Executive summary
The purpose of this report is to illustrate what MRP II is, what features it provides, and what benefit the manufacturers could get from it as well as the existent issues in MRP II system. The research also demonstrates how MRP II was implemented in manufacturing industry by studying a case of successful implementation of MRP II software.
Introduction and background of MRP II
MRP II is Manufacturing Resources Planning for short. It is defined as a man machine application system for the effective planning of all resources of all manufacturing company. From the global optimal point of view, using scientific method to plan, organize, control and coordinate all the manufacturing resources and all the links of operation of enterprises effectively and reasonably is what the MRP II concerned about. The purpose of using the MRP II system is to achieve continuous and balanced production and minimize the various items in the inventory. Eventually it can improve the economic efficiency of enterprises. It is an important tool for aligning manufacturing with a company’s overall strategy and goals.
There is a diagram can demonstrate the structure of MRP II:[3]
Since the 18th century industrial revolution, many handcraft industry workshop developed into industrial plants, then manufacturing emerged. With the emerging of manufacturing almost all the enterprises in the pursuit of basic objective are to minimum capital investment and obtain the biggest profit. The pursuit of this goal led to the manufacturing industry produced a lot of problems. In order to solve these problems, people in 19th century 60s realized “Material Requirement Plan” on computer, which is mainly used for inventory control. To protocol detailed report of parts demand within a few weeks, it was used to supply the ordering and adjust the original order to meet the changing needs. By the age of 70s, for the sake of adjusting the demand and plan timely, Closed-loop MRP (close MRP) with the feedback function emerged. Closed-loop MRP integrated the financial system and production system applying the management logic of plan –implementation-feedback. So it led to an effectively plan and control of production of each resource. At the end of 80s, people integrated the main parts of production such as sales, financial, costs and engineering technology as well as MRPII and Closed-loop MRP into a system. Then this system became a comprehensive planning tool which can be used to manage the enterprises. Oliver Wight from the USA called this integrated management technique manufacturing resource planning MRPII. It can utilize manufacturing resources, control capital occupation, shorten the production cycle, reduce cost, and implement the optimization of whole enterprises effectively under a careful plan. At the same time, it served the best products and services to capture the market. Additionally, MRP II can release the executives from complicated affairs and make them focus on improving the level of management. Thus they will have more energy to solve the substantive issues in management.
In modern manufacturing industry, MRP II system is generally divided into three subsystems: Production Control (planning and manufacturing), Logistics Management (distribution, procurement and inventory management) and Financial Management (accounting, costing and capital).
.
Implement in Manufacturing Industry
Manufacturing resource planning (MRP II) is concerned with the coordination of the entire manufacturing production, including materials, finance, and human relations. This technique was applied initially to mobile and airplane industry. MRP II is widely used in current manufacturing firm, and the original vision of integrated information systems as we know them today began with the development of MRPII in manufacturing.
ABAS is one of the most famous MRP II system, which provides cost-effective MRP II solutions to over 2700 customers at 3200 sites. It’s mainly service customers are small to mid-sized businesses in the Manufacturing, Distribution and Service marketplace. ABAS offers the integrated functions focusing on Engineer-to-Order, Make-to-Order, Assemble-to-Order and Made-to-Stock customers.
Customers usually face many challenges in their manufacturing process before using MRP II system. They generally used variously different software systems for purchasing, production, transportation and customer service. With information in all different places, it was difficult to find the needed information in an efficient way. Meanwhile, customers encountered excessive prices and complicated processes for ordering what they wanted. Moreover, Their software was a pretty much outdated which cannot satisfy diverse requirements of their customers.
Casa Fiora is a company providing a line of related hardware and soft home furnishings to coordinate with their custom draperies. Items in each of the collections are available in a variety of different fabrics and are delivered within four weeks or less. Because Casa Fiora is 99% custom made, the flexibility of MRP II system is crucial. ASAB gives their employees and customers quicker information and increases their quality of customer service by accessing information within a given time frame, without going between different systems, They could use ASAB to customize their production line to make it more efficient.
Some companies such as Bergmann & Hillebrand uses ABAS Business Software to accomplish production planning, utilization of capacity and warehouse management. By using the system all employees have the same access authorization to check details of each order at all times, i.e. which agreements have been entered into and which deadlines have to be kept. When the order is issued, ABAS Business Software checks whether the capacities are sufficient to meet delivery dates and the necessary material is in stock. The system supplies information on whether enough raw materials and purchased parts are available and in which warehouse they can be found. After the order date has been finished, the work orders are printed and the work order documentation are generated. Completed orders are reported back and another check for correctness is carried out before the order is closed. If bottleneck situations occur, such as lack of material or a due date is brought forward, then managers’ ability to improvise is required. Bottleneck situations with regard to the machines are dealt with by the master craftsperson who decides which order runs on which machine.
Customers could get lots of benefits through using ABAS. The clear structure of ABAS Business Software and sophisticated implementation strategies facilitate short implementation times, as well as the quick and smooth integration into the company structure and existing software environments. ABAS provides users with an extensive range of functions, which can be made easily, flexibly and cost efficiently. It provides a multifaceted optimization and use potential, such as an increase in productivity, improvement of transparency and service, increase in competitive strength, cost savings, and much more. These bring cost benefits in the user operation. Besides, It is easy to customize in according to users’ requirements. It also has a continuous upgrade strategy to ensure that the business software will also be reliable in the future. New functions and technologies are always integrated into the software standard so that users are always up-to-date.
SWOT Analysis of MRP II System STRENGTHS * Improved utilization of facilities and labor * Improved on-time completion * Increased customer service and satisfaction * Better inventory planning and scheduling * Better manufacturing planning and control * Faster response to market changes and shifts * Reduced purchase costs * Reduced inventory levels without reduced customer service | WEAKNESSES * MRP II system is complex * Expensive to procure * Requires significant employee training * Compatibility issues with other systems * Setting up a successful system takes a lot of time, effort and commitment at all levels of the organization * Security concerns | OPPORTUNITIES * Huge potential in the emerging global markets * Not only the huge companies but also more and more small and medium companies of developing countries such as China, India etc. pay attention to the MRP II system * High efficiencies becoming critical in the manufacturing industry due to the cut-throat competition and paper-thin margins | THREATS * Dividing opinion over Return-on-Investment (ROI) of such systems * No good ends—continued investment and training are essential * Increasing complexities of such systems * Security concerns regarding sharing of data over the network such as the Cloud technology * Inaccurate data leads to poor performance |

