IEOR 4000: Production Management

1

page 1

Professor Guillermo Gallego

Material Requirements Planning (MRP)

Material Requirements Planning (MRP) is a computer-based production planning and inventory control system. MRP is concerned with both production scheduling and inventory control. It is a material control system that attempts to keep adequate inventory levels to assure that required materials are available when needed. MRP is applicable in situations of multiple items with complex bills of materials. MRP is not useful for job shops or for continuous processes that are tightly linked.
The major objectives of an MRP system are to simultaneously:
1. Ensure the availability of materials, components, and products for planned production and for customer delivery,
2. Maintain the lowest possible level of inventory,
3. Plan manufacturing activities, delivery schedules, and purchasing activities.
MRP is especially suited to manufacturing settings where the demand of many of the components and subassemblies depend on the demands of items that face external demands. Demand for end items are independent. In contrast, demand for components used to manufacture end items depend on the demands for the end items. The distinctions between independent and dependent demands are important in classifying inventory items and in developing systems to manage items within each demand classification. MRP systems were developed to cope better with dependent demand items.
The three major inputs of an MRP system are the master production schedule, the product structure records, and the inventory status records. Without these basic inputs the MRP system cannot function.
The demand for end items is scheduled over a number of time periods and recorded on a master production schedule (MPS). The master production schedule expresses how much of each item is
wanted

Similar Documents

Free Essay

Material Resource Planning

...MRP II is manufacturing resource planning. MRP II provides planning for many areas of manufacturing companies which includes purchasing, inventory, material planning, shop floor scheduling, capacity planning, and accounting. MRP II allows for standardization and streamlines automation of business processes which leads to improvements in cost control and revenue. The MRP system assists the manufacturing company by suggesting purchase orders to be placed and exactly when to place them so that the materials required for the specific task arrive on time. The MRP system also recommends a start date for each work task required to perform the job. By knowing the materials needed parts and the start dates of the work tasks means that it is possible to pinpoint material shortages before they occur so that they can be avoided rather than finding out when it’s too late. MRP systems assists companies particularly manufacturing companies in various ways, the most important contribution that the MRP inventory system gives are in: • On-time material ordering which reduces expediting and material shortages. • Combining of material orders to suppliers which reduces order placement. • Real time planning of work which reduces rescheduling and increase productivity. • Makes company information more integrated and gives it the accessibility which improves task specific progress. Advantages: MRP II helps to standardize business processes by providing the business with automated methods...

Words: 441 - Pages: 2

Free Essay

Scm (Sales & Distribution)

...budgets) Controlling area to financial management area Controlling area to Operating Concern. Sales Organization • The highest-level of organizational unit in SD is Sales Organization. • Responsible for Distributing goods and services, Negociation sales conditions, Product liability and other customer rights of recourse. • Sales organization is also used to take for example a regional, national or international. • A sales organization assigned to a company code. Distribution Channel • Distribution Channel represents strategies to distribute goods and services to customer. • DC is assigned to a sales organization. The assignment is not unique. • You can share Customer, Material and Condition master data by maintaining a reference/common DC. Division • A Division is used to group material and services. A material can have only one Division. Abhishek Parihar SAP SD Certified Consultant E-Mail: abhishekparihar@rediffmail.com SAP SD IMP NOTES • • • • • We can make Customer- specific agreements for each Division, for example regarding partial deliveries or pricing within Division. (In CMIR) You can share Customer and Condition master data by...

Words: 11488 - Pages: 46

Free Essay

Mrp, Erp, Cad/Cam

...1.0 MATERIAL REQUIREMENTS PLANNING (MRP) DEFINITION Material requirements planning (MRP) is a production planning and inventory control system used to manage manufacturing processes. It is the process that helps companies makes volume and timing calculation. Most of MRP is based on the software, sometime company use the existing software and make the new software based on the company wants. The objectives of MRP system are to: • Ensure materials are available for production and products are available for delivery to customers. • Maintain the lowest possible material and product levels in store. • Plan manufacturing activities, delivery schedules and purchasing activities. • Required goods are available when required at a right place and time. • Reduce storage and inventory holding cost and improve customer service. MRP system typically requires certain data records which the MRP programs checks and update. The chart below shows the information required to perform MRP and some of the output. Customer order record exactly what each customer has ordered, how many they ordered and when they required delivery. Forecast demand using historical data to predict future trends, cycle and seasonality is always difficult. This process is more to predict of the orders. Inventory record in MRP is to know how some of the required items already in stock. This stock may be in the progress or in raw of material. Bills of the material contains detailed...

