization of development fund and poor implementation of development program. Answer: It plays an important role in the country’s economic development through implementing various development projects. To implement this development project finance is an important thing. Bangladesh Govt. has two means to finance development project e.g. i) Govt. own fund; and ii) development partner. In this regard, development partners are seen to give money as grants or loan; and to some extent they provide money as both form (grant and loan). Development planning process: Low utilization of development funds and poor implementation of development programmes is a common phenomenon in Bangladesh. The national planning process is characterized by numerous problems, a few of which are mentioned below as key challenges that need immediate remedial measures. a. Paucity of trust in institutions and their people: A general lack of trust in different institutions involved in the process could be observed, which is attributed to the absence of a deep rooted discipline in development planning. This applies at all levels, from implementing department/agency to Planning Commission via the sponsoring ministry/division. The sponsoring...

Words: 4758 - Pages: 20

Premium Essay

Hhhhh

...Guidelines in corporate management The Balanced Scorecard – Translating Strategy into Action Introduction Public transport organizations face many barriers when trying to execute the strategy formed by their corporate managements. Some of these common barriers include: • The vision barrier, which arises when most managers and employees do not really understand the organization’s strategy. The people barrier, which arises when only a small portion of managers have some incentives regarding strategy and performance. The management barrier, which arises when most management teams spend only a small amount of time discussing strategy. The resource barrier, which arises when most of the business units fail to link their daily work and therefore their budgets to the overall strategy. • • • Balanced Scorecard was developed by Robert Kaplan, a professor at Harvard University and David Norton, a consultant from Boston. They began developing the approach after leading a research study of a dozen companies exploring new methods of performance measure. Kaplan and Norton put together a system that was able to measure a variety of activities throughout the organization: customer issues, internal business processes, employee activities and the concerns of shareholders. Under the Balanced Scorecard system, a company’s financial results are “balanced” and interlinked with all of these perspectives. This scorecard was successfully adopted by a number of organizations and the results...

Words: 2242 - Pages: 9

Premium Essay

Project Management

...CASE: TROPHY PROJECT 1.1 Executive Summary Executive leaders are the guardians of an organisation’s preferred culture and behaviour, however this is not evident in this organisation, There is clearly no mutual respect for employees’ rights and support from top-level management as people are intimidated and threatened if they do not deliver results. The organizations behavioural strategy needs to transform from a bureaucratic to a learning organisation where employees operate in high performance teams and where good communication and free flow of information flourish (Pieter Steyn & Erik Schmikl, Pg 112 – Pg 113). The organisation does not address any sort of training, employee development, relationships with customers and other factors bearing on quality. Instead it focuses on mistakes and condemns them instead of viewing them as opportunities for growth and learning. Top leadership failed by not providing a culture of trust, support, cohesion and lacked motivational leadership. Arbitrary induction of methodologies believing it would solve the absence of management acumen. The project manager found himself in an activity trap; he spent more time preparing paperwork, reports and projection, which was needed for his weekly meeting with the corporate, instead of managing the project. (Harold Kerzner, Ph.D. Project Management A System Approach to Planning Scheduling and Controlling, Pg 265) In order to resolve some of these inherent problems, we propose the organisation consider...

Words: 5227 - Pages: 21

Premium Essay

Hahaha

... 306-669 Strategic Enterprise Systems Group Project Executive Summary IT is one of the major enablers of AirAsia’s successful low cost business model. Based on the environmental scanning performed, the demand for Low Cost Carrier (LCC) is expected to expand rapidly attracting more players to join the market thus increasing the degree of rivalry within the industry. In responding to this condition, it is imperative for AirAsia to continuously identify new sources of cost advantage so that it can provide the lowest possible price to the price sensitive customer and improve its market position. In this project, Advanced Planning and Scheduling (APS) system is recommended as the new source of AirAsia’s cost advantages. Using Venkatraman and Henderson’s model APS fits smoothly to the Technology Transformation Perspective where business strategy acts as a driver. The functionalities provided by APS system to improve AirAsia’s performance include event management technology, supplier portals, inventory planning, demand forecasting, maintenance management, and route profitability analysis. As a result of implementing APS system, AirAsia can obtain both strategic and operational benefits. AirAsia is strongly recommended to outsource the development of APS system. As project management plays critical role in ensuring successful implementation, it is suggested that AirAsia follows the recommendation provided in terms of planning, structure, practices, and postimplementation strategy...