As we see the SWOP analysis of MRP II, though there are some disadvantages and threats during implementing the system, the benefits, however, should very quickly make the exertion worthwhile.
Conclusion
Manufacturing resource planning (MRPII) refers to software that enables business processes related to manufacturing and distribution companies. MRPII includes virtually all business processes.
MRPII can apply to all business processes in a company, including manufacturing, planning, finance, order management, inventory, and distribution and purchasing. MRPII can also apply to business process within, and between, multiple entities within a larger company, including plants and distribution centers.
Benefits of MRP II:
In the narrow sense, the main benefit of MRP II is its ability to generate valid schedules and keep them valid. But valid schedules have broader benefits for the whole organization. These include, more or less in order of importance:
1. Improved on-time completion
A typical manufacturing organization using MRP II should be able to achieve on-time completion rates of 95 percent or more, because completion of a parent item is less likely to be delayed for lack of a component. On-time completion helps improve customer service.
2. Reduced inventories
Inventory falls typically by 20-35 percent because parts are not ordered until needed.
3. Capacity requirements planning data
Work centre capacity requirements can be planned for many periods into the future.
4. Improved direct labor productivity
Fewer shortages mean significantly less lost time and overtime, and less disruption to accommodate shortage-list jobs.
5. Improved productivity of support staff
MRP II cuts expediting and allows more time for planning. For example, purchasing can start looking for alternative or better suppliers; materials management can plan inventory needs better.
6. Total business planning
Drawbacks of MRPII
Though Manufacturing Resource Planning has a number of benefits, it has a few limitations too. They are:
MRP II system is complex.
MRP II implementation programmer takes a lot of time, effort and commitment at all levels of the organization to set up a successful MRP II system.
But actually MRP and MRP II are set of heuristics. Better production plans could be obtained by optimization over more powerful mathematical programming models, usually integer programming models. While they acknowledge that the use of heuristics, like those prescribed by MRP and MRP II, were necessary in the past due to lack of computational power to solve to solve complex optimization models, this is no longer true.

