which is 0.221 hrs simulation time per batch. (Exhibit 2: Average time per batch of each station). As day 7 and day 8 have 0 job arrivals, we used day 1-6 figures to calculate the average time for each station to process 1 batch of job arrivals. Base on the average time taken to process 1 batch of job arrivals, we were able to figure out how many batches each machine can handle. day | number of jobs arriving each day | utilization of station 1, averaged over each day | utilization of station
Words: 1324 - Pages: 6
severe way repeatedly before actually being spanked, If the child still does not want to be obedient after the necessary steps have been taken then they should receive a more severe discipline such as a spanking. The process of spanking is a very agonizing and tormenting process. The child would suffer first by being forced to listen to a long lecture, instead of just receiving the spanking. Knowing what was coming after the speech brought a lot of fear and anxiety. It felt as if his or her stomach
Words: 588 - Pages: 3
5 Event Handle 4 1.2.6 Statistic Handle 4 1.2.7 ICI 4 1.2.8 List 5 1.2.9 Object ID 5 1.2.10 Packet 5 1.2.11 Memory Object Type 5 1.2.12 Log Handle 5 1.2.13 Procedure 5 1.2.14 Process Handle 5 1.2.15 Sar Buffer Handle 5 1.2.16 Vartype 6 1.3 多线程安全 7 2. 基本核心函数 7 2.1 内部模型访问函数集 7 2.2 分布函数集 10 2.3 进程函数集 12 2.4 事件函数集 15 2.5 仿真函数集 16 2.6 鉴定函数集 17 2.7 拓扑函数集 18 2.8 接口控制信息函数集 23
Words: 4240 - Pages: 17
An executing instance of a program is called a process. Some operating systems use the term ‘task‘ to refer to a program that is being executed. A process is always stored in the main memory also termed as the primary memory or random access memory. Therefore, a process is termed as an active entity. It disappears if the machine is rebooted. Several process may be associated with a same program. On a multiprocessor system, multiple processes can be executed in parallel. On a uni-processor system
Words: 292 - Pages: 2
Executive Summary of Facilities scheduling at Mayer manufacturing case study Eddie Turner was appointed as a section supervisor in charge of scheduling activities for the new engineering research laboratory at the Mayer manufacturing company. Eddie reported to Gary Whitehead who was the manufacturing division manager. The new test lab was going to be used by the engineering, manufacturing and quality control departments to test therefore a proper schedule was needed to ensure every department
Words: 509 - Pages: 3
FINAL YEAR PROJECT On DESIGNING A SIMULATOR TO IMPLEMENT A JOB SCHEDULER BASED ON DIFFERENT POPULAR CPU SCHEDULING ALGORITHMS Submitted as partial fulfillment for the award of BACHELOR OF TECHNOLOGY Session 2014-15 In Computer Science & Engineering Under the guidance of Mr.MrinmoySen By AnanyaDas(11/CS/15, ananyadas092@gmail.com, +919681851782) AnshumanMahanty(11/CS/23, anshumanmahanty1@gmail.com, +917501169824) SayaniBanerjee(11/CS/93, sayanibanerjee.1@gmail.com, +919046422003)
Words: 6989 - Pages: 28
situation. A good choice is to make a team to evaluate the situation, then make a recommendation to management on how to fix the problem. A key reason is “Employee training helps increase productivity at the business. If workers are confused about a process or lack the knowledge required to complete the job successfully, they may waste work hours trying to figure out the concept.”( www.ehow.com). To help with issues that might arise with management that is against implementing a training program, one
Words: 431 - Pages: 2
with quantum 4: P1 | P2 | P3 | P4 | P5 | P1 | P2 | P3 | P4 | P5 | P1 | P2 | P3 | P5 | (B). Turnaround Time for all process, in all schedules: Process | SJF | Non Pre-emptive Priority | Round Robin | P1 | 35 | 31 | 41 | P2 | 47 | 12 | 45 | P3 | 16 | 40 | 46 | P4 | 7 | 47 | 35 | P5 | 25 | 21 | 47 | (C). Waiting time for all processes, in all schedules: Process | SJF | Non Pre-emptive Priority | Round Robin | P1 | 26 | 21 | 31 | P2 | 38 | 0 | 33 | P3 | 7 | 31 | 37 | P4
Words: 765 - Pages: 4
PORTFOLIO MANAGEMENT Meaning of portfolio:- A combination of securities with different risk & return characteristics will constitute the portfolio of the investor. Thus, a portfolio is the combination of various assets and/or instruments of investments. The combination may have different features of risk & return, separate from those of the components. The portfolio is also built up out of the wealth or income of the investor over a period of time, with a view to suit his risk and return
Words: 3303 - Pages: 14
1. INTRODUCTION 1.1. INDUSTRY ALLOCATION The assets, combined in this portfolio, have been chosen from three different industries – banking, retail and drug manufacturing industry. Each industry has its own characteristics and distinguishes from one another, for the purpose of creating a diversified portfolio. Factors, affecting the banking sector and Barclays Bank (the chosen asset) are related to the current economic crisis, interest rates and the policy led by the government (either encouraging
Words: 2266 - Pages: 10