2 Introduction: This paper is about the risks associated with the construction of the Empire State Building. Risk is defined as the probability that an unfavorable outcome will occur. This paper will be addressing the possibilities of fire detection failure in the entire Empire State Building and the root cause of the failure
Words: 285 - Pages: 2
Iinputting the variable cost information for the resources (manpower) used such as; the project manager, general contractor and the manufacturing engineer and the fixed costs assigned to project deliveries such as; $32,000 for building design, a construction of $2,100,000 and $780,000 for plant equipment. At this point it would appear that with a proposed budget limit of $2,750,000 set by the company’s Board of Directors that we are on target with an estimated total budget of $2,633,532 for the Huntsville
Words: 339 - Pages: 2
for the next 5 years. W. M. Jordan Company is a full service; client focused Construction Company based in Virginia. It began business in 1958 and is now nationally known and ranked, regional in geographic scope, and deeply connected to the local community from which build. W. M. Jordan Company mass services within the fields of building and design from Construction Management, Preconstruction Service to Construction Consulting (W. M. Jordan Company). In today society preservation is one of the
Words: 1360 - Pages: 6
John (CEO) and Jean Abernathy (CFO), a husband and wife team, owned and operated J&J Electrical Contractors, Inc. (J&J).1 J&J performed commercial, industrial, residential, and public electrical-contracting work. Electrical work included wiring and installing anything to do with power, lighting, or other electrical equipment, and electrical contractors had to be licensed by the state of California. Often, electrical contractors were called to a job by a general contractor who had overall responsibility
Words: 9433 - Pages: 38
The contract between Span Systems and Citizen- Schwarz AG (C-S), was for Span to develop new banking software for C-S. The contract has a one year timeline, and for $6 million. Due to unseen challenges in the development of the software, Span has struggled to meet the milestones of the contract. C-S’s IT Outsourcing Director Leon Ther has been monitoring Span’s progress and quality of the deliverables. Requirements for the software on both the user and system sides have grown more complicated unexpectedly
Words: 370 - Pages: 2
Completion Date: | | Mission | The construction of a new Seitz plant in Huntsville, AL that will be operational by June 30, 2012. | | Scope | Included in Scope: * Selection of Project Resources: Ex (Architect, Real Estate Consultant, and General Contractor) * Training of Huntsville plant managers. * Pre-Production and Production Planning * Building Concept and Design * Procurement of Building Site, Permits, and Appropriate Approvals * Construction of the Huntsville Plant Building
Words: 269 - Pages: 2
Final Exam Timeline The project that the G& E Company is considering undertaking is the construction of the new Pilot Stadium. The company has been given a window from June 1, 2003 until April 1, 2006 to complete the project. For every day that the project runs over schedule the company will be assessed a $50,000 penalty. Project manager must determine through critical path analysis if the project can be completed on time given the amount of individual projects and projected duration times
Words: 930 - Pages: 4
fun! 1. Is the building well proportioned? 2. Was the building well planned in relation to its surroundings? 3. Is the building equally beautiful when seen from different points of view? 4. Does the building show an interesting use of construction materials? Are they so used that they have become part of the design of the building? (For example, is stone used for the effect of its texture or its color? Do overlapping tiles create patterns? Have materials so varied as metal and glass been
Words: 334 - Pages: 2
9. Basis for Bid Evaluation 6 1.10. Ethical Standards 6 1.11. Responsibility for Surety Bonds 6 1.12. Proposal Format 6 1.13. List of Bidders 6 1.14. Letter of Acknowledgment 6 2. DESCRIPTION OF WORK 7 2.1. Engineering Contracts 7 2.2. Construction Contracts 8 3. PROPOSAL 8 3.1. Breakdown of Bid Price 9 3.2. Revisions and Extra Work 9 3.3. Escalation Formulas 9 3.4. Scheduled Completion Dates 9 3.5. List of Subcontractors 9 3.6. Key Supplier or Contractor Personnel 9 3.7. Length of
Words: 902 - Pages: 4
III. Objective/s: 1. Appeal on the proposal and proceed to the regular bidding process. 2. Advocate correct sound business ethics. IV. Areas of consideration: 1. Alexander Gavin, a Senior Project Manager of El Sahd Construction Company in Kuwait. Mr. Gavin was offered a proposal by the Ajax’s Manager to increase the bid amount to $33 Million of the project in Iran. Of the $3 Million increase, $1 Million will be his share for not disclosing the matter. If Mr. Gavin will
Words: 645 - Pages: 3