Recommendations (Next generation of MRP II system)
In 2011, a new concept was introduced into MRP II system which called Demand driven MRP system. This is also known as DDMRP. Demand Driven MRP is a multi-echelon formal planning and execution technique with five distinct components. [5] * Strategic Inventory Positioning. This is most concerned about “given our system and environment, where should we place inventory to have the best protection?” * Buffer Profiles and Level. The parts and materials that behave similarly on some important factors such as lead time, variability, whether to be made or bought or distributed are grouped into "buffer profile". The replenishment will be taken based on the buffer profile when the actual buffer level is initially set after strategic replenish position is determined. * Dynamic Adjustments. Maintaining dynamic buffer level is to adapt to fluctuated market and company's strategy change. * Demand Driven Planning. Customer demand is one of the important inputs of the system as development of Master Production Schedule (MPS) tightly relies on it. Accurate demand or most possible demand forecast will result in the execution of the remainder of the business process with little or no change. * Highly Visible and Collaborative Execution. All the integrated systems such as Purchase Order, Manufacturing Order, and Transfer Order with MRP should be connected seemingly which means they should synchronize with the changes occur within the execution of the production.
Where does the software go from here? To gain the big potential of the MRP system, the software should be enhanced with the following characteristics:
High Integration
Highly and smoothly integrate within sub-systems (Purchase Orders, Transfer Order, etc.) and all related systems, such as Customer Relationship Management, Supplier Chain Management will make information up-to-date and accurate and synchronized.
Simplicity
Simplicity will make people easy understand the system and easy to contribute to the success of implementation of system. Sophistication and complication of system are easy to get wrong data entry and produce a useless production plan.
Flexibility
The software should always support the change needs of a company. For example, a company likes to move their work order production to rate-based kanban shop floor plan; the software should allow this happen without a radical change of the software. The system is also highly committed to top level of management in order to incorporate the decision from business management. The optimum tradeoffs are not suitable for world class manufacturers as they are just best guess. For example, EOQ(economic order quantity) is tradeoff between inventory carry cost and set up cost, however, management may have different input about batch size.
Accessibility
The system should be easy accessed by people who are involved to do some customization. For example, writing custom report based on the information contained in system.
More Intelligence
Business Intelligence programs should be embedded into MRP II system to analyze the uncertainty and the interactions of uncertainties during the execution of production plan.

Reference:
[1] Garvin, David A, Note on Manufacturing Resource Planning (MRP II). Harvard Business School Background Note 687-097, June 1987.
[2] Introduction to MRP II: http://baike.baidu.com/view/395875.htm
[3] Manufacturing Resource Planning (MRP II): http://www.apicsforum.com/category/topics_dictionary/mrp_ii [4] Jianwei Yan, Research about Implement of MRP II System in discrete manufacturing, 2002.
[5] Manufacturing resource planning: http://en.wikipedia.org/wiki/MRPII
[6] Top ten ERP Software Systems for Manufacturing: http://www.top10erp.org/abas-erp-products-45
[7] Franjo Cecelja, Manufacturing Information and Data Systems, Elsevier Ltd. (2002), ISBN: 978-1-85718-031-2, P79-100.
[8] Xiande Zhao, Fujun Lai & Scott Young, A study of Manufacturing Resources Planning (MRPII) implementation in China, International Journal of Production Research (2010), London, 40:14, P3461-3478
[9] MANUFACTURING RESOURCE PLANNING (MRP II): http://cde.annauniv.edu/CourseMat/mba/sem2/dba1651/mrpii.html
[10]Shum, Paul (2003). Knowledge and Innovation Culture as Determinants of Financial Performance in New Product Development, Australia, The International Journal of Knowledge, Culture and Changes Management.
[11] URL: http://en.wikipedia.org/wiki/Material_requirements_planning
[12]What is MRP (I, II, III), http://www1.ximb.ac.in/users/fac/Surya/surya.nsf
[13] Brian H. Maskell, President, Why MRP II Has not Created World Class Manufacturing And Where Do we Go from Here, BMA Inc.
[14] J. Oleskow, P. Pawlewski, M. Fertsch, LIMITATIONS AND PERFORMANCE OF MRPII/ERP SYSTEMS –SIGNIFICANT CONTRIBUTION OF AI TECHNIQUES, Institute of Management Engineering, Poznan University of Technology, Strzelecka 11 Str., 60-965 Pozna?

