WIRE DRAWING
Objective

To know how copper and aluminum drawing is done, and also to understand the machine setting and how the machine operates.

Introduction

Wire drawing is the process by which a metal rod is forced through a series of varying cross section die(s) and hence the metal rod cross sectional area is varied so as to obtain the desired shape and size. In Kenwest cables company their are 3 wire drawing machines namely:- 1. M55 2. H20 3. M85
1.M55
This is the main copper drawing machine and the one which can handle the 1st drawing process which is hard drawing. The raw material used is usually copper rod of 7.9mm thickness as the hard drawing material. The M55 can also handle further copper drawing like the H20.

Operation procedure

The M55 has several units namely:- a) stand b) block c) drawing basin d) annealer e) spooler

a) stand
It is responsible in guiding the copper rod being fed to the block or drawing basin. If its hard drawing its fed to the block but when its further drawing its directly fed into the drawing basin. This is because at the block section the die obtained may have a larger diameter than the copper rod in the case of further drawing hence the block is not required.

b) Block
It is functional when hard drawing takes place. The 1st die is usually located in this section (the block section) hence drawing process begins at the block section. The copper rod being fed is usually about 7.9mm in diameter which is the diameter of the hard drawing copper. Animal fat is used in this section which acts as a lubricant to ease the process of the copper rod passing through the die. Jam oil cannot be used in this section because the block section does not have a system that supplies jam oil and recycle the jam oil for effective and efficient use.A thing to note is that the dies are made of a strong material called tungsten carbide hence are not easily worn out.This is because they experience a lot of frictional forces from the copper wire being forced through it.

c) Drawing basin
This is where the main drawing process is done. It contains several number of dies 7 to be exact. These dies are arranged in such a way that their cross sectional area reduces from one successive die to the next. This organized arrangement aids in the ease of cross sectional area reduction and to avoid breaking of the wire as it is being drawn. In the drawing process not only is the wire reduced in diameter but also its elongated in the process. Pulleys are found in this section and they are mainly used to provide space for elongation and the movement of the wire during the drawing process. The pulleys also aid in the alignment of the wire as its being drawn. Jam oil is used in the drawing basin and its used as a coolant and a lubricant. Jam oil has a high boiling point temperature making it a good coolant and its slimy nature makes it a good lubricant. If the machine runs for a very long time eventually the coolant will become hot thereby the heat exchanger is used to cool the jam oil through a counter flow process where cold water and jam oil are passed in opposite directions in 2 parallel adjacent pipes one carrying jam oil the other carrying cold water thereby reducing jam oil temperature.
The motor is responsible for the movement of the pulleys in the drawing basin to move. The rotary motion of the motor is transferred to a shaft using belts. Subsequently the shaft is connected to a gear box which contains gears which in turn is connected to a set of pulleys. The gears are used to vary the speed of the pulleys.

d) Annealer
Annealing is the process by which a conductor is made more ductile and its conductivity is increased by passing it through an anode and a cathode. The type of electric current used is the DC (Direct current).The AC (Alternating Current) produced is converted by the transformer to DC which is required and its transferred to the annealer through bus bars, to the anode and cathode. This section contains pulleys that aid in the movement of the copper rod. The steam generated from the boiler is transferred to the annealer. Its work is to prevent copper from being oxidized to form copper (ll) oxide which is black in colour.
At this annealer section a compressor is used in that it is responsible for supplying dry compressed air to the wire which in turn causes the wire to dry up.

Immediately after the annealer section their is another system of pulleys whereby the lower pulley has the freedom to move up and down or rather in a vertical motion, depending on the tension of the copper wire on the pulleys. The lower movable pulley is known as the dancer pulley. The dancer pulley aids in regulating the tension on the copper wire and preventing it from snapping. When the tension on the copper wire is high the dancer pulley moves up and when the tension on the copper wire is low the dancer moves down. e) spooler
This is where the take up stand is mounted and its mounted using a hydraulic mechanism. There is a traverse which is used to arrange the wire winded on the spool in an evenly distribute d manner. The control panel is located at the spooler section. The hydraulic pump present is responsible for the spool rotation and traverse movement. The traverse also has a limiting switch which basically limits the scope of its movement as it moves horizontally. This aids in better distribution of the copper windings on the spool.

2. H20
The H20 machine is similar to the M55 machine in that they are both used for drawing copper wires and have the same features. However the H20 machine is used for further drawing and cannot do hard drawing. The H20 machine also produces flex wires which are very small in diameter but the M55 cannot produce such small diametered copper wires. The H20 machine doesn't have the block section as compared to the M55 machine. The H20 machine had 21 dies.