Words: 7114 - Pages: 29

Premium Essay

Trophy Project

...Table of Contents 1. Executive Summary 3 2. Major problems Experienced in the Trophy Project 4 2.1. Synopsis of the Trophy project case study problems 4 3. List of Problems 4 3.1. Operational 4 3.2. Behavioural 5 3.3. Structural 5 4. Leadership at Top Management and functional management levels of the Organisation 7 4.1. Initiation Structures 8 4.2. Dysfunctional roles of Functional Manager 8 4.3. Lack of Senior Management Support 8 4.4. Reactionary Management style 10 4.5. Implementation strategy 10 4.6. Lack of Customer Relationship Management (CRM) 11 4.7. Internal Processes perspectives 11 4.8. Lack of Innovation and Learning (Learning and Growth) Perspective 11 5. Reichart’s Leadership and Managerial Abilities 12 5.1. Planning 12 5.2. Organizing 12 5.3. Staffing 12 5.4. Leading 13 5.5. Controlling 13 5.6. Major Skills lacking in Reichart’s leadership 14 6. Recommendations 14 6.1. Implementing a Strategic Transformation and Change Management Programme 15 6.1.1. Strategic transformation planning 15 6.1.2. Creating a Climate for Change 17 6.1.3. Continuous Organisational Improvement 17 6.1.4. Risk Management 18 6.1.5. Control 18 6.1.6. Stage–Gate Model 18 6.1.7. Balanced Scorecard 19 7. Conclusion 19 8. References 20 9. Annexure 22 9.1. Planning, Control, organising, & leading 22 9.2. BS – PM Learning Organisation Value Chain Schematic 23 9.3. Kotter’s 8-Step Process for Leading Change 23 9.4. Strategic transformation process 24 9.5...

Words: 4860 - Pages: 20

Premium Essay

Air Asia Management Strategy

... 306-669 Strategic Enterprise Systems Group Project Executive Summary IT is one of the major enablers of AirAsia’s successful low cost business model. Based on the environmental scanning performed, the demand for Low Cost Carrier (LCC) is expected to expand rapidly attracting more players to join the market thus increasing the degree of rivalry within the industry. In responding to this condition, it is imperative for AirAsia to continuously identify new sources of cost advantage so that it can provide the lowest possible price to the price sensitive customer and improve its market position. In this project, Advanced Planning and Scheduling (APS) system is recommended as the new source of AirAsia’s cost advantages. Using Venkatraman and Henderson’s model APS fits smoothly to the Technology Transformation Perspective where business strategy acts as a driver. The functionalities provided by APS system to improve AirAsia’s performance include event management technology, supplier portals, inventory planning, demand forecasting, maintenance management, and route profitability analysis. As a result of implementing APS system, AirAsia can obtain both strategic and operational benefits. AirAsia is strongly recommended to outsource the development of APS system. As project management plays critical role in ensuring successful implementation, it is suggested that AirAsia follows the recommendation provided in terms of planning, structure, practices, and postimplementation strategy...

Words: 7114 - Pages: 29

Premium Essay

Fsff

... 306-669 Strategic Enterprise Systems Group Project Executive Summary IT is one of the major enablers of AirAsia’s successful low cost business model. Based on the environmental scanning performed, the demand for Low Cost Carrier (LCC) is expected to expand rapidly attracting more players to join the market thus increasing the degree of rivalry within the industry. In responding to this condition, it is imperative for AirAsia to continuously identify new sources of cost advantage so that it can provide the lowest possible price to the price sensitive customer and improve its market position. In this project, Advanced Planning and Scheduling (APS) system is recommended as the new source of AirAsia’s cost advantages. Using Venkatraman and Henderson’s model APS fits smoothly to the Technology Transformation Perspective where business strategy acts as a driver. The functionalities provided by APS system to improve AirAsia’s performance include event management technology, supplier portals, inventory planning, demand forecasting, maintenance management, and route profitability analysis. As a result of implementing APS system, AirAsia can obtain both strategic and operational benefits. AirAsia is strongly recommended to outsource the development of APS system. As project management plays critical role in ensuring successful implementation, it is suggested that AirAsia follows the recommendation provided in terms of planning, structure, practices, and postimplementation strategy...