Similar Documents

Premium Essay

Erp Timeline

...ERP Timeline Michael Benitez CMGT / 556 October 03, 2011 Jeffery Doolin Abstract According to Systems-ERP, ERP (Enterprise Resource Planning) “is the evolution of Manufacturing Requirements Planning (MRP) II. From business perspective, ERP has expanded from coordination of manufacturing processes to the integration of enterprise-wide backend processes. From technological aspect, ERP has evolved from legacy implementation to more flexible tiered client-server architecture” (History and Evolution of ERP).  MRP’s contributions greatly impacted the modern business world as its concepts have been utilized to developed tools that will aid companies to cope with success. Although MRP is considered costly and requires a lot of man power but its benefits outweighed its disadvantages. Since man’s instinct is to move forward finding new ways to evolve same scenario happened with MRP solutions as new solutions was made to mimic and yet provides more benefits and flexibility, thus the birth of the evolved version of MRP II is ERP. According to Systems-ERP.com… (History and Evolution of ERP). ERP Timeline As time passes so as man’s ingenuity and innovation…throughout the year’s businessman, entrepreneurs, traders, business analyst and etc. are often struggling to find new ways to cope with the change of economy and its needs and to stay competitive amongst other companies. Those innovations that are called tools of the trade are often enhanced and/or sometimes replaced by new and...

Words: 1801 - Pages: 8

Premium Essay

Managerial Application of Information Technology

...Does a MRP system provide value to an organization? IS535: Managerial Applications of Information Technology Dr. Mario Missakian TABLE OF CONTENTS PAGE Proposal a. Does a MRP system provide value to an organization 4 i. Value added by MRP system 4 b. The problem 4 i. Frequent Back Orders 4 ii. High Inventory Levels 4 c. Benefits of MRP System 5 i. How will ABC, Inc. benefit 5 d. High Level Approach 6 i. Assessment of resources and costs ii. Presentation to Management 6 e. Audience 6 i. Who will benefit 6 ii. How the beneficiaries will benefit 6 iii. The role of senior management in the implementation 6 Milestone 1 a. Business problem relooked 7 i. Problems facing ABC 7 b. Company background 7 ii. ABC’s business 7 iii. ABC’s current state 7 c. Discussion of business issue 8 i. Why MRP Implementations Fail 8 ii. Risks associated with implementation 8 d. Benefits of Solving the problem 8 i. Benefits From Good Design 8 ii. Benefits From Correct Implementation 8 e. Initial business/Technical Approach 9 i. Implementation Approach 9 ii. Management Commitment Required 9 f. High Level Solution 9 i. Requirements and Design 9 ii. Specific Functions 9 Milestone 2 a. Implementation 10 i. Configuration 10 ii. Integration 10 iii. User Education 10 b. ...

Words: 3853 - Pages: 16

Premium Essay

Eenterprise Resource Planning-Erp

...ENTERPRISE RESOURCE PLANNING ENTERPRISE RESOURCE PLANNING Introduction: Enterprise resource planning (ERP) is a company-wide computer software system used to manage and coordinate all the resources, information, and functions of a business from shared data stores. An ERP system has a service-oriented architecture with modular hardware and software units or "services" that communicate on a local area network. The modular design allows a business to add or reconfigure modules (perhaps from different vendors) while preserving data integrity in one shared database that may be centralized or distributed what does this software do? Take the activities of a typical company or 'Enterprise', its purpose can be loosely described as 'to manufacture or procure products for sale'. These products may be tangible or intangible, but basically the company must 'Plan' and 'Control' the use of its entire resource base to meet these objectives. That is what 'E.R.P. software' does, it helps the managers and staff of an enterprise to manage its resources to manufacture/procure the products it sells within one software package. The single software package 'integrates' its elements or modules into one seamless package to control the enterprise activities. The most common activities being Purchasing, Manufacturing, Sales and Accounting. ENTERPRISE RESOURCE PLANNING ERP AND CYCLICAL STRUCTURE Origin of the term: MRP vs. ERP — Manufacturing management systems have evolved in stages...