Operation procedure

The H20 has several units namely:- a) stand b) drawing basin c) annealer d) spooler

a) Stand
This is where the pay off spool is fixed.

b) Drawing basin
This is where the drawing of the wire takes place and its a very important process. This section contains 21 dies and it also has pulleys which aid in the movement of the copper wire. Jam oil is usually filled in this basin which acts as a lubricant and as a coolant.

c) Annealer
Annealing is the process by which a conductor is made more ductile and also increases its conductivity.
The steam generated is usually used to prevent the copper wire from being oxidised to form copper (ll) oxide which is black in colour. The compressed air is used to dry the copper wire.There is also a system of pulleys in this section which aid in the movement of the copper wire. It also has a dancer pulley that is used to control the tension of the wire so as to prevent snapping of the wire.

d) spooler
This where the take up stand is mounted . There is a traverse which is used to arrange the wire winded on the spool in an evenly distributed manner. The control panel is located at this section. 3. M85
This is a drawing machine which is used in the drawing process of aluminium rods. It is used for hard and further drawing processes. Oil is used instead of jam oil in this drawing machine.

Operation procedure

The M85 has several units namely:- a) stand b) block c) drawing basin d) spooler e)Furnace

a) stand
This is where the pay off spool is fixed.

b)block
It is used in directing the aluminium wire to the drawing basin and it also contains a die............ ¥(check for more info) ¥

c) Drawing basin
This is where the drawing of the wire takes place and its a very important process. This section contains ....... dies and it also has pulleys which aid in the movement of the aluminium wire. Oil is usually filled in this basin which acts as a lubricant and as a coolant.

d)spooler
This is where the take up stand is mounted. There is a traverse which is used to arrange the wire winded on the spool in an evenly distributed manner. The hydraulic pump present is responsible for the spool rotation and traverse movement. The traverse also has a limiting switch which basically limits the scope of its movement as it moves horizontally. This aids in better distribution of the aluminium windings on the spool.

e) Furnace
This is where the aluminium wire is heated in a furnace at very high temperatures so as to increase its ductility and conductivity. This process is usually optional depending on whether the customer wants a ductile or hard aluminium.

Conclusion
1. M55 machine produces copper wires having diameters :- 1.38mm, 0.67mm, 0.85mm, 1.04mm, 1.35mm, 1.70mm, 2.14mm, 1.53mm, 1.78mm, 2.14mm and 2.52mm

2.H20 machine produces copper wires having very small diameters which makes the flexible hence their name flex wires.The sizes produced are :- 0.20mm, 0.25mm, 0.30mm, and 0.40mm.

3.M85 machine produces aluminum wires having the diameters:-

BUNCHER
Objective

To know and understand the machine setting and how the machine operation takes place.

Introduction

Bunching is the process of twisting several wires together through a die. In Kenwest cables company their are 2 buncher machines namely:- 1.Buncher 800 2.Buncher 1000

1.Buncher 800
It is more technologically advanced as compared to the buncher 1000. It has a high bunching speed as compared to the buncher 1000. The brakes are pneumatically operated. Every motor has its limit switch and a pressure regulator which is usually set to 2 bars. The pressure regulator aids in changing or varying the tension of the wire. It has 8 bar stands and a maximum of 7 are used hence their is an extra bar stand incase any others fails.

2.Buncher 1000
Its slower in speed as compared to the buncher 800. It has 8 bar stands which are for singles and 60 stands which are for flexible wires which have very small cross section.

Operation procedure This is the operational procedure of a buncher machine (buncher 800 and buncher 1000). Once the raw materials are received the set up of the machine is done and it includes the steps below:- 1. To determine the appropriate die(s). 2. Loading the conductors on the stands (pay off spool) 3. Changing the gears so as to attain the appropriate lay ie the magnitude of twist. 4. Load an empty take up spool. 5. Initiate the arrangement of the wires from pay off spool to the take up spool in a logical sequence. 6. Ensure everything else is in order. 7. Start the machine and monitor the entire process incase of any malfunctions.

Analysis

Selection of the die is governed by the cross sectional area of the twisted wires. The die cross sectional area should be slightly higher than the twisted wires cross sectional area.
For example
How to determine the cross sectional area of the twisted wire given the diameter of one wire where 7 similar wired are twisted together.

Draw diagram

As illustrated the diameter of the whole twisted wire will be given by 3 × diameter of one wire.