Words: 7166 - Pages: 29

Premium Essay

Business and Management

...ccsenet.org/ijbm International Journal of Business and Management Vol. 5, No. 9; September 2010 A Study of the Impact of Business Process on the ERP System Effectiveness Wen-Hsien Tsai (Coresponding author) Department of Business Administration National Central University, Jhongli, Taoyuan 320, Taiwan E-mail: whtsai@mgt.ncu.edu.tw Shu-Ping Chen Department of Business Administration National Central University, Jhongli, Taoyuan 320, Taiwan E-mail: irwin26@mail2000.com.tw Elliott T.Y. Hwang Department of Information Management Chung Yuan Christian University, Jhongli, Taiwan 320, Taiwan E-mail: eliott01@ms3.hinet.net Jui-Ling Hsu Department of International Trade Feng Chia University, Taichung 407, Taiwan E-mail: jlhsu@fcu.edu.tw Abstract An ERP implementation takes many years to complete and requires a large amount of IT investment and their effectiveness is hard to evaluate. Companies implement ERP systems to integrate the business processes of a company, and help organizations obtain a competitive advantage. In each ERP implementation stage, Business Process Reengineering (BPR) plays different important roles. This study examined the process problems (system process / business process), BPR and performance of ERP systems by using the questionnaire survey and AVOVA analysis. We also examined the relationship between degree of BPR and ERP system performance using regression analysis. Keywords: Enterprise Resource Planning (ERP), Business Process Reengineering (BPR), Information...

Words: 6246 - Pages: 25

Premium Essay

It- 3rd Year

...Network, Broad band Telecommunication. UNIT-II Mobile Commerce Introduction to Mobile Commerce, Mobile Computing Application, Wireless Application Protocols, WAP Technology, Mobile Information Devices, Web Security Introduction to Web security, Firewalls & Transaction Security, Client Server Network, Emerging Client Server Security Threats, firewalls & Network Security. UNIT-III Encryption World Wide Web & Security, Encryption, Transaction security, Secret Key Encryption, Public Key Encryption, Virtual Private Network (VPM), Implementation Management Issues. UNIT - IV Electronic Payments Overview of Electronics payments, Digital Token based Electronics payment System, Smart Cards, Credit Card I Debit Card based EPS, Emerging financial Instruments, Home Banking, Online Banking. UNIT-V Net Commerce EDA, EDI Application in Business, Legal requirement in E -Commerce, Introduction to supply Chain Management, CRM, issues in Customer Relationship Management. References: 1. Greenstein and Feinman, “E-Commerce”, TMH 2. Ravi Kalakota, Andrew Whinston, “Frontiers of Electronic Commerce”, Addision Wesley 3. Denieal Amor, “ The E-Business Revolution”, Addision Wesley 4. Diwan, Sharma, “E-Commerce” Excel 5. Bajaj & Nag, “E-Commerce: The Cutting Edge of Business”, TMH INFORMATION SYSTEMS (TIT-502) Unit-I Foundation of Information Systems: Introduction to information system in business, fundamentals of information systems, solving...

Words: 2913 - Pages: 12

Premium Essay

Long and Short Term Goals

...Ernest& Young or Accenture. Leading a team of 3-4 people in a small segment SAP implementation project will afford me complete understanding of project timeline as well as knowledge of the complete life-cycle of a SAP implementation. In turn, I will gain perspectives into architecture and people management in a fully functional SAP team. My role in Deloitte has familiarized me with the SAP Netweaver space. I became the primary resource for the entire team in both projects and operations in the Indian time zone, because of which my learning curve has been steep. But I need to learn strategy implementation for tasks and projects like creating project timelines and work allocation based on time. The Schulich MBA courses on Strategic management and Operations management would help me improve my analytical skills and will also enhance my SAP skills to a more managerial role. The program for strategy Field study would help me learn from case based and real time scenarios in actual situations, which would help me, get a firsthand experience of project planning and timelines. The Global Leadership program of the Schulich MBA is in itself a great opportunity to lead and develop one’s experience and be able to network across with people from different backgrounds. This would help me gain perspective on how different people function, on how various business functions and project implementations in various markets are affected by the competition and markets while enabling me to...

Words: 311 - Pages: 2

Premium Essay

Lifecycle Project Management Approach

...Lifecycle Project Management Approach Successful projects and campaigns result from quality stakeholder engagement, research, insight, careful planning, implementation, and constant adjustments based on feedback. We approach all projects from a project lifecycle perspective, with most projects following a series of interdependent stages. Typically, these stages include understanding, planning, designing, implementing, and concluding. There is a time and place for each product and service. Within each stage, projects may require any combination of management, research, creativity, training, and technical services. When we approach each project, we assess which project lifecycle stages will be required, and then we combine the best combination of services, products, and people for that stage. Recognizing there are no “one size fits all” solutions, we tailor each project to suit our clients’ individual needs and unique operating environments. Since all our products and services are aligned with the lifecycle stages, we offer the right support, at the right time, focused on the right goals.   Project lifecycle stages 1. Understanding Solid projects and campaigns begin with quality research and insight. This can include audience, product, competitor, and stakeholder research. The insights gleaned at this stage are used for the strategic planning, design, and implementation stages. Moreover, any baseline data may be used for pre/post comparisons within the final evaluation. ...

Words: 878 - Pages: 4