Words: 1673 - Pages: 7

Free Essay

Sm of Ch10

...Chapter 10 THE PRODUCTION BUSINESS PROCESS TEACHING TIPS I usually gloss over the materials on job costing, for my students have covered job costing in their Cost/Managerial course. I do emphasize the need for good ledger control over property, plant, and equipment. THE PRODUCTION BUSINESS PROCESS Production Planning and Control. A sales order or sales forecast cause the creation of production orders which specify items that should be produced. Materials are requisitioned and production is scheduled. Items are produced, inspected, transferred to finished goods inventory, then transferred to shipping to complete the process. Basic production requirements are provided by the bill of materials and master operations list. Resources available for production are communicated to the production control function through inventory status reports and factor availability reports. The production order serves as authorization for the production departments to make certain products. Materials requisitions are issued for each production order to authorize the inventory department to release materials to the production departments. Production status reports are periodically sent from the production departments to the production control function. Cost Accounting Controls. Job costing is a procedure in which costs are distributed to particular jobs or production orders. In process costing, costs are compiled in process or department accounts by periods (day, week, or month).The cost accounting department...

Words: 5358 - Pages: 22

Premium Essay

Bus 230 Wk 7 Quiz Chapter 8,9 - All Possible Questions

...directly by customer orders is called: a. derived demand. b. dependent demand c. anticipated demand. d. independent demand. a. scheduled demand. 2. “A” items in ABC analysis are: a. reviewed infrequently. b. particularly critical in financial terms. c. normally carried in large quantities. d. ordered infrequently. a. commonly managed by carrying inventory. 3. When the carrying cost of inventory is expressed as a percentage: a. it is usually the same as the borrowing cost of the organization. b. the lower it is, the lower the economic order quantity. c. it usually exceeds 57.5 percent per year. d. it must exclude the insurance cost of inventory. e. it is multiplied by the material unit cost to calculate the per unit carrying cost. 4. On an annual requirement of 100 items spread evenly throughout the year, any purchaser has an opportunity of buying all 100 units at a price of $100 each, or buying 10 units at a time at a price of $120. If the inventory carrying cost is 25 percent per year and assuming no ordering costs: a. buying 100 at a time will save the company $2,500 per year. b. buying 100 at a time will save the company $2,000 per year. c. buying 100 at a time will save the company $1,100 a year. d. buying 100 at a time will save the company $900 per year. e. buying 100 at a time will save the company $200 a year. 5. Closed-loop MRP: a. is a system which closes the loop between the supplier and the purchaser. b. requires a feedback loop...

Words: 925 - Pages: 4

Free Essay

Effectiveness of Material Requirenents Planning

...PROPOSAL Research Title Effectiveness of Material Requirements Planning (MRP) framework within manufacturing cooperatives based in Polokwane Municipality Area Presented by Phetola Cyprian Mogale Student Number: 113904 Postal Address P.O. Box 507 Polokwane Ladanna 0704 Contact Numbers Work 015 297 6632 Cell 082 906 2746 Email address: mogalep@libsa.co.za Date submitted: 12 April 2012 Proposal for dissertation submitted in partial fulfilment of the degree Masters in Business Administration at the Mancosa Management College of Southern Africa TABLE OF CONTENTS i CONTENT PAGE 1. Introduction 4 2. Research Context: Background 4 3. Research Problem 6 4. Aim of the Study 7 5. Research Objectives 7 6. Research Questions 7 7. Significance of the Study 8 8. Literature Review 9 9. Research Design and Methodology 12 9.1 Research Methodology 12 9.2 Sampling Strategy 13 9.3 Data Collection Instruments 14 9.4 Data Analysis 15 9.5 Pilot Study 15 10. Ethical Considerations 15 11. Chapter Organization 16 12. Proposed Time-Table 17 13. Bibliography 18 LIST OF TABLES TABLE 1.1 SAMPLE SIZE 13 LIST OF ACRONYMS ii CRP Capacity Requirements Planning DTI Department of Trade and Industry EOQ Economic Order Quantity ERP Enterprise Resource Planning ...

Words: 6238 - Pages: 25

Free Essay

Operations Management Abstract

...apply to every fire department, and help to make each department more successful. Material requirements planning (MRP) can help fire departments to develop incident action plans for any type of emergency they may face. A MRP can help a fire department be better prepared for emergencies by knowing what equipment they need, how much inventory they need, potential customers, and an estimate for the number of potential emergencies. The just-in-time approach will allow fire departments to overcome emergencies with a focus on effectiveness and a reduced inventory. The limited inventory with this approach will save fire department money by limiting storage and service fees. Implementing a maintenance program into a fire department’s training program will ensure the department has capable employees who can handle the frequent stressful situations they encounter. Firefighters are constantly seeking ways to improve themselves, and the operations management tools will help every firefighter become successful on emergency scenes. Introduction: I will introduce how my fire department currently operates in relation to the three improvements techniques I will be implementing. I will discuss briefly the three improvement techniques, MRP, Just-in-time, and maintenance. I. MRP in the fire department A: What tools/techniques are needed and when B: Materials and training needed to provide the service C: What tools/resources are currently...