Diameter of twisted wired= 3×diameter of one wire

Conclusion

Buncher 800 produces copper wires with the dimensions given below:-

Total area of bunch wires | Area of single wire | Number of wires | 2.5mm2 | 0.67mm2 | 7 | 4.0mm2 | 0.85mm2 | 7 |

Buncher 1000 produces copper wires with the dimensions given below:-

Flexible cables Total area of bunch wires | Area of single wire | Number of wires | 0.5mm2 | 0.20mm2 | 16 | 0.75mm2 | 0.20mm2 | 24 | 1.0mm2 | 0.20mm2 | 32 | 1.5mm2 | 0.25mm2 | 30 | 2.5mm2 | 0.25mm2 | 50 |

EXTRUDER

Objective

To know and understand the machine setting and how the machine operation takes place.

Introduction

Extrusion is a process used to create objects of a fixed cross-sectional profile. A material is pushed or drawn through a die of the desired cross-section.
Hot extrusion is a hot working process, which means it is done above the material's recrystallization temperature to keep the material from work hardening and to make it easier to push the material through the die. Most hot extrusions are done on horizontal hydraulic press.
In Kenwest cables company their are 3 extruder machines namely:- 1.BM80 2.BM30 3.Mapre
1.BM80
The screw and barrel method is employed as the method of movement of the polymer.
2.BM30
It uses gravity as the method of movement of the polymer to the crosshead. It is mainly used when making the green yellow insulation coating.
3.Mapre
It is the most advanced machine for extrusion at Kenwest cables. Its processes are all controlled for a control panel where by if one operation is not functioning or is not properly set the whole operation will not take place.

Operation procedure

The extrusion process begins with bear wire or cable being fed into the extruder. The insulation or polymer substance is fed into the hopper and in solid form it is then heated as it is pushed to the crosshead by way of screw and barrel as the screw turns it pushes the material to the crosshead. The crosshead holds a die which controls the shape and size of the wire or cable. By the time the polymer enters the crosshead it is in its liquid state. An embosser may be used if necessary at this stage. The embosser is to make engraved markings on the insulated cable mostly the are alphanumerical. The insulated material then goes into a chilled bath of water to cool and help retain its shape and size.Once the cable is cooled it is then dried and passed through a caterpillar or capstan which aids in the movement of the wire.The caterpillar helps in moving very thick and heavy cables while capstan is used to assist in the movement of thin and light cables. Then the wire is tested for defects with a spark tester. Then it is passed to a diameter control to check the consistency of the diameter of the insulated wire.
The wire is then passed to a printer where printed text or information is written on the insulated wire. The wire is then passed through a pulley system whereby a dancer pulley is one of the pulleys. Its work is to reduces tension in the wire as its being fed to the drum or spool. A traverse is used to direct the wire in an organised manner onto the pay off spool.
Note: In a case where double insulation is required chalk dust is used as it helps to prevent the two insulation coats to merge hence forming one single coat.

ARMOURING

Objective

To know and understand the machine setting, how the machine operation takes place and the properties of GI and working with galvanized steel wire.

Introduction

This is the process by which a cable is insulated using steel that is twisted on the insulated PVC coating of a wire cable. Their are 4 types of steel wire sizes namely:- 0.9mm, 1.25mm, 1.6mm, 2.0mm.

Operation procedure

The armouring process initiates from when a wire cable is wound on a drum and its fed into the machine where it is passed through a die. The wire originating from the pay off spool is armoured with steel before it passes through the die. The die however is used to ensure that the steel is held firmly and is directed on the cable. The armoured cable is then passed through some pulleys that are used to ensure proper or effective contact with the sensor pulley. The sensor counts the number of revolutions made and also the distance covered by the cable.
Their is a capstan where the armoured cable is wound on before its fed to the drum. It has fixed traverse which guides its alignment as its fed to the take up spool or drum. The twist alignment obtained from the armouring process is brought about by the rotation of the steel wires on the cable in either a clockwise or anticlockwise direction and this changes the twist alignment. The switching of the rotation is caused by the bevel gears present. The switching from one gear to the other causes a change in the direction of rotation hence causing a subsequent change in the twist alignment. The presence of the spur gears that can be changed are responsible for the spacing of the steel wires armoured on the cable.
Their is also a speed regulator which regulates the speed. Its working principle is that when the plate electrodes are immersed into the water and the gap between plate electrodes and the base conductor is decreased then the speed increases in that the conductivity increases as the gap is decreased. When the plate electrode gap is increased the speed decreases because the conductivity reduces to the extent that when the plate electrodes are removed from the water the machine speed will gradually decrease in speed until it comes to a halt.
The machine is driven by one big motor where by shafts,pulleys,belts and gears are used to change direction of motion and aid in the motion of the moving parts. It has a small motor that is connected to a chain and its responsible for moving the take up spool in a vertical manner.