Words: 6558 - Pages: 27

Free Essay

Operations Management

... March 6, 2015 II. View Point Manager of XYZ Company III. Statement of the problem The problem in the case is to contemplate installing a Materials Requirement Planning (MRP) System to the XYZ Company. The most pertinent questions in the problem are, How will it be done?, How much will be its cost? And what action will be needed to lead this project into success? IV. Objectives Short-range Objective - To set up the new system in order to have a smooth flow of production and avoid interruption. Long-range Objective – To be able to upgrade equipment which will help fit to the new system. V. SWOT Analysis STRENGTHS | WEAKNESSES | * Has workers with expertise in using company’s equipment & following the system * High availability of raw materials * Near to target market | * Poor manufacturing system * Inefficient use of resources * Higher percentage of employee turnover & scrap/waste | OPPORTUNITIES | THREATS | * Possible development of the production system * Affordability in the cost of production | * Breakdown of existing system * Competitors build stronger relationship with other customers | VI. Alternative Courses of Action * ACA# 1: Execute Materials Requirement Planning System. Advantages: Reduce the levels of inventory. Minimize the holding cost Disadvantages: Execution of the system will be at high cost. . ...

Words: 810 - Pages: 4

Free Essay

Economic

...Management: Processes and Supply Chains, 10e (Krajewski et al.) Chapter 16 Resource Planning 1) An ERP system revolves around a single comprehensive database that is made available across the entire organization. Answer: TRUE Reference: Enterprise Resource Planning Difficulty: Easy Keywords: enterprise resource planning, ERP Learning Outcome: Describe the process and applications of enterprise resource planning (ERP) 2) Companies that fully customize their ERP implementation reap the greatest rewards from such systems since they can continue to use the same processes to which all employees are accustomed. Answer: FALSE Reference: Enterprise Resource Planning Difficulty: Moderate Keywords: enterprise resource planning, ERP implementation Learning Outcome: Describe the process and applications of enterprise resource planning (ERP) 3) A firm's existing, older information system is called a "legacy system." Answer: TRUE Reference: Enterprise Resource Planning Difficulty: Moderate Keywords: enterprise resource planning, legacy system 4) Material requirements planning (MRP) is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders. Answer: TRUE Reference: Material Requirements Planning Difficulty: Easy Keywords: material requirements planning, MRP 5) A materials requirements planning (MRP) explosion occurs when the system is bombarded with too many orders to...

Words: 9434 - Pages: 38

Premium Essay

Mrp-Toyota

...Mrp-Toyota Materials Requirements Planning (MRP) Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for dependent demand items. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and derailleurs. The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. "MRP...

Words: 291 - Pages: 2

Premium Essay

Material Requirement Plannin

...Guillermo Gallego Material Requirements Planning (MRP) Material Requirements Planning (MRP) is a computer-based production planning and inventory control system. MRP is concerned with both production scheduling and inventory control. It is a material control system that attempts to keep adequate inventory levels to assure that required materials are available when needed. MRP is applicable in situations of multiple items with complex bills of materials. MRP is not useful for job shops or for continuous processes that are tightly linked. The major objectives of an MRP system are to simultaneously: 1. Ensure the availability of materials, components, and products for planned production and for customer delivery, 2. Maintain the lowest possible level of inventory, 3. Plan manufacturing activities, delivery schedules, and purchasing activities. MRP is especially suited to manufacturing settings where the demand of many of the components and subassemblies depend on the demands of items that face external demands. Demand for end items are independent. In contrast, demand for components used to manufacture end items depend on the demands for the end items. The distinctions between independent and dependent demands are important in classifying inventory items and in developing systems to manage items within each demand classification. MRP systems were developed to cope better with dependent demand items. The three major inputs of an MRP system are the master production schedule...

Words: 2977 - Pages: 12

Free Essay

Material Resource Planning

...SME 29-30TH April 2004, Tallinn, Estonia MRP SYSTEMS RESEARCH Eduard Shevtchenko Tallinn Technical University Institute of Machinery. Ehitajate tee 5, EE0026 Tallinn, Estonia e-mail: eduard.shevtshenko@ttu.ee ABSTRACT Paper will give the analysis of theoretical MRP base and “Monitor” and “Scala” software efficiency analysis in the solution of “resource planning management” problems. The aim is to find out what are the original features of every solution on the way to profit maximisation at manufacturing enterprise. Paper will show what are the results of software implementation at the manufacturing enterprise compared to the period of work without software. Estimation of the efficiency of the “Scala” and “Monitor” software starts from the preparation of manufacturing process stage, and stretched up to financial results achieved. In this paper results achieved throw planning activities will be compared with real results. Analyses of manufacturing problems solutions throw software installed: using of work centre loading simulation possibilities for the optimisation of present and future manufacturing capacity; pre-calculation for future products; rating of subcontractors; EOQ calculation; delivery performance analysis; optimisation of inventory; supply chain management. Theoretical MRP base analysis gives the estimation of final profit sensitivity to different input data. This work will be practically approved on the manufacturing enterprises, under the pressure of real limits...