Words: 453 - Pages: 2

Free Essay

Om Discussion Question

...The primary relationship between Materials Requirements Planning (MRP) and Enterprise Resource Planning (ERP) is that as ERP is used to manage and plan all the resources in a company, MRP is executed to manage the resource used particularly in the manufacturing process. For instance, while ERP may incorporate accounting, HR, customer service, manufacturing, and project management departments, MRP particularly incorporates the manufacturing department. So while MRP is a specific system just to plan the resources for manufacturing, as the movement to ERP is made, it turns into a broad and complete system that incorporates numerous departments in a company. MRP is mostly used to ensure that the right amount and kind of materials reach the right destination inside the given time limit. Planning and scheduling are used in this system that decide the “what number of and when”. MRP tends not to incorporate the finance and accounting department and typically deals with the sales, work orders, quotes and invoicing. The advantages of MRP system incorporate diminished costs of production caused by organized resource planning, enhanced response to market demand, time optimization because of scheduling and advances in planning and allocation. In contrast, some of the disadvantages of MRP incorporate the long procedure during implementation, training and instruction costs on showing workers and staff how to utilize the system to acquire all advantages anticipated to be provided when initially...

Words: 524 - Pages: 3

Premium Essay

Master Requirement Planning

...Material Requirements Planning (MRP) Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for items of dependent demand. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and bike chains. The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. MRP begins with a schedule...

Words: 1616 - Pages: 7

Free Essay

Devry Gscm 330 Complete Course-Latest 2015 December

...Devry GSCM 330 Complete Course-Latest 2015 December (All Discussisons All Quizes And All Lab Homework But No Final) IF You Want To Purchase A+ Work then Click The Link Below For Instant Down Load http://www.hwspeed.com/Devry-GSCM-330-Complete-Course-Latest-2015-December-2234123463.htm?categoryId=-1 IF You Face Any Problem Then E Mail Us At JOHNMATE1122@GMAIL.COM Question week 1 Master Planning (graded) How does master planning affect the overall organization? Why is this a necessary part of the overall management process of an organization? Planning Horizons (graded) What are time horizons as used in the corporate planning process? How do these horizons affect our forecasting processes? let’s first considertime horizons as used in the corporate planning process. What are these horizons and how do they affect our forecasting processes? week 2 Which forecast error measuring tool is the best? (graded) Of the four error tracking tools we have learned about in our assigned textbook reading (MAD, MSE, MAPE and seasonality), which method provides the best way to track forecast error? Give examples. Is it possible to forecast seasonal products without removing the seasonal variations? (graded) We calculate a seasonal index in order to remove the seasonal component before creating a forecast. Is it possible to remove this step and create a forecast with the seasonal variation still in place? Why or why not? Explain. whether it...

Words: 1783 - Pages: 8

Free Essay

Materials Requirements Planning

...Materials Requirements Planning I. Objectives of a Materials Requirement Planning (MRP) System A. Ensure materials are available for production and products are available for delivery to customers B. Maintain the lowest possible material and product levels in store C. Plan manufacturing activities, delivery schedules and purchasing activities II. There are two types of demand A. Dependent i. Directly related to the demand for higher-level assemblies or products and can be calculated, such as Raw materials and component inventories B. Independent i. Not related to the demand for any other product, example, finished goods such as a computer III. There are three types of the MRP System A. Type I-Inventory Control System i. Releases manufacturing and purchase orders for right quantities at the right time to support the master schedule B. Type II-Production and Inventory Control System i. Used to plan and control inventories and capacities C. Type III Enterprise Resource Planning System i. Used to plan and control all resources, i.e. inventory, personnel, cash, facilities and capital IV. Parts Explosion Process---The heart of MRP System A. Three Principle Inputs i. Master schedule a. Tells how much finished product is desired and when ii. Bill of Materials (BOM) a. Tells what goes into a finished product iii. Inventory records a. Tells how...