Analysis

The die size is determined by finding the summation of the initial cable diameter before armouring and the twice the diameter of the steel wire used in the amouring process.

¥(Draw illustration if possible and the GI properties)¥

Conclusion

The importance of armouring is to prevent mechanical or physical damage of the wire cables because they are mainly used in underground or buried in the ground. Due to this they are exposed to damages.

LAYING AND TWISTING

Objective

To know and understand the machine setting and how the machine operation takes place.

Introduction

This is the process by which two or more wires are intertwined together and are also formed into certain shapes if need be.

Operation procedure

The wires or cables to be twisted are fixed on their appropriate spool location in accordance to their cable insulation color. Then the wires are twisted together.
The twisted cables are then passed through a die which enables the effective twist on the cables this is to align the wires that are twisted. Then it is passed through a shaper where it is shaped to its required shape. Then it is passed through the sensor which counts the number of revolutions and subsequently the distance covered by the moving cable and its indicated in a meter reading.
The cable is then covered with plastic paper which is twisted in the opposite direction of the wire cables so as to prevent unnecessary unwrapping. The importance of the wrapping is to prevent mixing of the already coated cables when they are undergoing another coating in the extruder. (This process of wrapping with plastic paper is optional depending on whether the wire cables are coated or not ).
The cable is then wound on a capstan which has a traverse that's fixed. The traverse ensures effective alignment of the distribution of the cable to the collecting drum. The capstan is used to assist in the movement of the wire to the drum.
Their is also a speed regulator which regulates the speed. Its working principle is that when the plate electrodes are immersed into the water and the gap between plate electrodes and the base conductor is decreased then the speed increases in that the conductivity increases as the gap is decreased. When the plate electrode gap is increased the speed decreases because the conductivity reduces to the extent that when the plate electrodes are removed from the water the machine speed will gradually decrease in speed until it comes to a halt.
It has a control panel where its operations are controlled. It also has a gear system which assists in the effective lay of the wire cables being twisted.
It has a small motor and a big motor. The small motor is connected to a chain and its purpose is to aid in the movement of the movement of the drum in a vertical manner. The big motor is the one responsible for powering the whole motor.

Conclusion

The importance of laying or twisting is to provide the required shape of the cables being twisted and also to cover the cables with plastic paper which is important during the extrusion process.

COILING

Objective

To know and understand the machine setting and how the machine operation takes place.

Introduction

This is the process of winding of a wire cable onto a spool. The winding on the spool is usually measured in length or in weight. The wires which have no insulation are measured in weight while the wires which have an insulation are measured in length. There are two types of coiling machines namely:- i. Rear semi auto coiler ii. Coiling machine 1 and 2

Operation procedure

i. Rear semi auto coiler
The spool is taken to the stand as the take up spool where its loaded and ready for coiling process to initiate. The wire cable is connected to a system of pulleys whereby their is a dancer pulley where by the main purpose o the dancer pulley is to shift or allow less tension on the cable to avoid breakage of the cable. The door of this section has a limiting switch which when the door is opened it triggers and causes the machine to halt.
From the pulley section it is moved to the spark tester whereby its main function is to detect the non insulated section of the cable. From this point it is connected to a system of pulleys whereby it is directed to the winding section.
The winding section is where the winding or the coiling of the wire is done. It has 2 winders which are automated in that when one is moving the other is stationary and vice versa. It helps in saving time when the coiled wire is being removed the other winder continues winding. It has a door which is connected to a limiting switch such that when operating on one winder the other doesn't function.
Its powered by a coupling magnetic motor on a shaft that is responsible for the sequential non simultaneous operation of both the winders in that both winders cannot rotate at the same time. ii. Coiling machine 1 and 2
Their are two coiling machines namely coiling machine 1 and 2. It has a stand where the take up spool is placed and the wire is passed through a traverse which is used to position or ensure proper or effective alignment of the wire distribution to the pay off spool.
The wire passes through a meter reader which is responsible for measuring the length of the wire wound. It is however finally wound on a pay off spool.