Words: 3715 - Pages: 15

Premium Essay

Qawqaw12123

...1  ITS1622 Enterprise Resource Planning (Sample Test 1)   Sample Test 1 (Time: 1.5 hours) ITS1622 Enterprise Resource Planning Topics covered: 1. Business Functions and Processes 2. The Development of Enterprise Resource Planning Systems 3. The Implementation of Enterprise Resource Planning System 4. Implementation Challenge Q1. Within an ERP system package, name SIX functions that will be covered in Sales and Marketing Module. (6 marks) - Pre-sales - Sales order processing - Inventory sourcing - Delivery - Handle Billing - Payment Q2. Describe how each of the SIX functions in an ERP system package contribute to overall productivity of an organization. (12 marks) Pre-sales o Tracks customer contacts: provides the customer with a price quote Sales order processing • Uses the price quote to record items to be purchased; determines the sales price: record order quantities: configures quantity discounts: checks customer credit Inventory sourcing • Checks the inventory database to see if items can be delivered on time: updates the production planning database to avoid any shortfalls Delivery • Releases documents to the warehouse: item are picked; orders are packed and shipped Bill • Uses sales order data to create an invoice: updates accounting records: increases (debits) accounts receivable Payment • Accepts payment: decreases the customer’s accounts receivable balance with the amount of payment Q3. Give TWO typical problems that are common with manual sales order entry process...

Words: 1111 - Pages: 5

Free Essay

Mrp 2

...MANUFACTURING RESOURCES PLANNING What is MRP II and why it is being used Definition and History According to American Production and Inventory Control Society, MRP II can be defined as a method of the effective planning of all the resources of a manufacturing company (Higgins, Leroy and Tierney 1996). It is actually advancement or can be said as a upgrading of Material Requirement Planning System (MRP) system, which is a set of technique that uses bills of material, data and a master production schedule to calculate the requirements for materials in a manufacturing company. The MRP system was initiated in the 1960s and was spearheaded by a team of IBM innovators comprising Joe Orlicky, George Plossl and Ollie Wright who sought to create a structured methodology for planning and scheduling materials for complex manufactured products. Over the past 30 years MRP has spawned an entire industry in manufacturing and professional services. It has evolved hand in hand with technological advancements in the computer hardware industry. At the beginning, MRP systems were run on large mainframe computer costing a lot of money and required large technical staff to support them. However in the 1970s they underwent refinements that saw disparate modules get included and critical business concerns such as cost accounting and Capacity Requirements Planning get added. This gave rise to a new generation system called MRP II. Continued changes spurred by increased technological advances coupled...

Words: 610 - Pages: 3

Free Essay

Om Discussion Question

...The primary relationship between Materials Requirements Planning (MRP) and Enterprise Resource Planning (ERP) is that as ERP is used to manage and plan all the resources in a company, MRP is executed to manage the resource used particularly in the manufacturing process. For instance, while ERP may incorporate accounting, HR, customer service, manufacturing, and project management departments, MRP particularly incorporates the manufacturing department. So while MRP is a specific system just to plan the resources for manufacturing, as the movement to ERP is made, it turns into a broad and complete system that incorporates numerous departments in a company. MRP is mostly used to ensure that the right amount and kind of materials reach the right destination inside the given time limit. Planning and scheduling are used in this system that decide the “what number of and when”. MRP tends not to incorporate the finance and accounting department and typically deals with the sales, work orders, quotes and invoicing. The advantages of MRP system incorporate diminished costs of production caused by organized resource planning, enhanced response to market demand, time optimization because of scheduling and advances in planning and allocation. In contrast, some of the disadvantages of MRP incorporate the long procedure during implementation, training and instruction costs on showing workers and staff how to utilize the system to acquire all advantages anticipated to be provided when initially...