Words: 272 - Pages: 2

Free Essay

Mrp 2

...to American Production and Inventory Control Society, MRP II can be defined as a method of the effective planning of all the resources of a manufacturing company (Higgins, Leroy and Tierney 1996). It is actually advancement or can be said as a upgrading of Material Requirement Planning System (MRP) system, which is a set of technique that uses bills of material, data and a master production schedule to calculate the requirements for materials in a manufacturing company. The MRP system was initiated in the 1960s and was spearheaded by a team of IBM innovators comprising Joe Orlicky, George Plossl and Ollie Wright who sought to create a structured methodology for planning and scheduling materials for complex manufactured products. Over the past 30 years MRP has spawned an entire industry in manufacturing and professional services. It has evolved hand in hand with technological advancements in the computer hardware industry. At the beginning, MRP systems were run on large mainframe computer costing a lot of money and required large technical staff to support them. However in the 1970s they underwent refinements that saw disparate modules get included and critical business concerns such as cost accounting and Capacity Requirements Planning get added. This gave rise to a new generation system called MRP II. Continued changes spurred by increased technological advances coupled with the expansion of global business marketplace has led to changes in MRP II to enable it to facilitate the...

Words: 610 - Pages: 3

Premium Essay

Ppq Parts

...are many software packages that are needed to properly operate businesses. In order to perform particular tasks, specific specialized software is needed. Material Requirements Planning Among the many operating software systems, one of the most important is the Material Requirements Planning (MRP) system. Material Requirements Planning is the system that manages the process of production planning and inventory. This system uses a technique of inventory, expected receipts, and bill of materials. This system also uses the Master Production Schedule (MPS) to determine the material requirements. There have been four main benefits of having a MRP system in your business. These benefits include, but are not limited to, better responses on customer orders, faster responses on market changes, improve utilization of facilities and labor, and reduced inventory levels (Heizer, J). Capacity Requirement Planning The Capacity Requirement Planning (CRP) is a method that many businesses use to determine the available production capacity. It will start off by assessing the schedule of production that the company has planned. It will then analyze the actual production capacity of the company, and weigh it against the schedule of production to see if the company can meet the schedule with its current production capacity (Capacity Requirements Planning.) Enterprise Resource Planning The Enterprise Resource Planning (ERP) is a software system that effectively plans and controls all resources...

Words: 689 - Pages: 3

Free Essay

Supply Chain Sap

...Material Requirements Planning Areas Use In this section you will find information about how Material Requirements Planning Areas (MRP areas) are transferred from SAP R/3 to the location master data of the SAP Advanced Planner and Optimizer (SAP APO). An MRP area is understood to be a planning area within a plant that is subject to separate inventory management and material requirements planning. Features The Material Requirements Planning Area in SAP R/3 You can find information on the MRP areas in SAP R/3 under the components Logistics ® Production Planning and Control (PP) ® Requirements Planning ® Special Planning Process ® MRP Area. The Material Requirements Planning Area in SAP APO. The SAP R/3 MRP area of a plant is represented as the location Production Plant in SAP APO. All additional SAP R/3 MRP areas are represented as locations with their own location types. Restrictions: The SAP R/3 MRP area may only be assigned to one storage location. The process Subcontracting MRP Area in SAP R/3 is supported in APO without an MRP area. Integration R/3 – APO You can transfer the MRP area to SAP APO via the integration model APO Core Interface (CIF) and then create this as a location with the corresponding location type in connection with the MRP area of a plant or another MRP area. If MRP area processing is activated in SAP R/3 you can use CIF to control whether you would like to work with MRP areas in SAP APO. SNP Planning ...

Words: 482 - Pages: 2

Free Essay

Global Supply Chain

...The organization employs 550 people and has projected annual earnings of $46 million. The company’s products include plastic fans and fan parts produced at its facilities in Hangzhou, China and custom plastic parts produced at its plant in Pontiac, Michigan. The company's major customers for its standard and customized fans are automotive parts manufacturers, aircraft manufacturers, the Department of Defense, and appliance manufacturers. Recently, the company has experienced some issues with its. On-time deliveries in the China plant have averaged only 93% over the past year, which is inadequate for a Six Sigma company focused on exceeding ISO 9000 manufacturing standards. The senior management team must examine all steps in the material requirements planning, supply chain management, and production and inventory processes to look for potential areas to eliminate waste and redundancies, gain efficiencies through automation or other process changes, and improve the process design and supply chain for the manufacturing of its electric fans. Production and Inventory Processes Change Recommendations After reviewing the production process of the plant in Hangzhou, China, the team noted inefficiencies in several departments due to the manual procedures being utilized and redundancies in certain departments, including the inventory system. The importance of a good inventory control system cannot be overstated as it is tied directly to the financial performance of an organization (Chase...

Words: 1268 - Pages: 6