Similar Documents

Premium Essay

Student

...Armco Inc. Armco Inc is a steel manufacturer that used to be the sixth largest in its industry in United States in 1990. The Kansas City Works within its Midwestern Steel Division was hit by the decline in the business in the US steel industry. The firm produces grinding media and carbon wire rod. The first on has been successful in the industry with its great durability compared to the competitors. Carbon wire rods on the other hand were non profitable and covered only some of its fixed costs through its production volume. The old performance measurement system used by Armco Inc did not work properly because it had some problems. First, it did not provide information on the product mix being produced while it provided data on total tonnage produced but didn’t breakdown what was produced. Second the measurement system compared actual to objective but didn’t provide data on what factors exactly caused variance. Third, the costs were not broken down by fixed costs, variable costs and relevant range. Also the reports were generated on the 15th day following every month ending so I think managers could not take immediate corrective actions which would have been sometimes very necessary. In my opinion, also the fact that the system did not measure Key Performance Index for each department such as the new system, is one important reason why the old system was inadequate. there was inconsistency with organization’s current strategy. The objective of Armco Inc. is maximizing profits...

Words: 316 - Pages: 2

Free Essay

Wire Diagram

...Contractor Requirements The successful contractor will have a certified electrician on site whenever work is being done on or near electrical wiring. The successful contractor will be a certified installer of the infrastructure components being provided. All work must meet local, state, and federal regulation codes. The successful contractor will have a Registered Communications Distribution Designer (RCDD) onsite and supervising all work. Purpose of this RFP The purpose of this RFP is to detail the work that is to be done, from the beginning to end stages in order for various contractors to bid on this project. Any contractors bidding on this project must give technical and commercial proposals in accordance with the terms and conditions mentioned in this document. Cables, network equipment, and other infrastructure components that meet customer requirements will be purchased through outside vendors by the contractors. The source company reserves the right to negotiate the prices for the hardware and/or any software needed to complete this project. The bidder will furnish all labor, tools, and any other equipment needed to successfully complete this contract. Work Included The scope of this RFP covers the deployment of the following technology and service components, hardware/ storage infrastructure solution supply, installation & configuration of racks, switches and other devices. Any and all overtime or off-hours work required to complete the scope of work within...

Words: 299 - Pages: 2

Premium Essay

Nt 1310 Unit 3

...rating Unshielded Twisted-Pair is copper wire that is used in a twisted pair. Which is two conductors of a single circuit that are twisted together to prevent crosstalk UTP typically have only one outer covering or jacket for one or more of the twisted pairs. Shielded Twisted-Pair is copper wire that is almost the same but also with the outer covering each twisted pair is also shielded separately and then shielded again before the outer jacket Fiber-Optic Cable bandwidth is dramatically higher than with copper speeds and it uses a strand of glass or plastic to transmit data using light pulses transmission distances are much further away it is not susceptible to outside EMI or crosstalk interference. It is more secure than copper wire it very hard to tap in to unlike copper wire. Dark Fiber is just a term used for unused or unneeded strands of installed fiber because you always want to install more than you need cause networks always grow. Coaxial Cable is widely used for cable tv it has solid copper core with a Teflon insulation around that either a foil sleeve of a braided wire mesh and then the outer jacket Plenum is the space between the deck ant the false ceiling when it is used for HVAC Riser is a vertical shaft that allows you to run wires between two floors Rip Cord is installed in some wire it is also called the slitting cord it is meant to make it easier to split the jacket on the cable when more than 2” of the wire needs to be exposed. Core in cabling is what...

Words: 569 - Pages: 3

Free Essay

Breaking Tradition

...Breaking Tradition Will fiber ever make it to the desktop? This article is basically is about the differences between copper network infrastructure cabling and fiber-optic cable. Although it is overall cheaper to install and obtain fiber-optic cable companies are still electing to us copper networking. The reason that copper is still on top is because the companies that manufacture it are making sure that copper wire is still being made specifically for certain infrastructures. Copper wiring also seems to be a lot easier to work with for the time being due to lack of engineering economical of the 24 or 48 port fibers switches. I think that quality of the information was short, sweet and to the point. This article was not overloaded with information. If also was not difficult for anyone person to understand the point of it. I do not know much about the in and outs of computers. Even less about the behind screens of putting the network and the hardware together. I think the way the article was presented was done very well. Personally, I think that it take time for people get on broad with new technology. In my opinion, this article seems to be well informative. Also in reading the material it was very descriptive in regards to the contrast between copper cabling and fiber-optic cable. It went into detail regarding both the pros and cons between for the use of fiber-optic cable. However at the end of the article the writer proceeds to states that he feels that...