Words: 524 - Pages: 3

Free Essay

Tax in India

...Production Planning Solution Techniques Part 1 MRP, MRP-II Mads Kehlet Jepsen Production Planning Solution Techniques Part 1 MRP, MRP-II – p.1/31 Overview Production Planning Solution Techniques Part 1 MRP, MRP-II – p.2/31 Overview Material Requirement Planning(MRP) Production Planning Solution Techniques Part 1 MRP, MRP-II – p.2/31 Overview Material Requirement Planning(MRP) MRP Procedure Production Planning Solution Techniques Part 1 MRP, MRP-II – p.2/31 Overview Material Requirement Planning(MRP) MRP Procedure Issues with MRP Production Planning Solution Techniques Part 1 MRP, MRP-II – p.2/31 Overview Material Requirement Planning(MRP) MRP Procedure Issues with MRP Manufacturing Resource Planning MRP II Production Planning Solution Techniques Part 1 MRP, MRP-II – p.2/31 Overview Material Requirement Planning(MRP) MRP Procedure Issues with MRP Manufacturing Resource Planning MRP II Time driven Rough-Cut Capacity Planning Production Planning Solution Techniques Part 1 MRP, MRP-II – p.2/31 Overview Material Requirement Planning(MRP) MRP Procedure Issues with MRP Manufacturing Resource Planning MRP II Time driven Rough-Cut Capacity Planning Heuristic for Time driven Rough-Cut Capacity Planning Production Planning Solution Techniques Part 1 MRP, MRP-II – p.2/31 Overview Material Requirement Planning(MRP) MRP Procedure Issues with MRP Manufacturing Resource Planning MRP II Time driven Rough-Cut Capacity Planning Heuristic for Time driven Rough-Cut Capacity...

Words: 7576 - Pages: 31

Premium Essay

Riordan

...Description Riordan Manufacturing Company has four locations in Albany, Georgia, Pontiac, Michigan, Hangzhou, China, and San Jose, each with unique operation needs at each location. Procedures are similar throughout the company but are executed differently. The inventory management and control is separated into three separate areas: Raw Materials Receiving; Manufacturing and Inventory; and Final Product Shipping. (Apollo Group, 2005-2008). Each of the four plants has a designated receiving area where raw materials are received. The shipments are then compared to a weekly scheduled order report as the shipments come in. When the orders are received they are entered into the inventory system. The staff is responsible for completing inventory usage reports which are entered into the inventory systems as raw materials are being used. The staff member then enters the manufactured products into the inventory systems as those items are being produced. Consumers can submit a sales order form, which is entered into the Customer Shipping and Billing System; this will then create an order shipping document. The inventory clerks can then update the inventory system based on the shipping documents. (Apollo Group, 2005-2008). This may seem to be an effective way of managing a company and its inventory but there is a large room for error and improvement. A large part of the processes is done manually between the inventory systems and the customer shipping and billing system....

Words: 442 - Pages: 2

Premium Essay

Edi Technology

...Enterprise resource planning in the global marketplace, advantages and limitations Name: Michael Yin Course: OPM-5050 Professor: R. Levary Abstract Enterprise Resource Planning (ERP) is one of the major issues the modern-day entrepreneurial world. This paper discusses ERP in details and extensively. The paper introduces ERP by giving background information, discusses the evolution of ERP systems, analyses the advantages and limitations of ERP systems, and concludes by giving a summary of the important aspects of ERP discussed. Enterprise resource planning in the global marketplace, advantages and limitations Introduction The entrepreneurial scene and global market have become more vibrant in the recent years, and for this reason, there have been debates and concerns on how enterprises and companies should enhance their competitiveness and agility. The greatest concern in the business world is profitability, and in accomplishing this, enterprises have put in place strategies and measures that gradually help make strides towards the desired direction. Another primary focus of enterprises is to see an improvement of their business agility and to accomplish this, enhancements have been made including efficiency of production, product and service quality, as well as response time to consumers. A fundamental aspect of the accomplishment of the mentioned enhancements and objectives is information technology. As much as its installation and implementation in enterprises is costly...

Words: 3324 - Pages: 14

Premium Essay

Master Requirement Planning

...Material Requirements Planning (MRP) Material requirements planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for items of dependent demand. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactured bicycles, dependent demand inventory items might include aluminum, tires, seats, and bike chains. The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise. MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. MRP begins with a schedule...

Words: 1616 - Pages: 7