Words: 319 - Pages: 2

Free Essay

Mexicana Wire Works

...Managing Operations is Sound Prioritization: The Mexicana Wire Works Case A case report presented to the faculty of the Master of Business Administration Far Eastern University In partial fulfilment of the requirements In Quantitative Analysis Submitted To: Professor Willy Cuason Submitted By: Jeancy Dela Rosa Joan Eclipse Gerra Lanuza Mark Nimeno Timmyleh Pocong Jerome Tumambing June 03, 2014 I. Case Background Mexicana Wire Winding, Inc. is a subsidiary of Westover Wire Works based in Texas which is a medium-sized producer of wire windings of electrical transformers. Ron Garcia is the new management trainee, who studied operations management in his MBA program but lacks any technical knowledge about the manufacturing process. He is tasked to help the company in solving the increase in booking orders for April.There will be new equipments coming in the next several months but these won‘t help them fill the April orders. (Render & Stair, 2012) To better understand the case the group researched on the sequence on how to produce wire windings as discussed in the case: 1. “Wire Winding- the metalworking process used to reduce the cross-section of a wire by pulling the wire through a single, or series of, drawing die(s). There are many applications for wire drawing, including electrical wiring, cables, tension-loaded structural components, springs, paper clips...

Words: 1406 - Pages: 6

Free Essay

Instruction Set

...Set of Instructions Author Author Affiliation Abstract Instructions are set of guidelines that helps to perform a process or procedure. Making an USB fan is an easy “Do It Yourself” project. Anybody with access to a computer USB port can run a small fan. This paper describes instructions to be followed in order to make a USB fan. Title of Paper Equipment required: 1. Small 5 Volt dc Motor. 2. An adhesive glue, 3. A (exhausted) round shaped marker pen, 4. An USB cable, 5. Cutting tool like scissors or knife, 6. Wire stripper, 7. Tape, 8. Plastic gear available from any small toy car. 9. A circular piece of plastic of diameter 3” Instructions: 1. Firstly cut the USB cable at one end (it should be the end with female jack), 2. Locate red and black cables. Leave the rest. 3. Stripe out the copper wires using cable stripper, 4. Connect the red and black cable to that of the motor, 5. Attach the gear to the shaft of the motor, 6. Now make 8 cut to the center of the circular plastic. It would take small triangular shapes. Twist the triangular shaped wings of the fan slightly inwards, 7. Attach the circular plastic to the gear using glue, 8. Put the motor with the plastic on top of the marker and stick with the glue, 9. Now fix the other part of the marker on top of the cd vertically. 10. Connect the male USB jack to the USB port of a computer. The fan should move perfectly. Figure 1: Completed...

Words: 318 - Pages: 2

Free Essay

Unit 5 Assignment 1 Cabling Factors and Tolls Discussion

...to meet those demands of mobility, and also for the life of the wire so that it does not crack, break, fray or short. We had a job at a university where we moved flat panels on a track system to create different screen sizes, and for that we had to make sure the cable would meet the demand. Capacitance Cat 6 is not always better than Cat 5. If a video extender is made for Cat 5e, using Cat 6 may cause you a problem. The electrical properties are different, and the circuitry inside may not be able to reconcile the increased capacitance. You should confirm with the manufacturer before making a substitute in a Category cable. Jacket What type of jacket does your cable need? You have plenum, riser, PVC/non-plenum and direct burial. Plenum cable is often required in commercial work, especially in buildings where there are open-air returns; it is essential to meeting code. Integrators will often use riser grade at the riser, and then transfer to plenum in the plenum space. This saves some cost, but I recommend you second-guess saving that few cents per foot in most cases. The chances of mixing up a box of cable and pulling riser in the plenum space may increase your liability as a company or cause you to re-pull cable when the inspector fails your install. If you only send plenum to site, you eliminate this possibility. A tennis ball would be a good makeshift tool because you can cut a hole in it to place wires...

Words: 318 - Pages: 2

Free Essay

Cable vs. Fiber

...types of cables and their abilities. The capabilities of these types of wires, prices, availability, and future uses are important factors to take into consideration when designing a layout for a building. Some other important variables to consider are how many people are trained to install the cabling and how durable that cabling is and how it can withstand long term use. Copper cabling is the widely used standard of today. It has been used as a communications line since the first telegraphs. Over the years it has developed into thin multi lined cables that can send an abundant amount of data. Since it has been around so long it is widely understood and taught to professionals as well as your average Joe. Category 5e and 6 are both capable of sending signal speeds much faster than we are able to produce at bandwidths that we haven’t reached yet. So at least for the near future copper cabling can still sustain Moore’s law. This law states that technology will double in capacity and for half of the price every two years. While copper is inexpensive now it becomes more expensive with its wide use. Also its abundance will degrade over time as it is used commercially worldwide. Some more of the flaws that are involved with copper are EMI, unnoticeable tampering, and potential. Electromagnetic interference can cause signal delay and corruption as it effects copper wiring. Tampering is easy to do since these wires are easily penetrated and will continue the signal down the trunk line...

Words: 643 - Pages: 3

Free Essay

Unit 6 Assignment 1

...signal loss and check for equipment that may cause interference and degrade network performance. The following paragraphs describe three (3) cable testers and how they work and which cable system(s) they are most suitable for. The first tester is the wire-mapper. Wire-mappers are used primarily with copper twisted-pair cable installations. These devices, according to Oliviero and Woodward (2011, p.422, 441) “Transmit signals through each pair in a twisted-pair cable to determine if it is connected correctly to the correct pin at each end.” The second tool is the tone generator. A tone generator is a two-piece unit that consists of a tone generator and a probe. This type of tester's primary function, amongst installers, is to identify specific locations in a punch-down block then label accordingly. According to Oliviero and Woodward (2011, p.442-443), these testers “Transmit[s] a signal, or, with an alligator clip, you connect the unit to an individual wire. The other unit is an inductive amplifier, which is a pen-like probe that emits an audible tone when touched to the other end of the conductor.” Primary functions are identify a particular cable within a bundle and to test for opens, shorts, and miswires of individual wires. Unfortunately, there is a disadvantage to using this device; time consuming. The third and final tester to be discussed are Multifunction Cable Scanners (commonly referred to as a certification tool). Alarmingly, these devices are highly expensive...

Words: 399 - Pages: 2

Free Essay

Issc341 Week 2 Assignment Lesson 1 Review

...beginning with Layer 7. Application, Presentation, Session, Transport, Network, Data Link, and Physical. 6. Why is it important for operating system venders to consider the OSI/RM when developing networking software? The OSI/RM allows systems from various venders to communicate with one another. Significant deviance from the OSI/RM will result in communication failures. 7. What is the difference between routable and non-routable protocols? Routable protocols can pass through a router and can travel through LANs and WANs. Non-routable protocols use predefined routes that cannot be changed. 8. Name the two types of twisted-pair cable, and the two varieties of wire available for each. Shielded twisted-pair cable (STP) and unshielded twisted-pair cable (UTP). They both come in either stranded wire or solid wire. 9. What are the two major types of fiber-optic cables? Single mode and Multi Mode 10. A network administrator suspects a security problem on a wireless network, and has changed...

Words: 394 - Pages: 2

Free Essay

Lab 4

...Review 4.1 It allows the ability to wire the cables however you would like without having to create a crossover. so that the cabling can have a strong signal. If you put it at the end it will have send a weaker signal than by putting it a little closer, inevitably giving you less packet and data loss. It cuts down the bandwidth and speed of the connections the more you add. Review 4.2 the bend radius is the amount a fiber optic cable that can be bent without worry of breakage. The current recommendation is to have the bend radius no smaller than 20 times the cable diameter. Some cables will have a fiberglass rod for stability, a larger jacket around each cable, Kevlar is sometimes used, and tight buffer coating. Review 4.3 Legacy equipment such as current home scenarios require UTP. But if you are going far distances than fiber is most definantly the way to go. I would have the audio/video put onto one wireless ap and then a second for the remaining computers in the office. If it is a small business I would have 2 wireless AP setup at either end of the building as well. Review 4.4 the divide and conquer has you test each layer of the osi model and then decide where the trouble is coming from and than work up/down from there. Most times it is the hardware or software that is breaking connection or needs setup rather than a cable issue. Though if you have a high traffic area there are times that cables could become...

Words: 274 - Pages: 2

Free Essay

Demo

...Today’s data centers house a large number of diverse bandwidth devices including bladed servers, clustered storage systems, virtualization appliances and backup devices all interconnected by networking equipment. These devices requires physical cabling with an increasing demand for higher performance and flexibility, all of which require a reliable scalable and manageable cabling infrastructure. Challenges arise not only with trying to research data center cabling offerings in order to determine what you need for today and for future growth , but also with evolving cabling industry guidance which sometimes lags in the race to deliver standards for deploying technologies such as 10 Gbit/sec data transmissions and beyond . Using structured approach: Using structured approach means establishing a main distribution area one or several horizontal distribution areas and two post racks for better access and cable management. Figure shows the top view of data center layout showing a Main Distribution Area , a Horizantal Distribution Area and several Equipment Distribution Areas. Figure shows sample logical diagram of cable distribution between and HAD and several EDA’s using horizontal cables Layout of a horizontal Distribution Area that includes patch panels, cable managers, and network equipment. Structuring the cabling has many benefits and since manufactures strive to confirm to standards compatibility should not be a major issues. A structured infrastructure provides...

Words: 313 - Pages: 2

Premium Essay

Unit 5

...IT113 Unit 5 Homework Chapter 6 1. What are the 3 basic tools required to install a plug for UTP cable? A. Stripper (the wire kind), wire cutter, cable crimper 2. What type of fiber-optic tester should you purchase to make sure the fiber-optic cable was installed without any fault and that enough light is being transmitted through the fiber, and what are the three key attributes to know before you purchase a tester? A. You want the tester to have the capability for correct fiber connectors, support the correct type of fiber (single vs. multi mode) and test appropriate wavelength. You should purchase an attenuation tester since you are testing for the power of the light transmission. 3. Which of the following supplies enables the reduction of friction on the cables while being pulled? A. Wire pulling lubricant Chapter 9 1. What are the main aspects that must be addressed when designing and installing wall plates? A. Fixed or modular design wall plate, wall plate location, manufacturer system, and wall plate mounting system. 2. Which TIA standards should you refer to for ensuring proper design and installation of wall plates? A. Residential is ANSI/TIA-570-B, Commercial is ANSI/TIA-568-C.1 3. Your commercial office building environment is expected to change over the next few years as some of the network devices that are presently installed with coax connections need to be converted to RJ-45 and some network devices that are currently RJ-45 connections may need...

Words: 408 - Pages: 2

Free Essay

Copper Versus Fiber

...Edward Taylor 00957058 Copper vs. Fiber There are two main forms of cable used in telecommunications, copper wire and fiber optic cable. Copper is a much more popular choice in most networking situations due to its inexpensive sticker price. Copper wire does pose certain issues that the more expensive and delicate counterpart does not. There is also a huge difference between the two cable types when it comes to performance and bandwidth. Copper wire is most commonly used in network construction and in cabling for home entertainment use. UTP (unshielded twisted pair) is a very commonly used cable used to connect network devices. It is very flexible and relatively inexpensive and thus is the most commonly used. Category 5,5e or 6e cables are used to connect client devices to a network and also are flexible and relatively inexpensive. Coaxial cables are a more rigid and durable cable that have a higher bandwidth than UTP or Cat 5, 5e or 6e cable. All of these cables use copper wiring which is flexible and cheap but will potential issues. Due to copper’s conductive properties it will cause grounding issues when wiring a building. Wiring outside with copper also causes potential hazards in regards to lightning strikes. There are opportunities when running cable for a network to use both types of cabling. When running cable in areas that are not subject to a lot of foot traffic, using fiber optic cable is best used due to the much larger bandwidth. Because of its fragility...

Words: 408 - Pages: 2

Free Essay

Outdoor Adventure

...color, sex (boy-girl-boy-girl), etc. Extensions up: Must completely start over if someone falls, can’t talk, can’t go over people. Extensions down: Only the person that fell must go back, students can talk Picture Frame Object: Students stand on a log in a square shape or confined surface and must arrange themselves in the given order while staying entirely in that confined area. Orders: Birthday, height, age, sign, clothes, eye color, sex (boy-girl-boy-girl), etc. Extensions up: Must completely start over if someone falls, can’t talk, can’t go over people. Extensions down: Only the person that fell must go back, students can talk Lord of the Rings Object: Students must walk on a wire from their tree to the tree across from them. There are any amount of trees and the wires converge on a ring in the center. There is a rope from one tree to another not across from it. Extensions up: Must completely start over if someone falls, can’t talk, must go back to starting tree when they fall, can’t go back once they make it across Extensions down: Only the person that fell must go back, students can talk, can come back and help once across, give them a pole, only need to go to the center. Whale Watch Object: Students stand on a platform teetering on a log. Get everyone on and off without it touching the ground. Get everyone on it to show them it can be done. Extensions up: Must completely start over if it touches, can’t talk. Extensions down: Students can talk,...

Words: 691 - Pages: 3